Exam Home Website
中文 English
0
/100
FAIL
Correct: 0/100 Total Questions: 100 Time Spent: 60min0sec
Passing: 80
Retake History
Answer Review
✗
Question 1. Embarkation stations shall be located:
Your Answer: (Not answered)
Correct Answer: D (as close as possible to the survival craft stowage positions and convenient for boarding)
💡 SOLAS III/11 requires embarkation stations close to the survival craft stowage positions.
✗
Question 2. How should a safety culture be built on board?
Your Answer: (Not answered)
Correct Answer: A (Through leadership by example, open communication, training and encouragement, making safety the crew's own practice)
💡 The effectiveness of a safety management system depends on its culture: the master and officers setting an example, open communication and reporting encouraged, continuous training and encouragement and attention to safety performance, so that safety becomes the crew's own behaviour rather than passive compliance with rules.
✗
Question 3. How often shall abandon ship and liferaft drills be held on a cargo ship?
Your Answer: (Not answered)
Correct Answer: A (Monthly)
💡 SOLAS III/19: such drills shall take place at least once a month on cargo ships.
✗
Question 4. What does SOLAS provide regarding combining different types of drill?
Your Answer: (Not answered)
Correct Answer: B (Drills of different kinds may be combined where reasonable and practicable, provided the objectives of each are met)
💡 SOLAS permits drills of different kinds, such as abandon ship and fire drills, to be combined where reasonable and practicable, provided that the training objectives of each are achieved. Combining must not mean omitting essential elements.
✗
Question 5. What is required for manholes and flush covers in the freeboard deck?
Your Answer: (Not answered)
Correct Answer: C (Kept closed and secured, preventing sea water entering spaces below when the deck is swept)
💡 SOLAS and the Load Line Convention require manholes and flush covers in the freeboard deck leading to spaces below to be kept closed and secured, with gaskets and fastenings, preventing sea water from entering when the deck is swept or the ship lists. A simple plate is not watertight.
✗
Question 6. What do SOLAS and good practice address for periods when the machinery space is unattended?
Your Answer: (Not answered)
Correct Answer: B (Alarms must reliably reach the duty engineer and the bridge, with periodic rounds maintained)
💡 During unattended periods the alarm system must work reliably and transmit alarms to the engineers' accommodation or the bridge, with periodic rounds maintained so that machinery abnormalities are detected promptly. A failed alarm system is a serious deficiency.
✗
Question 7. What shall the radio log essentially contain?
Your Answer: (Not answered)
Correct Answer: C (Records of distress, urgency and safety communications and equipment failures)
💡 Records of distress and safety communications and equipment failures.
✗
Question 8. From where shall the valves of fuel oil tanks be capable of being closed?
Your Answer: (Not answered)
Correct Answer: A (Remotely from outside the space)
💡 SOLAS requires remote closing from outside the space so the fuel supply can be shut off in case of fire.
✗
Question 9. Which ships shall be fitted with a BNWAS?
Your Answer: (Not answered)
Correct Answer: A (all passenger ships and cargo ships of 500 GT and above)
💡 SOLAS V/19: all passenger ships and cargo ships of 500 GT and above shall be fitted with a BNWAS.
✗
Question 10. What is the master's duty when an incident involves dangerous goods?
Your Answer: (Not answered)
Correct Answer: A (Report to the authorities and take emergency measures)
💡 Report to the authorities and take the appropriate emergency measures.
✗
Question 11. What safety is required for lifting appliances at sea?
Your Answer: (Not answered)
Correct Answer: D (Use within the rated load, periodic inspection of wires and brakes and operation by trained persons)
💡 Lifting appliances should be used within the rated safe working load, with periodic inspection of the wires, brakes and limit switches and records kept, operated by trained persons and the slings and cargo securing checked before lifting. Overloading or using defective equipment causes casualties.
✗
Question 12. What are the capacity and pressure requirements of the emergency fire pump?
Your Answer: (Not answered)
Correct Answer: A (Capacity not less than forty per cent of the required total of the main fire pumps and able to maintain the required main pressure in any condition)
💡 Under SOLAS II-2/10 the emergency fire pump should have a capacity not less than forty per cent of the required total of the main fire pumps and be able to maintain the required pressure on the fire main in any condition, including the most unfavourable draught and trim. It should have an independent source of power and self-priming capability.
✗
Question 13. What fixed fire-extinguishing system must be fitted in the cargo tank deck area of a tanker?
Your Answer: (Not answered)
Correct Answer: C (A fixed deck foam system)
💡 SOLAS II-2/10.5 requires tankers to be provided with a fixed deck foam system for the cargo tank deck area.
✗
Question 14. How does the survival craft requirement for a passenger ship differ from that for a cargo ship?
Your Answer: (Not answered)
Correct Answer: A (Each side must accommodate all persons, with additional liferafts for a percentage of the total number of persons)
💡 SOLAS III/21 requires each side of a passenger ship to accommodate all persons on board, with additional liferafts for a percentage of the total number of persons, so that everyone can escape if one side is unavailable.
✗
Question 15. What are the main requirements for air pipes on the freeboard deck?
Your Answer: (Not answered)
Correct Answer: D (Their openings should have effective closing appliances, and the pipes should be so arranged that water cannot enter the tanks when the ship heels)
💡 Air pipes ventilate the tanks and their opening height and closing appliances must meet the requirements, ensuring that in conditions of heeling and boarding seas water cannot enter the tanks and affect stability and liquid management. The closing appliances should be kept effective and closed as required.
✗
Question 16. The purpose of a NAVTEX receiver is to:
Your Answer: (Not answered)
Correct Answer: D (automatically receive and print maritime safety information such as navigational and weather warnings)
💡 SOLAS IV/7: a NAVTEX receiver automatically receives and prints maritime safety information such as navigational and weather warnings.
✗
Question 17. What does SOLAS address regarding fixed fire detection in ro-ro spaces?
Your Answer: (Not answered)
Correct Answer: B (A fixed fire detection and fire alarm system capable of detecting a fire in the vehicle space promptly)
💡 SOLAS requires ro-ro and vehicle spaces to have a fixed fire detection and fire alarm system. Because these spaces are large and vehicles carry fuel, fire spreads rapidly, and periodic rounds alone would not detect it in time.
✗
Question 18. What segregation is required between dangerous goods and foodstuffs?
Your Answer: (Not answered)
Correct Answer: D (Toxic or contaminating dangerous goods must be segregated from foodstuffs as the IMDG Code requires, preventing contamination)
💡 The IMDG Code requires class 6 toxic substances and materials liable to contaminate foodstuffs to be segregated from food cargoes as prescribed, normally in different holds or separated by a complete bulkhead, preventing leakage from contaminating food and poisoning persons. Stowing them adjacent on the ground that the packages are sound does not comply.
✗
Question 19. Which Code governs the stability of ships carrying grain in bulk?
Your Answer: (Not answered)
Correct Answer: C (The International Grain Code)
💡 The International Grain Code.
✗
Question 20. The packaging of dangerous goods shall:
Your Answer: (Not answered)
Correct Answer: C (comply with the packing requirements of the IMDG Code and be properly marked and labelled)
💡 SOLAS VII/3 requires packaging in accordance with the IMDG Code with proper marking and labelling.
✗
Question 21. What readiness condition must survival craft be in while the ship is at sea?
Your Answer: (Not answered)
Correct Answer: C (They must be ready for immediate use, capable of being launched at any time)
💡 SOLAS requires survival craft and their launching appliances to be kept ready for immediate use throughout the voyage. They may not be dismantled at sea or stowed where they cannot be launched quickly.
✗
Question 22. A crew member's actual rank does not match the certificate held, a junior certificate being used for a senior post. The finding is?
Your Answer: (Not answered)
Correct Answer: A (Serving with a mismatched certificate is an illegal manning arrangement, a serious deficiency to be corrected)
💡 A crew member's certificate of competency should match the rank held. Using a lower-grade certificate for a higher post is an illegal manning arrangement. It weakens the capability of the post and violates the safe manning requirements. It is a serious deficiency to be corrected, normally by changing personnel or supplying properly certificated crew.
✗
Question 23. Which statement about the decision to abandon ship is correct?
Your Answer: (Not answered)
Correct Answer: C (The decision rests with the master, who orders abandonment only when the ship is beyond saving)
💡 The decision to abandon ship rests with the master, who orders it only when the ship is beyond saving and remaining on board endangers personnel. Before abandoning, every effort should be made to call for assistance, prepare the craft and their equipment, muster and account for all persons, and give the abandon-ship signal for orderly boarding.
✗
Question 24. What marking shall life-saving appliances and their stowage positions have?
Your Answer: (Not answered)
Correct Answer: A (Clear markings for quick identification in an emergency)
💡 Markings shall identify the appliances and their stowage positions.
✗
Question 25. Under the ISM Code, non-conformities shall be:
Your Answer: (Not answered)
Correct Answer: B (analysed, corrected and prevented from recurring)
💡 SOLAS IX/9 (ISM) requires non-conformities to be analysed, corrected and prevented from recurring.
✗
Question 26. What do SOLAS and the related standards require for the cylinders of a fixed CO2 system?
Your Answer: (Not answered)
Correct Answer: D (Periodic checks of cylinder pressure and weight and verification that the piping is clear)
💡 SOLAS and the related standards require periodic checks of cylinder pressure and weight to detect leakage, and verification that piping and nozzles are clear. A visual check alone will not reveal internal leakage or blockage.
✗
Question 27. What should be done if the stowage factor does not suit the ship's hold capacity?
Your Answer: (Not answered)
Correct Answer: D (Adjust the quantity loaded according to hold capacity and stability limits, loading in stages or re-allocating the cargo if necessary)
💡 If the cargo is of large stowage factor and the holds are insufficient, or of small stowage factor so that the hull is overstressed, the quantity loaded or the stowage plan should be adjusted according to capacity, stability and strength limits. Loading regardless would cause overloading or insufficient stability.
✗
Question 28. VHF DSC distress and safety calls shall be transmitted on channel:
Your Answer: (Not answered)
Correct Answer: C (70)
💡 SOLAS IV/7: VHF DSC distress and safety calls are transmitted on channel 70 (156.525 MHz).
✗
Question 29. What is the purpose of the radar reflector among the lifeboat equipment?
Your Answer: (Not answered)
Correct Answer: C (To increase the radar echo of the boat so that it is detected by searching vessels)
💡 SOLAS requires a lifeboat to carry a radar reflector, increasing the radar echo so that searching vessels detect the boat at a greater distance, improving the chance of rescue.
✗
Question 30. If a lifeboat on one side is unserviceable, what must be done?
Your Answer: (Not answered)
Correct Answer: B (Report to the company at once and arrange repair as soon as possible, assessing the risk and considering trading restrictions or alternative measures in the meantime)
💡 An unserviceable lifeboat means the ship cannot ensure that all persons can escape if one side is lost. The company should be informed at once and repair arranged as soon as possible, with the risk assessed and the Administration consulted meanwhile, for example on trading restrictions or temporary measures. The ship must not trade normally with the deficiency.
✗
Question 31. Which extinguisher is least suitable for a galley cooking oil fire?
Your Answer: (Not answered)
Correct Answer: C (Direct water jets)
💡 Water on a fat fire causes splashing and reignition; a blanket or fat-fire agent must be used.
✗
Question 32. To where is the ship security alert system alert transmitted?
Your Answer: (Not answered)
Correct Answer: A (To the shore authority designated by the Administration)
💡 The SSAS alert goes ashore to the designated authority and does not sound an alarm on board.
✗
Question 33. What should be done about a failed water ingress detector on a bulk carrier?
Your Answer: (Not answered)
Correct Answer: D (Repair promptly and, pending repair, increase manual checks such as sounding the bilges, with records kept)
💡 A failed water ingress detector should be repaired as soon as possible and, pending repair, manual checks increased, such as periodic sounding of holds, ballast tanks and bilges, with the failure and the temporary measures recorded. Switching the system off would remove the warning of flooding and is a serious deficiency.
✗
Question 34. When shall a fixed fire detection and alarm system operate?
Your Answer: (Not answered)
Correct Answer: C (On abnormal temperature rise or presence of smoke)
💡 It shall operate on abnormal temperature rise or presence of smoke.
✗
Question 35. How will a PSCO normally test the radar during a PSC inspection?
Your Answer: (Not answered)
Correct Answer: A (Check range changing, tuning, gain adjustment and correct target detection and presentation)
💡 A PSCO will normally operate the radar, checking range changing, tuning and gain adjustment, correct detection and presentation of targets and the target acquisition capability of the ARPA. Powering it on or explaining verbally will not satisfy the inspection.
✗
Question 36. What analysis and records are required if a voyage plan is not followed exactly?
Your Answer: (Not answered)
Correct Answer: B (Analyse the cause, such as avoidance, sheltering or a fault, assess the effect and record it, revising the plan if necessary)
💡 Where the execution of a voyage plan deviates, the reason should be analysed, whether avoidance, sheltering, an equipment fault or a temporary task, the effect on the remaining passage and safety assessed and the matter recorded, with the remaining plan revised as appropriate, such as updating waypoints or adjusting timing, keeping the plan consistent with what is being done.
✗
Question 37. What factors must a voyage plan consider under SOLAS and good practice?
Your Answer: (Not answered)
Correct Answer: A (Prohibited and restricted areas, shoal water and draught limits, traffic density, weather and tides, and emergency shelter)
💡 A voyage plan should consider prohibited and exercise areas, shoal water and draught limitations, traffic density, weather and tidal conditions and emergency shelter anchorages and alternative routes, making the passage safe and practicable with contingency arrangements.
✗
Question 38. If the master finds a defect affecting safe navigation that cannot be repaired on board, the first action is to:
Your Answer: (Not answered)
Correct Answer: A (Report to the Company and arrange repair)
💡 The master should report to the Company so that repair can be arranged and the voyage adjusted.
✗
Question 39. What reporting is required if a ship carrying dangerous goods is involved in an incident?
Your Answer: (Not answered)
Correct Answer: B (Report the nature, quantity and location of the dangerous goods and the circumstances to the Administration, port State and relevant parties as required)
💡 SOLAS VII requires a ship carrying dangerous goods involved in an incident to report the class, quantity and location of the goods and the circumstances to the relevant authorities, enabling the emergency services to know the hazards and act appropriately.
✗
Question 40. Besides the proper shipping name, what must appear on a dangerous goods document?
Your Answer: (Not answered)
Correct Answer: C (The UN number and the hazard class)
💡 Dangerous goods documents must show the proper shipping name, UN number, class and packing group.
✗
Question 41. Fuel oil used in machinery spaces shall generally have a flash point (closed cup) of not less than:
Your Answer: (Not answered)
Correct Answer: A (60 °C)
💡 SOLAS II-2/4 generally requires a flash point of not less than 60 °C, except emergency generators may use fuel with a flash point of not less than 43 °C.
✗
Question 42. What does SOLAS address regarding gravity davits?
Your Answer: (Not answered)
Correct Answer: B (The craft must be launched by gravity without power and capable of being released from within the craft)
💡 SOLAS requires a gravity davit to launch the craft by gravity without power and to be capable of release from within the craft, so that abandonment can still be carried out if power is lost or personnel are dispersed.
✗
Question 43. What are the requirements for the position of the satellite EPIRB on board?
Your Answer: (Not answered)
Correct Answer: C (Readily accessible, capable of floating free and activating automatically if the ship sinks)
💡 SOLAS requires the EPIRB to be mounted where it is readily accessible manually, will float free and activate automatically if the ship sinks. Keeping it locked in a room or drawer does not comply.
✗
Question 44. What is required regarding correction of charts and publications?
Your Answer: (Not answered)
Correct Answer: B (They shall be kept corrected up to date)
💡 They shall be kept corrected up to date.
✗
Question 45. In SOLAS I/2 the expression "upright position" is used to define which condition of the ship?
Your Answer: (Not answered)
Correct Answer: B (The reference condition with no heel, used for measuring freeboard and similar particulars)
💡 SOLAS and the Load Line Convention take the upright (no heel) condition as the datum for measuring moulded depth, freeboard and similar particulars, irrespective of the loading condition.
✗
Question 46. Which Convention governs the ship's handling of ballast water?
Your Answer: (Not answered)
Correct Answer: B (The Ballast Water Management Convention)
💡 Ballast water is to be managed under the Ballast Water Management Convention.
✗
Question 47. What is required regarding the release of lifeboat gripes in an abandon ship drill?
Your Answer: (Not answered)
Correct Answer: B (Practise releasing the securing arrangements so the crew is familiar with the method and sequence)
💡 An abandon ship drill should include practical release of the lifeboat gripes, limiters and securing arrangements, so that the crew is familiar with the sequence, such as releasing the limiter before the securing, and with the tools. A briefing does not ensure correct operation in an emergency.
✗
Question 48. How must operating instructions and markings for equipment be managed?
Your Answer: (Not answered)
Correct Answer: B (Clear instructions and warnings, available near the equipment and kept in good condition)
💡 Operating instructions and warning markings for critical equipment should be provided near the equipment, clear and in good condition, not fallen off or illegible, so that the operator can consult them at any time. Relying on memory without markings makes errors likely after a change of personnel or under pressure.
✗
Question 49. In a fire involving packaged dangerous goods, which document, besides MFAG, gives emergency response guidance?
Your Answer: (Not answered)
Correct Answer: D (The EmS Guide, giving fire and spill procedures by UN number)
💡 SOLAS VII/5 requires the EmS Guide on board, giving fire and spill response procedures by UN number, used together with MFAG for medical first aid.
✗
Question 50. What is the purpose of the emergency towing arrangement required on a tanker?
Your Answer: (Not answered)
Correct Answer: A (To enable the ship to be taken in tow quickly when the main engine or steering fails, reducing the risk of becoming a hazard)
💡 Under SOLAS II-1/3-4 a tanker should be provided with an emergency towing arrangement at the bow and stern so that it can be taken in tow quickly if the main engine or steering fails, reducing the risk of an accident and pollution when out of control in a busy or sensitive area. The arrangement should be capable of rapid deployment.
✗
Question 51. Where must the water ingress alarm of a bulk carrier be displayed?
Your Answer: (Not answered)
Correct Answer: B (On the navigation bridge, so the watchkeeper learns at once of flooding in a hold)
💡 SOLAS XII/12 requires the water ingress detection alarm of a bulk carrier to be displayed on the bridge so the officer of the watch can identify the flooded hold and act immediately. Display elsewhere delays response.
✗
Question 52. A crew member is found serving in a position with an expired certificate of competency. The finding is?
Your Answer: (Not answered)
Correct Answer: A (Serving without a valid certificate is a serious violation that may lead to detention)
💡 A crew member should hold a valid certificate of competency for the rank and the required training certificates. Serving with an expired certificate violates the safe manning and certification rules and is a serious deficiency, normally detainable, which requires renewal or a change of personnel before departure.
✗
Question 53. What does SOLAS require for change-over of power supplies for radio equipment?
Your Answer: (Not answered)
Correct Answer: A (Change-over between the main and reserve sources must be completed within the prescribed time, keeping communication unbroken)
💡 SOLAS requires radio equipment to be capable of rapid change-over between the main and reserve sources, so that distress and safety communication is not interrupted for a long period by the change. The change-over arrangement should be tested periodically for reliability.
✗
Question 54. The number and arrangement of watertight bulkheads shall ensure that the ship retains sufficient stability:
Your Answer: (Not answered)
Correct Answer: B (after damage to any one compartment, meeting the damage stability requirements)
💡 SOLAS II-1/4 requires watertight bulkheads so that the ship satisfies the required damage stability assumptions.
✗
Question 55. For a hydraulic steering gear, provision shall be made to detect abnormal conditions by means of:
Your Answer: (Not answered)
Correct Answer: C (a tank level gauge with a low-level alarm)
💡 SOLAS II-1/29 requires a tank level gauge with a low-level alarm to monitor hydraulic fluid leakage.
✗
Question 56. Which statement about the use of weather routeing is correct?
Your Answer: (Not answered)
Correct Answer: D (The route should be chosen taking account of weather forecasts and the ship's condition, avoiding severe weather and monitoring the passage plan)
💡 Weather routeing should combine professional weather forecasts with the ship's condition, such as stability, cargo and draught, to choose a relatively safe route avoiding typhoons, heavy seas and severe weather, monitoring and adjusting the plan during the voyage. It is an aid, the final navigational decision being the master's responsibility.
✗
Question 57. What does SOLAS address regarding stability when carrying timber deck cargo?
Your Answer: (Not answered)
Correct Answer: B (The increase in weight from water absorbed by the timber and ice accretion must be included, with the prescribed stability criteria applied)
💡 SOLAS and the Load Line Convention prescribe stability requirements for ships carrying timber deck cargo, requiring account to be taken of the weight gained from water absorbed, ice accretion and increased windage, assessed against the prescribed criteria, failing which capsize may occur.
✗
Question 58. Which statement about the enhanced programme of inspections for tankers and bulk carriers is correct?
Your Answer: (Not answered)
Correct Answer: B (It prescribes stricter close-up examination and thickness measurement, and requires a survey planning document)
💡 The ESP requires a survey planning document identifying the extent of close-up surveys and thickness measurements, and is stricter than routine surveys. Its application is not determined solely by an age of 20 years.
✗
Question 59. What is required when anchoring in restricted visibility?
Your Answer: (Not answered)
Correct Answer: A (Choose a position after confirming suitable depth and bottom and the absence of dangers nearby, keeping radar and visual monitoring afterwards)
💡 If anchoring becomes necessary in poor visibility, the depth and nature of the bottom and the surrounding area should first be confirmed. After anchoring, radar and visual watch should be maintained, dragging monitored, the anchor lights and shapes displayed and engines kept ready.
✗
Question 60. What records and reporting are required for injury and illness?
Your Answer: (Not answered)
Correct Answer: B (Record the time, symptoms, treatment given and outcome and report to the company as required, including for work injuries)
💡 An injury or illness on board should be recorded with the time, how it happened, the symptoms, the first aid and treatment given, the outcome and the follow-up, and reported to the company as the system and regulations require, promptly for a work related injury, occupational disease or serious illness, providing a basis for claims and improvement.
✗
Question 61. Subdivision of a passenger ship is based on which load line?
Your Answer: (Not answered)
Correct Answer: A (Subdivision load line)
💡 It is based on the subdivision load line.
✗
Question 62. How do statutory certificates and surveys stand in relation to each other?
Your Answer: (Not answered)
Correct Answer: D (certificates rest on the prescribed surveys being completed and endorsed; annual, intermediate or renewal surveys overdue void them)
💡 Chapter I treats a certificate as the outcome of survey rather than a status held once and for all: an initial survey issues it, annual, intermediate and renewal surveys are completed and endorsed on it, and an overdue survey voids it, so trading on a lapsed endorsement is non-compliance. Extension of a certificate is hedged by conditions and a maximum period; the class of a hull or a survey report does not stand in its place.
✗
Question 63. Port State Control inspections shall be carried out:
Your Answer: (Not answered)
Correct Answer: C (in accordance with international conventions and the port State's regulations)
💡 SOLAS I/19 requires inspections under international conventions and the port State's regulations.
✗
Question 64. Before releasing a fixed gas fire-extinguishing system in a machinery space, how long shall the warning sound?
Your Answer: (Not answered)
Correct Answer: D (Not less than one minute)
💡 SOLAS II-2/10.5: a warning of not less than one minute shall be given before release to ensure personnel are clear.
✗
Question 65. What reporting do SOLAS and the related rules require for ships carrying dangerous goods?
Your Answer: (Not answered)
Correct Answer: D (Report the class, quantity and location of the dangerous goods as required by the port State)
💡 SOLAS VII and the related rules require the ship to report the class, quantity and location on board of the dangerous goods as required by the port State, so that the port can respond promptly if an incident occurs.
✗
Question 66. What does SOLAS address regarding SART batteries and testing?
Your Answer: (Not answered)
Correct Answer: D (Periodic testing and checking of battery expiry, ensuring the prescribed standby and operating time)
💡 SOLAS requires periodic testing of the SART and checking of its battery condition and expiry, ensuring the prescribed standby and operating periods. An unsuitable battery means the searching radar cannot detect the survival craft.
✗
Question 67. Which type of portable extinguisher is suitable for electrical fires?
Your Answer: (Not answered)
Correct Answer: C (carbon dioxide)
💡 SOLAS II-2/10 requires extinguishers suitable for electrical fires, typically CO2 or dry powder.
✗
Question 68. How must fire dampers be controllable under SOLAS?
Your Answer: (Not answered)
Correct Answer: B (Manually operable from both sides of the division, and with remote or automatic closing in certain cases)
💡 SOLAS requires fire dampers to be operable by hand from both sides of the division and, where ventilation serves spaces such as category A machinery spaces, to be capable of remote or automatic closing.
✗
Question 69. What preparation and checks are required before entering port?
Your Answer: (Not answered)
Correct Answer: D (Test the main engine and steering gear, check the telegraph, verify draught and under-keel clearance and confirm certificates and documents are in order)
💡 Before entering port the main engine and steering gear should be tested, the telegraph checked, the windlass and thrusters where fitted examined, the draught and under-keel clearance verified and the nautical publications corrected and certificates ready, so that the ship is fully under control in confined waters.
✗
Question 70. What does the management element of a SIRE inspection normally cover?
Your Answer: (Not answered)
Correct Answer: D (Crew qualifications and training records, hours of work and rest and the conduct of safety meetings and training)
💡 The management element of a SIRE inspection normally covers the qualifications and certificates of competence of the crew, training and familiarisation records, records of hours of work and rest for fatigue management and the actual conduct of safety meetings and training, together with the crew's grasp of their own duties.
✗
Question 71. What should the radio personnel do when the abandon ship alarm is sounded?
Your Answer: (Not answered)
Correct Answer: D (Ensure a distress alert has been transmitted and maintain communication, taking portable radio equipment into the survival craft)
💡 On the abandon ship alarm, the personnel responsible for radio should ensure a distress alert has been sent with the position and nature of distress, attempt to establish communication and take the portable VHF and, where applicable, the EPIRB into the survival craft as prescribed, so that distress communication continues after abandonment.
✗
Question 72. Under the SOLAS chapter V requirements for the field of vision from the conning position, which statement about seeing the sea surface ahead of the bow is correct?
Your Answer: (Not answered)
Correct Answer: B (the field should run from dead ahead to 22.5 degrees abaft the beam on each side, the sea surface ahead being visible at not less than twice the ship's length and in any case 500 m)
💡 Regulation V/22 sets checkable figures: an arc from dead ahead to 22.5 degrees abaft the beam on each side, with the sea surface visible from an eye height of 1.5 times the maximum summer draft or 15 m, whichever is greater, at twice the ship's length but not less than 500 m — in both loaded and ballast conditions.
✗
Question 73. What should be done immediately after the lifeboat is in the water?
Your Answer: (Not answered)
Correct Answer: B (Manoeuvre clear of the ship, start the engine and check the condition of the boat and its equipment)
💡 Once in the water the boat should be manoeuvred clear of the ship to avoid being drawn down by a sinking ship or struck by superstructure, the engine started, the persons counted and the condition of the boat and its equipment checked, with the craft subsequently assembling as directed by the master.
✗
Question 74. What is the relationship between the validity of an exemption certificate and the main certificate?
Your Answer: (Not answered)
Correct Answer: B (The exemption certificate must not be valid for longer than the main certificate to which it relates)
💡 SOLAS provides that an exemption certificate must not be valid for a period longer than the main certificate to which it relates. When the main certificate expires or is replaced the exemption certificate must be dealt with accordingly, the two being valid together to give effect to the exemption.
✗
Question 75. The function of a hydrostatic release unit for a liferaft is to:
Your Answer: (Not answered)
Correct Answer: B (release the liferaft automatically when the ship sinks to a certain depth)
💡 SOLAS III/13 requires a hydrostatic release unit to release the liferaft automatically when the ship sinks.
✗
Question 76. What should the cargo securing manual specify regarding maintenance of securing equipment?
Your Answer: (Not answered)
Correct Answer: C (The inspection intervals, rejection criteria and record requirements for securing equipment)
💡 SOLAS and the CSS Code require the cargo securing manual to include requirements for the inspection and maintenance of securing equipment, specifying the intervals, rejection criteria such as limits of wear, corrosion and deformation and the records to be kept, enabling the crew to judge whether an item is serviceable and to replace it promptly.
✗
Question 77. The length of a fire hose in spaces other than machinery spaces shall generally not exceed:
Your Answer: (Not answered)
Correct Answer: D (20 m)
💡 SOLAS II-2/10 generally limits hose length to 20 m outside machinery spaces and 15 m inside machinery spaces.
✗
Question 78. On what basis is the extent of close-up survey determined?
Your Answer: (Not answered)
Correct Answer: A (Ship type, age, cargo characteristics and known high risk areas taken together)
💡 The ESP requires the extent of close-up survey to be determined by the ship type and age, the characteristics of the cargoes carried, such as the corrosive or abrasive effect of coal and ore, and the known high risk areas such as hatch coamings and hopper tanks, supported by a survey programme.
✗
Question 79. Which statement about the lashing and securing of containers is correct?
Your Answer: (Not answered)
Correct Answer: A (Securing should be carried out in accordance with the approved cargo securing manual, taking account of the effect of the trading area and ship motions on the securing loads)
💡 Under SOLAS V/5 and the Code of Safe Practice for Cargo Stowage and Securing, containers and similar cargo should be lashed and secured in accordance with the approved cargo securing manual, taking account of the trading area, ship motions and accelerations on the securing loads, preventing cargo shifting or going overboard during the voyage.
✗
Question 80. What layers of protection do SOLAS and the IMO resolutions require for enclosed space entry?
Your Answer: (Not answered)
Correct Answer: B (Ventilation, testing, a permit, a standby person and rescue preparation forming a complete entry procedure)
💡 SOLAS and the IMO resolutions require a complete procedure for enclosed space entry: ventilation, testing, a permit, a standby person and rescue arrangements. The layers work together; no single measure ensures safety.
✗
Question 81. In what state must fire doors be kept at sea under SOLAS?
Your Answer: (Not answered)
Correct Answer: D (Closed, opened only for passage of persons, and fitted with self-closing devices)
💡 SOLAS requires fire doors to be kept closed at sea, opened only when someone passes through, and to be fitted with self-closing devices. Holding them open with rope or wedges is a common PSC deficiency and defeats the fire protection of the division.
✗
Question 82. Which is the 4 MHz band DSC distress frequency among the HF frequencies?
Your Answer: (Not answered)
Correct Answer: A (4207.5 kHz)
💡 HF DSC distress frequencies are 4207.5, 6312, 8414.5, 12577 and 16804.5 kHz. 2187.5 kHz is an MF frequency and 6312 kHz belongs to the 6 MHz band.
✗
Question 83. Liferafts shall be stowed so that they:
Your Answer: (Not answered)
Correct Answer: A (float free automatically if the ship sinks before manual release)
💡 SOLAS III/13 requires liferafts to be stowed to float free automatically, using a hydrostatic release unit.
✗
Question 84. What does SOLAS address regarding ventilation of paint and flammable liquid lockers?
Your Answer: (Not answered)
Correct Answer: C (Independent mechanical ventilation capable of effectively removing flammable vapour)
💡 SOLAS requires paint and flammable liquid lockers to have independent mechanical ventilation effectively removing flammable vapour, preventing accumulation and ignition. Sharing ventilation with accommodation would carry toxic vapour into the living spaces.
✗
Question 85. What time limits apply to launching and recovering a rescue boat?
Your Answer: (Not answered)
Correct Answer: B (Launching and recovery, when loaded, each within 5 minutes)
💡 Launching and recovery when fully loaded shall each be within 5 minutes.
✗
Question 86. What does SOLAS address regarding brakes and limits on survival craft launching appliances?
Your Answer: (Not answered)
Correct Answer: A (Reliable brakes controlling the speed of lowering and holding the craft, with end limits provided)
💡 SOLAS requires launching appliances to have reliable brakes to control the speed of lowering and hold the craft, with end limits preventing over-running or release, protecting the persons on board.
✗
Question 87. What should be checked about the type approval marking of life-saving appliances?
Your Answer: (Not answered)
Correct Answer: C (That the appliance bears the approval marking or certificate number of the Administration or a recognised body)
💡 SOLAS and the LSA Code require life-saving appliances to be type approved and to bear the approval marking or certificate number. On inspection the marking should be clear and consistent with the certificate. Appliances without an approval mark may not be accepted by the surveyor or the PSC, and are a deficiency.
✗
Question 88. Which measure complies with SOLAS for protection against electric shock?
Your Answer: (Not answered)
Correct Answer: C (Live parts shall be protected against accidental contact)
💡 Live parts which may be accidentally touched shall be protected.
✗
Question 89. What is required regarding the use of torches and signal lights at night?
Your Answer: (Not answered)
Correct Answer: C (Bright lights that could be mistaken for navigation lights or mislead others must be avoided, so as not to affect others' appreciation or one's own look-out)
💡 COLREG and good seamanship require avoiding lights at night that could be mistaken for navigation lights or mislead another vessel. A searchlight must be used with care, only to draw attention when another vessel is not showing the lights required.
✗
Question 90. What verification of the effectiveness of rectification is required?
Your Answer: (Not answered)
Correct Answer: B (Verify through re-inspection, testing or practical demonstration, not merely by documents or undertakings)
💡 After rectification its effectiveness should be verified by actual re-inspection, testing equipment or observing the crew, such as re-testing after a repair or checking the crew's operation after training, with evidence that the deficiency has been removed. A plan or an undertaking does not show that the work is done.
✗
Question 91. What rowing equipment shall a liferaft carry?
Your Answer: (Not answered)
Correct Answer: D (Oars suitable for rowing)
💡 Oars shall be provided so the raft can be moved short distances.
✗
Question 92. What inputs does a management review of the safety management system normally include?
Your Answer: (Not answered)
Correct Answer: A (Internal and external audit results, accident and near miss analysis, handling of non-conformities and feedback on the system)
💡 Inputs to a management review normally include the results of internal and external audits, the analysis of accidents and near misses, non-conformities and their correction, the effectiveness of training, the implementation of the previous review's decisions and feedback from the crew and outside, from which the effectiveness of the system is assessed and improvements decided.
✗
Question 93. The collision bulkhead shall be located at a distance from the forward perpendicular of not less than:
Your Answer: (Not answered)
Correct Answer: D (0.05L or 10 m, whichever is less)
💡 SOLAS II-1/12 requires the collision bulkhead to be located not less than 0.05L or 10 m (whichever is less) from the forward perpendicular, and not more than 0.08L.
✗
Question 94. What means should be used first for distress communication in sea area A4?
Your Answer: (Not answered)
Correct Answer: B (MF/HF equipment, DSC, radiotelephony and NBDP, trying several bands)
💡 Sea area A4 has no satellite or VHF coast station coverage, so distress communication should be attempted first on MF/HF equipment, including DSC alerting, radiotelephony distress calls and narrow-band direct printing telegraphy, trying several bands to establish contact with a coast station or another ship.
✗
Question 95. From what tonnage shall speed and distance measuring equipment be fitted?
Your Answer: (Not answered)
Correct Answer: B (500 GT)
💡 500 GT and above.
✗
Question 96. What are the principal risks the officer of the watch should consider when navigating in coastal waters?
Your Answer: (Not answered)
Correct Answer: C (High traffic density, many fishing and small craft, crossing routes and shoal water, and fishing gear or aquaculture installations)
💡 Coastal waters have dense traffic, frequent fishing and small craft, crossing routes, fishing gear and aquaculture installations, while shoal water affects under-keel clearance. The officer must enhance the look-out, manoeuvre prudently and keep a safe speed.
✗
Question 97. What restrictions apply to hot work or hammering on a tanker in port?
Your Answer: (Not answered)
Correct Answer: A (Hot work and spark-producing operations are prohibited in the cargo area and spaces where vapour may accumulate, requiring a hot work permit)
💡 Hot work and spark-producing operations such as hammering, cutting or the use of non-protected tools are prohibited in the cargo area and nearby spaces on a tanker. Where hot work is genuinely necessary, a permit must be obtained under the procedure with gas testing and firefighting standby completed.
✗
Question 98. What is the focus when navigating in or near ice under SOLAS V and related requirements?
Your Answer: (Not answered)
Correct Answer: B (Enhanced look-out, reduced speed and attention to hull stress and changing ice conditions)
💡 Navigation in ice calls for enhanced look-out, controlled speed and continuous monitoring of ice conditions and hull condition to avoid damage. Increasing speed or switching off aids worsens the risk.
✗
Question 99. Where one of the two means of escape from a machinery space is an enclosed route, what does SOLAS require?
Your Answer: (Not answered)
Correct Answer: B (It must be protected by A-60 class divisions with self-closing doors and lighting)
💡 SOLAS requires an enclosed means of escape from a machinery space to be protected by A-60 class divisions with self-closing fire doors and lighting, so that it remains usable as an escape route during a machinery space fire.
✗
Question 100. What does SOLAS address regarding the axe in a firefighter's outfit?
Your Answer: (Not answered)
Correct Answer: D (An axe suitable for breaking through must be provided and stowed with the rest of the outfit)
💡 SOLAS requires an axe to be provided in the firefighter's outfit for breaking through doors, windows and structure in smoke-filled or obstructed conditions, stowed with the rest of the outfit in an accessible position.