Question 1. What prevents heat stress and heat stroke at work?
Your Answer: (Not answered)
Correct Answer: D (sensible work scheduling, water and salt replacement and rotation)
💡 Avoid peak heat, replace water and salt and rotate; treat and report dizziness or vomiting immediately.
✗
Question 2. Before entering an enclosed space, which core procedure is required?
Your Answer: (Not answered)
Correct Answer: B (permit, ventilation, gas test, standby and comms)
💡 Enclosed-space entry needs a permit, continuous ventilation, O2/LEL testing, a standby and communications.
✗
Question 3. When a pilot's order is clearly dangerous, the master should?
Your Answer: (Not answered)
Correct Answer: B (immediately correct or take command, keeping a record)
💡 The master must query or take over on the spot, then report to company and authorities with records.
✗
Question 4. At sea the rudder angle indicator disagrees with the actual angle; what applies?
Your Answer: (Not answered)
Correct Answer: A (change to emergency steering, report and manage it as a system defect)
💡 A false rudder indicator undermines handling; change to emergency steering, report and manage as a defect until fixed.
✗
Question 5. The difference between an observation and a PSC deficiency in tanker vetting?
Your Answer: (Not answered)
Correct Answer: A (observations suggest improvement; PSC deficiencies carry statutory enforcement)
💡 Vetting observations are advisory from charterers; PSC deficiencies are legally enforceable with deadlines.
✗
Question 6. Corrective actions for a non-conformity should follow the principle of?
Your Answer: (Not answered)
Correct Answer: A (eliminating the root cause, preventing recurrence, and verifying closure)
💡 Effective corrective action removes the root cause and is verified closed; cosmetic fixes get re-raised at review.
✗
Question 7. What is the role of the civil liability convention system for oil pollution?
Your Answer: (Not answered)
Correct Answer: B (a layered system of strict liability, compulsory insurance and limitation)
💡 It gives victims prompt and adequate compensation through strict liability, compulsory insurance and a supplementary fund.
✗
Question 8. The danger of back-dating or writing records late is?
Your Answer: (Not answered)
Correct Answer: C (destroys authenticity, easily detected by inspection and inquiry, inviting severe penalty)
💡 Back-dating shows handwriting, ink and timeline contradictions, escalating a clerical issue into one of integrity.
✗
Question 9. Liferaft markings are unclear and the strap aged at sea; you should?
Your Answer: (Not answered)
Correct Answer: B (report the company for service at port including markings and strap)
💡 Markings and straps affect identification and release; arrange service at an approved station, monitoring meanwhile.
✗
Question 10. Under coercion the crew activate the ship security alert system. How does that system raise the alert?
Your Answer: (Not answered)
Correct Answer: A (alerting the authority and the company in silence, nothing being shown or sounded on this ship or nearby)
💡 Covert is the design point: trigger switches where a crew under control can still work them in secret; the message carries the ship's identity, position and the nature of the threat; there is no confirmation on board and no broadcast to neighbours, since anyone who noticed would cut the alert or destroy the equipment. The authority and the company receive it and start the shore response. Sounding the alarm, broadcasting, or showing a confirmation on the display all defeat that purpose.
✗
Question 11. Has an ordinary seaman the authority to stop the job?
Your Answer: (Not answered)
Correct Answer: A (anyone who sees something unsafe may stop the job, have it checked, and not be answerable for having stopped it)
💡 The point of the authority is that stopping is not held against the man who stopped: anyone who sees an unsafe condition may halt the work, have the hazard looked at, and go on once it is covered. If stopping brings a report to answer for and lost time charged to him, people learn to keep it to themselves, and the next accident is often this one swallowed. Whether it lives is seen in a few places: whether training covers it, whether anyone has actually used it at the pre-job talk, what the company asks first when a stop is reported - the facts, or the cost - and what the record shows. A record book with no stop in it is usually not evidence that nothing was unsafe, but that the route is closed.
✗
Question 12. Choosing an anchorage to shelter from a storm should consider?
Your Answer: (Not answered)
Correct Answer: B (holding ground, shelter and swinging room to avoid dragging ashore)
💡 Select good holding ground, shelter, depth and swinging room with adequate cable to avoid dragging in gale.
✗
Question 13. How often must lifeboats actually be launched in drills?
Your Answer: (Not answered)
Correct Answer: C (launched and manoeuvred periodically per convention intervals)
💡 Boats must be launched and manoeuvred at prescribed intervals, rotating craft, not merely lowered.
✗
Question 14. Availability assurance for GMDSS equipment normally requires?
Your Answer: (Not answered)
Correct Answer: A (shore maintenance, at-sea electronic maintenance or duplication of equipment)
💡 Availability is assured by shore maintenance agreements, onboard electronic maintenance or duplicated equipment.
✗
Question 15. After a pilot boards, how does the master's responsibility change?
Your Answer: (Not answered)
Correct Answer: A (no transfer; the master keeps full responsibility for the ship's safety)
💡 A pilot is an adviser; the master retains command and must supervise or take over when needed.
✗
Question 16. What should the dangerous goods emergency procedure contain?
Your Answer: (Not answered)
Correct Answer: B (specific response, protection and first aid for leakage or fire by class)
💡 Procedures must give class-specific actions, protective equipment and first aid, not just phone numbers.
✗
Question 17. How does the warranty of seaworthiness affect claims?
Your Answer: (Not answered)
Correct Answer: B (unseaworthiness at sailing is a common ground to decline cover)
💡 Cover is conditional on seaworthiness at sailing; pre-existing defects or poor manning can defeat a claim.
✗
Question 18. A healthy SMS culture encourages crew to?
Your Answer: (Not answered)
Correct Answer: A (proactively report hazards/near misses without fear of blame (just culture))
💡 A just culture surfaces hazards—the self-cleaning capability of the SMS.
✗
Question 19. What does the CII rating reflect?
Your Answer: (Not answered)
Correct Answer: A (carbon dioxide emitted per unit of transport work)
💡 The CII measures carbon per tonne-mile or per gross tonne-mile and rates the ship annually to drive improvement.
✗
Question 20. A number of men are taken ill after eating. What comes first?
Your Answer: (Not answered)
Correct Answer: D (keep the suspect food and the samples, treat and report, and check the water and how it was prepared)
💡 The first step is to keep the evidence and then treat: the suspect dish, the raw material it came from, what is left of the meal, and the vomit and motions of the cases - all kept as samples, marked and frozen, because whatever is tested later depends on these; at the same time the dehydration and shock are watched under first aid, and a serious case may mean a diversion. The report goes to the company and to the health authority of the next port, not left until the ship is alongside. Cleaning up is the worst thing to do - once the galley is disinfected nothing can be found. Then three lines are checked: the temperature records of the refrigerated and frozen stores, cross-contamination between raw and cooked and the hygiene of those handling it, and the drinking water and the plant that makes it. Until the cause is known, the meal that is suspect is stopped and a substitute provided, rather than the same food served under a different cook.
✗
Question 21. The key to IMDG dangerous goods stowage is?
Your Answer: (Not answered)
Correct Answer: A (segregate by class, arrange ventilation/temperature and keep declarations)
💡 Segregate by class and compatibility, meet ventilation/temperature rules and carry declarations.
✗
Question 22. When the same non-conformity recurs across fleet vessels, the company should primarily?
Your Answer: (Not answered)
Correct Answer: B (fleet root-cause analysis and revise procedures)
💡 Recurring non-conformities signal systemic causes; conduct fleet-wide root cause analysis and revise procedures.
✗
Question 23. Finding the actual draught exceeds the load line certificate, you should?
Your Answer: (Not answered)
Correct Answer: D (stop loading and discharge to comply, reporting company and Administration)
💡 Overloading breaches load line and buoyancy: stop, lighten to comply and report; never sail in that condition.
✗
Question 24. What does the system require for reporting non-conformities and accidents?
Your Answer: (Not answered)
Correct Answer: D (report promptly, investigate and analyse and take corrective action)
💡 Reporting feeds improvement: report promptly, find root causes and correct, not only major cases or annual summaries.
✗
Question 25. IMO intact stability requirements are usually verified via?
Your Answer: (Not answered)
Correct Answer: D (checking stability criteria for loading conditions in approved stability data)
💡 Approved stability data must show compliance of each loading condition with the criteria.
✗
Question 26. When should the SMC "intermediate audit" within its validity take place?
Your Answer: (Not answered)
Correct Answer: B (between the 2nd and 3rd anniversary, within ±3 months)
💡 The intermediate audit must fall in the 2nd–3rd anniversary window (±3 months); missing it can void the certificate.
✗
Question 27. What are the key measures against static electricity while a tanker is loading?
Your Answer: (Not answered)
Correct Answer: A (bonding the shore connection, keeping initial rate low, avoiding splash filling and seldom opening the gauging hatches)
💡 Charge is generated by rate, by splash, by filtering and by what the oil carries, and the defences are to make less of it and to carry off what is made: the line rate held low until the submerged outlets and the circulation are confirmed, the bonding across the shore connection kept effective, the gauging and observation openings left shut during loading with sounding and sampling done after the settling time the procedure gives, no splash filling and no wiping or sweeping with synthetic cloth while oil is running. The old wrong answers, opening every port and pushing the rate up to finish early, add to the hazard, and warming the cargo to thin it has nothing to do with static. Non-certified electrical gear and tools have no place in the zone either.
✗
Question 28. A certificate is nearly due and the company has arranged nothing. What does the master do?
Your Answer: (Not answered)
Correct Answer: A (urging the company in writing, copied to the designated person, and reporting to the authority if need be)
💡 The master carries the final responsibility for safety and for the ship's seaworthiness, and an expired certificate is not a matter of paper: it makes the ship unfit for her trading, exposes her to refusal of entry and detention, and pulls the conditions of insurance and charter with it. So the reminder goes out in writing to the company and is copied to the designated person, stating the date due, the ports reachable and where survey can be got, escalating to the classification society and the flag if nothing moves, and the whole exchange is filed as proof of what was done. Extension of a survey is granted by the authority that issued the certificate under its own rules; a date the master invents for himself is worth nothing. He may suggest which port to make and whether a service exists there, but taking the ship into an expired state is not one of the options open to him.
✗
Question 29. An internal auditor reviewing their own department causes?
Your Answer: (Not answered)
Correct Answer: A (loss of independence, lower credibility)
💡 Independence underpins objectivity; self-audit is no audit.
✗
Question 30. What is the key step in accepting stores and spares?
Your Answer: (Not answered)
Correct Answer: C (check specification, model and certificates, inspect condition and quantity and sign)
💡 Acceptance checks specification, model, certificates, condition and quantity, preventing counterfeit parts on board.
✗
Question 31. What should a technical condition report be?
Your Answer: (Not answered)
Correct Answer: B (objective and specific with evidence and recommendations to support shore decisions)
💡 Reports must be objective, specific and evidenced with recommendations so shore can resource and decide without distortion.
✗
Question 32. In port a crew member who has been drinking tries to enter the work area; what applies?
Your Answer: (Not answered)
Correct Answer: D (stop him entering, send him to rest and act under the alcohol policy)
💡 Entering the work area after drinking gravely threatens safety; stop him, apply the alcohol policy and record it.
✗
Question 33. The three most common causes of shipboard fire are?
Your Answer: (Not answered)
Correct Answer: A (electrical faults, hot work and poor control of flammables)
💡 Fires mostly stem from electrical faults, hot work and poor flammable-material control; these are the priorities.
✗
Question 34. What does the system require for emergency preparedness?
Your Answer: (Not answered)
Correct Answer: C (identify potential emergencies and set response procedures and drills)
💡 Preparedness identifies possible emergencies, sets response procedures and tests them through drills.
✗
Question 35. What has to be finished before entering the high-risk area?
Your Answer: (Not answered)
Correct Answer: D (work through the best management practices item by item - physical barriers, watches, route reporting and joining the convoy)
💡 Readiness for such a transit is a list: physical barriers at the side and at cabin doors, a citadel found, watches and lookout strengthened, transmitters switched off or run at low power as required, course and position reported under the reporting scheme, the link with escort forces tested beforehand, deck monitors and hoses rigged. All of this is set out item by item in the fifth edition of the best management practices, and the company, on the basis of the ship security assessment, turns it into arrangements the ship can actually carry out, with a drill to prove it. Relying on speed or on an escort alone hands the preparation to somebody else.
✗
Question 36. The purpose of adjusting course and speed in heavy weather is?
Your Answer: (Not answered)
Correct Answer: D (reduce synchronous rolling and slamming to limit hull damage)
💡 Reducing speed or changing heading avoids resonance and slamming, cutting structural stress and cargo shift.
✗
Question 37. Which best shows systematic ballast water management?
Your Answer: (Not answered)
Correct Answer: A (plan, duties, training, records and self-checks forming a closed loop)
💡 Systematic management means a closed loop of documents, duties, training, records and improvement, not equipment alone.
✗
Question 38. A complete set of SMS records should form?
Your Answer: (Not answered)
Correct Answer: B (a closed-loop evidence chain from plan, execution to verification)
💡 A closed loop proves the SMS truly runs—for audit and law.
✗
Question 39. The list of critical operations onboard is established by?
Your Answer: (Not answered)
Correct Answer: C (the Company in the SMS; the Master implements onboard)
💡 The Company identifies and documents critical operations; the Master implements them onboard.
✗
Question 40. A crew member is weak in English. What does the master do?
Your Answer: (Not answered)
Correct Answer: A (judge him against the safety demands of the post, then train or reassign where he falls short)
💡 Language bears directly on safe performance: distress traffic, collision-avoidance co-ordination, fire and dewatering orders, dangerous-goods marks and equipment plates all depend on reading and hearing. The master assesses the seafarer against the safety tasks of his post, arranges targeted training with supported use on the job, moves him to a post of lower language demand and lower risk, or reports the gap to the company so that the company decides on manning. The standard is not relaxed because the voyage is tight, and complete certificates prove qualification for discharge, not that orders can be heard and given on board.
✗
Question 41. Which figures measure whether the system works?
Your Answer: (Not answered)
Correct Answer: B (the count of casualties and near misses, deficiencies found at inspection, drills done on time, the trend in non-conformities)
💡 The figures that say something are in the working: how many casualties and how many near misses (more near misses reported usually means a better reporting culture, and the two belong together), the deficiencies found at port State and class inspection and what they were, whether drills were done on schedule, the number of non-conformities and how fast they were closed, crew turnover and training completed, breakdowns and maintenance overdue, detentions. These are what management review is fed. Hire rates, page counts and the size of the office tell other things, not whether the system works; one year proves little - the trend and the comparison with like ships matter.
✗
Question 42. Before entering a high risk area, hardening measures usually include?
Your Answer: (Not answered)
Correct Answer: C (razor wire, fire hoses, locked aft access and citadel preparation)
💡 Hardening means razor wire, water jets, locked stern, fewer handholds plus citadel and backup comms readiness.
✗
Question 43. The precondition for extending an NC correction deadline is?
Your Answer: (Not answered)
Correct Answer: A (root cause known, plan agreed with interim safety measures)
💡 Extension needs analyzed cause, agreed plan and interim safeguards—no open-ended delay.
✗
Question 44. A proper critical-operation procedure should contain?
Your Answer: (Not answered)
Correct Answer: A (responsible person, timing, steps, risks and preventive measures)
💡 Procedures must state who, when, how, risks and precautions for correct execution.
✗
Question 45. Verification after an equipment retrofit should be?
Your Answer: (Not answered)
Correct Answer: A (run functional and safety checks and update records before service)
💡 Test functions and safety, check interlocks and alarms, update drawings and instructions and confirm before service.
✗
Question 46. The essence of BMP5 (Best Management Practices) is?
Your Answer: (Not answered)
Correct Answer: A (a systematic combination of assessment, hardening, detection and reporting)
💡 BMP5 stresses pre-transit assessment and registration, hardening, vigilant detection and prompt reporting procedures.
✗
Question 47. The main difficulty of night lookout is?
Your Answer: (Not answered)
Correct Answer: B (judging distance and movement is hard and shore lights confuse)
💡 At night distance and motion are hard to judge and shore lights mask navigation lights, so read combinations and radar.
✗
Question 48. Why is a false dangerous goods declaration harmful?
Your Answer: (Not answered)
Correct Answer: A (the ship cannot stow or respond correctly, which may cause a serious accident)
💡 False declarations mean dangerous cargo handled as general cargo, wrecking segregation and response, a classic accident cause.
✗
Question 49. An abnormal rise in spare consumption usually indicates?
Your Answer: (Not answered)
Correct Answer: A (an unresolved root fault or poor maintenance)
💡 Abnormal use points to root faults or weak maintenance; do root cause analysis instead of just restocking.
✗
Question 50. Who carries out the management review of the system, and on what?
Your Answer: (Not answered)
Correct Answer: C (top management of the company, at planned intervals, on whether the system suits, covers enough and works)
💡 It sits at the level of top management and runs at planned intervals, commonly yearly, not when something has gone wrong. What feeds it is already listed: the findings of internal and external audit, the investigation of casualties and near misses, the count and clearance of non-conformities, what the ships themselves have raised, the weaknesses shown by drills, new demands from the authority or from charterers, and what came of the last review. What comes out is not a line that the system works well but a conclusion on three questions - does it suit the business, does it cover enough, does it actually work - together with the resources to be spent and the documents to be changed, and those conclusions must be traceable down to the deck, where the master and crew are to know what of their part moved. To write it as the master's monthly report, or as paperwork for an audit, pushes the top level's own duty downward.
✗
Question 51. Class requires defects found during survey to be rectified within a time limit; the SMS should?
Your Answer: (Not answered)
Correct Answer: A (record it as a non-conformity with corrective action, assign an owner and verify closure)
💡 External survey findings enter the non-conformity system with owner, deadline and verified closure.
✗
Question 52. During bunkering a leak is found in the hose; what applies?
Your Answer: (Not answered)
Correct Answer: B (stop work, close valves and contain the leak)
💡 Stop pumping, close valves and contain; resume only with a sound hose to prevent a larger spill.
✗
Question 53. Audit finds crew unfamiliar with muster stations and no records exist. The most likely root cause is?
Your Answer: (Not answered)
Correct Answer: A (monthly drills and familiarization not effectively implemented)
💡 Unfamiliarity without records means drills and familiarization skipped or were formal—a training-system failure.
✗
Question 54. Lookout requirements in restricted visibility include?
Your Answer: (Not answered)
Correct Answer: D (post extra lookouts, run radar and lights and listen for fog signals)
💡 Post extra lookouts, plot radar, show lights, sound signals and keep the bridge quiet to hear others.
✗
Question 55. Finding badly corroded lifeboat falls, you should?
Your Answer: (Not answered)
Correct Answer: D (stop using that boat, arrange renewal and report the company)
💡 Corroded falls compromise strength; take the boat out of use, arrange renewal and track closure with the company.
✗
Question 56. For urgent evacuation ashore, the SMS should?
Your Answer: (Not answered)
Correct Answer: C (contact RCC/agent for helicopter or port, prepare medical handover)
💡 Fast evacuation buys golden time; handover ensures continuity.
✗
Question 57. After new equipment is fitted, the SMS should?
Your Answer: (Not answered)
Correct Answer: B (update procedures and training, revise drawings and add it to the PMS)
💡 Update instructions, drawings and the PMS and train the crew, or a management gap appears immediately.
✗
Question 58. What marks a technical defect as a system problem?
Your Answer: (Not answered)
Correct Answer: A (recurrence or long-term non-closure)
💡 A one-off is technical; recurrence or delay signals failure in maintenance, spares or oversight and needs system action.
✗
Question 59. When the Master finds shore support or resources insufficient, the correct channel is?
Your Answer: (Not answered)
Correct Answer: A (request support via the DPA from shore management)
💡 The DPA is the resource link; the Master obtains needed support through the DPA from the Company.
✗
Question 60. When should the emergency generator start automatically?
Your Answer: (Not answered)
Correct Answer: B (when the main source fails, starting and supplying within the required time)
💡 It must start and supply emergency loads within the required time on main power failure, verified by regular testing.
✗
Question 61. How are improvement results locked in?
Your Answer: (Not answered)
Correct Answer: B (revise SMS documents, add to training and checklists and keep monitoring)
💡 Write into procedures, train and checklists and keep monitoring, or gains fade with crew turnover and time.
✗
Question 62. Which is NOT a resource requirement of the system?
Your Answer: (Not answered)
Correct Answer: B (providing the ship with marketing staff)
💡 The system secures resources for safety and pollution prevention: people, stores and shore support, not marketing staff.
✗
Question 63. The starting point of safety performance management is?
Your Answer: (Not answered)
Correct Answer: D (decide what to measure and set targets and a baseline)
💡 Define what to measure with targets and baselines before collecting data, avoiding aimless statistics.
✗
Question 64. What mainly determines when a mooring line is condemned?
Your Answer: (Not answered)
Correct Answer: C (broken wires, wear, deformation and ageing reaching maker or system criteria)
💡 Condemn by actual damage against maker or system criteria rather than by service time alone.
✗
Question 65. When port restrictions complicate crew changes, the approach is?
Your Answer: (Not answered)
Correct Answer: A (verify visas and rules early, change port if needed and report)
💡 Check immigration and health rules early; if impossible, change port or agree extensions and log the decision.
✗
Question 66. Requirements for the ballast water record book are?
Your Answer: (Not answered)
Correct Answer: D (record uptake, exchange or treatment and discharge with time, position and volume)
💡 Record operations with time, coordinates, volumes and treatment per the convention alongside the plan and certificate.
✗
Question 67. The key to managing a multinational crew is?
Your Answer: (Not answered)
Correct Answer: A (common working language, clear communication rules and cultural respect)
💡 Set a common language with standard phrases and read-back, respecting religious and cultural needs.
✗
Question 68. The most common error in crisis communication is?
Your Answer: (Not answered)
Correct Answer: A (delaying and leaving an information vacuum)
💡 Delay is the worst sin; silence reads as admission, so state known facts and actions promptly.
✗
Question 69. The purpose of a post-emergency debrief is?
Your Answer: (Not answered)
Correct Answer: B (review decisions/actions, find gaps, revise plan and train)
💡 Debrief identifies gaps to revise the plan, upgrade gear and train the crew.
✗
Question 70. The towline parts while towing - what is done first?
Your Answer: (Not answered)
Correct Answer: B (alert both vessels, hold their positions, then weigh reconnection against anchoring or another way of keeping position)
💡 When the towline parts, the two ships stop constraining each other at once: the tug swings and the tow drifts on wind and current, which becomes a dangerous situation within minutes if a shoal, a bridge pier or traffic is near. The first step is therefore to warn both vessels, plus nearby shipping and the shore station where needed, hold position and use the tug's own engines and rudder to control the relationship between the two ships. Only then comes the judgement on reconnection - spare line, coming round to lead a new towline, or an alternative such as anchoring or a temporary line. Reporting to the company is required but sits behind holding position.
✗
Question 71. Detention for a major SMS non-conformity affects the Company by?
Your Answer: (Not answered)
Correct Answer: A (harms reputation, insurance, charter; triggers DOC review)
💡 SMS detention signals serious failure, hitting business and certificates.
✗
Question 72. Record retention periods should be?
Your Answer: (Not answered)
Correct Answer: A (set by the SMS meeting statutory minimums, destroy only after)
💡 Retention must meet law and traceability; early destruction invites risk.
✗
Question 73. When a newbuilding joins the Company SMS, it should?
Your Answer: (Not answered)
Correct Answer: D (complete familiarisation, procedure-equipment alignment and audit approval)
💡 Newbuilds must merge into the SMS and be approved, not run outside it.
✗
Question 74. Rolling increases on the fringe of a typhoon; you should?
Your Answer: (Not answered)
Correct Answer: A (adjust course and speed to avoid resonance and secure cargo)
💡 Alter course and speed away from resonance, secure cargo and gear, keep weather reception and reporting.
✗
Question 75. What is the master's first key role in an emergency?
Your Answer: (Not answered)
Correct Answer: A (establish command and an information hub keeping the overall picture)
💡 In emergencies the master commands, holds the whole picture and assigns tasks; operating gear himself loses overall control.
✗
Question 76. Emergency contact lists within SOPEP/SSP should be?
Your Answer: (Not answered)
Correct Answer: C (kept current, reachable 24 hours with primary and backup channels)
💡 Verify regularly, ensure round-the-clock reachability and list authorities, company, agents, club and SAR contacts.
✗
Question 77. The minimum requirement for the in-port watch is?
Your Answer: (Not answered)
Correct Answer: B (keep enough qualified crew aboard with rounds to meet emergency needs)
💡 Keep sufficient qualified crew, patrol deck and moorings and keep fire and comms ready for instant response.
✗
Question 78. A person is seen falling overboard to starboard during the watch. What is the officer's first sequence of actions?
Your Answer: (Not answered)
Correct Answer: A (a lighted lifebuoy over the side and the man-overboard alarm, time and position entered, the ship manoeuvred to keep the casualty in sight and return, nearby vessels warned)
💡 Survival depends on never losing sight of the casualty: the call, the lighted lifebuoy, the alarm and the position entry go together, then the turn practised in drills brings the ship back to windward of the man while the lookout holds sight, with nearby vessels and the rescue coordination centre informed. Stopping loses steerage and drifts the ship off; reporting to the company or checking the crew list first throws away the few minutes that matter.
✗
Question 79. Involving front-line crew in drafting documents aims to?
Your Answer: (Not answered)
Correct Answer: C (make content realistic, operable and better accepted)
💡 Having operators review drafts exposes impractical clauses and ambiguity and builds ownership and compliance.
✗
Question 80. If a real emergency occurs during a drill, the correct response is?
Your Answer: (Not answered)
Correct Answer: A (stop the drill, switch to real response and announce clearly)
💡 Stop and announce "this is not a drill", then start the real response to avoid confusion.
✗
Question 81. Before entering an enclosed space (empty tank, cofferdam), the mandatory requirement is?
Your Answer: (Not answered)
Correct Answer: A (test O2/toxic/explosive, ventilate, standby, permit; never enter alone)
💡 Enclosed spaces carry oxygen/toxic/explosive hazards; testing, stand-by and permit are mandatory.
✗
Question 82. When a ship is put under third-party management, who is the Company?
Your Answer: (Not answered)
Correct Answer: B (the entity that takes the system responsibility and is named on the Document of Compliance)
💡 The Company in the Code means the shipowner or any organisation or person that has taken over the shipowner's responsibility and the functions of managing the ship - it may be a manager or a bareboat charterer. Which one it is can be read off the Document of Compliance, the system documents and the designated person's authority. A management agreement on its own is not enough: the document's scope must cover the ship, and the system files on board, the designated person's name and contact and the lines of responsibility must all point to that entity, or what the crew follow has no source. When a ship moves to another manager the certificate and the documents move with it - the step most often missed when owners are changed.
✗
Question 83. Sparks fly from the terminal conveyor during loading; you should?
Your Answer: (Not answered)
Correct Answer: C (suspend work at once and tell the terminal to find the source)
💡 Sparks are a serious ignition source; stop, notify the terminal and resume only when safe.
✗
Question 84. What is the first insurance step after a collision?
Your Answer: (Not answered)
Correct Answer: D (notify insurers, preserve evidence and arrange joint surveys)
💡 Notify insurers, secure evidence and arrange joint survey to support apportionment and claims later.
✗
Question 85. The company wants a statement signed that does not match the ship. What is done?
Your Answer: (Not answered)
Correct Answer: A (refusing to sign, the reason and the evidence written down, the designated person told)
💡 The master's signature is where an irreplaceable judgment enters the papers: what he signs is read back at survey, at audit, in a claim and in a criminal inquiry as evidence, and it decides how far others trust the state of the gear and the space. To sign what is not so takes that false statement onto himself, and the people ashore who asked may not carry what follows. So he does not sign, and he writes why, with what he saw, the records and the reports behind it, and takes it to the designated person - that route exists in the system for exactly this, and the rules give the master the authority to decide on board and to call for what the shore must provide. Amending the words, another man signing, or signing first and noting later, does not make the paper true and only spreads the loss of footing further; if the shore answers by pressure or by finding another hand, that is itself a thing to report and to put on record.
✗
Question 86. Upon receiving a non-conformity report, the master should?
Your Answer: (Not answered)
Correct Answer: B (confirm facts, organize correction, record and report to company)
💡 The master verifies, corrects, keeps evidence and reports up; major NCs also to the Administration.
✗
Question 87. Under ISPS, the CSO, SSO and PFSO respectively are?
Your Answer: (Not answered)
Correct Answer: B (the security responsible persons at Company, ship and port-facility levels)
💡 Each owns security at Company, ship and port; they coordinate across the interface.
✗
Question 88. For which situations should the ship make its emergency arrangements?
Your Answer: (Not answered)
Correct Answer: B (every kind of occurrence that may happen, collision and grounding, fire, pollution and injury, each with a procedure that can be worked)
💡 The emergency preparedness element asks the company to identify what may happen on its ships and to write, for each case, who takes charge, who does what, with what equipment, how the bridge, the engine room and the shore are called and when help is requested. The usual list runs through collision, grounding, fire and explosion, cargo damage or shifting, serious injury or death, sickness needing treatment ashore, oil or other pollution, abandoning ship, a security incident, failure of the steering gear or the main engine, damage in heavy weather, and loss of communications or of power. The procedure has to be usable on board, the crew have practised it, and what the drill or the real event shows has to go back into the documents. To be ready only for fire and for abandoning ship, or to prepare what an inspector happens to ask about, leaves the ship to meet the unprepared case; and an officer putting his questions will start from the voyage and the cargo this ship carries and ask where in the system it is provided for.
✗
Question 89. How the Company ensures crew competence is?
Your Answer: (Not answered)
Correct Answer: D (check certificates, assess ability, train and periodically confirm)
💡 Certificates are a threshold; assessment and training sustain competence.
✗
Question 90. Before entering port the pilot ladder is found damaged; what applies?
Your Answer: (Not answered)
Correct Answer: B (replace or repair it and report; it must not be used while defective)
💡 A defective pilot ladder risks injury, complaints and detention; replace or repair, report and confirm it is serviceable.
✗
Question 91. The correct closed-loop handling of a non-conformity is?
Your Answer: (Not answered)
Correct Answer: A (identify, report, root-cause analysis, corrective action, verify effectiveness, record)
💡 Closed-loop control requires each step to be traceable and recorded; verification prevents fake fixes.
✗
Question 92. What is the first principle in writing documents?
Your Answer: (Not answered)
Correct Answer: B (consistent with actual practice so what is written can be done)
💡 Documents must reflect real practice; never write what cannot be done, since that becomes a serious gap.
✗
Question 93. What is the maintenance focus for windlass brakes and chain stoppers?
Your Answer: (Not answered)
Correct Answer: A (holding power and structural integrity, tested periodically with records)
💡 Brakes and stoppers hold the cable; test holding power and structure regularly or anchors may be lost.
✗
Question 94. The priority order for distress, urgency and safety traffic is?
Your Answer: (Not answered)
Correct Answer: D (distress first, then urgency, then safety)
💡 Distress traffic has absolute priority; urgency next, then safety, with routine traffic lowest.
✗
Question 95. How should watchkeeping be maintained while in port?
Your Answer: (Not answered)
Correct Answer: B (keep sufficient crew aboard with regular rounds meeting manning and response needs)
💡 Keep enough qualified crew aboard for rounds, manning minimums and emergency response, especially during cargo or bunkering.
✗
Question 96. The ship risk profile used for PSC targeting mainly relies on?
Your Answer: (Not answered)
Correct Answer: C (ship type and age, past records, company performance and RO record)
💡 The profile combines type, age, deficiency and detention history, company and RO performance to target inspections.
✗
Question 97. After a total blackout, the first measure is?
Your Answer: (Not answered)
Correct Answer: B (restore emergency power, secure steering and communications and find the cause)
💡 Secure emergency power, steering and communications, find the cause and restore loads in stages to avoid another trip.
✗
Question 98. Finding unauthorised persons on board while in port, you should?
Your Answer: (Not answered)
Correct Answer: D (detain and identify, report to master and shore, act per the plan)
💡 Control their movement, identify them, report to master, company and port security, then hand over with records.
✗
Question 99. What should the ship prioritise when preparing for survey?
Your Answer: (Not answered)
Correct Answer: D (self-check key items, sort certificates and records and rehearse equipment demonstrations)
💡 Preparation must be substantive: self-check, organise records and rehearse demonstrations to avoid exposing systemic gaps.
✗
Question 100. The ship is found discharging sewage without permission in port; the master should?
Your Answer: (Not answered)
Correct Answer: A (stop at once, report and cooperate with investigation and evidence)
💡 Stop, report port and company, cooperate, preserve records and never flee or conceal, which worsens outcomes.