Question 71. In the planned maintenance system, which equipment is picked out for special attention?
Your Answer:
(Not answered)
Correct Answer:
C (equipment whose sudden failure would put safety, persons on board or the environment at risk)
💡 The weight sits on the critical equipment list. The test is neither price nor mere presence in the inventory but whether sudden failure would endanger the ship, the people on board or the environment, which brings in the steering gear and its hydraulics, fire pumps and fixed extinguishing systems, lifeboats and their release gear, the main engine and the auxiliaries serving it, and the navigation and communication gear. Company and ship keep the list together from the actual layout, the maker's instructions and the record of past failures, and each entry states who checks it, how often and what counts as satisfactory, the sheet being signed and filed when done. The surveyor will look for those records, but nobody else writes the list for the ship. Spreading the effort evenly over a few hundred items is how the handful that truly must not fail end up with no one watching them.