Question 1. How do hinged and sliding watertight doors differ in use while the ship is at sea?
Your Answer: (Not answered)
Correct Answer: C (the hinged door shut before the ship leaves port and kept shut at sea, while a sliding door permitted to be used may be closed at any moment from the bridge and from either side)
💡 The line is drawn not by which way the door swings or how fast it shuts, but by whether it may be standing open at sea. A hinged door, open, leaves the bulkhead doing nothing, so it is to be shut before the ship parts from the port and kept shut on the voyage. A power slide sits where people must pass, so it is allowed to work at sea where permission covers it, on the terms that it can be closed at any moment from the bridge and from either side of it, that the closing has a sound and a indication, that lamps show where the door stands, that it is tested at intervals and written up, and that a document on board says which doors may be used at sea and when they must be closed, the master seeing it carried out before sailing. Whether the indication, the alarm and the local control work is a common thing to test in an inspection and in a drill; to treat it as long as somebody keeps an eye on it is the opposite of the requirement.
✗
Question 2. How must the expiry dates of medicines be managed?
Your Answer: (Not answered)
Correct Answer: B (Check expiry dates periodically and replace expired medicines, keeping records of the checks and updates)
💡 Medicines on board should be checked periodically for expiry, the integrity of packaging and storage conditions, with expired or deteriorated items replaced and records kept. Using an expired medicine may be ineffective or harmful, and it will be recorded as a deficiency at inspection.
✗
Question 3. The clear width of stairways forming means of escape shall generally be not less than:
Your Answer: (Not answered)
Correct Answer: C (800 mm)
💡 SOLAS II-2/13 generally requires the clear width of escape stairways to be not less than 800 mm.
✗
Question 4. Where a machinery space is provided with two means of escape, they shall:
Your Answer: (Not answered)
Correct Answer: C (be as widely separated as possible)
💡 SOLAS II-2/13 requires the two means of escape to be as widely separated as possible.
✗
Question 5. For a ship without an approved treatment plant, what is the general distance requirement for the discharge of sewage?
Your Answer: (Not answered)
Correct Answer: C (Beyond 12 nautical miles from the nearest land and at the specified speed)
💡 Under MARPOL Annex IV, where no approved treatment plant is fitted, sewage may generally be discharged beyond twelve nautical miles from the nearest land and subject to speed and other conditions, while a ship with an approved plant may discharge closer when the conditions are met. Port States may also have stricter local rules.
✗
Question 6. What performance must survival craft achieve in respect of wind and sea conditions under SOLAS?
Your Answer: (Not answered)
Correct Answer: A (They must float safely and retain their performance under the prescribed wind and sea conditions)
💡 SOLAS requires survival craft designed for the prescribed wind and sea conditions, able to float safely and maintain their essential performance in heavy weather. A declaration for calm water alone does not meet the needs after abandonment.
✗
Question 7. What is required when a ship navigates within a VTS area?
Your Answer: (Not answered)
Correct Answer: D (The ship must participate in the VTS as required and comply with its instructions, without the master's responsibility being relieved)
💡 A ship in a VTS area must report as required and comply with traffic management instructions, but VTS instructions do not relieve the master of responsibility for the safety of the ship.
✗
Question 8. What checking of survival craft markings is required?
Your Answer: (Not answered)
Correct Answer: A (Confirm the ship's name, port of registry and number of persons the craft can accommodate are clearly and completely marked)
💡 SOLAS requires survival craft to be clearly marked with the ship's name, port of registry and the number of persons it can accommodate. Inspection should confirm the markings are clear, durable and complete. Illegible markings hamper identification of the ship by rescuers and judgement of the craft's capacity, and are a common deficiency.
✗
Question 9. What does SOLAS require regarding automatic controls and safety devices for main machinery and boilers?
Your Answer: (Not answered)
Correct Answer: B (Safety devices must be fitted to give warning or take action automatically when parameters become abnormal, preventing damage)
💡 SOLAS II-1 requires safety devices for propulsion machinery and boilers that warn or act automatically on abnormal conditions such as low lubricating oil pressure or high cooling water temperature, preventing damage.
✗
Question 10. The use of the automatic pilot shall be such that:
Your Answer: (Not answered)
Correct Answer: C (in congested waters or restricted visibility the helmsman shall take over hand steering under the direct control of the OOW)
💡 SOLAS V/19: in congested waters or restricted visibility the helmsman shall take over hand steering under the direct control of the OOW.
✗
Question 11. On what band does a SART operate?
Your Answer: (Not answered)
Correct Answer: C (9 GHz (X band))
💡 It operates on 9 GHz (X band) so as to be detected by radar.
✗
Question 12. The navigation lights are found not to meet the required position, colour or arc of visibility. The finding is?
Your Answer: (Not answered)
Correct Answer: B (Non-compliant navigation lights affect the ability of other ships to judge the situation, a deficiency to be corrected)
💡 The position, colour and arc of visibility of the navigation lights, such as masthead, sidelights and stern light, must meet the requirements so that other ships can judge the heading and movement of the vessel from the correct bearing and distance. Non-compliance may lead to misjudgement and increased risk of collision. It is a deficiency to be corrected.
✗
Question 13. What rescue arrangement is required when entering an enclosed space?
Your Answer: (Not answered)
Correct Answer: B (A standby person at the entrance with rescue equipment and continuous communication)
💡 Entry into an enclosed space requires a standby person at the entrance, continuous communication and rescue equipment including breathing apparatus, so that immediate rescue is possible. Solo entry is a principal cause of multiple fatalities.
✗
Question 14. A rescue boat shall be provided with equipment including:
Your Answer: (Not answered)
Correct Answer: B (a complete set including oars, lifebuoy, first-aid kit and searchlight)
💡 SOLAS III/34 (LSA Code) requires a rescue boat to carry equipment including oars, lifebuoy, first-aid kit and searchlight.
✗
Question 15. What are common reasons for a finding of ISM system failure during a PSC inspection?
Your Answer: (Not answered)
Correct Answer: B (Repeated serious deficiencies of the same kind, records seriously inconsistent with the ship, or the crew unfamiliar with key operations or emergency duties)
💡 Findings of system failure commonly rest on the recurrence of serious deficiencies of the same kind, showing corrective action has been ineffective, records seriously inconsistent with the ship, such as falsified drill records, the crew unfamiliar with the equipment they operate or with their emergency duties, and critical equipment long out of repair, all showing that the system is not being implemented effectively.
✗
Question 16. At what stage must the initial survey for statutory certificates be completed?
Your Answer: (Not answered)
Correct Answer: A (Before the ship is put into service)
💡 SOLAS I/7 requires the initial survey to be completed and the certificates obtained before the ship is put into service. Operating without them is a serious breach of the Convention.
✗
Question 17. Under SOLAS, fuel oil tanks shall generally not be located in:
Your Answer: (Not answered)
Correct Answer: B (double bottoms)
💡 SOLAS II-2/4 generally prohibits fuel oil tanks in double bottoms, subject to exemptions for small ships or with Administration approval.
✗
Question 18. What does SOLAS address regarding sounding and observation arrangements for fuel oil tanks?
Your Answer: (Not answered)
Correct Answer: C (Safe and reliable measuring arrangements, preventing oil from overflowing or spraying out)
💡 SOLAS requires fuel oil tank measuring arrangements to be safe and reliable, such as self-closing sounding pipes or closed level gauges, preventing oil from overflowing or spraying onto hot surfaces during measurement and causing fire.
✗
Question 19. What is required for manholes and flush covers in the freeboard deck?
Your Answer: (Not answered)
Correct Answer: C (Kept closed and secured, preventing sea water entering spaces below when the deck is swept)
💡 SOLAS and the Load Line Convention require manholes and flush covers in the freeboard deck leading to spaces below to be kept closed and secured, with gaskets and fastenings, preventing sea water from entering when the deck is swept or the ship lists. A simple plate is not watertight.
✗
Question 20. In what form shall the fire control plan be presented?
Your Answer: (Not answered)
Correct Answer: D (Plans, with symbols, showing divisions, control stations and fire-fighting appliances on each deck)
💡 Plans with standard symbols showing divisions, control stations and appliances on each deck.
✗
Question 21. Before a fixed gas fire-extinguishing system is released, what precaution does SOLAS require?
Your Answer: (Not answered)
Correct Answer: A (An alarm shall be given and evacuation of the space ensured, normally with a delay)
💡 SOLAS requires an audible and visual alarm and a delay or interlock before release of a fixed gas system, so that persons can leave the space and casualties are avoided.
✗
Question 22. When should a renewal survey of a statutory certificate normally be completed?
Your Answer: (Not answered)
Correct Answer: A (Within a window of three months before or after the expiry date of the existing certificate)
💡 Under SOLAS I/14 and the harmonised survey system a renewal survey should be completed within a window of three months before or after the expiry date of the existing certificate, a new certificate being issued on satisfactory completion, with account taken of the harmonisation period. Failure leaves the certificate invalid and affects the ship's operation and insurance.
✗
Question 23. What structural condition should be confirmed before loading a bulk carrier?
Your Answer: (Not answered)
Correct Answer: A (The condition of hatch covers and coamings, deformation or corrosion of the internal structure and leakage of the double bottom and piping)
💡 Before loading a bulk carrier the condition of the hatch covers and coamings should be confirmed sound, the internal structure and stiffening free of serious deformation or corrosion and the double bottom and ballast piping free of leakage, with the bilges draining properly. These bear directly on the safety of loading and the structural integrity of the voyage.
✗
Question 24. For power-operated sliding watertight doors, control shall be possible from:
Your Answer: (Not answered)
Correct Answer: C (both the navigation bridge and a position above the bulkhead deck)
💡 SOLAS II-1/10 requires power-operated sliding watertight doors to be operable from the navigation bridge and from a position above the bulkhead deck, as well as locally.
✗
Question 25. What means should be used first for distress communication in sea area A4?
Your Answer: (Not answered)
Correct Answer: B (MF/HF equipment, DSC, radiotelephony and NBDP, trying several bands)
💡 Sea area A4 has no satellite or VHF coast station coverage, so distress communication should be attempted first on MF/HF equipment, including DSC alerting, radiotelephony distress calls and narrow-band direct printing telegraphy, trying several bands to establish contact with a coast station or another ship.
✗
Question 26. How many rocket parachute flares shall each lifeboat or liferaft carry?
Your Answer: (Not answered)
Correct Answer: B (4)
💡 SOLAS III/7.1: each survival craft shall carry 4 rocket parachute flares.
✗
Question 27. What is the principal risk addressed by the requirements for venting arrangements of tanker cargo tanks?
Your Answer: (Not answered)
Correct Answer: B (Preventing overpressure or vacuum in the tanks caused by cargo operations and temperature changes)
💡 Venting arrangements equalise tank pressure during cargo operations and temperature changes, preventing structural damage from overpressure and deformation from vacuum.
✗
Question 28. What mainly determines the minimum range of a radar installation?
Your Answer: (Not answered)
Correct Answer: C (Pulse width and antenna height)
💡 Minimum range depends chiefly on pulse width and the height of the antenna.
✗
Question 29. Sea area A1 means an area within the radiotelephone coverage of at least one:
Your Answer: (Not answered)
Correct Answer: A (VHF coast station with continuous alerting capability)
💡 SOLAS IV/2: Sea area A1 is the area within the radiotelephone coverage of at least one VHF coast station with continuous DSC alerting.
✗
Question 30. What should be done if oil overflows during bunkering?
Your Answer: (Not answered)
Correct Answer: C (Stop the operation at once, take emergency measures to contain the spill and prevent it entering the water)
💡 On overflow during bunkering the operation should be stopped at once by the agreed signal and emergency measures taken, such as absorbents and booms, with the spill collected and reported as required. Continuing would increase the quantity spilled and create pollution and fire risk.
✗
Question 31. On the night watch the OOW must keep track of every watertight door. Under SOLAS chapter II-1, which requirement for power-operated sliding watertight doors is stated correctly?
Your Answer: (Not answered)
Correct Answer: A (the bridge shall carry indicators showing each door open or closed, closing normally taking between 20 and 40 seconds with the alarm sounding throughout)
💡 Bridge indicators showing each door individually exist so the OOW can confirm watertight integrity at any moment, not only after flooding; the 20-40 second closing time and continuous alarm give persons below the door time to clear. Verbal relaying or control-room-only indication is a substitute the regulation does not accept.
✗
Question 32. What safety is required in spaces adjacent to a hold containing cargo that may release harmful gas?
Your Answer: (Not answered)
Correct Answer: B (Monitor gas concentrations in adjacent spaces such as enclosed passages and stores, preventing gas ingress)
💡 For cargoes that may release harmful or flammable gas, the IMSBC Code requires monitoring not only inside the hold but also the possibility of gas entering adjacent enclosed spaces such as passages, stores and the machinery space through bulkheads, piping and access ways, preventing poisoning or the ignition of the gas.
✗
Question 33. Under SOLAS V/8, what follows from a breach of the regulations?
Your Answer: (Not answered)
Correct Answer: A (Responsibility follows and regard shall be had to navigational dangers)
💡 Responsibility follows and regard shall be had to navigational dangers.
✗
Question 34. After grounding, what should the master give priority to?
Your Answer: (Not answered)
Correct Answer: D (Ascertain the extent of flooding and damage, assess stability and pollution risk, prevent further damage and pollution and report)
💡 After grounding the first priority is to ascertain the flooding of compartments, the damage to the hull and the ship's position, assess stability, the grounding forces and the pollution risk, and take measures to prevent further damage and pollution, such as closing watertight doors, controlling draught and trim, informing those concerned and reporting. Forcing a refloat at once may worsen the damage and must be carefully assessed.
✗
Question 35. What are the stowage and testing requirements for the emergency towing arrangement?
Your Answer: (Not answered)
Correct Answer: C (Stowed so as to be readily available and inspected at regular intervals)
💡 SOLAS requires the emergency towing arrangement to be stowed where it can be rapidly deployed and to be inspected regularly, so that it works in an emergency. Long-term stowage in a hold or neglect of inspection may delay assistance.
✗
Question 36. Before departure the master shall ensure that:
Your Answer: (Not answered)
Correct Answer: D (the ship's stability and trim are satisfactory)
💡 SOLAS II-1/5 requires the master to verify stability and trim before departure.
✗
Question 37. What is required regarding VHF use when navigating in confined waters?
Your Answer: (Not answered)
Correct Answer: C (Maintain a VHF watch and contact other vessels or the VTS as necessary, keeping transmissions concise on the prescribed channels)
💡 In confined waters a VHF watch should be maintained, normally on channel 16 and the locally designated channel, with concise and standard phraseology used for coordination or reporting and the exchange ended as soon as possible. Occupying the channel at length obstructs others' emergency communication.
✗
Question 38. What is the application of SOLAS Chapter V?
Your Answer: (Not answered)
Correct Answer: D (All ships, except where expressly provided otherwise)
💡 It applies to all ships except where expressly provided otherwise.
✗
Question 39. What shall the bridge be able to indicate for watertight doors?
Your Answer: (Not answered)
Correct Answer: C (Whether each door is open or closed)
💡 The bridge shall indicate whether remotely controlled doors are open or closed.
✗
Question 40. What is the purpose of the emergency source of electrical power?
Your Answer: (Not answered)
Correct Answer: A (To supply essential services such as emergency lighting, communications and steering when the main source fails)
💡 The emergency source supplies essential safety services when the main source fails, maintaining lighting, communication and steering capability. It is not intended to replace the main source for extended operation.
✗
Question 41. After a marine casualty such as a collision or grounding with serious loss, what is required of the master as to reporting?
Your Answer: (Not answered)
Correct Answer: C (Report to the flag Administration as required and, where necessary, to the nearest coastal State, and preserve the relevant records and information)
💡 Under SOLAS I/21 and related requirements, after a marine casualty the ship should report to the flag Administration as required and, where necessary, to the nearest coastal State, and should preserve evidence, the official log book and related records for the investigation. Concealing or delaying a report aggravates liability.
✗
Question 42. The emergency fire pump needs manual priming before it will draw water. What does SOLAS address?
Your Answer: (Not answered)
Correct Answer: B (A deficiency; the emergency fire pump must draw water by itself, and manual priming would delay emergency use)
💡 SOLAS requires the emergency fire pump to be self-priming, or to have a priming arrangement meeting the requirements, so that it draws water without manual priming in an emergency. Needing manual priming would delay the water supply when it matters and is a deficiency.
✗
Question 43. Charts shall be corrected:
Your Answer: (Not answered)
Correct Answer: B (in accordance with the latest notices to mariners)
💡 SOLAS V/27 requires charts and publications to be corrected up to date from notices to mariners.
✗
Question 44. What measures shall be taken for cargo liable to spontaneous combustion?
Your Answer: (Not answered)
Correct Answer: A (Temperature monitoring and ventilation)
💡 Monitoring of temperature with ventilation and, if necessary, early discharge.
✗
Question 45. A paint locker shall be located behind:
Your Answer: (Not answered)
Correct Answer: B (A class divisions, with independent ventilation and extinguishing arrangements)
💡 SOLAS II-2/9 requires paint lockers to be bounded by A class divisions with independent ventilation and extinguishing.
✗
Question 46. A pressure test found insufficient pressure when two jets were played simultaneously. What does SOLAS require?
Your Answer: (Not answered)
Correct Answer: A (Fire pumps must maintain the prescribed pressure and jets when the required number of hydrants are in simultaneous use)
💡 SOLAS II-2 requires the fire pumps to maintain the prescribed pressure and reach of the jets with the required number of hydrants in simultaneous use. Insufficient pressure impairs firefighting and is a deficiency.
✗
Question 47. What reward mechanisms for crew suggestions may be used?
Your Answer: (Not answered)
Correct Answer: D (Rewards and recognition may encourage the crew to propose improvements, driving continual refinement)
💡 The ISM system encourages mechanisms of reward, recognition and inclusion in appraisal for crew who put forward effective improvements or detect significant hazards in time, giving them an incentive to take part in safety management and driving continual enhancement and genuine effectiveness of the system.
✗
Question 48. In addition to the Polar Ship Certificate, a ship operating in polar waters must carry:
Your Answer: (Not answered)
Correct Answer: C (A Polar Water Operational Manual)
💡 SOLAS XIV requires a Polar Water Operational Manual setting out polar procedures and limitations.
✗
Question 49. How many fire pumps are required on a passenger ship of 4000 GT and above?
Your Answer: (Not answered)
Correct Answer: D (Three)
💡 At least three.
✗
Question 50. What is the relationship between the emergency switchboard and the main switchboard under SOLAS?
Your Answer: (Not answered)
Correct Answer: C (The emergency switchboard is supplied from the emergency source, normally the emergency generator or battery, with appropriate interconnection to the main switchboard)
💡 SOLAS requires the emergency switchboard to be supplied from the emergency source, the emergency generator or battery, with appropriate interconnection to the main switchboard for normal conditions, while remaining independently supplied if the main source fails.
✗
Question 51. What is the capacity requirement for survival craft on a passenger ship?
Your Answer: (Not answered)
Correct Answer: A (Each side must accommodate all persons on board, with additional liferafts as prescribed)
💡 SOLAS III requires the survival craft on each side of a passenger ship to accommodate all persons on board, with additional liferafts as prescribed, so all can escape even if one side is unusable.
✗
Question 52. A new chief officer needs to familiarise himself with the damage control plan. Where does SOLAS II-1/23 require it to be permanently exhibited?
Your Answer: (Not answered)
Correct Answer: B (On the navigation bridge, in the cargo control room and at the damage control station)
💡 SOLAS II-1/23 requires the damage control plan to be permanently exhibited at the positions where it will be needed, including the navigation bridge, cargo control room and damage control station.
✗
Question 53. Earthing of electrical equipment on board serves to:
Your Answer: (Not answered)
Correct Answer: C (Prevent electric shock and leakage)
💡 Earthing protects against electric shock and leakage causing fire.
✗
Question 54. What is the maximum length of a fire hose for use on the open deck?
Your Answer: (Not answered)
Correct Answer: B (20 m)
💡 On the open deck and in accommodation spaces the hose shall not exceed 20 m.
✗
Question 55. The carriage of dangerous goods in packaged form shall follow:
Your Answer: (Not answered)
Correct Answer: B (the International Maritime Dangerous Goods (IMDG) Code)
💡 SOLAS VII/3: the carriage of dangerous goods in packaged form shall follow the IMDG Code.
✗
Question 56. What is required for position monitoring when navigating in restricted waters?
Your Answer: (Not answered)
Correct Answer: B (Cross-check the position using several means such as visual bearings, radar and GPS, detecting any discrepancy early)
💡 SOLAS and good seamanship require the position in restricted waters to be cross-checked by several means, such as visual bearings, radar and GPS, detecting errors early. Reliance on a single means may lead to grounding through equipment error.
✗
Question 57. Which documents should the company ensure are kept on board?
Your Answer: (Not answered)
Correct Answer: B (The system documentation relevant to the ship's operation, including the manual, procedures and record forms, accessible to the crew)
💡 ISM Code 5 requires the documentation relevant to the operation of the ship, including the safety management manual, procedures, instructions and record forms, to be on board and accessible to the crew for reference and correct execution.
✗
Question 58. As a minimum, the flash point of fuel oil (excluding diesel lubricating oil) shall be:
Your Answer: (Not answered)
Correct Answer: B (60°C)
💡 SOLAS II-2/4.2: fuel oil, other than diesel lubricating oil, shall have a flash point of at least 60°C.
✗
Question 59. The general emergency alarm shall be audible:
Your Answer: (Not answered)
Correct Answer: B (Throughout the ship, including crew accommodation)
💡 Throughout the ship, including crew accommodation.
✗
Question 60. How many firefighter's outfits must a cargo ship of 1000 GT and above carry?
Your Answer: (Not answered)
Correct Answer: C (At least two)
💡 SOLAS II-2/10.10 requires at least two firefighter's outfits on cargo ships of 1000 GT and above. Tankers are additionally required to carry extra outfits, normally four.
✗
Question 61. How often must the radio reserve source of energy (batteries) be tested?
Your Answer: (Not answered)
Correct Answer: C (Weekly)
💡 SOLAS IV/13 and the associated performance standards require the reserve batteries to be checked and tested weekly to confirm capacity and condition of connections.
✗
Question 62. What is the sequence of action when visibility suddenly deteriorates at sea?
Your Answer: (Not answered)
Correct Answer: A (Inform the master at once, prepare the engine and reduce to a safe speed, start radar and navigation lights, sound fog signals and enhance the look-out)
💡 Sudden loss of visibility requires prompt action in sequence: inform the master, tell the engine room to stand by and reduce to a safe speed, start the radar on a longer range scale and switch on navigation lights, sound fog signals as prescribed, post an additional look-out and keep a sharp listening watch, considering anchoring if necessary.
✗
Question 63. What is the significance of the distinction between life-saving appliances and arrangements in SOLAS Chapter III?
Your Answer: (Not answered)
Correct Answer: A (Appliances are items such as survival craft and lifejackets, while arrangements are the boarding, launching, stowage and lighting provisions)
💡 In SOLAS Chapter III, life-saving appliances are items such as craft, lifejackets and equipment, while arrangements refer to the structural provisions for boarding, launching, stowage and lighting. The two attract different points of attention at survey.
✗
Question 64. What is checked regarding the donning of personal equipment in a fire drill?
Your Answer: (Not answered)
Correct Answer: A (That the firefighter's outfit is correctly worn, the breathing apparatus airtight and communication working)
💡 A fire drill should check that the firefighter's outfit is correctly worn, including helmet, protective clothing, boots and gloves, that the breathing apparatus face mask is airtight and tested and that communication between the team members and with the bridge works, so that actual operations are safe and effective.
✗
Question 65. How must a company ensure that its safety management system remains effective?
Your Answer: (Not answered)
Correct Answer: A (Through internal audits, evaluation of effectiveness and management review leading to continuous improvement)
💡 The ISM Code requires the company to carry out internal audits, evaluation and management review, continually improving the system so that it meets operational needs. A one-off system is not acceptable.
✗
Question 66. After overhaul of launching appliances, what further test does SOLAS III/35 require?
Your Answer: (Not answered)
Correct Answer: A (A load test with the full complement at intervals of not more than five years)
💡 SOLAS III/35 requires that launching appliances be subjected to a test with the full complement on board at intervals of not more than five years, to verify performance under rated load.
✗
Question 67. What does SOLAS address regarding the relationship between survey intervals and the validity of certificates?
Your Answer: (Not answered)
Correct Answer: B (The validity period corresponds to the survey cycle, and failure to survey in time makes the certificate invalid)
💡 SOLAS links the survey cycle to the validity of the certificate: the initial, annual or intermediate and renewal surveys are the conditions for maintaining validity. Failure to carry out any of them in time affects the validity of the certificate.
✗
Question 68. What are the consequences if a similar serious deficiency recurs after a detention?
Your Answer: (Not answered)
Correct Answer: A (The ship's risk profile rises and she may be targeted for more frequent inspection)
💡 A recurrence of the same serious deficiency indicates a systemic problem in the system or management. The ship's risk profile rises and she may be targeted, for example as a high risk ship under the Tokyo MOU, with noticeably more frequent and stringent inspections.
✗
Question 69. What is the purpose of a company's periodic visits and inspections of its ships?
Your Answer: (Not answered)
Correct Answer: A (To verify the effective implementation of the system on board, identify and help resolve problems and promote continual improvement)
💡 The ISM Code requires the company to inspect its ships periodically, through internal audits and visits, in order to verify that the system works effectively on board, identify non-conformities and opportunities for improvement and provide support, not merely to assess the crew. Problems found should be followed up to closure.
✗
Question 70. What is the purpose of the voyage data recorder required by SOLAS V/19?
Your Answer: (Not answered)
Correct Answer: C (To provide data on the navigation and operation of the ship for accident investigation)
💡 The VDR records navigational and operational data for use in casualty investigation. The data is protected and must not be used for crew assessment or other purposes.
✗
Question 71. Which statement about the purpose of the international shore connection is correct?
Your Answer: (Not answered)
Correct Answer: A (To enable water to be supplied to the ship's fire main from the shore or another ship if necessary, its dimensions being internationally standardised)
💡 Under SOLAS II-2/10 the relevant ships should carry at least one international shore connection so that, if necessary, the ship's fire main can be connected to the fire system of the shore or another ship for an external supply of water. Its dimensions should be standardised and its accessories such as bolts and gaskets complete and properly stowed.
✗
Question 72. The VDR is found not to have recorded the bridge audio and radar images of the recent voyage. The finding is?
Your Answer: (Not answered)
Correct Answer: C (The VDR must continuously record the required data; failure to record affects accident investigation)
💡 The VDR is used to reconstruct the navigation and decisions at the time of an accident and should continuously record the required data, such as position, speed, radar images, bridge audio and alarms. Failure to record key data deprives an accident investigation of its basis. It is a deficiency to be corrected.
✗
Question 73. What does SOLAS require for electrical equipment used in hazardous areas of machinery spaces?
Your Answer: (Not answered)
Correct Answer: C (It must be of a type protected against the hazard appropriate to that area)
💡 SOLAS II-1 requires electrical equipment in machinery spaces and other hazardous areas to be of a type protected against the particular hazard, so as to prevent ignition.
✗
Question 74. What is the purpose of the automatic closing and hold-back release arrangements of fire doors?
Your Answer: (Not answered)
Correct Answer: D (To enable the doors to be held open for passage in normal service and to close automatically on a fire alarm to maintain the fire division)
💡 Under SOLAS II-2/9 fire doors required to be self-closing should be fitted with automatic closing arrangements and, where necessary, hold-back release arrangements that release the door on detection of a fire. The door may be held open in normal service for passage and ventilation and closes automatically on a fire alarm to maintain the fire division. The arrangements should be tested regularly.
✗
Question 75. Cargo ships shall be provided with survival craft having a capacity for:
Your Answer: (Not answered)
Correct Answer: D (100% of the total number of persons on board)
💡 SOLAS III/31 requires cargo ships to be provided with survival craft for 100% of the total number of persons on board.
✗
Question 76. Who uses and keeps the stowage plan of dangerous goods on board?
Your Answer: (Not answered)
Correct Answer: A (The master and the officer responsible for cargo work, kept as required for emergencies and inspection)
💡 SOLAS VII requires the manifest or stowage plan of dangerous goods to be available to the master and the officer responsible for cargo operations, for segregation, emergency location and reporting, and to be retained for the voyage for inspection by PSC and by emergency services. Keeping it only ashore or being unable to produce it when needed does not comply.
✗
Question 77. Speed and distance measuring equipment shall provide the bridge with:
Your Answer: (Not answered)
Correct Answer: C (speed and distance information over the ground)
💡 SOLAS V/19 requires speed and distance measuring equipment providing speed and distance over the ground.
✗
Question 78. After collision damage affecting safety, which survey shall be carried out?
Your Answer: (Not answered)
Correct Answer: A (Additional survey)
💡 An additional survey shall be carried out after damage affecting safety.
✗
Question 79. What principle governs the selection of electrical equipment within the cargo area of a tanker?
Your Answer: (Not answered)
Correct Answer: D (Equipment of an explosion-protected type appropriate to the hazard level of the area must be used)
💡 SOLAS II-2 requires electrical equipment in hazardous areas of a tanker to be of an explosion-protected type suited to the hazard level. Ordinary equipment is not permitted even with more frequent inspection.
✗
Question 80. How should life-saving appliances other than lifeboats and liferafts be distributed?
Your Answer: (Not answered)
Correct Answer: B (One full set on board and one at the shore establishment)
💡 SOLAS III/21: the quantity shall be sufficient to provide one set for all on board and one at the shore establishment.
✗
Question 81. When the ship security level is raised from level 1 to level 2, what should be done?
Your Answer: (Not answered)
Correct Answer: D (Enhanced security measures should be applied under the approved ship security plan, such as tighter access control, surveillance and checking of persons)
💡 When the security level is raised the ship should apply enhanced security measures under the approved ship security plan, such as restricted access, closer surveillance of decks and sides, checking of persons and goods and controlling passages and lighting. The master may request a higher level for local conditions.
✗
Question 82. On what principle are portable extinguishers provided in accommodation spaces?
Your Answer: (Not answered)
Correct Answer: A (According to the arrangement of the spaces, so that an extinguisher can be reached quickly wherever a fire starts)
💡 SOLAS requires portable extinguishers distributed according to the arrangement of accommodation spaces, so that one can be reached quickly wherever a fire starts. Central stowage prevents timely attack on a fire in its early stage.
✗
Question 83. What is the relationship between the intermediate and annual surveys?
Your Answer: (Not answered)
Correct Answer: D (The intermediate survey is held on the second or third anniversary and takes the place of that annual survey, examining selected items in greater depth)
💡 SOLAS provides that the intermediate survey of the cargo ship safety equipment and safety construction certificates is held on the second or third anniversary date, replacing that annual survey and examining selected items in greater depth, such as internal structure and piping.
✗
Question 84. A Ship Security Alert System (SSAS) is intended to:
Your Answer: (Not answered)
Correct Answer: B (transmit a security alert to the competent authority indicating the ship's identity and position)
💡 SOLAS XI-2/6: a Ship Security Alert System transmits a security alert, indicating the ship's identity and position, to the competent authority.
✗
Question 85. The carriage of dangerous chemicals in bulk shall follow:
Your Answer: (Not answered)
Correct Answer: B (the International Bulk Chemical Code (IBC Code))
💡 SOLAS VII/7: the carriage of dangerous chemicals in bulk shall follow the IBC Code.
✗
Question 86. A Polar Ship Certificate shall state:
Your Answer: (Not answered)
Correct Answer: A (the ship's operational limitations in polar waters, such as ice class and temperature range)
💡 SOLAS XIV/2: a Polar Ship Certificate states the ship's operational limitations in polar waters, such as ice class and temperature range.
✗
Question 87. What must the PWOM contain regarding operational measures for polar waters?
Your Answer: (Not answered)
Correct Answer: A (Ice assessment in voyage planning, ship capability limitations, emergency procedures and training requirements)
💡 The Polar Water Operational Manual must cover voyage planning, ice assessment, the ship's ice class capabilities and limitations, operation of equipment in low temperature, emergency procedures and training, guiding the master's decisions in ice.
✗
Question 88. What must a Declaration of Security contain?
Your Answer: (Not answered)
Correct Answer: B (The responsibilities, contacts and measures of each party at the security level applicable and the procedure if it changes)
💡 The ISPS Code requires a Declaration of Security to set out the responsibilities, points of contact and measures of the ship and the port facility at the applicable security level, together with the procedure if that level changes, making the security responsibilities during the interface clear.
✗
Question 89. Before releasing a fixed gas fire-extinguishing system in a machinery space, how long shall the warning sound?
Your Answer: (Not answered)
Correct Answer: D (Not less than one minute)
💡 SOLAS II-2/10.5: a warning of not less than one minute shall be given before release to ensure personnel are clear.
✗
Question 90. What should be done about abnormal radar echoes such as false echoes?
Your Answer: (Not answered)
Correct Answer: A (Identify and eliminate them by adjusting gain or clutter controls, verifying by visual look-out)
💡 A radar may show false or indirect echoes or be affected by rain, snow and sea clutter. The officer should identify and eliminate these by adjusting the gain, clutter controls or the range scale and verify targets by visual look-out, avoiding a wrong appreciation or a missed target.
✗
Question 91. What does SOLAS V and STCW require regarding the arrangement of navigational watches?
Your Answer: (Not answered)
Correct Answer: B (Watch arrangements must ensure that personnel are not impaired by fatigue in carrying out their duties)
💡 SOLAS V/34 and STCW require watch schedules that prevent fatigue from impairing the performance of duties, with prescribed minimum rest hours. Fatigue management is continuous, not a night-time concern only.
✗
Question 92. How many two-way VHF radiotelephone sets must be provided?
Your Answer: (Not answered)
Correct Answer: D (At least three, sited on the bridge and at the survival craft positions for use on abandonment)
💡 SOLAS requires at least three two-way VHF sets, normally two on the bridge and one at a survival craft position, ensuring on-scene communication after abandonment.
✗
Question 93. The function of a 406 MHz EPIRB is to:
Your Answer: (Not answered)
Correct Answer: A (transmit a distress alert via satellite with identification and position)
💡 SOLAS IV/7: a 406 MHz satellite EPIRB transmits a distress alert, with identification and position, via the COSPAS-SARSAT system.
✗
Question 94. What must be checked on board when loading containers under SOLAS and the CSS Code?
Your Answer: (Not answered)
Correct Answer: D (The weight, position and securing of containers, preventing structural damage or securing failure from overweight boxes)
💡 SOLAS VI/2 requires the declared weight of containers to be verified against actual weight and securing carried out in accordance with the securing manual. Overweight boxes or improper securing cause structural damage and loss of cargo overboard.
✗
Question 95. What does SOLAS address regarding SART batteries and testing?
Your Answer: (Not answered)
Correct Answer: D (Periodic testing and checking of battery expiry, ensuring the prescribed standby and operating time)
💡 SOLAS requires periodic testing of the SART and checking of its battery condition and expiry, ensuring the prescribed standby and operating periods. An unsuitable battery means the searching radar cannot detect the survival craft.
✗
Question 96. What fire precautions are required before bunkering?
Your Answer: (Not answered)
Correct Answer: A (Confirm firefighting equipment in place, close relevant openings, clear deck of oil and establish communication with the barge)
💡 Before bunkering, firefighting equipment such as extinguishers, hoses and absorbents should be in place, openings through which oil could enter should be closed and the deck kept free of oil, with communication and an agreed emergency stop arranged with the supplier, preventing overflow and fire.
✗
Question 97. What does SOLAS require regarding operating instructions and illustrations for life-saving appliances?
Your Answer: (Not answered)
Correct Answer: C (Instructions and illustrations posted at the survival craft in the working language of the ship or English)
💡 SOLAS requires operating instructions and clear illustrations, such as the steps for lowering, releasing and starting the engine, to be posted at the survival craft in the working language of the ship or in English, so that the crew can act quickly from the diagram in an emergency.
✗
Question 98. With regard to manoeuvring indications on the bridge:
Your Answer: (Not answered)
Correct Answer: A (propeller speed and direction of rotation shall be indicated on the bridge)
💡 SOLAS V/19 requires propeller speed and direction of rotation to be indicated on the bridge.
✗
Question 99. What is the safety significance of spare parts management?
Your Answer: (Not answered)
Correct Answer: D (Essential parts must be carried for critical equipment so that failures can be repaired promptly without affecting safety)
💡 Carrying spares for critical safety equipment, such as parts for fire pumps, wearing components of the emergency generator and steering gear and items of life-saving equipment, enables failures to be repaired promptly, avoiding the ship remaining in a deficient state for a long time while spares are awaited, which would affect her safety.
✗
Question 100. If more than the specified proportion of the crew of a cargo ship is changed, when should abandon-ship and fire drills be held?
Your Answer: (Not answered)
Correct Answer: C (Within 24 hours after leaving port if more than 25 per cent of the crew has changed)
💡 Under SOLAS III/19, if more than twenty-five per cent of the crew has been changed, abandon-ship and fire drills should be held within twenty-four hours after the ship leaves port. This ensures that newly joined crew quickly become familiar with their emergency duties without waiting for the routine monthly drill.