Answer Review
✗
Question 1. What does the system require of maintenance records?
Your Answer: (Not answered)
Correct Answer: C (true, timely, traceable and matched to the planned maintenance system)
💡 Records must be true, timely and linked to planned maintenance, building history for assessment and survey.
✗
Question 2. Materials and spares delivered by the agent should be?
Your Answer: (Not answered)
Correct Answer: D (check each item's description, specification and quantity and sign with records)
💡 Verify specifications against the request, count and inspect before signing; this prevents wrong or missing items.
✗
Question 3. A crew member is found missing while at sea; the first action is?
Your Answer: (Not answered)
Correct Answer: B (turn back to search, sound the alarm and alert VTS and nearby ships)
💡 Alter course to search, sound the alarm, alert VTS and nearby ships and mark the position with lifebuoys.
✗
Question 4. The buffer when commercial pressure reaches the ship is?
Your Answer: (Not answered)
Correct Answer: D (a clear master's safety veto backed by company support)
💡 Publicly grant the master a safety veto with a no-reprisal pledge so he is backed by policy, not alone.
✗
Question 5. What is the correct handling of electrical equipment after damp ingress?
Your Answer: (Not answered)
Correct Answer: C (isolate, dry it out and confirm insulation before use)
💡 Dry and megger-test before returning to service; energising damp equipment causes short circuits or breakdown.
✗
Question 6. The purpose of redundancy for critical equipment is?
Your Answer: (Not answered)
Correct Answer: D (maintain essential safety functions when one item fails)
💡 Redundancy such as dual steering pumps and emergency power prevents loss of control from a single failure.
✗
Question 7. The correct way for a master to handle crew misconduct is?
Your Answer: (Not answered)
Correct Answer: A (handle fairly per the rules, explain and keep records)
💡 Apply company rules fairly with facts, explain for education and record fully, avoiding arbitrariness.
✗
Question 8. Liability for oil pollution damage is generally handled on which principle?
Your Answer: (Not answered)
Correct Answer: C (strict liability with compulsory insurance and direct action against the insurer)
💡 Under CLC the shipowner bears strict liability with compulsory financial security and direct action against insurers.
✗
Question 9. The value of analysing deficiency distribution is?
Your Answer: (Not answered)
Correct Answer: D (identify recurring systems and port patterns to target resources)
💡 Statistics by system, ship type, trade and port reveal weak points and risk hotspots guiding training and preparation.
✗
Question 10. Company communication with crew about an incident should?
Your Answer: (Not answered)
Correct Answer: B (transparent, timely with follow-up actions to maintain trust)
💡 Brief the crew transparently on developments and safeguards to prevent rumours and preserve trust.
✗
Question 11. The typical sign of normalization of deviance is?
Your Answer: (Not answered)
Correct Answer: C (shortcuts gradually accepted as normal)
💡 Normalization of deviance is when small, uncorrected shortcuts become accepted routine, breeding major risk.
✗
Question 12. Tracking of survey conditions and recommendations should be?
Your Answer: (Not answered)
Correct Answer: D (entered in the SMS register, met by deadline with evidence retained)
💡 Log conditions with deadlines and owners and keep completion evidence so certification is not endangered.
✗
Question 13. If an audit finds documents inconsistent with practice, it is?
Your Answer: (Not answered)
Correct Answer: A (a system non-conformity requiring document revision or changed practice)
💡 A written-versus-practice gap is a classic system defect; revise the document or the practice and verify they match.
✗
Question 14. What mainly causes uneven load among mooring lines?
Your Answer: (Not answered)
Correct Answer: C (different material and length with no timely adjustment)
💡 Different elongation means uneven load; adjust and monitor to stop one line taking all the strain.
✗
Question 15. What is the focus when checking certificates and survey status on handover?
Your Answer: (Not answered)
Correct Answer: D (validity, conditions of class and outstanding items being clear)
💡 Check validity, conditions of class and outstanding survey items and plan accordingly.
✗
Question 16. After a collision, besides damage control, also?
Your Answer: (Not answered)
Correct Answer: D (assess the other vessel and casualties/pollution, send appropriate distress/report)
💡 Collisions involve mutual aid and liability; assess fully and report.
✗
Question 17. A "substandard ship" is often judged by?
Your Answer: (Not answered)
Correct Answer: B (multiple defects plus poor upkeep and SMS failure)
💡 Substandard status is the combination of defects, poor upkeep and failed SMS, not age alone.
✗
Question 18. The STCW minimum rest requirement for seafarers is?
Your Answer: (Not answered)
Correct Answer: B (not less than 10 hours in any 24h, and not less than 77 hours in 7 days)
💡 Rest prevents fatigue: ≥10h/24h (≤2 periods, one ≥6h), ≥77h/7days.
✗
Question 19. When carrying deck cargo, the key considerations are?
Your Answer: (Not answered)
Correct Answer: C (control weight/height within limits, keep visibility and stability, lash securely)
💡 Limit height/weight, protect visibility and stability, lash per manual and re-check during voyage.
✗
Question 20. The reporting chain for a security threat is?
Your Answer: (Not answered)
Correct Answer: A (watchkeeper, SSO, master, CSO and shore authorities)
💡 Escalate to SSO and master, who reports company and coastal authorities while applying SSP measures.
✗
Question 21. During bunkering the supplier unilaterally raises the quantity figure; you should?
Your Answer: (Not answered)
Correct Answer: D (check own sounding and note reservations on the document)
💡 Reconcile against own soundings, annotate the BDN with reservations, report the company and seal samples.
✗
Question 22. The key protection for hot work environments on board is?
Your Answer: (Not answered)
Correct Answer: C (hydration, cooling, job rotation and monitoring condition)
💡 Provide water and electrolytes, shorten shifts, improve ventilation and watch for heat exhaustion signs.
✗
Question 23. When using an electronic document management system, the key control is?
Your Answer: (Not answered)
Correct Answer: A (access rights, change audit trail, backup and loss prevention)
💡 Electronic control needs access, audit trail and backup; otherwise it is less controllable than paper.
✗
Question 24. The precondition for unattended machinery space (UMS) operation is?
Your Answer: (Not answered)
Correct Answer: A (comprehensive alarms, reliable standby power and the engineer on call)
💡 UMS requires approved alarms to public spaces and cabins, reliable auto standby and an engineer available at call.
✗
Question 25. What risks does protection and indemnity cover mainly?
Your Answer: (Not answered)
Correct Answer: B (liability to third parties such as injury, pollution and cargo claims)
💡 P and I covers third party liabilities including injury, pollution, cargo claims and fines, complementing hull cover.
✗
Question 26. Where should the SMC be kept?
Your Answer: (Not answered)
Correct Answer: D (kept on board for inspection, displayed or in the certificate file)
💡 The SMC must be on board (or a valid copy) with the DOC copy for inspection.
✗
Question 27. The effect of fatigue on night watchkeeping is?
Your Answer: (Not answered)
Correct Answer: A (lowers alertness, slows reaction and causes missed targets)
💡 Circadian rhythms make pre-dawn the lowest alertness; counter with rotation, movement, lighting and cross-checks.
✗
Question 28. A common management cause of excessive bilge water is?
Your Answer: (Not answered)
Correct Answer: B (unrepaired leaks with oil entering the bilge)
💡 Excess bilge usually comes from long-unrepaired leaks; fix the root cause through defect and maintenance systems.
✗
Question 29. Which is NOT the priority order of risk control measures?
Your Answer: (Not answered)
Correct Answer: B (personal protective equipment first)
💡 Control priority runs elimination, substitution and engineering, then administrative, with PPE the last resort.
✗
Question 30. Before berthing, the tug plan should specify?
Your Answer: (Not answered)
Correct Answer: B (number, power, made-fast positions and working signals)
💡 The plan fixes number, bollard pull, positions and signals, agreed by master, pilot and tugs.
✗
Question 31. What follows from delaying necessary repairs to save money?
Your Answer: (Not answered)
Correct Answer: D (the fault grows, causing higher repair cost and safety risk)
💡 Delaying turns small defects into failures or accidents, costing far more and risking detention.
✗
Question 32. The basic principle of Annex I on oil discharge is?
Your Answer: (Not answered)
Correct Answer: C (prohibited except under strict conditions on content, area and equipment)
💡 Discharge is banned except narrow cases such as compliant machinery bilge water underway outside special areas.
✗
Question 33. The common risk of schedule-driven haste is?
Your Answer: (Not answered)
Correct Answer: A (sacrificing safety margins causing aggressive handling and violations)
💡 Schedule pressure induces speeding, skipped checklists and deferred maintenance; contain it with explicit rules.
✗
Question 34. Who should be reported to when fuel quality is disputed after bunkering?
Your Answer: (Not answered)
Correct Answer: D (company, supplier and P&I club, retaining samples and documents)
💡 Report to company, supplier and club while preserving samples, bunker notes and measurements as evidence.
✗
Question 35. The purpose of a toolbox talk before high-risk work is?
Your Answer: (Not answered)
Correct Answer: D (brief risks, roles and emergency measures and confirm understanding)
💡 A short briefing clarifies hazards, duties, protection and emergency steps for all at low cost and high value.
✗
Question 36. Why is garbage sorted on board?
Your Answer: (Not answered)
Correct Answer: D (to enable lawful handling and shore reception and cut illegal discharge risk)
💡 Sorting is the prerequisite for lawful handling, letting each category follow its rule and cutting mis-discharge risk.
✗
Question 37. Discovering the chart lacks recent danger notices while at sea; you should?
Your Answer: (Not answered)
Correct Answer: D (check the latest notices, mark the danger and amend the route to avoid it)
💡 Uncorrected danger data invalidates the route; check current notices, mark the chart and divert if needed.
✗
Question 38. The ship is tidied before an inspection. What is that for?
Your Answer: (Not answered)
Correct Answer: D (slippery appearance invites a deeper inspection, and the first impression counts)
💡 Rusted plating, rope coiled anyhow, passages blocked, engine-room floor plates still oily - the officer reads management out of that and moves from sampling to digging: maintenance records called for, a demonstration on the spot, a look at wastage below. A ship that is tidy, correctly marked and clear in her passages generally gets the normal scope. Tidying is therefore not for the photograph; it is about not handing the inspector the depth of his inspection at the start. These items are themselves safety requirements - passages, lighting, handrails, escape routes - so straightening them sweeps out hazards at the same time.
✗
Question 39. What is the purpose of cross-checking on board?
Your Answer: (Not answered)
Correct Answer: B (reducing single-person error through independent second checks)
💡 Cross-checking catches errors before they have consequences, a proven defence on the bridge and in the engine room.
✗
Question 40. The difference between records and documents in the SMS?
Your Answer: (Not answered)
Correct Answer: A (documents prescribe actions, records evidence them, traceable and unalterable)
💡 Documents tell how; records prove what was done—they must be genuine, timely and traceable.
✗
Question 41. Which of the following is NOT a typical SMS performance KPI?
Your Answer: (Not answered)
Correct Answer: C (bunker price market fluctuation)
💡 SMS KPIs track safety/pollution performance. Bunker price fluctuation is a commercial cost, not a safety KPI.
✗
Question 42. Who normally owns the survey expiry alert?
Your Answer: (Not answered)
Correct Answer: A (shared by the company SMS owner and the master)
💡 The company keeps the register and books surveys; the master tracks validity and reminds the company.
✗
Question 43. Which is NOT an input to management review?
Your Answer: (Not answered)
Correct Answer: A (crew members' private family matters)
💡 Inputs concern system performance and risk such as audits, accident analysis and compliance data, not private matters.
✗
Question 44. Why keep the bell book properly?
Your Answer: (Not answered)
Correct Answer: C (it keeps the orders and their times in sequence, so the manoeuvre can be rebuilt afterwards)
💡 The bell book fixes each order and its response time in sequence. An investigation into a collision, grounding, loss of control or main-engine failure has to answer when the order was given, when it was answered and what happened in between; the entries are cross-checked against the deck log and the voyage data recorder, and that is what makes them objective evidence. Blurred handwriting, gaps in the sequence or entries added after the event cost the record its weight. Fuel figures, handover signatures and maintenance planning are by-products, not the reason the book is kept.
✗
Question 45. What distinguishes a special operation from a critical one?
Your Answer: (Not answered)
Correct Answer: A (an error shows no consequence at the moment; the harm accumulates out of sight)
💡 Both kinds have to be written up; they differ in when the consequence arrives. In a critical operation - anchoring and mooring, port entry and departure, bunkering, cargo lashing, enclosed-space entry - a mistake does its damage at once. In a special operation - structure and corrosion maintenance, spare gear and repairs, training and familiarisation, periodic testing of equipment - the ship keeps running and the cargo keeps flowing, and the fault shows up months later as a crack, wastage or a failure on demand. Because the result is not immediate, this is the work most likely to be squeezed, deferred and back-dated, which is exactly why the system asks for a plan, an owner, records and verification by the master and the shore, not repair after the fact.
✗
Question 46. A common corrective measure for asymmetric flooding is?
Your Answer: (Not answered)
Correct Answer: C (counter-flood symmetrically to reduce heel)
💡 Counter-flooding on the opposite side reduces heel but must respect stability and strength, not sacrifice buoyancy.
✗
Question 47. Shore technical support to the ship should show in?
Your Answer: (Not answered)
Correct Answer: A (timely advice, repair plans and spares, tracking defect closure)
💡 Shore technical backing keeps equipment reliable.
✗
Question 48. When reality forces deviation from a written procedure, one should?
Your Answer: (Not answered)
Correct Answer: C (deviate temporarily if safe, record and review afterwards)
💡 Controlled deviation must be recorded and reviewed—flexible yet disciplined.
✗
Question 49. Alternatives when ship-shore communication is lost are?
Your Answer: (Not answered)
Correct Answer: D (use backup satellite, MF/HF or relay through another ship or coast station)
💡 Fall back to backup satellite or MF/HF, or relay via other ships and coast stations so contact is never lost.
✗
Question 50. The consequence of refusing a PSCO boarding is?
Your Answer: (Not answered)
Correct Answer: C (may be treated as refusal of inspection leading to detention or denial of entry)
💡 Refusal usually brings denial of entry or detention; cooperation within safety limits is always correct.
✗
Question 51. Route monitoring alarm settings should consider?
Your Answer: (Not answered)
Correct Answer: A (deviation limits matched to leg risk, water width and ship handling)
💡 Set per leg: tight in narrow channels, wider offshore, avoiding nuisance alarms or loss of protection.
✗
Question 52. Overconfidence in collision avoidance often shows as?
Your Answer: (Not answered)
Correct Answer: A (premature "safe" call, late avoidance, trusting experience over rules)
💡 Experience over rules is a common trap for veteran casualties.
✗
Question 53. Controlling loading rate and tank allocation during loading mainly aims to?
Your Answer: (Not answered)
Correct Answer: C (limit structural stress, free surface, static and overflow)
💡 Control rate and sequence to manage stress, free surface and overflow risks.
✗
Question 54. The difference between safety observation and safety audit is?
Your Answer: (Not answered)
Correct Answer: B (observation targets daily behaviour with immediate feedback; audit targets conformity)
💡 Observation is routine peer or supervisor feedback; audit is planned verification of conformity and effectiveness.
✗
Question 55. The role of Vessel Traffic Services is?
Your Answer: (Not answered)
Correct Answer: C (provide traffic information and advice, assisting but not relieving the master)
💡 VTS gives information and coordination advice, but command and decisions remain with the master.
✗
Question 56. The basis for judging substantial corrosion in a gauging report is?
Your Answer: (Not answered)
Correct Answer: A (wastage percentage against original thickness beyond the allowed limit)
💡 It is the percentage loss against original thickness versus allowable limits; excessive items must be renewed.
✗
Question 57. If PSC finds the Company's Designated Person (DPA) unreachable 24/7, this is?
Your Answer: (Not answered)
Correct Answer: D (a major non-conformity: the ship-shore emergency link is broken)
💡 The DPA is the ship-shore hub; unreachability breaks emergency support—a major non-conformity.
✗
Question 58. Under ISPS, the CSO, SSO and PFSO respectively are?
Your Answer: (Not answered)
Correct Answer: B (the security responsible persons at Company, ship and port-facility levels)
💡 Each owns security at Company, ship and port; they coordinate across the interface.
✗
Question 59. When a charterer complains of delay, the master should first?
Your Answer: (Not answered)
Correct Answer: A (verify facts and timeline, report to owners with objective records)
💡 Build a factual timeline from logs, clarify causes and report to owners without assigning liability on the spot.
✗
Question 60. How does free surface affect GM (metacentric height)?
Your Answer: (Not answered)
Correct Answer: A (liquid shifting reduces effective GM and stability)
💡 Slack tanks let liquid shift, reducing effective GM; keep tanks full or empty to limit effects.
✗
Question 61. What is the cycle of continual improvement?
Your Answer: (Not answered)
Correct Answer: A (plan, do, check, act and repeat with rising performance)
💡 Improvement follows plan, do, check, act, each round lifting performance.
✗
Question 62. Which is NOT a purpose of the ship's technical files?
Your Answer: (Not answered)
Correct Answer: B (replacing on-scene inspection and judgement)
💡 Technical files support decisions but never replace on-scene inspection and professional judgement.
✗
Question 63. When KPIs look good yet accidents still occur, it indicates?
Your Answer: (Not answered)
Correct Answer: D (the metrics miss real risk or data quality is poor)
💡 Divergence means wrong measures, poor definitions or false reporting; audit the data chain and relevance.
✗
Question 64. What is the purpose of the ship-shore safety checklist?
Your Answer: (Not answered)
Correct Answer: A (confirm both sides' safety conditions item by item and agree responsibilities)
💡 The checklist confirms each safety item and is signed by both parties, creating shared understanding and clear responsibilities.
✗
Question 65. The IMO Assembly resolution that adopted the ISM Code is?
Your Answer: (Not answered)
Correct Answer: B (A.741(18))
💡 The ISM Code was adopted by IMO Assembly resolution A.741(18).
✗
Question 66. To test real capability, drills should occasionally?
Your Answer: (Not answered)
Correct Answer: A (be unannounced with injected variables to test improvisation)
💡 Surprise drills expose plan gaps and real skill—an improvement chance.
✗
Question 67. What is the maintenance focus for windlass brakes and chain stoppers?
Your Answer: (Not answered)
Correct Answer: A (holding power and structural integrity, tested periodically with records)
💡 Brakes and stoppers hold the cable; test holding power and structure regularly or anchors may be lost.
✗
Question 68. Are technical management and ship energy efficiency the same thing?
Your Answer: (Not answered)
Correct Answer: C (hull and propeller condition and the engine's state set the baseline; neglect cancels saving)
💡 The efficiency figure is computed from the technical state the ship is in: hull condition and the antifouling, the propeller's finish and geometry, the engine's injection and turbocharger state, shaft load and waste-heat use together fix how much fuel a given speed costs. Fouling and roughness under the water, pitted blades, dirty scavenge spaces and poor injectors eat back what slow steaming, route optimisation and add-on devices have saved. Technical management is therefore the base work under energy efficiency, and the efficiency monitoring points back at the plant: fuel and speed logged per voyage, condition assessed, cleaning intervals planned, and an anomaly chased in the equipment before it is chased in the numbers.
✗
Question 69. Who carries out the management review of the system, and on what?
Your Answer: (Not answered)
Correct Answer: C (top management of the company, at planned intervals, on whether the system suits, covers enough and works)
💡 It sits at the level of top management and runs at planned intervals, commonly yearly, not when something has gone wrong. What feeds it is already listed: the findings of internal and external audit, the investigation of casualties and near misses, the count and clearance of non-conformities, what the ships themselves have raised, the weaknesses shown by drills, new demands from the authority or from charterers, and what came of the last review. What comes out is not a line that the system works well but a conclusion on three questions - does it suit the business, does it cover enough, does it actually work - together with the resources to be spent and the documents to be changed, and those conclusions must be traceable down to the deck, where the master and crew are to know what of their part moved. To write it as the master's monthly report, or as paperwork for an audit, pushes the top level's own duty downward.
✗
Question 70. What is the purpose of the master's standing orders?
Your Answer: (Not answered)
Correct Answer: B (state the limits to observe and when to call the master)
💡 Standing orders fix the master's limits for watchkeepers, above all when to call him and what is forbidden.
✗
Question 71. At sea the rudder angle indicator disagrees with the actual angle; what applies?
Your Answer: (Not answered)
Correct Answer: A (change to emergency steering, report and manage it as a system defect)
💡 A false rudder indicator undermines handling; change to emergency steering, report and manage as a defect until fixed.
✗
Question 72. Which ships must carry the oil pollution emergency plan?
Your Answer: (Not answered)
Correct Answer: A (oil tankers of 150 gross tonnage and upwards, other ships of 400 gross tonnage and upwards)
💡 Under Annex I an oil tanker of 150 gross tonnage and upwards and any other ship of 400 gross tonnage and upwards must have the plan on board, controlled as part of the safety management system - the copy that matters is the one that can be picked up at once, not the one held ashore. Its reporting procedures, contacts, equipment and the standing of who does what have to agree with the ship as she is, and are drilled, with what the drill exposes going back into the document. It must also join up with the pollution cover and the reporting demands of the coastal state, or in a real spill it is only read aloud.
✗
Question 73. Alongside, the ship keeps moving off the berth; you should?
Your Answer: (Not answered)
Correct Answer: B (check line tension and fenders, adjust and inform the terminal)
💡 Usually slack lines or rising wind: adjust lines and fenders, add lines if needed and tell the terminal.
✗
Question 74. The purpose of a draft survey is to?
Your Answer: (Not answered)
Correct Answer: B (compute loaded weight from draught corrected for density)
💡 It reads draughts, measures water density and corrects for trim to derive the loaded quantity.
✗
Question 75. The typical validity of an SMC is?
Your Answer: (Not answered)
Correct Answer: A (five years, with at least one intermediate audit)
💡 An SMC is valid five years subject to an intermediate audit; lapses affect trading.
✗
Question 76. NOx emission control mainly targets?
Your Answer: (Not answered)
Correct Answer: B (diesel engines limited by Tier levels for NOx)
💡 Annex VI sets Tier I/II/III NOx limits for marine diesels, with Tier III in NOx ECAs.
✗
Question 77. The SMS education on crew health and safety awareness should?
Your Answer: (Not answered)
Correct Answer: A (be regular, covering diet, rest, protection and stress coping)
💡 Health education builds self-care—prevention first.
✗
Question 78. Ship-to-shore communications have failed. In what order is contact restored?
Your Answer: (Not answered)
Correct Answer: B (work through the alternate links and shore stations in order, then the agent, the association and the flag)
💡 The response works down the list of standbys: if the primary system is dead, go to another satellite service, to high frequency or to a coast station, relay through VHF with a neighbouring ship or shore station, and if that fails use the port agent, the shipowner's association, the flag administration or the rescue co-ordination centre - recording each attempt with its time, channel, correspondent and result. What has to survive an emergency is the ability to give a position and to ask for help, so the standbys are tested at intervals and their accounts and credit kept live. Waiting for the link to return, or filing the report after the event, leaves the ship out of contact for that period; a private telephone is neither reliable nor in the procedure, and proves nothing afterwards.
✗
Question 79. Emergency equipment (fire, life-saving, comms) should be?
Your Answer: (Not answered)
Correct Answer: C (clearly located, periodically tested, always ready)
💡 Gear must be findable, usable and tested—preconditions for response.
✗
Question 80. The principle of ventilation control at a fire is?
Your Answer: (Not answered)
Correct Answer: B (cut air supply then controlled smoke removal when required)
💡 Close vents and doors to limit oxygen, then ventilate in order; indiscriminate opening feeds the fire.
✗
Question 81. Regarding the stevedoring programme arranged by the agent, the master should?
Your Answer: (Not answered)
Correct Answer: A (review effects on stability, strength and draught, requesting changes if needed)
💡 Loading sequence affects stress and stability, so review it and stop work that threatens safety, informing the company.
✗
Question 82. Speed control when berthing normally requires?
Your Answer: (Not answered)
Correct Answer: C (very low speed with braking available, tugs assisting as needed)
💡 Berth with minimal speed and braking capability retained to avoid damage to berth or ships.
✗
Question 83. The SMS requirement for GMDSS radio watch is?
Your Answer: (Not answered)
Correct Answer: B (maintain watch per rules, ensuring distress comms)
💡 Radio watch is the distress lifeline; continuous and compliant.
✗
Question 84. After fitting an exhaust gas cleaning system, what should be watched?
Your Answer: (Not answered)
Correct Answer: B (discharge compliance of wash water, sludge disposal and operating records)
💡 Open systems face wash water limits and local bans, closed ones sludge handling; keep records and watch local rules.
✗
Question 85. The strongest expression of shore-side safety commitment is?
Your Answer: (Not answered)
Correct Answer: A (prioritize safety over cost when they conflict and deliver resources)
💡 Commitment shows when safety beats schedule and cost, backed by real resources rather than slogans.
✗
Question 86. To reduce human error, the SMS emphasises?
Your Answer: (Not answered)
Correct Answer: C (standard procedures, adequate rest, clear communication, just (non-punitive) reporting)
💡 Human-factor management is systemic, not individual; a just culture surfaces hazards.
✗
Question 87. The master's safety attitude affects the crew by?
Your Answer: (Not answered)
Correct Answer: A (leading by example; the master sets the safety-culture tone)
💡 The master sets the safety-culture tone; conduct shapes compliance.
✗
Question 88. What is the master's legal duty after the ship is detained?
Your Answer: (Not answered)
Correct Answer: D (cooperate with rectification and apply for re-inspection, never sail without clearance)
💡 A detained ship must not leave; complete rectification, apply for re-inspection and inform company and flag State.
✗
Question 89. How should fault reporting and correction close the loop in PMS?
Your Answer: (Not answered)
Correct Answer: A (report, analyze, repair, verify, record to prevent recurrence)
💡 Faults go report→analyze→repair→verify→record; repeats signal PMS gaps.
✗
Question 90. A ballast tank level rises without apparent cause at sea; you should?
Your Answer: (Not answered)
Correct Answer: D (trace cross-flooding or ingress, monitor and report to assess stability)
💡 Rising level suggests valve leakage or hull ingress; find the source, monitor and compute stability, sheltering if needed.
✗
Question 91. The key role of leadership in running the SMS is?
Your Answer: (Not answered)
Correct Answer: B (lead by example, set standards, allocate resources and sustain attention)
💡 Leaders shape the SMS by example, resourcing and visible presence more than by paperwork.
✗
Question 92. When the master or key crew is temporarily absent, the SMS requires?
Your Answer: (Not answered)
Correct Answer: C (a designated competent substitute with handover, no duty vacuum)
💡 Key posts need an authorised competent back-up to avoid a command gap.
✗
Question 93. Liferaft markings are unclear and the strap aged at sea; you should?
Your Answer: (Not answered)
Correct Answer: B (report the company for service at port including markings and strap)
💡 Markings and straps affect identification and release; arrange service at an approved station, monitoring meanwhile.
✗
Question 94. Meeting head-on in a narrow channel where both cannot easily keep right; what applies?
Your Answer: (Not answered)
Correct Answer: C (slow early and agree a passing arrangement by sound signals and VHF)
💡 Keep right per the rules, coordinate by VHF and whistle, and slow or let one wait to avoid a close head-on.
✗
Question 95. The first report after man overboard should emphasise?
Your Answer: (Not answered)
Correct Answer: A (last known position, time and prevailing wind, sea and current conditions)
💡 Give last known position, time and drift factors so SAR can compute drift and define the search area fast.
✗
Question 96. Company feedback to ship reports should?
Your Answer: (Not answered)
Correct Answer: A (respond promptly with clear direction or resources and follow up)
💡 The company must reply with decisions, resources and ownership; silence kills crew confidence.
✗
Question 97. Condition monitoring yields vibration, oil-sample and temperature data. How should that stand against the planned maintenance system?
Your Answer: (Not answered)
Correct Answer: B (intervals amended by what is measured: steady items extended within limits, items showing abnormality brought forward)
💡 The planned system is built on running hours and calendar dates; condition monitoring supplies the measured evidence. Metal rising in an oil sample, bearing temperature and spectrum telling of early deterioration, move work forward; long steadiness allows an extension within what the company and class accept. The two supplement rather than displace each other, and cancelling the scheduled items stakes reliability on the sensor and its alarm threshold, which can themselves fail.
✗
Question 98. Why is a ship-shore communications arrangement agreed before tanker operations begin?
Your Answer: (Not answered)
Correct Answer: A (both sides working to one set of calls and emergency stop signals so that a fault halts the pumps at once)
💡 The checklist completed before cargo work begins asks how the two sides will talk: which watches are kept, on which channel or by which signals, who may trigger an emergency stop and how the pumps are restarted, and who on each side is the person to reach. Arranged beforehand and tested, it lets either side halt the pumping the moment something is wrong, and the agreed way of confirming before starting again is what keeps a well-meant stop from turning into a rush. It is no substitute for the explosion-proof communication the hazardous area requires, and it is not written for an inspection or to divide liability afterwards; a channel or a watch changed without telling the other side empties the arrangement of meaning, and what was agreed belongs in the record.
✗
Question 99. What does sediment management in ballast tanks involve?
Your Answer: (Not answered)
Correct Answer: B (periodic removal and disposal per procedure to avoid spread on discharge)
💡 Sediment concentrates organisms; remove it on plan and dispose per procedure, never discharge or dump it.
✗
Question 100. How does damage stability differ from intact stability?
Your Answer: (Not answered)
Correct Answer: C (damage stability considers residual stability and floating condition after flooding)
💡 Damage stability assesses residual stability and attitude after assumed flooding, the basis of subdivision and damage control.