Exam Home Website
中文 English
0
/100
FAIL
Correct: 0/100 Total Questions: 100 Time Spent: 60min0sec
Passing: 80
Retake History
Answer Review
✗
Question 1. What is an effective measure against counterfeit marine products?
Your Answer: (Not answered)
Correct Answer: B (choose reliable suppliers and require certificates and traceable marking)
💡 Guard the supply chain: qualified suppliers, certificates and traceable marking, checked item by item on receipt.
✗
Question 2. Before entering a High Risk Area (HRA), the SSP normally requires?
Your Answer: (Not answered)
Correct Answer: A (heightened level, hardening and watches, possibly armed guards)
💡 Enhanced hardening, extra watches and citadel readiness per BMP before entering an HRA.
✗
Question 3. The correct use of the echo sounder in shallow water is?
Your Answer: (Not answered)
Correct Answer: B (combine with tide and draught for under-keel clearance and set a shallow alarm)
💡 Combine sounding with tide, draught and squat to compute clearance and set alarms; never rely on one reading.
✗
Question 4. Alternatives when ship-shore communication is lost are?
Your Answer: (Not answered)
Correct Answer: D (use backup satellite, MF/HF or relay through another ship or coast station)
💡 Fall back to backup satellite or MF/HF, or relay via other ships and coast stations so contact is never lost.
✗
Question 5. Oil is seen near the ship in port and may have come from your vessel; you should?
Your Answer: (Not answered)
Correct Answer: C (check own lines and valves, report the port and activate the spill plan)
💡 Inspect lines and bilges, report port and company, start the plan, preserve evidence and never leave port.
✗
Question 6. The ultimate onboard responsibility for implementing and supervising critical-operation instructions lies with?
Your Answer: (Not answered)
Correct Answer: B (the Master (leads SMS implementation))
💡 The Master leads SMS implementation and bears final responsibility for critical-operation compliance.
✗
Question 7. How does free surface affect GM (metacentric height)?
Your Answer: (Not answered)
Correct Answer: A (liquid shifting reduces effective GM and stability)
💡 Slack tanks let liquid shift, reducing effective GM; keep tanks full or empty to limit effects.
✗
Question 8. The purpose of the Load Line Certificate is?
Your Answer: (Not answered)
Correct Answer: A (assigns freeboard and marks to protect reserve buoyancy)
💡 It fixes freeboard and marks per zone and season to keep reserve buoyancy and prevent overloading.
✗
Question 9. What does extending corrective action fleet-wide mean?
Your Answer: (Not answered)
Correct Answer: C (extend cause checks and fixes to other ships or departments with the same risk)
💡 After fixing one case, check other ships for the same risk and act so problems do not rotate around the fleet.
✗
Question 10. Why is a ship-shore communications arrangement agreed before tanker operations begin?
Your Answer: (Not answered)
Correct Answer: A (both sides working to one set of calls and emergency stop signals so that a fault halts the pumps at once)
💡 The checklist completed before cargo work begins asks how the two sides will talk: which watches are kept, on which channel or by which signals, who may trigger an emergency stop and how the pumps are restarted, and who on each side is the person to reach. Arranged beforehand and tested, it lets either side halt the pumping the moment something is wrong, and the agreed way of confirming before starting again is what keeps a well-meant stop from turning into a rush. It is no substitute for the explosion-proof communication the hazardous area requires, and it is not written for an inspection or to divide liability afterwards; a channel or a watch changed without telling the other side empties the arrangement of meaning, and what was agreed belongs in the record.
✗
Question 11. The basic principle for reporting a major casualty to the company is?
Your Answer: (Not answered)
Correct Answer: A (immediate verbal report followed by written within the required time)
💡 Notify the company at once by phone or telex, then file the written report within the required period.
✗
Question 12. Port inspection finds the lifeboat engine will not start; you should?
Your Answer: (Not answered)
Correct Answer: C (report for repair, track as a critical defect and request re-inspection)
💡 Engine failure is critical: repair and verify before sailing with re-inspection, and inform the company.
✗
Question 13. When crew change leaves a key post vacant, the master should?
Your Answer: (Not answered)
Correct Answer: A (report the company and adjust arrangements; do not sail with the deficiency)
💡 A vacant key post is a manning deficiency: report, get qualified relief and do not sail in that condition.
✗
Question 14. The effect of squat in shallow water is?
Your Answer: (Not answered)
Correct Answer: A (greater at higher speed, possibly leaving insufficient under-keel clearance)
💡 In shallow water high speed causes squat and trim change; limit speed and allow generous clearance.
✗
Question 15. What is the effect of an open communication climate on board?
Your Answer: (Not answered)
Correct Answer: D (hazards and errors surface early and are corrected)
💡 Openness makes crew report hazards and errors so problems are found before accidents, a hallmark of safety culture.
✗
Question 16. A crew member finds a defect that does not immediately affect navigation. He should?
Your Answer: (Not answered)
Correct Answer: D (report it under the SMS and enter the corrective process, assessing if deferred repair is acceptable)
💡 Any defect must be reported and risk-assessed; controlled deferred repair is allowed with approval and monitoring.
✗
Question 17. A chart correction log should record?
Your Answer: (Not answered)
Correct Answer: A (notice number, year, date applied and who applied it)
💡 Log each notice by number, year, date and signature for traceability and accountability.
✗
Question 18. What should be done for a suspected infectious disease case?
Your Answer: (Not answered)
Correct Answer: D (isolation, reporting, protection and disinfection with notification per port rules)
💡 Isolate, protect, disinfect and notify as required to stop rapid spread in a closed ship environment.
✗
Question 19. After a blackout on the main switchboard, the first priority is?
Your Answer: (Not answered)
Correct Answer: D (restore emergency power, steering and comms then find the cause)
💡 Restore emergency power, steering and communications first, then load gradually and trace the cause.
✗
Question 20. The shared goal of technical management and the SMS is?
Your Answer: (Not answered)
Correct Answer: A (keep the ship continuously safe, seaworthy and non-polluting)
💡 Both aim at protecting life, ship and sea through reliable technical condition and disciplined management.
✗
Question 21. The correct relationship between cost control and safety is?
Your Answer: (Not answered)
Correct Answer: C (safety is the precondition; optimise cost within safety and compliance)
💡 Meet safety and legal requirements first, then cut cost within them; savings below the safety line cost more later.
✗
Question 22. The idea of reliability-centred maintenance is?
Your Answer: (Not answered)
Correct Answer: A (choose the maintenance strategy by failure consequence and mode)
💡 It picks scheduled, condition-based or run-to-failure per consequence and mode, directing resources where they matter.
✗
Question 23. Requirements for the ballast water record book are?
Your Answer: (Not answered)
Correct Answer: D (record uptake, exchange or treatment and discharge with time, position and volume)
💡 Record operations with time, coordinates, volumes and treatment per the convention alongside the plan and certificate.
✗
Question 24. What should crew training on garbage focus on?
Your Answer: (Not answered)
Correct Answer: D (sorting rules, prohibited items and recording requirements)
💡 Training must make clear what is banned, how to sort and how to record, preventing inadvertent breaches and fines.
✗
Question 25. Stowaways are found on board. What comes first?
Your Answer: (Not answered)
Correct Answer: D (controlling and isolating them under the security plan and reporting to the company, the coastal State and the next port)
💡 What the security plan says about stowaways is followed: the people are held somewhere safe where they can move freely neither to the ship's work nor to harm themselves, the ship is searched once more, the time, place, number and circumstances are written down, and the master, the company, the coastal or flag State and the authorities of the next port are told, so that identification and what follows of removal can be arranged. To pass them to another ship, to shut them in a hold, or to say nothing, spoils the position of everyone on board and the administrative process at once. The channel they came in by needs watching as well: the gangway, the moorings, cargo-space ventilators and the lookout are tightened, and the search before entering port is done again. Food, water and any medical attention go in the record too.
✗
Question 26. To judge whether the SMS operates, an auditor mainly relies on?
Your Answer: (Not answered)
Correct Answer: D (objective evidence (records, observation, interviews), not just the manual)
💡 "Write what you do, do what you write, record what you do": audit seeks operational evidence.
✗
Question 27. What should a technical condition report be?
Your Answer: (Not answered)
Correct Answer: B (objective and specific with evidence and recommendations to support shore decisions)
💡 Reports must be objective, specific and evidenced with recommendations so shore can resource and decide without distortion.
✗
Question 28. When undermanning is found, the audit should trace it to?
Your Answer: (Not answered)
Correct Answer: A (company manning policy and resourcing, a shore management duty)
💡 Undermanning usually stems from company staffing and budget decisions, so findings should point ashore.
✗
Question 29. The ISPS Code is made mandatory under which SOLAS chapter, and when did it enter force?
Your Answer: (Not answered)
Correct Answer: A (Chapter XI-2, in force 1 July 2004)
💡 The ISPS Code is mandatory under SOLAS Chapter XI-2, in force 1 July 2004.
✗
Question 30. How should repeatedly raised observations be handled?
Your Answer: (Not answered)
Correct Answer: A (escalate to a non-conformity with root cause analysis and action)
💡 Repeated observations mean prevention failed; escalate to an NC with root cause analysis and corrective action.
✗
Question 31. Fatigue management measures in the SMS include?
Your Answer: (Not answered)
Correct Answer: A (sensible watches, limit hours, ensure rest and log)
💡 The SMS limits hours, guarantees rest and logs it; fatigue is a leading human-error cause.
✗
Question 32. The role of "clear grounds" in PSC inspection is?
Your Answer: (Not answered)
Correct Answer: A (the trigger for conducting a more detailed inspection)
💡 Clear grounds such as evident disrepair or system failure justify expanding into a detailed inspection.
✗
Question 33. During bunkering a leak is found in the hose; what applies?
Your Answer: (Not answered)
Correct Answer: B (stop work, close valves and contain the leak)
💡 Stop pumping, close valves and contain; resume only with a sound hose to prevent a larger spill.
✗
Question 34. On a ship changing flag, the SMS must?
Your Answer: (Not answered)
Correct Answer: A (be re-audited and certificated by the new flag's RO; DOC matches new Company)
💡 Flag change needs new-flag audit; certificates don't auto-transfer, preventing flag-hopping.
✗
Question 35. Emergency procedures should specify communications to include?
Your Answer: (Not answered)
Correct Answer: B (internal alarms, external reporting contacts and channels)
💡 State alarm signals, mustering, reporting contacts such as company and coastal State, and the channels used.
✗
Question 36. The core of cargo records and documentation management is?
Your Answer: (Not answered)
Correct Answer: B (accurate, complete, traceable and retained with proper handover)
💡 Records, manifests, bill remarks and surveys must be accurate and retained as the evidence chain for claims.
✗
Question 37. What is the management point for shore power use?
Your Answer: (Not answered)
Correct Answer: B (confirm voltage, frequency and interface and have a changeover procedure)
💡 Shore connection needs parameter checks, a changeover and emergency procedure and trained staff to avoid blackouts.
✗
Question 38. Which part of port disbursements is most easily reduced by management?
Your Answer: (Not answered)
Correct Answer: B (costs from waiting time and extra services)
💡 Fixed taxes and basic rates leave little room; cut waiting, overtime and duplicated services instead.
✗
Question 39. What is each of them, the certificate and the two declarations?
Your Answer: (Not answered)
Correct Answer: A (the certificate proves the ship meets the conditions; Part I states the flag requirements, Part II the measures the company takes)
💡 The certificate shows the ship has been verified against the Convention; the Declaration of Maritime Labour Compliance attached to it has two parts: Part I, issued by the flag state, saying how that state has turned the requirements into national terms; Part II, written by the company, saying how they are met on this ship - hours of work recorded, rest protected, medicines and equipment managed, complaints handled. The inspector reads Part II against what is actually done, and where the two disagree that is the deficiency. The certificate runs for five years at most with an intermediate inspection, while the declaration is revised with the system documents; both are carried on board, not held at the office.
✗
Question 40. Which is NOT a purpose of internal audit?
Your Answer: (Not answered)
Correct Answer: D (assessing a bonus for the audited ship)
💡 Internal audit verifies conformity and effectiveness and finds improvements, not a bonus assessment tool.
✗
Question 41. How long should crew change documents and records be kept?
Your Answer: (Not answered)
Correct Answer: C (kept for the period set by company and law for inspection and disputes)
💡 Crew change records are evidence for inspection and disputes; keep them for the required period and retrievable.
✗
Question 42. The purpose of a toolbox talk before high-risk work is?
Your Answer: (Not answered)
Correct Answer: D (brief risks, roles and emergency measures and confirm understanding)
💡 A short briefing clarifies hazards, duties, protection and emergency steps for all at low cost and high value.
✗
Question 43. What is the basic rule for discharging oily mixtures in a special area?
Your Answer: (Not answered)
Correct Answer: D (prohibited in principle, with a narrow exception for treated low concentrations while underway)
💡 Special areas are far stricter: discharge is prohibited except under narrow conditions while underway and must be logged.
✗
Question 44. When adjusting ballast to improve stability you should?
Your Answer: (Not answered)
Correct Answer: C (compute GM and hull shear/bending within limits)
💡 Ballast changes must respect both stability and hull shear/bending limits, not just GM.
✗
Question 45. Personnel in key safety roles (helmsman, OOW) shall?
Your Answer: (Not answered)
Correct Answer: C (hold appropriate certificates and know the post's SMS instructions)
💡 Key roles require certificates of competency and familiarity with SMS instructions and emergency duties.
✗
Question 46. Audit finds crew unfamiliar with muster stations and no records exist. The most likely root cause is?
Your Answer: (Not answered)
Correct Answer: A (monthly drills and familiarization not effectively implemented)
💡 Unfamiliarity without records means drills and familiarization skipped or were formal—a training-system failure.
✗
Question 47. Before a new SMS goes live, one should arrange?
Your Answer: (Not answered)
Correct Answer: A (a trial run, training and internal audit to verify before formal use)
💡 Trial runs expose gaps before the SMS is formally enforced.
✗
Question 48. A ship's Oil Record Book does not match reality and the master admits falsification. What should the company do?
Your Answer: (Not answered)
Correct Answer: A (report to the Administration, investigate and impose corrective accountability)
💡 Falsified statutory records are serious: report, investigate root causes and correct rather than conceal.
✗
Question 49. Main sea water pump fails causing high temperature at sea; you should?
Your Answer: (Not answered)
Correct Answer: B (change to the standby pump, reduce load and investigate)
💡 Switch to standby, reduce load to cut heat, find the cause and stop if needed to prevent damage.
✗
Question 50. The proper route when disputing a detention decision is?
Your Answer: (Not answered)
Correct Answer: D (appeal to the port State authority or through the flag State)
💡 Disputes go through official appeal or the flag State; meanwhile cooperate and rectify per procedure.
✗
Question 51. Temporary and preliminary notices should be handled how?
Your Answer: (Not answered)
Correct Answer: A (pencil them in and log; act as instructed when cancelled or made permanent)
💡 T and P notices are pencilled in and logged, then erased or inked as directed on cancellation or permanence.
✗
Question 52. What is the correct company attitude toward near misses?
Your Answer: (Not answered)
Correct Answer: B (collect, analyze, share and rectify)
💡 Near misses reveal latent weaknesses; encourage reporting and act on them to prevent accidents.
✗
Question 53. The response to GNSS failure is?
Your Answer: (Not answered)
Correct Answer: A (use celestial, terrestrial, radar fixes and dead reckoning to hold position)
💡 Revert to terrestrial, radar, depth comparison and DR, logging the event and exercising manual skills.
✗
Question 54. The voyage plan should be kept on board and?
Your Answer: (Not answered)
Correct Answer: C (accessible, familiar, amended with master sign-off)
💡 Keep it accessible, ensure familiarity, and amend with master's confirmation.
✗
Question 55. During a shipyard repair period, how is SMS responsibility allocated?
Your Answer: (Not answered)
Correct Answer: A (master retains overall responsibility; yard work is under ship permits and oversight)
💡 Responsibility stays with the master; yard hot work, enclosed space and work aloft need ship permits and oversight.
✗
Question 56. Which scenario does a security drill NOT normally simulate?
Your Answer: (Not answered)
Correct Answer: A (main engine blackout response)
💡 Security drills cover deliberate threats; plant failure is a technical emergency covered by safety drills.
✗
Question 57. An internal audit should cover?
Your Answer: (Not answered)
Correct Answer: A (both shore-side management and each ship's SMS operation (sampled))
💡 Internal audit covers Company and fleet, sampled by risk and cycle.
✗
Question 58. For critical operations involving shore/third parties (bunkering, mooring), the SMS shall?
Your Answer: (Not answered)
Correct Answer: C (define interface duties, communication and safety confirmation)
💡 Interface operations need defined responsibilities, communication and safety checkpoints to avoid gaps.
✗
Question 59. The purpose of Standard Marine Communication Phrases (SMCP) is?
Your Answer: (Not answered)
Correct Answer: A (reduce VHF ambiguity through standardised English phrasing)
💡 SMCP standardises maritime English to cut ambiguity in VHF exchanges among multinational crews.
✗
Question 60. Before berthing, the steering responds sluggishly; what applies?
Your Answer: (Not answered)
Correct Answer: D (report, change to emergency steering and cancel berthing until the cause is found)
💡 Sluggish steering makes berthing highly risky; report, change to emergency steering and suspend berthing until fixed.
✗
Question 61. The most direct test of whether SMS documents are effective is?
Your Answer: (Not answered)
Correct Answer: C (whether crew follow them and behaviour matches the text)
💡 Effectiveness is behavioural: observe whether work matches documents, not whether audits passed.
✗
Question 62. The core objective of Bridge Resource Management is?
Your Answer: (Not answered)
Correct Answer: C (integrate people, equipment and information to avoid single-person error)
💡 BRM uses defined roles, communication, cross-checking and challenge to trap errors before they become casualties.
✗
Question 63. Shore management support to the ship should reflect?
Your Answer: (Not answered)
Correct Answer: B (timely technical, information and decision support for safe operation)
💡 Shore is the ship's backbone, especially in emergencies and major issues.
✗
Question 64. The most common error in crisis communication is?
Your Answer: (Not answered)
Correct Answer: A (delaying and leaving an information vacuum)
💡 Delay is the worst sin; silence reads as admission, so state known facts and actions promptly.
✗
Question 65. Before night navigation the master normally issues?
Your Answer: (Not answered)
Correct Answer: A (night orders specifying watch, collision avoidance and call requirements)
💡 Night orders convey the master's intent to officers—key responsibility handover.
✗
Question 66. Who should sign entries in the Oil Record Book?
Your Answer: (Not answered)
Correct Answer: B (the officer in charge of the operation, countersigned by the master)
💡 Each operation is recorded and signed by the officer in charge and each page is signed by the master.
✗
Question 67. What is the point of having a designated person at all?
Your Answer: (Not answered)
Correct Answer: C (a way for the master to reach past the ordinary levels when what business wants and what safety needs pull against each other)
💡 The provision sits in the elements of the system because the ship's business is driven by cargo and schedule, while a safety requirement costs money and spends a voyage, and if the matter can only travel up one level at a time the master is left alone between the two. The company is therefore to designate someone on the shore side who can reach top management directly, who is answerable for the system being worked and kept right on its ships, and who can be got at from the ship at whatever hour. The channel is not there to speed orders downwards but to give the safety side a way up that does not pass through the level that cares about the schedule: refusing to sail in an unfit condition, asking for a repair or for a change of hands, sending a hazard report, none of these going through the traffic end first. The master's responsibility has not moved to the shore - his authority and his judgement on board are stated in the Convention as before - and the designated man is neither the auditor nor a substitute for the review. Whether a company has the post in earnest can be judged by whether the master's reports reach top management by any other road, and by whose decision stands when the two pull against each other.
✗
Question 68. An auditor asks a crew member a procedure and the master answers instead. The correct assessment is?
Your Answer: (Not answered)
Correct Answer: C (the crew member lacks knowledge, a familiarisation non-conformity)
💡 Key crew must answer their own procedures; the master filling in reveals a training gap and warrants findings.
✗
Question 69. The value of equipment history files is?
Your Answer: (Not answered)
Correct Answer: B (support trend analysis, life assessment and renewal decisions)
💡 Histories reveal repeat failures and degradation rates, guiding strategy and renewal decisions.
✗
Question 70. What is the minimum the launching arrangement for lifeboats has to meet?
Your Answer: (Not answered)
Correct Answer: A (letting go safely and releasing under the adverse trim and heel the rules lay down)
💡 The arrangement has to take the boat, loaded as the rules prescribe, down the side and off the hooks with the ship in her worst expected attitude; the angles of list and trim are given in the Life-Saving Appliance Code by ship type and are not the same for passenger and cargo ships, the text in force being what governs. Release and re-setting fall to the people in the boat, with the instructions and warnings by the position. To think of the launch test as something done only upright and on calm water, or to wait for the main engines to supply power, spends the time when the ship is actually being abandoned, and a shore crane or a neighbour was never the design case. Hooks and gear are examined monthly and written up, the examination covering whether release takes place under load and in the water.
✗
Question 71. After a PSC inspector raises an SMS deficiency, the ship should normally?
Your Answer: (Not answered)
Correct Answer: B (rectify within a reasonable prescribed period and obtain verification of closure)
💡 PSC deficiencies must be rectified within a set time and verified; failure may escalate to detention.
✗
Question 72. What conditions apply to paralleling generators?
Your Answer: (Not answered)
Correct Answer: B (voltage, frequency and phase must match before paralleling)
💡 Match voltage, frequency and phase or heavy circulating current damages machines and may black out the ship.
✗
Question 73. What applies to the emergency stop signal between ship and shore?
Your Answer: (Not answered)
Correct Answer: C (agreed and confirmed beforehand so either side can stop pumps instantly)
💡 Agree and confirm the stop signal beforehand so either side can act immediately, a key spill prevention measure.
✗
Question 74. What is the quality control point for hull paint repairs?
Your Answer: (Not answered)
Correct Answer: A (surface preparation, ambient conditions and film thickness to specification)
💡 Quality depends on blast standard, temperature, humidity and dew point, and film thickness; any gap shortens coating life.
✗
Question 75. The effect of a major non-conformity on certification is?
Your Answer: (Not answered)
Correct Answer: A (failure to correct promptly may suspend or invalidate the certificate)
💡 Major NCs must be corrected at once; overdue or unverified ones can suspend or withdraw certification.
✗
Question 76. A complete set of SMS records should form?
Your Answer: (Not answered)
Correct Answer: B (a closed-loop evidence chain from plan, execution to verification)
💡 A closed loop proves the SMS truly runs—for audit and law.
✗
Question 77. In reconstructing a grounding, investigators first ask for the bell book. Its principal value lies in:
Your Answer: (Not answered)
Correct Answer: C (setting out, in time order, the engine orders from the bridge and when they were executed, so the sequence and intervals of stop and astern orders can be reconstructed)
💡 The bell book records orders and the moment they were executed; rpm, scavenge pressure and load belong to the engine room log, and fuel figures to consumption records — the first two options are the usual cross-wiring. In collision and grounding cases the interval between full ahead, stop and astern is often decisive.
✗
Question 78. MLC 2006 mainly applies to?
Your Answer: (Not answered)
Correct Answer: B (seafarers' working and living conditions aboard)
💡 MLC 2006 covers seafarers' employment, accommodation, food, health protection, medical care and welfare.
✗
Question 79. What must the passage plan settle for dense traffic and narrow water?
Your Answer: (Not answered)
Correct Answer: B (extra lookout, the engine ready, a speed settled for the water, and avoiding arrangements and the channel agreed beforehand)
💡 The plan says beforehand who will be on the bridge for that leg, how the lookout is reinforced, when the engine is made ready, how far before a turning point speed comes down, on what basis the safe speed is fixed - not copied from the figures in the article but worked from draught, traffic density, visibility and how much room the ship needs to turn - how squat and the set towards the bank are handled, on which channel the meeting with a tow or a large ship is arranged, when the pilot is called, and what would make the master give up and drop anchor instead. Keeping to the starboard side of a channel, and asking before overtaking, belong in the same plan; and the arrangement is worth a rehearsal, since paper that is not practised turns into shouting at the last moment.
✗
Question 80. Fire precautions for battery and charging rooms include?
Your Answer: (Not answered)
Correct Answer: A (well ventilated, no smoking, prevent hydrogen accumulation)
💡 Charging releases hydrogen, so ventilate mechanically, use explosion-proof fittings and avoid sparking tools.
✗
Question 81. Which about critical shipboard operations is WRONG?
Your Answer: (Not answered)
Correct Answer: A (critical operations may be set ad hoc by the watch without documentation)
💡 Critical operations must be documented and strictly followed, not improvised by the watch.
✗
Question 82. Which item must NOT be missing from a drill record?
Your Answer: (Not answered)
Correct Answer: C (date, participants, equipment used, timings and findings)
💡 Records need the scenario, participants, times, findings and actions; omissions suggest poor SMS records.
✗
Question 83. In emergencies, shipboard and ship-shore comms should be?
Your Answer: (Not answered)
Correct Answer: B (concise, confirmed by read-back, with key info recorded)
💡 Confused emergency comms cause failure; read-back and records prevent errors.
✗
Question 84. Using casualty/deficiency data to guide improvement reflects?
Your Answer: (Not answered)
Correct Answer: B (evidence-based SMS management (PDCA loop))
💡 Data is the compass for improvement; trend analysis beats firefighting.
✗
Question 85. The closed-loop relationship between training and the SMS is?
Your Answer: (Not answered)
Correct Answer: D (the SMS identifies needs, training closes gaps and results feed back improvements)
💡 System gaps become training needs and training results feed back as verification, closing the improvement loop.
✗
Question 86. What is the role of the P and I club in an incident?
Your Answer: (Not answered)
Correct Answer: A (handle claims, provide legal support and arrange security)
💡 Clubs handle claims, legal support and security, assisting with arrest, pollution and injury matters.
✗
Question 87. Who approves the loading/stowage plan?
Your Answer: (Not answered)
Correct Answer: A (master approves, chief officer prepares with terminal coordination)
💡 The chief officer prepares and the master approves it, covering stability, strength, segregation and port order.
✗
Question 88. A common cause of position offset on ECDIS is?
Your Answer: (Not answered)
Correct Answer: B (chart datum mismatch or missing antenna offset reference)
💡 Usually datum mismatch between chart and GNSS or an unconfigured antenna offset; verify both routinely.
✗
Question 89. The focus of a technical superintendent's visit is?
Your Answer: (Not answered)
Correct Answer: A (check equipment condition, maintenance and defect closure and support the ship)
💡 Superintendents review critical equipment, maintenance quality, spares and defect closure while supporting the ship.
✗
Question 90. The hidden cost of cutting maintenance budgets is?
Your Answer: (Not answered)
Correct Answer: A (higher failure and detention risk with bigger repair and off-hire losses)
💡 Deferred maintenance saves now but costs more in breakdowns, emergency repairs, detention and off-hire.
✗
Question 91. A good non-conformity report should state?
Your Answer: (Not answered)
Correct Answer: B (objective evidence, the requirement breached, nature and suggested correction)
💡 Findings are factual—evidence and basis, enabling closure.
✗
Question 92. Turning casualty lessons into SMS improvement hinges on?
Your Answer: (Not answered)
Correct Answer: A (fleet-wide circulation, procedure revision and retraining)
💡 Lessons confined to one ship waste the tuition paid in casualties.
✗
Question 93. Safety measures during pilot transfer include?
Your Answer: (Not answered)
Correct Answer: C (pilot ladder lit, lifebuoy and heaving line ready, crew attending, controlled speed and lee)
💡 Rig ladders properly, provide lighting, lifebuoy and heaving line with an attendant, keeping a lee and slow speed.
✗
Question 94. The purpose of a Ship Security Assessment (SSA) is?
Your Answer: (Not answered)
Correct Answer: A (identify security threats and vulnerabilities to underpin the plan)
💡 The SSA identifies threat scenarios and weaknesses, shaping measures in the SSP and updating as circumstances change.
✗
Question 95. What is the basic concept of general average?
Your Answer: (Not answered)
Correct Answer: D (extraordinary sacrifice or expenditure for common safety, shared by all interests)
💡 General average covers deliberate sacrifice for common safety, apportioned among ship, cargo and freight interests.
✗
Question 96. The purpose of parallel indexing is?
Your Answer: (Not answered)
Correct Answer: A (continuously detect deviation from the planned track early)
💡 Comparing radar returns to fixed reference lines reveals any off-track drift continuously.
✗
Question 97. Violent yawing at anchor from a sudden strong current; what applies?
Your Answer: (Not answered)
Correct Answer: A (veer more cable, stand by engines, report and assess whether to shift)
💡 Strong current yawing raises dragging risk; veer cable, stand by engines, report and shift or weigh anchor if needed.
✗
Question 98. The most easily detected and serious SMS deficiency at PSC is?
Your Answer: (Not answered)
Correct Answer: D (falsified drill records (logged but never performed))
💡 Forgery shows loss of control over safety; PSC sees it as integrity and system failure—often detention.
✗
Question 99. The ship has been struck and is taking water. What does damage control begin with?
Your Answer: (Not answered)
Correct Answer: A (finding which compartments are flooded and what free surface does, keeping the watertight integrity, pumping and plugging, telling the master as it happens)
💡 Damage control is a chain: which compartment is breached, how much water is in it, what the free surface has taken out of the stability; then plugging, pumping, shoring, and watching how the heel and trim develop. Every step feeds the bridge, because it is on that information that the master decides to seal, to ballast, to shift cargo or to ask for a tow, so assessing, limiting the damage and reporting run at the same moment rather than one after the other. Emptying the space is what comes after the chain has failed, and making for a port hands the decision to the speed; the chain is only as fast as the watertight doors shut, the pumps available and the damage gear ready, which is why the number reported, not only the action taken, belongs in the drill.
✗
Question 100. Discovering the chart lacks recent danger notices while at sea; you should?
Your Answer: (Not answered)
Correct Answer: D (check the latest notices, mark the danger and amend the route to avoid it)
💡 Uncorrected danger data invalidates the route; check current notices, mark the chart and divert if needed.