Question 42. A tanker is alongside with hoses connected and loading about to start. What must be jointly completed and signed by ship and shore first?
Your Answer:
(Not answered)
Correct Answer:
C (the ship/shore safety checklist, covering communication, static, lines and emergency stop)
💡 The checklist settles the conditions item by item: communication and its backup, bonding and grounding, initial restricted flow rate, venting and gas-freeing, detection, the signal and the party for an emergency stop, and readiness of fire and life-saving appliances. Each side signs for its own part; an open item is closed before loading, not signed afterwards.