Question 1. For internal combustion engines in machinery spaces, which requirement of the fuel system shall be met?
Your Answer: (Not answered)
Correct Answer: A (high-pressure fuel pipes shall be protected to prevent fuel spraying)
💡 SOLAS II-2/4 requires high-pressure fuel pipes to be protected to prevent spray of fuel onto hot surfaces or ignition.
✗
Question 2. For short international voyages, the total capacity of survival craft on passenger ships may be reduced to a minimum of:
Your Answer: (Not answered)
Correct Answer: A (50%)
💡 Reductions are permitted subject to the stated minimum proportion.
✗
Question 3. Regarding fuel oil in the Antarctic area, which is correct?
Your Answer: (Not answered)
Correct Answer: C (The use and carriage of heavy fuel oil are prohibited)
💡 MARPOL/SOLAS prohibit the use and carriage of heavy fuel oil in the Antarctic area.
✗
Question 4. In addition to one per person, passenger ships shall carry:
Your Answer: (Not answered)
Correct Answer: A (an additional appropriate number of lifejackets for watchkeeping and other personnel)
💡 SOLAS III/7 requires passenger ships to carry additional lifejackets for watchkeeping personnel and those at muster stations.
✗
Question 5. Which aspects must the ship's electrical system be protected against under SOLAS?
Your Answer: (Not answered)
Correct Answer: D (Short circuit, overload and earth fault, preventing electrical fire and equipment damage)
💡 SOLAS requires protection against short circuit, overload and earth fault to prevent electrical fire, equipment damage and electric shock. A single type of protection is not enough.
✗
Question 6. The function of a hydrostatic release unit for a liferaft is to:
Your Answer: (Not answered)
Correct Answer: B (release the liferaft automatically when the ship sinks to a certain depth)
💡 SOLAS III/13 requires a hydrostatic release unit to release the liferaft automatically when the ship sinks.
✗
Question 7. What safety is required in operating ballast system valves?
Your Answer: (Not answered)
Correct Answer: B (Valves clearly identified and operated in order, preventing misoperation causing cross-connection or cargo contamination)
💡 SOLAS and good practice require the valves of the ballast and bilge systems to be clearly identified and operated in a proper sequence, normally following the ballast plan, preventing an inadvertent opening from cross-connecting ballast and cargo tanks, contaminating cargo or causing a sudden change in stability.
✗
Question 8. Why does SOLAS V/19.2.2 require a heading repeater at the steering position?
Your Answer: (Not answered)
Correct Answer: D (So that the helmsman can read the heading without leaving the steering position)
💡 SOLAS requires a heading repeater at the steering position so the helmsman can read the heading directly without leaving his station.
✗
Question 9. The bow structure requirements for bulk carriers mainly address:
Your Answer: (Not answered)
Correct Answer: B (carriage of high-density solid bulk cargoes such as ore)
💡 SOLAS XII/9: the bow structure requirements address the carriage of high-density solid bulk cargoes such as ore.
✗
Question 10. Passenger ships of 4 000 GT and above shall be provided with at least how many independently driven fire pumps?
Your Answer: (Not answered)
Correct Answer: B (3)
💡 SOLAS II-2/10 requires at least three independently driven fire pumps for passenger ships of 4 000 GT and above.
✗
Question 11. What approval does the ship security plan require?
Your Answer: (Not answered)
Correct Answer: C (Approval by the Administration or a recognised security organisation authorised by it, and implementation within the approved scope)
💡 ISPS Code Part A/8 requires the ship security plan to be approved by the Administration or a recognised security organisation authorised by it and implemented within that approval. Neither the company, the master nor the port facility has approval authority.
✗
Question 12. What problem may an excessive initial metacentric height cause?
Your Answer: (Not answered)
Correct Answer: C (A short rolling period and violent rolling, which may shift cargo or injure personnel)
💡 An excessive initial metacentric height produces a short rolling period and violent rolling, a stiff ship, which can shift cargo and equipment, injure personnel and increase structural stresses. More stability is not always better; it should be within a reasonable range.
✗
Question 13. Under the ISM Code, the company shall designate person(s) (DPA) to be responsible for:
Your Answer: (Not answered)
Correct Answer: C (linking the company with the ship on safety and pollution prevention matters)
💡 SOLAS IX/6: the company shall designate person(s) (DPA) to link the company with the ship on safety and pollution prevention matters.
✗
Question 14. Class A and class B divisions: what separates them?
Your Answer: (Not answered)
Correct Answer: A (class A of steel or equivalent with non-combustible insulation, stopping flame and smoke; class B need only be non-combustible and for a shorter time)
💡 Three things decide the class: the material, the limit on temperature rise on the unexposed face, and the time the division stands up to the standard fire test. Class A asks for steel or equivalent material with non-combustible insulation behind, so that neither flame nor smoke passes, and for the longest test period; class B asks only that the material be non-combustible, with lower insulation and strength and a much shorter time holding flame. Either class may be a bulkhead or a deck, the name not fixing the use; which class a boundary needs depends on how dangerous the space is, whether the ship carries passengers or cargo, and what the rules require around machinery spaces, stairways and control stations. Cut a hole for a pipe and leave it unsealed and the division stops being what it was, which is the commonest thing an inspection finds.
✗
Question 15. Which statement about the use of weather routeing is correct?
Your Answer: (Not answered)
Correct Answer: D (The route should be chosen taking account of weather forecasts and the ship's condition, avoiding severe weather and monitoring the passage plan)
💡 Weather routeing should combine professional weather forecasts with the ship's condition, such as stability, cargo and draught, to choose a relatively safe route avoiding typhoons, heavy seas and severe weather, monitoring and adjusting the plan during the voyage. It is an aid, the final navigational decision being the master's responsibility.
✗
Question 16. Besides the annual visual check, when must the lifeboat on-load release gear undergo a load test?
Your Answer: (Not answered)
Correct Answer: A (A thorough examination and test, with or without load, every five years)
💡 Under SOLAS III/4 and the related circulars the lifeboat on-load release gear should be examined annually by a competent person and, at the required interval, normally every five years, undergo an operational test without load or a thorough test with load, to verify that it releases and resets safely under load.
✗
Question 17. A ship's enclosed escape route from the machinery space was used to store spare parts. What is the finding?
Your Answer: (Not answered)
Correct Answer: C (A serious deficiency, because the enclosed escape route must remain clear for evacuation)
💡 SOLAS requires the enclosed escape route to be kept clear for emergency evacuation. Using it to store articles obstructs evacuation and adds fire load, a deficiency seriously affecting safety.
✗
Question 18. What is the fundamental purpose of the charts or ECDIS required by SOLAS V/19?
Your Answer: (Not answered)
Correct Answer: B (To give the navigator the geographical and hazard information needed to plan and monitor the voyage)
💡 Charts or ECDIS are required so that the navigator can plan the route, monitor the ship's position and identify dangers. They are navigational safety equipment.
✗
Question 19. What do SOLAS and good practice address regarding inspection and maintenance of extinguishers?
Your Answer: (Not answered)
Correct Answer: A (Periodic checks of weight or pressure with records kept)
💡 SOLAS requires portable extinguishers to be checked periodically for pressure or weight, seal and discharge mechanism, with records kept, preventing leakage or failure of the agent so that the extinguisher cannot put out a fire when needed.
✗
Question 20. What precautions do SOLAS and good practice emphasise against the danger of overstressed mooring lines?
Your Answer: (Not answered)
Correct Answer: D (Ropes must be selected to match the safe working load of the fittings, and personnel must keep clear of the line of tension)
💡 Mooring lines must be matched to the safe working load of the equipment, and personnel must stand clear of the snap-back area. A parted line recoiling is a common fatal accident on board and requires attention from both ship and shore.
✗
Question 21. Which fixed system is normally provided for oil fires in machinery spaces?
Your Answer: (Not answered)
Correct Answer: A (A fixed high expansion foam, low pressure CO2 or equivalent system)
💡 SOLAS requires a fixed extinguishing system in category A machinery spaces, normally fixed high expansion foam, low pressure CO2 or an equivalent system. Portable extinguishers are not a substitute.
✗
Question 22. What does routine checking of the bilge system include?
Your Answer: (Not answered)
Correct Answer: C (Strainers free of blockage, valves operating freely and pumps priming properly, with records kept)
💡 Routine checks of the bilge system should cover strainers and mud boxes for blockage and cleanliness, valves for free and correct operation and pumps for starting and priming, with records kept. Checking only in dry dock would leave the system failing in service without anyone knowing.
✗
Question 23. Sea area A3 means an area, excluding sea areas A1 and A2, within the coverage of:
Your Answer: (Not answered)
Correct Answer: C (an Inmarsat geostationary satellite service)
💡 SOLAS IV/2: Sea area A3 is the area, excluding A1 and A2, within the coverage of an Inmarsat geostationary satellite service.
✗
Question 24. Which statement about the changeover to emergency steering is correct?
Your Answer: (Not answered)
Correct Answer: B (Emergency steering should be possible in the steering gear space or at an alternative position, and the crew should be familiar with the operating and communication procedures)
💡 Under SOLAS II-1/29 and the operational requirements emergency steering should be possible in the steering gear space or at a designated alternative position, with communication to the bridge by direct telephone or as required. The crew should become familiar with the changeover and steering procedures through emergency steering drills, and test records should be retained.
✗
Question 25. What preparations should a ship make before an annual survey?
Your Answer: (Not answered)
Correct Answer: A (Keep equipment in good order and have records, certificates and survey reports ready so that the survey proceeds smoothly)
💡 Before a survey, equipment should be in working order, records and certificates available, routine maintenance completed and known problems dealt with, avoiding deficiencies, or even an effect on the validity of certificates, from equipment not working or records missing.
✗
Question 26. When navigating in or near an area of restricted visibility, which action is required?
Your Answer: (Not answered)
Correct Answer: A (Proceed at a safe speed, have engines ready, sound fog signals, stop if necessary and take avoiding action in ample time)
💡 Under the collision regulations a vessel navigating in or near an area of restricted visibility should proceed at a safe speed, have engines ready for immediate manoeuvre, sound fog signals, stop if necessary and take avoiding action in ample time for detected targets. On hearing a fog signal apparently forward of the beam, speed should be reduced or the vessel stopped.
✗
Question 27. What is the principle for stowing survival craft?
Your Answer: (Not answered)
Correct Answer: A (So that they can be launched quickly and safely under unfavourable conditions)
💡 They shall be stowed so that they can be launched quickly and safely even under unfavourable conditions.
✗
Question 28. What reporting is required if a ship carrying dangerous goods is involved in an incident?
Your Answer: (Not answered)
Correct Answer: B (Report the nature, quantity and location of the dangerous goods and the circumstances to the Administration, port State and relevant parties as required)
💡 SOLAS VII requires a ship carrying dangerous goods involved in an incident to report the class, quantity and location of the goods and the circumstances to the relevant authorities, enabling the emergency services to know the hazards and act appropriately.
✗
Question 29. Where must the distress signals of a lifeboat be stowed?
Your Answer: (Not answered)
Correct Answer: A (In a watertight container inside the lifeboat, readily available and protected from damp)
💡 SOLAS requires the distress signals to be stowed in a watertight container in the lifeboat, protected from damp and available at hand if the ship is abandoned. Stowing them on the bridge or in a store would make them unavailable.
✗
Question 30. What does SOLAS require for each fire hose?
Your Answer: (Not answered)
Correct Answer: D (Each hose must have a nozzle and be stowed near its hydrant ready for use)
💡 SOLAS requires each fire hose to be fitted with a nozzle and stowed near its hydrant so that it can be connected and used at once. Stowing hoses and nozzles separately delays firefighting.
✗
Question 31. The security drills required by the ship security plan are found not held at the required intervals. The finding is?
Your Answer: (Not answered)
Correct Answer: A (Security drills should be held and recorded at the required intervals; failure is a security management deficiency)
💡 The ship security plan requires security drills to be held at regular intervals and recorded, keeping the crew familiar with security threats and emergency procedures. Failure to hold or record them shows the security measures are not being implemented properly. It is a deficiency to be corrected.
✗
Question 32. What is addressed regarding the setting of the machinery space bilge alarm?
Your Answer: (Not answered)
Correct Answer: D (Alarm on the bilge reaching a certain level, with the alarm point arranged to attract the watchkeeper's attention in good time)
💡 The bilge alarm should operate as soon as water reaches a certain level, normally above the bilge wells, so abnormal accumulation is noticed promptly. A high setting delays the response, and with unattended machinery the alarm should be transmitted to the bridge.
✗
Question 33. What is required to restore survival craft after use?
Your Answer: (Not answered)
Correct Answer: A (Clean promptly after use or a drill, replenish consumables, re-secure and return to stowage, restoring immediate readiness)
💡 SOLAS requires survival craft to be cleaned promptly after a drill or use, the equipment and supplies consumed such as water and pyrotechnics replenished and the craft re-secured and returned to stowage, restoring immediate readiness. Long neglect would make the appliance unusable in an emergency.
✗
Question 34. A PSCO asks how many separate means of escape each main vertical zone must have. What is the correct answer?
Your Answer: (Not answered)
Correct Answer: C (At least two)
💡 SOLAS II-2/13 requires at least two means of escape from each main vertical zone or similar space, remote from each other, so that one route is not cut off by fire or smoke.
✗
Question 35. What launching methods are acceptable for survival craft?
Your Answer: (Not answered)
Correct Answer: C (Davit, free-fall or others appropriate to the type, all ensuring safety)
💡 Methods appropriate to the type, such as davit or free-fall, are acceptable.
✗
Question 36. What should the radio personnel do when the abandon ship alarm is sounded?
Your Answer: (Not answered)
Correct Answer: D (Ensure a distress alert has been transmitted and maintain communication, taking portable radio equipment into the survival craft)
💡 On the abandon ship alarm, the personnel responsible for radio should ensure a distress alert has been sent with the position and nature of distress, attempt to establish communication and take the portable VHF and, where applicable, the EPIRB into the survival craft as prescribed, so that distress communication continues after abandonment.
✗
Question 37. In addition to ventilation, what shall be fitted in paint lockers and flammable liquid stores?
Your Answer: (Not answered)
Correct Answer: D (A fixed fire-extinguishing system)
💡 SOLAS II-2/10.6.3: paint lockers and flammable liquid stores shall have a fixed fire-extinguishing arrangement.
✗
Question 38. A ship was detained by PSC and, after rectification, released following re-inspection by a recognised organisation. Under SOLAS, who issues the relevant certificate?
Your Answer: (Not answered)
Correct Answer: C (The Administration or a person duly authorised by it)
💡 The power to issue certificates rests with the Administration. A recognised organisation may act only within the scope of a formal authorisation given by that Administration.
✗
Question 39. What arrangements does SOLAS permit to ensure the availability of radio equipment in sea areas A1 and A2?
Your Answer: (Not answered)
Correct Answer: A (Duplication of equipment, a shore-based maintenance agreement, or at-sea maintenance capability — one of the three)
💡 SOLAS IV/15 allows availability to be ensured by duplication of equipment, a shore-based maintenance contract or at-sea maintenance capability, used singly or in combination.
✗
Question 40. Within an emission control area, what is the sulphur limit of fuel oil used on board?
Your Answer: (Not answered)
Correct Answer: A (0.10 per cent m/m)
💡 Within an emission control area the sulphur limit of fuel oil used on board is 0.10 per cent m/m. The ship should be able to show compliance through bunker delivery notes, changeover procedures and records, and should allow sufficient changeover time before entering the area.
✗
Question 41. What monitoring of moisture content is required for cargoes liable to liquefy?
Your Answer: (Not answered)
Correct Answer: B (Confirm the moisture content is below the transportable moisture limit before loading and guard against rain increasing it during loading)
💡 The IMSBC Code requires confirmation that the moisture content is below the TML before loading, normally from a certificate or test report, with attention during loading to rain, changes in the moisture of the cargo and water in the hold, preventing the content rising above the TML and liquefaction at sea.
✗
Question 42. What crew preparation is required before entering ice in polar waters?
Your Answer: (Not answered)
Correct Answer: D (Special polar operations training, clear emergency duties for ice conditions and drills of emergency procedures at low temperature)
💡 The Polar Code requires relevant training and familiarisation before entering polar waters, covering the contents of the PWOM, ice operating procedures and the use of emergency and life-saving equipment in low temperature, with the duties of each position in an ice emergency made clear and corresponding drills held.
✗
Question 43. The training manual shall be written in:
Your Answer: (Not answered)
Correct Answer: B (the working language of the ship, with translations where necessary)
💡 SOLAS III/35 requires the training manual in the working language of the ship, with translations where necessary.
✗
Question 44. What is the definition of GMDSS sea area A2?
Your Answer: (Not answered)
Correct Answer: A (An area within MF coast station DSC coverage)
💡 In the GMDSS, sea area A2 is an area within MF coast station continuous digital selective calling coverage, excluding A1. The provision of MF DSC equipment and the corresponding distress alerting means for the trading area is a basic requirement of fitness for that area.
✗
Question 45. What communication is required when entering an enclosed space?
Your Answer: (Not answered)
Correct Answer: B (Continuous communication with the standby person, including periodic contact, with immediate withdrawal if it is lost)
💡 SOLAS and the IMO resolutions require the entrant to maintain continuous communication with the standby person at the entrance, normally by agreed periodic contact, and to withdraw at once if communication cannot be restored, preventing an incident from going unnoticed.
✗
Question 46. Emergency lighting was tested and some survival craft embarkation stations had no lighting. What does SOLAS require?
Your Answer: (Not answered)
Correct Answer: C (Embarkation stations, survival craft stowage positions and the water alongside must be lit from the emergency source)
💡 SOLAS requires embarkation stations, survival craft stowage positions and the water alongside to be illuminated from the emergency source of power, ensuring safe abandonment. Torches are not a substitute for fixed emergency lighting.
✗
Question 47. Where shall emergency escape breathing devices be provided?
Your Answer: (Not answered)
Correct Answer: C (On means of escape that may be affected by smoke)
💡 EEBDs are provided on means of escape that may be affected by smoke.
✗
Question 48. Where a fixed pressure water-spraying system is fitted in a machinery space, its nozzles shall cover:
Your Answer: (Not answered)
Correct Answer: B (all areas of the machinery space where fire may occur)
💡 SOLAS II-2/10 requires the fixed pressure water-spraying system to cover all areas of the machinery space where fire may occur.
✗
Question 49. Steering gear tests are required to be carried out:
Your Answer: (Not answered)
Correct Answer: A (on sea trials and before departure)
💡 SOLAS II-1/29 requires steering gear tests, including during sea trials and prior to departure, to verify performance.
✗
Question 50. The carriage of grain in bulk shall follow:
Your Answer: (Not answered)
Correct Answer: B (the International Grain Code)
💡 SOLAS VI/6: the carriage of grain in bulk shall follow the International Grain Code.
✗
Question 51. The officer of the watch sees a man fall overboard off the starboard side. What is the first action?
Your Answer: (Not answered)
Correct Answer: A (turning at once towards the person to get back quickly, the lifebuoy with its self-lighting smoke gone, the man-overboard alarm sounded)
💡 The first business is to get the ship back to the water he went in: turning towards him keeps him clear of the screws and shortens the return — the Anderson turn is quickest in good visibility, the Williamson turn brings the ship back along her own track by night or in fog. The lifebuoy with its light and smoke marks the spot, three long blasts give the man-overboard alarm, VHF carries the ship's intentions, and the muster list sets the look-out and the boat. Stopping the ship, or reporting before manoeuvring, throws away the minutes in which recovery is still possible.
✗
Question 52. What do SOLAS and good practice require if remote control of the main engine fails?
Your Answer: (Not answered)
Correct Answer: D (Transfer promptly to local or emergency control and inform the bridge so that appropriate measures can be taken)
💡 If remote control of the main engine fails, the change-over to local or emergency control should be made promptly and the bridge informed at once so that measures such as reducing speed, stopping or anchoring can be taken. In confined waters manoeuvring capability must be restored as quickly as possible.
✗
Question 53. What is the required capacity of the main source of electrical power?
Your Answer: (Not answered)
Correct Answer: D (It must be capable of supplying all services necessary to maintain the ship in normal operational and habitable conditions)
💡 SOLAS II-1/40 requires the main source to supply all services necessary for normal operation and habitability, including propulsion auxiliaries, lighting, ventilation and communications.
✗
Question 54. For a ship with no emergency generator, for how long shall the GMDSS reserve source of energy supply?
Your Answer: (Not answered)
Correct Answer: C (6 hours)
💡 SOLAS IV/13: the reserve source shall be capable of supplying for 6 hours on ships without an emergency generator.
✗
Question 55. What does COLREG require regarding sound signals in areas of dense traffic?
Your Answer: (Not answered)
Correct Answer: A (Manoeuvring and warning signals must be given as prescribed, with light signals where appropriate)
💡 COLREG requires vessels in sight of one another to give the prescribed manoeuvring signals, such as one short blast for a starboard alteration, and to sound warning signals in narrow channels or at a bend. Sound signals are an important means of indicating intention and warning others.
✗
Question 56. Who shall approve the Cargo Securing Manual?
Your Answer: (Not answered)
Correct Answer: A (The Administration or its recognized organization)
💡 The Administration or its recognized organization.
✗
Question 57. The shipper shall provide the ship with cargo information before loading, including:
Your Answer: (Not answered)
Correct Answer: A (information necessary for proper stowage and securing, such as weight and stowage factor)
💡 SOLAS VI/5: the shipper shall provide, before loading, information necessary for proper stowage and securing such as weight and stowage factor.
✗
Question 58. What is the fresh water requirement in a lifeboat under SOLAS?
Your Answer: (Not answered)
Correct Answer: D (Not less than 3 litres for each person of the rated capacity, with the prescribed drinking vessel for each person)
💡 SOLAS requires not less than 3 litres of fresh water for each person of the rated capacity, with the prescribed drinking vessel for each person. Insufficient water seriously reduces survival time after abandonment.
✗
Question 59. Before a fixed gas fire-extinguishing system is released, what precaution does SOLAS require?
Your Answer: (Not answered)
Correct Answer: A (An alarm shall be given and evacuation of the space ensured, normally with a delay)
💡 SOLAS requires an audible and visual alarm and a delay or interlock before release of a fixed gas system, so that persons can leave the space and casualties are avoided.
✗
Question 60. What is meant by permeability in the subdivision calculation?
Your Answer: (Not answered)
Correct Answer: D (The proportion of the volume of a space that can be occupied by water)
💡 Permeability is the proportion of the volume of a space that can be occupied by water after damage. Its value differs for machinery spaces, accommodation and cargo spaces, and directly affects the volume of water entering and the calculation of residual stability.
✗
Question 61. What do SOLAS and the related standards require for the cylinders of a fixed CO2 system?
Your Answer: (Not answered)
Correct Answer: D (Periodic checks of cylinder pressure and weight and verification that the piping is clear)
💡 SOLAS and the related standards require periodic checks of cylinder pressure and weight to detect leakage, and verification that piping and nozzles are clear. A visual check alone will not reveal internal leakage or blockage.
✗
Question 62. What is the core principle SOLAS requires for the arrangement of ballast and bilge piping?
Your Answer: (Not answered)
Correct Answer: B (Bilge water from one compartment must not be able to pass through the piping system into another compartment)
💡 SOLAS requires bilge and ballast piping to be arranged so that water cannot pass from one compartment to another through the system, causing inadvertent flooding or cargo contamination. The arrangement is subject to approval.
✗
Question 63. A fixed detection system was tested with smoke. What action must follow detection under SOLAS?
Your Answer: (Not answered)
Correct Answer: B (An audible and visual alarm on the bridge or at the control station, indicating the space concerned)
💡 SOLAS requires detection to produce an audible and visual alarm on the bridge or at a continuously manned control station and to indicate the space involved. Automatic discharge is not necessarily required.
✗
Question 64. Speed and distance measuring equipment shall provide the bridge with:
Your Answer: (Not answered)
Correct Answer: C (speed and distance information over the ground)
💡 SOLAS V/19 requires speed and distance measuring equipment providing speed and distance over the ground.
✗
Question 65. What is the capacity requirement for survival craft on a passenger ship?
Your Answer: (Not answered)
Correct Answer: A (Each side must accommodate all persons on board, with additional liferafts as prescribed)
💡 SOLAS III requires the survival craft on each side of a passenger ship to accommodate all persons on board, with additional liferafts as prescribed, so all can escape even if one side is unusable.
✗
Question 66. How should the officer of the watch allow for wind and current when navigating in harbour waters?
Your Answer: (Not answered)
Correct Answer: A (Consider the drift caused by wind and current, keep a margin and apply rudder in good time)
💡 Harbour waters are confined and wind and current cause lateral drift. The officer should anticipate their direction and strength, adjust course and speed early and keep a handling margin, avoiding being set down onto a berth or into shoal water.
✗
Question 67. Under what speed and draught conditions is the capability of the main steering gear determined?
Your Answer: (Not answered)
Correct Answer: D (At maximum service speed and deepest seagoing draught)
💡 SOLAS determines the required capability of the main steering gear at maximum service speed and deepest seagoing draught, which forms the basis of its design.
✗
Question 68. What is the purpose of a heading transmission system?
Your Answer: (Not answered)
Correct Answer: C (Transmitting heading information to radar, AIS and similar equipment)
💡 It transmits heading information to radar, AIS and similar equipment.
✗
Question 69. The ventilation of a cargo pump room on a tanker shall be capable of at least how many air changes per hour?
Your Answer: (Not answered)
Correct Answer: C (20)
💡 SOLAS II-2/4 requires cargo pump room ventilation of at least 20 air changes per hour.
✗
Question 70. What protection is required when taking shore power in port?
Your Answer: (Not answered)
Correct Answer: A (Confirm voltage, frequency and phase sequence match, with insulation checked and proper earthing, preventing damage and electric shock)
💡 Before taking shore power, the voltage, frequency and phase sequence should be confirmed to match, with the cable insulation checked, reliable earthing established and earth leakage protection fitted. Once connected, the phase sequence should be verified to prevent motors running backwards and the equipment confirmed to operate normally, preventing damage and electric shock.
✗
Question 71. What is the cycle for safety management system audits?
Your Answer: (Not answered)
Correct Answer: D (Internal audits normally not exceeding 12 months, annual verification of the DOC and intermediate verification of the SMC)
💡 The ISM Code requires internal audits at intervals not exceeding 12 months, annual verification of the Document of Compliance to keep it valid and intermediate verification of the Safety Management Certificate within its period of validity. Failure to verify in time affects the validity of the certificates.
✗
Question 72. Which audible signalling device must be attached to a lifejacket?
Your Answer: (Not answered)
Correct Answer: D (A whistle)
💡 SOLAS III/7.1 requires a whistle secured by a cord to each lifejacket. A horn is not the required appliance.
✗
Question 73. When a ship changes flag, which is required?
Your Answer: (Not answered)
Correct Answer: D (Both the former and new flag States must recognise the ship's safety status)
💡 Flag change requires formal recognition of safety status by both the former and new flag States.
✗
Question 74. What closed-loop management of hazards is required?
Your Answer: (Not answered)
Correct Answer: B (Assign responsibility, measures and deadlines for each hazard found and track it to closure, with reasons recorded for items not completed)
💡 Hazards found at inspections, drills, reports and internal audits should be managed in a closed loop: assigning the person responsible and a deadline, implementing the measures, verifying the effect, closing the item and recording it. Items not completed on time should have the reason stated, the risk assessed and a new arrangement made, preventing hazards from persisting.
✗
Question 75. What does SOLAS V require regarding the use of traffic separation schemes?
Your Answer: (Not answered)
Correct Answer: B (Ships must use the scheme in accordance with the relevant rules and navigate within the appropriate lane)
💡 SOLAS V and COLREG require ships to use traffic separation schemes in accordance with the rules, navigating within the appropriate lane in the established direction. Sailing against the flow or crossing at will is not permitted.
✗
Question 76. What does SOLAS address regarding redundancy and reliability of propulsion machinery?
Your Answer: (Not answered)
Correct Answer: A (Stand-by or alternative means for critical auxiliary equipment, preventing loss of propulsion from a single failure)
💡 SOLAS requires stand-by or alternative means for critical auxiliaries affecting propulsion, such as cooling water pumps, lubricating oil pumps and fuel pumps, preventing loss of propulsion from a single failure, which would have serious consequences especially in confined waters.
✗
Question 77. What nautical publications must be carried under SOLAS V/27?
Your Answer: (Not answered)
Correct Answer: B (Sailing directions, lists of lights and fog signals, tide tables and notices to mariners as required for the voyage)
💡 SOLAS V/27 requires all nautical publications necessary for the voyage, including sailing directions, lists of lights, tide tables and notices to mariners, kept corrected. Charts alone do not satisfy the requirement.
✗
Question 78. Which of the following is not broadcast by AIS?
Your Answer: (Not answered)
Correct Answer: C (Contents of the cargo commercial contract)
💡 AIS broadcasts identity, position, course, speed, draught and destination — not commercial contract details.
✗
Question 79. What measures do SOLAS and the IMSBC Code require for solid bulk cargoes liable to self-heat or release harmful gas?
Your Answer: (Not answered)
Correct Answer: A (Obtain full cargo information before loading, increase ventilation and gas testing and restrict entry into the holds)
💡 The IMSBC Code requires precautions for cargoes liable to self-heat or release harmful gas: full cargo information, increased ventilation and gas testing, restricted entry into the holds and emergency preparation, preventing spontaneous combustion, poisoning or explosion.
✗
Question 80. What is the principal method of structural fire protection in accommodation and service spaces under SOLAS II-2?
Your Answer: (Not answered)
Correct Answer: B (Division into main vertical zones by class A and B divisions to limit fire spread)
💡 SOLAS II-2 protects accommodation and service spaces principally by fire-resisting divisions into main vertical zones with class A and B boundaries, rather than by extinguishing or detection equipment alone.
✗
Question 81. The inert gas system alarms shall operate on:
Your Answer: (Not answered)
Correct Answer: A (high oxygen content, abnormal gas pressure and abnormal water level conditions)
💡 SOLAS II-2/5 requires alarms for high oxygen content, abnormal pressure and abnormal water levels.
✗
Question 82. The quantity of extinguishing medium stored for a fixed gas fire-extinguishing system shall be sufficient for:
Your Answer: (Not answered)
Correct Answer: B (the volume of the largest protected space)
💡 SOLAS II-2/10 requires the stored quantity of medium to be sufficient for the largest protected space.
✗
Question 83. What is the usual maximum validity of a Cargo Ship Safety Radio Certificate?
Your Answer: (Not answered)
Correct Answer: B (Five years, with periodical surveys)
💡 Under SOLAS I/12 the Cargo Ship Safety Radio Certificate has a usual validity of not more than five years, with periodical surveys as required. The performance and provision of the radio installation, including distress alerting, communications and the reserve source of energy, are the focus of the survey.
✗
Question 84. What is required regarding VHF channel 16 watchkeeping?
Your Answer: (Not answered)
Correct Answer: A (Continuous watch while under way)
💡 A continuous watch on VHF channel 16 shall be kept while under way.
✗
Question 85. What is the function of the inert gas system on a tanker's cargo tanks?
Your Answer: (Not answered)
Correct Answer: B (To keep the oxygen content below the prescribed limit and prevent explosion of cargo vapour)
💡 The inert gas system keeps the oxygen content in the tanks below the prescribed limit, removing the condition necessary for explosion of hydrocarbon vapour.
✗
Question 86. What does SOLAS address regarding protection of hot surfaces in machinery spaces?
Your Answer: (Not answered)
Correct Answer: D (Surfaces above the prescribed temperature must be insulated or guarded, preventing ignition of oil on contact)
💡 SOLAS requires piping and equipment surfaces above the prescribed temperature, such as 220 degrees Celsius, to be insulated or guarded, preventing fuel or lubricating oil from being ignited on contact.
✗
Question 87. How many means of escape, widely separated, shall be provided on each deck in accommodation spaces?
Your Answer: (Not answered)
Correct Answer: B (Two)
💡 SOLAS II-2/13: at least two widely separated means of escape shall be provided on each deck.
✗
Question 88. A port State finding deficiencies affecting safety may:
Your Answer: (Not answered)
Correct Answer: C (require rectification and, if necessary, detain the ship)
💡 SOLAS I/19 allows the port State to require rectification and detain the ship if necessary.
✗
Question 89. What do SOLAS and the IMDG Code require if dangerous goods leak on board?
Your Answer: (Not answered)
Correct Answer: D (Follow the measures in the EmS Guide for the relevant UN number, preventing ignition and personnel exposure)
💡 SOLAS VII requires the measures in the EmS Guide for the UN number concerned to be followed, including personal protection, ventilation, collection and isolation. Some substances react with water, so washing with water is not always appropriate; the Guide must be followed.
✗
Question 90. What is the minimum daily water ration per person in a survival craft under SOLAS III/7.1?
Your Answer: (Not answered)
Correct Answer: A (1.5 litres)
💡 SOLAS III/7.1 requires not less than 1.5 litres of water per person per day in survival craft, for the required number of days at the rated capacity. One litre is a common misremembering.
✗
Question 91. What structural condition should be confirmed before loading a bulk carrier?
Your Answer: (Not answered)
Correct Answer: A (The condition of hatch covers and coamings, deformation or corrosion of the internal structure and leakage of the double bottom and piping)
💡 Before loading a bulk carrier the condition of the hatch covers and coamings should be confirmed sound, the internal structure and stiffening free of serious deformation or corrosion and the double bottom and ballast piping free of leakage, with the bilges draining properly. These bear directly on the safety of loading and the structural integrity of the voyage.
✗
Question 92. What protection does SOLAS require for electric and electrohydraulic steering gear?
Your Answer: (Not answered)
Correct Answer: A (Short circuit and overload protection, with an alarm for single phase failure)
💡 SOLAS II-1/30 requires electric and electrohydraulic steering gear to have short circuit and overload protection and to give an alarm in the event of a single phase failure, preventing sudden loss of steering.
✗
Question 93. What is the purpose of the safety contour and safety depth settings in ECDIS?
Your Answer: (Not answered)
Correct Answer: A (To warn automatically of shoal water and dangers by triggering safety alarms)
💡 The safety contour and safety depth define the navigable safe area and trigger automatic alarms when the ship approaches shoal water or dangers. They are central to passage monitoring.
✗
Question 94. What is the purpose of electronic position fixing and navigation systems such as satellite systems on board?
Your Answer: (Not answered)
Correct Answer: A (To provide continuous position and navigation information supporting navigation and collision avoidance)
💡 Electronic position fixing systems such as satellite systems provide continuous position, course and speed information forming the basis of navigation and collision avoidance. Their accuracy and reliability must be monitored and cross-checked.
✗
Question 95. How often must deck cargo be inspected during a voyage?
Your Answer: (Not answered)
Correct Answer: B (Periodically according to the cargo and weather, with more frequent checks before and after heavy weather)
💡 Deck cargo securing should be inspected periodically, particularly before and after heavy weather, after a change of course and when the temperature changes markedly, with slack, worn or deformed lashings tightened or replaced at once. A check before sailing would not reveal loosening that occurs during the voyage.
✗
Question 96. A vessel uses ECDIS as her primary means of navigation. Which back-up arrangement satisfies SOLAS chapter V when the superintendent checks it before departure?
Your Answer: (Not answered)
Correct Answer: C (an appropriate back-up arrangement on board, for example a full set of current official paper charts of the right scale, or a second ECDIS on an independent power supply)
💡 Regulation V/19 requires due allowance for ECDIS failure; accepted back-ups are a full set of current official paper charts, or a second ECDIS on independent power, or another type-approved arrangement. Data discs, USB sticks and printouts preserve data but are not an independently usable means of navigation.
✗
Question 97. What requirement shall navigation lights meet?
Your Answer: (Not answered)
Correct Answer: C (The lights requirements of COLREG)
💡 They shall comply with the lights requirements of COLREG.
✗
Question 98. What does SOLAS prescribe regarding the assumed extent of damage for damage stability calculations?
Your Answer: (Not answered)
Correct Answer: C (Assumed longitudinal, transverse and vertical extents of damage taken as prescribed)
💡 SOLAS prescribes the assumed longitudinal, transverse and vertical extents of damage, for example the longitudinal extent of side damage determined from the ship's length and depth, on which the damage stability calculation is based. The assumed values must not be altered arbitrarily.
✗
Question 99. SOLAS requires each ship to be provided with:
Your Answer: (Not answered)
Correct Answer: A (a training manual describing the use of life-saving appliances and survival knowledge)
💡 SOLAS III/35 requires a training manual describing the use of the ship's life-saving appliances and survival knowledge.
✗
Question 100. What do SOLAS and good practice require in preparation for mooring before berthing?
Your Answer: (Not answered)
Correct Answer: C (Station the mooring party in advance, prepare ropes and fenders and agree the mooring plan with the terminal)
💡 Before berthing, the mooring party should be stationed in advance, ropes and fenders prepared and the mooring plan agreed with the terminal, with the berth condition confirmed. Inadequate preparation leads to impact or a parted line during the operation.