Exam Home Website
中文 English
0
/100
FAIL
Correct: 0/100 Total Questions: 100 Time Spent: 60min0sec
Passing: 80
Retake History
Answer Review
✗
Question 1. Alternatives when ship-shore communication is lost are?
Your Answer: (Not answered)
Correct Answer: D (use backup satellite, MF/HF or relay through another ship or coast station)
💡 Fall back to backup satellite or MF/HF, or relay via other ships and coast stations so contact is never lost.
✗
Question 2. During bunkering the flow meter does not move; what applies?
Your Answer: (Not answered)
Correct Answer: B (suspend, check metering and the line before continuing)
💡 A failed meter makes quantity unverifiable; suspend and check metering and lines before resuming.
✗
Question 3. Under Chapter 10 of the ISM Code, what should the company establish to keep the ship and her equipment fit for safe operation?
Your Answer: (Not answered)
Correct Answer: D (a planned maintenance system with scheduled tests and records)
💡 Chapter 10 asks for a system, not a logbook: makers' manuals, statutory items and the ship's own experience combined into a schedule with owners, intervals and completion marks, including tests of critical equipment. A break-down record only proves something failed, a budget sheet manages money, and a charter-party does not shift the company's duty.
✗
Question 4. Key actions an oil spill drill should cover are?
Your Answer: (Not answered)
Correct Answer: B (reporting, stopping operations, containment and recovery plus shore contact)
💡 Practise alarms and reporting, stop valves, boom deployment and recovery, and test shore and agent contact.
✗
Question 5. How should fatigue and rest be managed with a multinational crew?
Your Answer: (Not answered)
Correct Answer: B (record rest uniformly under rules and the system and watch actual sleep quality)
💡 Apply one standard with honest records, and watch sleep quality and work patterns so compliance is real, not on paper.
✗
Question 6. Checking depth and bottom quality before anchoring is part of?
Your Answer: (Not answered)
Correct Answer: A (implementing voyage planning and risk assessment)
💡 Anchorages are chosen from depth, bottom, swinging room and weather, applying voyage planning and risk assessment.
✗
Question 7. Can tabletop exercises replace hands-on drills on board?
Your Answer: (Not answered)
Correct Answer: B (no, statutory drills must be hands-on; tabletops complement decision training)
💡 Tabletops train judgement but cannot replace statutory hands-on drills; combine both.
✗
Question 8. The effect of the radar close-range blind zone is?
Your Answer: (Not answered)
Correct Answer: B (very close targets may show poorly; sight and hearing must compensate)
💡 Radar misses very close targets, so visual lookout and listening matter in berthing and crowded waters.
✗
Question 9. Under a time charter, who is normally responsible for manning and managing the ship?
Your Answer: (Not answered)
Correct Answer: C (owners handle crew and management; charterers direct employment and cargo)
💡 Owners retain manning and technical management; charterers direct employment and voyages, as split by the charterparty.
✗
Question 10. When undermanning is found, the audit should trace it to?
Your Answer: (Not answered)
Correct Answer: A (company manning policy and resourcing, a shore management duty)
💡 Undermanning usually stems from company staffing and budget decisions, so findings should point ashore.
✗
Question 11. What does localising SMS documents on board mean?
Your Answer: (Not answered)
Correct Answer: A (add ship-specific parameters and steps for installed equipment and trades)
💡 Adapt generic templates to installed machinery, trades and manning so they fit this particular ship.
✗
Question 12. Finding missing fenders at the berth with no tugs available, the master should?
Your Answer: (Not answered)
Correct Answer: D (postpone berthing and report company and agent to improve conditions)
💡 Missing fenders and no tugs raise impact risk greatly; hold off, report and wait rather than force it.
✗
Question 13. Security activities (boarding, search, drills) should be?
Your Answer: (Not answered)
Correct Answer: A (logged in the security record as compliance and incident evidence)
💡 Security logs prove ISPS compliance and support investigations.
✗
Question 14. For critical shipboard operations affecting safety/pollution, ISM requires?
Your Answer: (Not answered)
Correct Answer: A (documented instructions and strict compliance)
💡 Rule 7: the Company must establish documented instructions for critical operations and ensure compliance.
✗
Question 15. The role of tide tables in voyage planning is?
Your Answer: (Not answered)
Correct Answer: D (determine times and heights for clearance and timing)
💡 Tide data underpins under-keel clearance calculations and the timing of transits over shoal areas.
✗
Question 16. If cost-cutting causes severe crew shortage or equipment decay, it is?
Your Answer: (Not answered)
Correct Answer: D (failure to fulfil SMS duty, breaching the safety/environment policy)
💡 Commitments need resources; cutting safety for cost is a fundamental failure.
✗
Question 17. After a slight grounding, the first actions are?
Your Answer: (Not answered)
Correct Answer: C (stop, assess damage, sound tanks and report, planning refloating)
💡 Stop, check damage and flooding, sound tanks and depths, report and plan a safe refloating operation.
✗
Question 18. If the relieving officer takes over with poor visibility, the correct action is?
Your Answer: (Not answered)
Correct Answer: B (adapt to night vision and the situation and confirm before taking over)
💡 Adapt vision and verify the situation, then take over formally; never take the watch blind.
✗
Question 19. Before an external (RO) audit, the Company should?
Your Answer: (Not answered)
Correct Answer: B (self-check and fix, gather records, assign escorts and answers)
💡 Daily soundness plus pre-audit self-check beats last-minute fixes.
✗
Question 20. What is the purpose of the requisition and approval process?
Your Answer: (Not answered)
Correct Answer: C (control cost, prevent waste and ensure necessary supply)
💡 Requisition and approval secure supply while controlling cost and stock, avoiding waste and costly urgent airfreight.
✗
Question 21. The hazard of bridge crowding is?
Your Answer: (Not answered)
Correct Answer: A (distracts the watchkeeper and may confuse command and control)
💡 Unnecessary people chatter, block views and distract the watch; restrict the bridge to those needed.
✗
Question 22. Records generated by the SMS (drills, maintenance, training) should?
Your Answer: (Not answered)
Correct Answer: C (be retained for prescribed periods and readily retrievable as evidence of compliance)
💡 Retention periods are set by the SMS; records evidence compliance and support casualty tracing.
✗
Question 23. The legal status of the ISM Code within the convention framework is?
Your Answer: (Not answered)
Correct Answer: A (implemented as Chapter IX of SOLAS)
💡 The ISM Code is given mandatory force through SOLAS Chapter IX (Management for the Safe Operation of Ships).
✗
Question 24. Cargo handling under the SMS requires?
Your Answer: (Not answered)
Correct Answer: C (an approved cargo plan and watch arrangement with a clear chain of command)
💡 Cargo ops need plan, watch and command chain to prevent loss and casualties.
✗
Question 25. Why is the metalwork of electrical equipment earthed?
Your Answer: (Not answered)
Correct Answer: A (when insulation fails it gives the fault current a path, so the protection operates first and the voltage on the enclosure is held down)
💡 Earthing works at the moment insulation fails: as soon as the enclosure goes live the fault current finds its way back to the supply through the earth connection and the fuse, breaker or residual current device clears it before anyone touches the metal; without that path the enclosure can sit near phase voltage, and a person standing on it becomes the path. On board there is a second thing to hold: the power distribution runs with an insulated neutral, so a single fault does not trip anything - the insulation level indicator is what warns, and if that warning is left while a second earth appears, the two together make a short circuit and neither the tripping nor the enclosure voltage is then what the first reasoning promised. The earth conductor must therefore be continuous and its joints tight, and an alarm left hanging is not a small matter.
✗
Question 26. When port reception facilities are inadequate, the ship should?
Your Answer: (Not answered)
Correct Answer: B (report as required and store properly, never discharging because of it)
💡 Inadequate facilities are no excuse; report and keep storing, retaining evidence of the shortfall.
✗
Question 27. What should the written handover record be?
Your Answer: (Not answered)
Correct Answer: B (concise and complete, signed by both with time and key items)
💡 The record shows time, position, movement and key items, signed by both, for accountability and traceability.
✗
Question 28. Regarding third-party surveys arranged by the charterer, the master should?
Your Answer: (Not answered)
Correct Answer: A (verify purpose and credentials, cooperate without disclosing sensitive commercial data)
💡 Verify purpose and authorisation, get owner approval and avoid unauthorised disclosure that harms the owner.
✗
Question 29. When pirates have boarded and control accommodation, crew should?
Your Answer: (Not answered)
Correct Answer: B (prioritise life, comply and wait for a chance to alert or retreat)
💡 Prioritise life: do not resist, comply, and when safe trigger alarms or retreat; never provoke the attackers.
✗
Question 30. Signs of water ingress through a hatch cover are found at sea; you should?
Your Answer: (Not answered)
Correct Answer: D (secure the hatch, start pumping and find the sealing failure)
💡 Secure and tighten, start bilge pumping, find the sealing fault and monitor hold water levels.
✗
Question 31. When the safety policy conflicts with local law, the ship should?
Your Answer: (Not answered)
Correct Answer: D (follow the stricter one, never below the convention minimum)
💡 The floor is the convention and mandatory law; policy may exceed but not fall below.
✗
Question 32. Requirements for the ballast water record book are?
Your Answer: (Not answered)
Correct Answer: D (record uptake, exchange or treatment and discharge with time, position and volume)
💡 Record operations with time, coordinates, volumes and treatment per the convention alongside the plan and certificate.
✗
Question 33. IMO intact stability requirements are usually verified via?
Your Answer: (Not answered)
Correct Answer: D (checking stability criteria for loading conditions in approved stability data)
💡 Approved stability data must show compliance of each loading condition with the criteria.
✗
Question 34. When a ship is put under third-party management, who is the Company?
Your Answer: (Not answered)
Correct Answer: B (the entity that takes the system responsibility and is named on the Document of Compliance)
💡 The Company in the Code means the shipowner or any organisation or person that has taken over the shipowner's responsibility and the functions of managing the ship - it may be a manager or a bareboat charterer. Which one it is can be read off the Document of Compliance, the system documents and the designated person's authority. A management agreement on its own is not enough: the document's scope must cover the ship, and the system files on board, the designated person's name and contact and the lines of responsibility must all point to that entity, or what the crew follow has no source. When a ship moves to another manager the certificate and the documents move with it - the step most often missed when owners are changed.
✗
Question 35. Struck by a neighbouring ship in port, the first action is?
Your Answer: (Not answered)
Correct Answer: B (check damage and personnel, prevent further flooding and report company and port)
💡 Check damage and people, control flooding and leaks, preserve evidence and notify company, port and club.
✗
Question 36. The ISM Code requires the company to designate a person (DPA) having direct access to the highest level of management. What is the main purpose of this provision?
Your Answer: (Not answered)
Correct Answer: C (to provide a link to the highest management level, free of escalation limits, monitoring safety and pollution-prevention aspects and ensuring shore-based support)
💡 The DPA provision answers the classic failure mode in which shipboard findings are absorbed by the reporting chain. The Code leaves the Master's authority untouched; treating the DPA as the PSC interface confuses the company security officer role under the ISPS Code; document custody belongs to the documentation element.
✗
Question 37. What triggers updating training material?
Your Answer: (Not answered)
Correct Answer: C (regulatory change, incident lessons, retrofits and procedure revisions)
💡 Update material with rules, lessons, equipment and procedure changes so training always matches reality.
✗
Question 38. The purpose of a toolbox talk before high-risk work is?
Your Answer: (Not answered)
Correct Answer: D (brief risks, roles and emergency measures and confirm understanding)
💡 A short briefing clarifies hazards, duties, protection and emergency steps for all at low cost and high value.
✗
Question 39. When should an oil tanker emergency shutdown be triggered?
Your Answer: (Not answered)
Correct Answer: D (leak, fire, overpressure or lost communications)
💡 Trigger ESD on leaks, fire, overpressure or lost communications—safety over schedule.
✗
Question 40. Why check depth and turning room before berthing?
Your Answer: (Not answered)
Correct Answer: B (confirm manoeuvrability and safety margin against grounding and contact)
💡 Check depth, turning room and tug configuration so the manoeuvre stays within the ship's capability.
✗
Question 41. Underway in high-risk waters, deck security watch should?
Your Answer: (Not answered)
Correct Answer: C (24h multi-point patrol and look-out to spot fast skiffs early)
💡 Early detection is key; dense watch defeats blind spots and skiff raids.
✗
Question 42. Ship technical files (drawings, certificates, TM, repairs) should be?
Your Answer: (Not answered)
Correct Answer: B (systematically archived and traceable, supporting maintenance and transfer)
💡 Complete technical files underpin maintenance and transactions.
✗
Question 43. How should the SMS control port agent services?
Your Answer: (Not answered)
Correct Answer: D (choose qualified agents, define duties, verify safety-related info)
💡 Agents hold berth/pilot/supply info; wrong choice or fake info causes casualties.
✗
Question 44. Chronic fatigue from scheduling requires the SMS to?
Your Answer: (Not answered)
Correct Answer: B (adjust manning and watches to ensure rest compliance)
💡 Fatigue breeds accidents; the SMS must fix scheduling and manning.
✗
Question 45. The core benefit of Bridge Resource Management is?
Your Answer: (Not answered)
Correct Answer: D (integrating people, machine, information, cutting coordination failures)
💡 BRM turns individual skill into team reliability, cutting human-error casualties.
✗
Question 46. By what means does a port State control officer check that the safety management system actually runs on board?
Your Answer: (Not answered)
Correct Answer: B (record and practice compared, drills, maintenance, permits and the closing out of non-conformities being sampled)
💡 Complete paperwork is not a running system. On board the officer looks for a chain of evidence: drills held when the plan says and written up, critical equipment with its maintenance and testing recorded, the permits for enclosed entry, hot work and such-like critical operations actually issued as the procedure requires, deficiencies and non-conformities closed out with measures that took effect, and crew able to state their part in the plan and work the equipment in front of him. Where record and practice disagree the deficiency may be written up as a failure of the system rather than of one item of gear, and answers that do not match between crew members commonly open the inspection further. That is how running effectiveness is judged.
✗
Question 47. A ship's Oil Record Book does not match reality and the master admits falsification. What should the company do?
Your Answer: (Not answered)
Correct Answer: A (report to the Administration, investigate and impose corrective accountability)
💡 Falsified statutory records are serious: report, investigate root causes and correct rather than conceal.
✗
Question 48. Liability for oil pollution damage is generally handled on which principle?
Your Answer: (Not answered)
Correct Answer: C (strict liability with compulsory insurance and direct action against the insurer)
💡 Under CLC the shipowner bears strict liability with compulsory financial security and direct action against insurers.
✗
Question 49. The core of ISM Chapter 5 (Master's Responsibility and Authority) is?
Your Answer: (Not answered)
Correct Answer: A (master's overriding authority and power to issue orders for safety)
💡 Chapter 5 gives the master overriding authority to decide and order for safety and pollution prevention.
✗
Question 50. The sign of a closed-loop corrective action after an incident is?
Your Answer: (Not answered)
Correct Answer: A (action implemented, verified effective and embedded in SMS)
💡 Corrective action must be done, verified and embedded; unverified means not closed.
✗
Question 51. Corrective actions for a non-conformity should follow the principle of?
Your Answer: (Not answered)
Correct Answer: A (eliminating the root cause, preventing recurrence, and verifying closure)
💡 Effective corrective action removes the root cause and is verified closed; cosmetic fixes get re-raised at review.
✗
Question 52. Which is NOT a necessary condition for SMC issuance?
Your Answer: (Not answered)
Correct Answer: B (next voyage plan completed)
💡 Issuance needs a valid DOC, implemented SMS and a passed initial audit—not a voyage plan.
✗
Question 53. Which of these is NOT a shore-side safety department's job?
Your Answer: (Not answered)
Correct Answer: C (decide the avoidance and the handling for the master from the office)
💡 The shore side supports, resources and supervises: manning, training, spares, documents and money reaching the ship, audits organised and corrections followed, emergency back-up and outside liaison when something happens. Conning the ship and the judgement on the spot are the master's - the rules and the system both state his absolute authority to override. Deciding an avoidance from an office knows nothing of the local picture and tangles the liability afterwards. What the shore may properly do is set limits and raise flags, as in a weather routing discussion, not give the helm orders.
✗
Question 54. When the Master judges safety threatened and resources insufficient, from whom to seek shore support?
Your Answer: (Not answered)
Correct Answer: D (the Designated Person Ashore (DPA))
💡 The DPA is the support interface; the Master uses it to obtain resources from shore management.
✗
Question 55. The management key when several statutory regimes coexist is?
Your Answer: (Not answered)
Correct Answer: A (integrate into one SMS register, avoiding fragmented control)
💡 Put all statutory documents and records in one register with owners and validity, avoiding fragmentation.
✗
Question 56. For tanker loading/discharge, tank cleaning, gas-freeing, the SMS requires?
Your Answer: (Not answered)
Correct Answer: A (approved procedures and checklists with clear command and watch)
💡 Critical cargo ops need written procedures, checklists and assigned responsibility.
✗
Question 57. Long stay at a tropical port calls for precautions against?
Your Answer: (Not answered)
Correct Answer: A (cargo self-heating, hold condensation and insect-borne disease)
💡 Watch hold temperature and sweat, ventilate and inspect, and control insects and disease to protect the crew.
✗
Question 58. Consequences when crew are unfamiliar with emergency stations in PSC?
Your Answer: (Not answered)
Correct Answer: C (signals failed training/drills, possible detention and NC)
💡 Unfamiliar crew reveal failed training/drills; PSC may detain and raise an SMS non-conformity.
✗
Question 59. What determines the order of letting go mooring lines when unberthing?
Your Answer: (Not answered)
Correct Answer: B (tug arrangement, wind and current and the load on each line)
💡 The sequence follows tug layout, wind, current and loads: slack lines first, control lines retained, so the ship does not swing out uncontrolled.
✗
Question 60. Which is NOT an element of an emergency drill?
Your Answer: (Not answered)
Correct Answer: A (telling participants the correct answers beforehand to guarantee success)
💡 Drills should be realistic and expose gaps; giving answers defeats the purpose and tests nothing real.
✗
Question 61. The preparation and approval of a repair list should?
Your Answer: (Not answered)
Correct Answer: B (department raises, C/E or master reviews, company approves and tracks)
💡 Repair lists are raised by departments, reviewed by C/E or master, approved and tracked by the company.
✗
Question 62. When bunkering and cargo work run simultaneously, the management focus is?
Your Answer: (Not answered)
Correct Answer: B (clear responsibility, segregation and comms with emergency readiness)
💡 Assign owners, patrol, keep unified comms and ensure emergency stop and spill response are instantly available.
✗
Question 63. ISM Chapter 11 requires the SMS documentation to be?
Your Answer: (Not answered)
Correct Answer: C (controlled, current, readily available to crew, and protected from obsolete versions)
💡 Documents must be controlled: version, distribution, revision and obsolescence, so the ship uses the current edition.
✗
Question 64. The concept of residual risk is?
Your Answer: (Not answered)
Correct Answer: D (the risk that remains after controls are applied)
💡 Residual risk remains after controls; judge acceptability and brief those exposed so nobody assumes zero risk.
✗
Question 65. Berthing at night with poor quay lighting and a strong cross-current, the master should?
Your Answer: (Not answered)
Correct Answer: B (postpone or request extra tugs and lighting after risk assessment)
💡 With poor light and cross-current do not force it; wait or add tugs rather than be driven by schedule.
✗
Question 66. An example of a leading indicator is?
Your Answer: (Not answered)
Correct Answer: C (timely hazard closure rate and near-miss reports)
💡 Leading measures reflect prevention activity such as drills, reporting and closure rates, predicting future outcomes.
✗
Question 67. The purpose of an intermediate audit is?
Your Answer: (Not answered)
Correct Answer: A (maintain validity, confirm continued effectiveness in the certificate period)
💡 The intermediate audit mid-term confirms continued SMS effectiveness to keep the certificate valid.
✗
Question 68. Which is NOT a daily duty of the Ship Security Officer?
Your Answer: (Not answered)
Correct Answer: D (directing cargo handling operations)
💡 The SSO handles security checks, drills and records; cargo operations belong to the deck department.
✗
Question 69. Finding a person hiding in a cargo hold while in port, you should?
Your Answer: (Not answered)
Correct Answer: A (control and identify per the SSP, reporting to master and shore)
💡 Control movement and identify per the SSP, report to master, company and port security and hand over.
✗
Question 70. What follows from an inaccurate estimate of the centre of gravity?
Your Answer: (Not answered)
Correct Answer: B (distorted results that may hide real stability deficiency)
💡 A wrong vertical centre of gravity directly distorts judgement; use reliable data and conservative values.
✗
Question 71. The SMS requirement for spares and stores of critical equipment is?
Your Answer: (Not answered)
Correct Answer: B (ensure adequate, quality supply so critical equipment is not left unrepaired)
💡 Spares management underpins maintenance capability; shortages can disable critical equipment.
✗
Question 72. What is the basic rule for discharging oily mixtures in a special area?
Your Answer: (Not answered)
Correct Answer: D (prohibited in principle, with a narrow exception for treated low concentrations while underway)
💡 Special areas are far stricter: discharge is prohibited except under narrow conditions while underway and must be logged.
✗
Question 73. Quality control of contracted maintenance should be?
Your Answer: (Not answered)
Correct Answer: D (set standards, supervise the work and accept on completion)
💡 Outsourcing does not transfer duty: specify standards, supervise key steps and accept strictly.
✗
Question 74. What applies to stowage of stretchers and medical equipment?
Your Answer: (Not answered)
Correct Answer: A (fixed and clearly marked positions, quick to reach and checked periodically)
💡 Mark fixed positions, keep them reachable and inspect regularly; gear that cannot be found is as good as absent.
✗
Question 75. Involving front-line crew in drafting documents aims to?
Your Answer: (Not answered)
Correct Answer: C (make content realistic, operable and better accepted)
💡 Having operators review drafts exposes impractical clauses and ambiguity and builds ownership and compliance.
✗
Question 76. The purpose of Standard Marine Communication Phrases (SMCP) is?
Your Answer: (Not answered)
Correct Answer: A (reduce VHF ambiguity through standardised English phrasing)
💡 SMCP standardises maritime English to cut ambiguity in VHF exchanges among multinational crews.
✗
Question 77. Entering an unfamiliar port at night, the master should?
Your Answer: (Not answered)
Correct Answer: B (assess the risk and prefer daylight entry, or prepare fully and strengthen the watch)
💡 Unfamiliar ports at night are risky; prefer daylight, or study fully, add lookout and keep the master on the bridge.
✗
Question 78. Backup requirements for electronic SMS documents are?
Your Answer: (Not answered)
Correct Answer: C (back up periodically, available offline and restore-tested)
💡 Back up regularly with offline access and test restoration, or failure still leaves documents unusable.
✗
Question 79. Which is NOT a purpose of the spare parts register?
Your Answer: (Not answered)
Correct Answer: D (replacing the equipment operating manual)
💡 The register tracks stock, supports buying and checks, but never replaces manuals and technical data.
✗
Question 80. The role of handover notes in knowledge transfer is?
Your Answer: (Not answered)
Correct Answer: D (pass open items, known problems and reasoning, avoiding information gaps)
💡 Document pending work, hazards and actions taken with reasons so the reliever starts with full context.
✗
Question 81. A common problem with decision-making under stress is?
Your Answer: (Not answered)
Correct Answer: C (cognitive tunnelling ignoring better options)
💡 Stress narrows attention to salient cues and skips verification; team cross-checks counter this.
✗
Question 82. For suppliers of provisions, stores, bunkers, the SMS should?
Your Answer: (Not answered)
Correct Answer: B (vet competence, set acceptance standards, prevent contraband/unsafe items)
💡 Supplier control prevents bad stores and security hazards coming aboard.
✗
Question 83. How should electronic chart update files be handled?
Your Answer: (Not answered)
Correct Answer: A (use official sources and scan and verify before importing)
💡 Use official or authorised sources, scan and verify version before import to avoid malicious code.
✗
Question 84. The core elements of a permit to work are?
Your Answer: (Not answered)
Correct Answer: B (scope, duration, test data, precautions and issuing and accepting persons)
💡 State scope and period, gas tests or isolation, precautions, issuer and executor, plus completion sign-off.
✗
Question 85. High crew turnover affects the SMS by?
Your Answer: (Not answered)
Correct Answer: D (raising unfamiliarity risk, needing stronger handover and training)
💡 Turnover fluctuates familiarity; the SMS counters with handover and training.
✗
Question 86. The typical hallmark of a major non-conformity is?
Your Answer: (Not answered)
Correct Answer: B (systemic failure or serious safety/pollution threat, immediate correction)
💡 A major NC shows systemic failure threatening life/environment; correct immediately, verify and report.
✗
Question 87. At anchor at night a small boat loiters near the ship; you should?
Your Answer: (Not answered)
Correct Answer: C (increase lookout and lighting, log it and report master or shore as appropriate)
💡 A loitering craft at night may mean theft or security risk; light up, watch, log and report to master or shore.
✗
Question 88. The purpose of timing drills is?
Your Answer: (Not answered)
Correct Answer: D (quantify response, expose delays and provide a basis for improvement)
💡 Timing converts impressions into comparable data on muster and launching, revealing bottlenecks to work on.
✗
Question 89. What is the value of trend analysis of technical condition?
Your Answer: (Not answered)
Correct Answer: D (detect deterioration early and arrange preventive action)
💡 Trend analysis spots drift and deterioration before failure, turning maintenance from reactive to proactive.
✗
Question 90. The management focus for emergency medical stores is?
Your Answer: (Not answered)
Correct Answer: C (equipped by ship type and trade, checked and restocked with trained users)
💡 Equip by ship type, trade and manning, check expiry and restock, and ensure someone can give first aid.
✗
Question 91. The risk of relying heavily on satellite communications is?
Your Answer: (Not answered)
Correct Answer: B (loss of ship-shore contact and emergency comms if interrupted or degraded)
💡 Over-reliance without HF or alternate routes strands the ship when links fail or service is denied; keep redundancy.
✗
Question 92. For enclosed-space entry, hot work etc., the SMS requires?
Your Answer: (Not answered)
Correct Answer: B (permit, testing, stand-by and emergency readiness)
💡 Permit-to-work pins down hazards of high-risk work—a life-saving system.
✗
Question 93. What is the basis for deck cargo and securing calculations?
Your Answer: (Not answered)
Correct Answer: D (the cargo securing manual and cargo weight, dimensions and friction)
💡 Securing follows the manual with cargo data; experience cannot replace calculation and verification.
✗
Question 94. A supercargo embarked should follow which rule?
Your Answer: (Not answered)
Correct Answer: A (obey the master and ship's safety rules without interfering in navigation)
💡 Supercargo follow ship rules and safety briefings and must not interfere with navigation or cargo safety decisions.
✗
Question 95. In heavy weather a request comes to jettison cargo; the master should?
Your Answer: (Not answered)
Correct Answer: A (decide after assessing necessity for life and ship safety and report)
💡 Jettison requires necessity for life and ship, reported and recorded; neither automatic nor always refused.
✗
Question 96. When the OOW sees the master making an erroneous manoeuvre, he should?
Your Answer: (Not answered)
Correct Answer: B (alert clearly with reasons and persist until heard)
💡 Speak up immediately with evidence such as bearing trend and persist; silent compliance is a classic BRM failure.
✗
Question 97. How often should the safety/environment policy be reviewed?
Your Answer: (Not answered)
Correct Answer: B (periodically (e.g. at management review) and after major changes)
💡 The policy must be reviewed as rules, risks and the organisation change.
✗
Question 98. Key controls in changing over to low-sulphur fuel are?
Your Answer: (Not answered)
Correct Answer: A (control temperature and sequence, complete before entering the ECA and log it)
💡 Follow procedures managing temperature to avoid slugs and viscosity shock, completing before entry and logging it.
✗
Question 99. Who approves the loading/stowage plan?
Your Answer: (Not answered)
Correct Answer: A (master approves, chief officer prepares with terminal coordination)
💡 The chief officer prepares and the master approves it, covering stability, strength, segregation and port order.
✗
Question 100. The key control points of catering hygiene on board?
Your Answer: (Not answered)
Correct Answer: B (control of purchasing, storage, cooking temperatures and personal hygiene)
💡 Control sourcing, refrigeration temperatures, separation, cook health and hygiene plus cleaning of utensils.