Exam Home Website
中文 English
0
/100
FAIL
Correct: 0/100 Total Questions: 100 Time Spent: 60min0sec
Passing: 80
Retake History
Answer Review
✗
Question 1. Noticing the autopilot slowly drifting the ship off track, you should?
Your Answer: (Not answered)
Correct Answer: A (take manual control, correct and investigate the cause)
💡 Take manual control, correct, check settings and sensors and only resume automatic after cross-checking.
✗
Question 2. Measures against noise-induced hearing loss are?
Your Answer: (Not answered)
Correct Answer: A (wear hearing protection, limit exposure and test hearing periodically)
💡 Use plugs or muffs in noisy spaces, limit time and test hearing regularly to detect loss early.
✗
Question 3. What determines the tug plan for berthing and unberthing?
Your Answer: (Not answered)
Correct Answer: C (ship size, wind and current, and berth conditions together)
💡 Tug numbers follow ship size, wind, current and berth with margin, not a fixed custom.
✗
Question 4. What applies to the emergency stop signal between ship and shore?
Your Answer: (Not answered)
Correct Answer: C (agreed and confirmed beforehand so either side can stop pumps instantly)
💡 Agree and confirm the stop signal beforehand so either side can act immediately, a key spill prevention measure.
✗
Question 5. On receiving a distress signal from another vessel/aircraft, the ship should?
Your Answer: (Not answered)
Correct Answer: B (proceed to assist unless own safety precludes, and report to RCC)
💡 Assisting distressed craft is a duty, unless own safety is at risk.
✗
Question 6. Over-reliance on automation (e.g. autopilot) can?
Your Answer: (Not answered)
Correct Answer: D (erode vigilance and manual skill, slow response to anomalies)
💡 Automation reliance breeds monitoring laziness, slow in emergencies.
✗
Question 7. The relationship between MARPOL Special Areas and SMS documentation?
Your Answer: (Not answered)
Correct Answer: A (SMS must state stricter discharge limits and ops in special areas)
💡 Special Areas ban or tightly limit discharge; the SMS must spell out compliance per area.
✗
Question 8. When a detention is publicised, the company should?
Your Answer: (Not answered)
Correct Answer: B (correct facts first, then respond with progress and facts)
💡 Rectify first with evidence, then communicate; cover-ups compound reputational and compliance risk.
✗
Question 9. How are external documents (regulations, circulars) incorporated into the SMS?
Your Answer: (Not answered)
Correct Answer: D (identify applicability, update controlled list, brief and revise internal docs)
💡 Track new rules, assess applicability, update the list, brief staff and revise internal procedures.
✗
Question 10. The hazard of bridge crowding is?
Your Answer: (Not answered)
Correct Answer: A (distracts the watchkeeper and may confuse command and control)
💡 Unnecessary people chatter, block views and distract the watch; restrict the bridge to those needed.
✗
Question 11. How long must the Oil Record Book be kept on board?
Your Answer: (Not answered)
Correct Answer: A (at least three years after the last entry)
💡 Keep it on board at least three years after the final entry for port State verification.
✗
Question 12. What should a technical condition report be?
Your Answer: (Not answered)
Correct Answer: B (objective and specific with evidence and recommendations to support shore decisions)
💡 Reports must be objective, specific and evidenced with recommendations so shore can resource and decide without distortion.
✗
Question 13. The value of equipment history files is?
Your Answer: (Not answered)
Correct Answer: B (support trend analysis, life assessment and renewal decisions)
💡 Histories reveal repeat failures and degradation rates, guiding strategy and renewal decisions.
✗
Question 14. What are the requirements for the garbage record book?
Your Answer: (Not answered)
Correct Answer: D (every discharge or reception recorded, signed by the responsible person and the master)
💡 Record each operation by type, quantity and position with signatures, together with shore receipts as verification evidence.
✗
Question 15. A non-conformity description should include?
Your Answer: (Not answered)
Correct Answer: A (facts, location and time, the specific requirement breached and evidence)
💡 State observed facts and evidence and cite the clause or procedure breached so the auditee can act precisely.
✗
Question 16. What is the value of cyber emergency drills?
Your Answer: (Not answered)
Correct Answer: A (verifying the plan and exposing gaps in recovery)
💡 Drills test isolation, reporting and recovery, exposing failed backups or unclear duties and driving improvement.
✗
Question 17. The primary role of a ship agent is?
Your Answer: (Not answered)
Correct Answer: B (handle port formalities for the owner and coordinate services)
💡 The agent handles customs, health, berthing, supplies and crew matters, coordinating terminal, pilot and vendors.
✗
Question 18. If loading computer results differ from reality, what applies?
Your Answer: (Not answered)
Correct Answer: B (stop work, check input data and find the cause before continuing)
💡 Differences usually come from wrong tank inputs or inaccurate soundings; verify inputs and measurements before carrying on.
✗
Question 19. Sea suction blocked by frazil ice in ice-covered waters; you should?
Your Answer: (Not answered)
Correct Answer: A (switch to an alternate sea chest, back-flush and reduce load)
💡 Blocked suctions stop cooling; change chests or back-flush and reduce load to avoid overheating shutdown.
✗
Question 20. A crew member collapses inside an enclosed space; the standby's correct reaction is?
Your Answer: (Not answered)
Correct Answer: A (do not rush in; alarm and rescue with proper equipment)
💡 The standby must not enter unprotected; blind multiple rescues cause secondary casualties—alarm and use gear.
✗
Question 21. A minor incident occurs in port without damage; the master should?
Your Answer: (Not answered)
Correct Answer: B (still report and record under procedure and find the cause)
💡 No damage does not mean no risk; report and record minor events, a key source of hazard detection.
✗
Question 22. The basic safety principle of container stowage is?
Your Answer: (Not answered)
Correct Answer: B (sound weight distribution, effective securing within stack loads and visibility limits)
💡 Respect stack and tier limits, place heavy boxes low, keep visibility and lash per the manual.
✗
Question 23. When a critical operation is found done outside the instruction (a non-conformity), the ship shall?
Your Answer: (Not answered)
Correct Answer: D (correct per NC procedure, analyse cause and prevent recurrence)
💡 Deviation is a non-conformity; correct it and do root-cause analysis to prevent recurrence (Rule 9).
✗
Question 24. Standby engines before entering port mainly serves to?
Your Answer: (Not answered)
Correct Answer: A (allow immediate speed/astern response for emergencies)
💡 Engines ready allow quick changes of speed or astern movement when a situation develops.
✗
Question 25. Which measure against fatigue really works?
Your Answer: (Not answered)
Correct Answer: D (schedules that meet the rules, rest protected in real periods, and a hard institutional cap on uncontrolled overtime)
💡 Fatigue is controlled by scheduling and rest, not by willpower or stimulant drinks: minimum rest is met and arranged so that a real sleep period is possible, night and continuous duty are limited together with extra work after handover, and overtime is authorised, recorded and capped; berth noise, lighting and vibration are improved, rosters that cannot be worked without overtime are corrected, and the watchkeeper is genuinely off before going on. When the workload exceeds the limit the company is told and the arrangement changed rather than the watch held by force. Cutting records only moves the fatigue elsewhere, and willpower does not rescue the next day's watch.
✗
Question 26. What is the purpose of the damage control plan?
Your Answer: (Not answered)
Correct Answer: C (show watertight subdivision, openings and closing appliances to guide emergency action)
💡 The plan gives watertight boundaries and closing points for decisions; crew must know it and find data in the dark.
✗
Question 27. Once a new SMS runs steadily, the focus should shift to?
Your Answer: (Not answered)
Correct Answer: B (monitoring performance, continuous review and improvement, not static)
💡 An SMS is never "done"; PDCA keeps it evolving with risk.
✗
Question 28. What is the purpose of onboard medical records?
Your Answer: (Not answered)
Correct Answer: A (record the condition and treatment, supporting further care and defining responsibility)
💡 Records support continuing care and serve as objective evidence in disputes and claims; keep them true and complete.
✗
Question 29. What does the system require of shore staff?
Your Answer: (Not answered)
Correct Answer: C (have the competence to support ship safety and pollution prevention)
💡 Shore staff must be competent and resource the ship; ship and shore together make the system work.
✗
Question 30. Who usually organizes the annual internal audit on board?
Your Answer: (Not answered)
Correct Answer: A (arranged by the company DPA with qualified auditors)
💡 The company schedules an annual board audit, usually via the DPA with qualified personnel.
✗
Question 31. During cargo operations on a tanker, who is answerable on the spot?
Your Answer: (Not answered)
Correct Answer: D (the master carries the overall responsibility, the chief officer runs cargo operations, the chief engineer the machinery)
💡 The system states the responsibility plainly: the master carries overall responsibility for safety and pollution prevention on board, the chief officer normally commands cargo work (cargo control, valves and pressures, liaison with the shore), and the chief engineer answers for pumps, lines and power on the machinery side. The cargo control room operator works to the chief officer's arrangements; the bridge watchkeeper is responsible for navigation and lookout, not for directing cargo operations alongside, and the shore authority is bounded by the hose and the connection flange. Who gives orders on the spot, who can stop the operation and who is told when something goes wrong has to be written down and repeated at the pre-transfer conference.
✗
Question 32. A certificate is nearly due and the company has arranged nothing. What does the master do?
Your Answer: (Not answered)
Correct Answer: A (urging the company in writing, copied to the designated person, and reporting to the authority if need be)
💡 The master carries the final responsibility for safety and for the ship's seaworthiness, and an expired certificate is not a matter of paper: it makes the ship unfit for her trading, exposes her to refusal of entry and detention, and pulls the conditions of insurance and charter with it. So the reminder goes out in writing to the company and is copied to the designated person, stating the date due, the ports reachable and where survey can be got, escalating to the classification society and the flag if nothing moves, and the whole exchange is filed as proof of what was done. Extension of a survey is granted by the authority that issued the certificate under its own rules; a date the master invents for himself is worth nothing. He may suggest which port to make and whether a service exists there, but taking the ship into an expired state is not one of the options open to him.
✗
Question 33. The role of Vessel Traffic Services is?
Your Answer: (Not answered)
Correct Answer: C (provide traffic information and advice, assisting but not relieving the master)
💡 VTS gives information and coordination advice, but command and decisions remain with the master.
✗
Question 34. Ship-shore comms during a security incident should be?
Your Answer: (Not answered)
Correct Answer: C (confidential, concise, on designated channels, preventing leak or misleading)
💡 Leaked security comms endanger hostages and ops; keep controlled.
✗
Question 35. ISM Chapter 8 requires emergency preparedness to?
Your Answer: (Not answered)
Correct Answer: A (identify potential emergencies with procedures, drills and review)
💡 Identify emergencies, plan responses and drill and review regularly so crews act correctly under stress.
✗
Question 36. The internal audit frequency should generally satisfy?
Your Answer: (Not answered)
Correct Answer: A (company ashore units and each ship at least annually, key departments more often)
💡 ISM 12 requires periodic internal audits; practice means annual coverage of ashore units and each ship.
✗
Question 37. The significance of a deductible is?
Your Answer: (Not answered)
Correct Answer: D (small losses borne by the owner, keeping premiums sensible and loss prevention motivated)
💡 Deductibles make owners absorb small losses, lowering premiums and encouraging prevention in small claims.
✗
Question 38. After the Master uses overriding authority to depart from procedures, the Master should?
Your Answer: (Not answered)
Correct Answer: A (record the rationale and circumstances and report to the Company afterwards)
💡 Document the departure with rationale and report it, supporting review and accountability.
✗
Question 39. On a spill, the SMS action chain is?
Your Answer: (Not answered)
Correct Answer: C (alarm, contain/recover per SOPEP, report to authority/Company)
💡 Spills need early report and control; SOPEP gear and reporting are timely.
✗
Question 40. The first step for a new ship management Company to build an SMS is?
Your Answer: (Not answered)
Correct Answer: C (top management commitment and policy, defining responsibility structure)
💡 The SMS starts with leadership commitment and policy; templates can't replace it.
✗
Question 41. What should crew change planning prioritise first?
Your Answer: (Not answered)
Correct Answer: D (safety and compliance including visas, travel risk and rest hours)
💡 Crew change involves visa, health, security and travel risk; assess safety and compliance before cost and speed.
✗
Question 42. The ISM Code makes the company establish emergency-preparedness procedures. What are they to cover?
Your Answer: (Not answered)
Correct Answer: B (the foreseeable emergencies — collision, grounding, fire, casualty, oil spill, abandon ship)
💡 The emergency-preparedness section asks the company to identify: the emergencies that ship, area and cargo can meet, a plan for each with duties, communications and resources, drills to prove the plan works, and the drill findings fed back into revision. Substituting piracy for every case, letting a port State defect list stand in for identification, or trimming drills when they inconvenience, all leave the procedure on paper.
✗
Question 43. Which is outside document control?
Your Answer: (Not answered)
Correct Answer: B (crew members' private letters)
💡 Document control covers system documents and records, not private correspondence.
✗
Question 44. While the ship is in for repair, who runs safety and pollution prevention?
Your Answer: (Not answered)
Correct Answer: B (the responsibility boundary between company, yard and ship has to be put down in writing)
💡 Repair time is high-risk time: hot work, tank entry, work at height and lifting run together on a ship that may still hold residues, gas and flammables. Before work starts the boundary between yard, ship and company is settled and written into the contract and the work permits - who authorises hot work, who tests the atmosphere and stands the fire watch, who controls extinguishing and alarms, who takes the waste oil, bilge and residue and issues the receipt, how tank entry is permitted. The ship's people join the rounds and the acceptance, and completed work is signed off against standard and test record rather than left to the yard's own quality check. Where the boundary is blurred, all three parties fail to explain the accident afterwards.
✗
Question 45. The main risk of reducing manning levels is?
Your Answer: (Not answered)
Correct Answer: A (accumulated fatigue, weaker emergency response and more errors)
💡 Cutting crew raises fatigue and weakens response, with post-incident costs far exceeding savings and possible manning breaches.
✗
Question 46. What does follow-up verification after a drill mean?
Your Answer: (Not answered)
Correct Answer: D (recheck that actions from the debrief were done and effective)
💡 Assign owners and deadlines for drill findings and recheck effectiveness; unverified means not closed.
✗
Question 47. What makes the ship's first-aid capability real?
Your Answer: (Not answered)
Correct Answer: D (stores, trained people, reachable shore advice and a written procedure - all four)
💡 Missing any one of the four, and the ship has an accident: medicines and equipment carried to the ship's grade and route, listed, in date and registered; crew trained to stop bleeding, do resuscitation, splint and move a casualty, handle burns and inhalation injury, with drugs and injections given only by the trained; medical advice from the shore reachable when the link allows - radio, satellite or a shore service - with medical history, health records and the drug list available on board; and the steps for treatment, evacuation and notification written into the system and drilled. A full chest is not the ability to use it, and a link to advice ashore is not a reason to skip training.
✗
Question 48. Safety management of potable water on board includes?
Your Answer: (Not answered)
Correct Answer: A (periodic residual chlorine and microbiological testing plus tank cleaning)
💡 Test microbes and chlorine residual, clean and disinfect tanks with records to prevent waterborne outbreaks.
✗
Question 49. How to treat "inshore traffic zones" and "deep-water routes" in planning?
Your Answer: (Not answered)
Correct Answer: C (use per rules, avoid restricted zones, deep-draft uses deep-water route)
💡 Use designated deep-water routes for deep-draft vessels; avoid inshore zones unintentionally.
✗
Question 50. Procurement of critical spares should be managed by the SMS to?
Your Answer: (Not answered)
Correct Answer: A (ensure qualified sources, timely supply and acceptance, no substandard)
💡 Spare quality bears on safety; the SMS controls the procurement chain.
✗
Question 51. The most dangerous consequence of deck icing is?
Your Answer: (Not answered)
Correct Answer: D (raised centre of gravity degrading stability and risking capsize)
💡 Ice raises G and windage, seriously harming stability and risking capsize, especially for smaller ships; clear it.
✗
Question 52. What does extending corrective action fleet-wide mean?
Your Answer: (Not answered)
Correct Answer: C (extend cause checks and fixes to other ships or departments with the same risk)
💡 After fixing one case, check other ships for the same risk and act so problems do not rotate around the fleet.
✗
Question 53. A common reason management innovation fails is?
Your Answer: (Not answered)
Correct Answer: B (it fails to address real front-line pain points, form over substance)
💡 Innovation that adds forms without solving problems becomes a burden; define the pain point first.
✗
Question 54. What does the system require of maintenance records?
Your Answer: (Not answered)
Correct Answer: C (true, timely, traceable and matched to the planned maintenance system)
💡 Records must be true, timely and linked to planned maintenance, building history for assessment and survey.
✗
Question 55. The core of cargo records and documentation management is?
Your Answer: (Not answered)
Correct Answer: B (accurate, complete, traceable and retained with proper handover)
💡 Records, manifests, bill remarks and surveys must be accurate and retained as the evidence chain for claims.
✗
Question 56. Why is temperature monitored in dangerous goods spaces?
Your Answer: (Not answered)
Correct Answer: B (to prevent self-heating, polymerisation or decomposition leading to runaway reaction)
💡 Some cargoes self-heat or decompose when warm; monitoring and ventilation are key controls against fire and explosion.
✗
Question 57. When communications break in an emergency, what should the standby means include?
Your Answer: (Not answered)
Correct Answer: C (satellite and medium/high frequency sets standing by, the beacon, the transponder and the pyrotechnics behind them)
💡 The call should not depend on a single path: the beacon puts an alert with the position out through the satellite system as soon as it is freed; the radar transponder answers on the search units' own screens; the satellite station and the medium/high frequency set stand for one another, very high frequency serving the short reach; rockets, torches and the mirror still work when the radio has failed or a position must be shown. What the sea area calls for is carried, effective, with batteries in date and the crew having handled it, so that one path failing sends the watch to the next rather than to the shore and its telephone cover, or to a neighbour's good will. Stowage and waterproofing are counted separately, so a single wetting does not take the whole set of means at once.
✗
Question 58. What is the focus when checking an agent's disbursement account?
Your Answer: (Not answered)
Correct Answer: D (whether services actually occurred and rates match the agreement)
💡 Check that services happened and rates match the quotation; query and record discrepancies to stop systematic overcharging.
✗
Question 59. Before the pilot leaves after berthing, the master should?
Your Answer: (Not answered)
Correct Answer: D (confirm mooring is secure, complete handover and sign necessary documents)
💡 Confirm mooring, complete handover and paperwork and ensure nothing is outstanding before the pilot leaves.
✗
Question 60. Large areas of floating debris are met at sea; what applies?
Your Answer: (Not answered)
Correct Answer: B (slow down, keep watch, keep clear and report, minding the propeller and sea suction)
💡 Debris can foul the propeller or block sea suctions; slow, keep clear, watch closely and check the sea system afterwards.
✗
Question 61. The fundamental purpose of an SMS audit is NOT to?
Your Answer: (Not answered)
Correct Answer: A (pick faults to fine, but to verify effectiveness and improve)
💡 Audits are constructive—finding weaknesses to improve, not to punish.
✗
Question 62. After new equipment is fitted, the SMS should?
Your Answer: (Not answered)
Correct Answer: B (update procedures and training, revise drawings and add it to the PMS)
💡 Update instructions, drawings and the PMS and train the crew, or a management gap appears immediately.
✗
Question 63. How does the ISM Code relate to pollution prevention?
Your Answer: (Not answered)
Correct Answer: A (pollution prevention is one of its objectives, embedded in operations and emergencies)
💡 ISM lists pollution prevention as an objective and integrates it into operations and emergency preparedness (e.g. SOPEP).
✗
Question 64. What does the system require for emergency preparedness?
Your Answer: (Not answered)
Correct Answer: C (identify potential emergencies and set response procedures and drills)
💡 Preparedness identifies possible emergencies, sets response procedures and tests them through drills.
✗
Question 65. The purpose of testing the main engine before port entry is?
Your Answer: (Not answered)
Correct Answer: A (confirm ahead and astern reliability for engine standby and emergency manoeuvring)
💡 Trial of ahead and astern confirms the plant responds so emergency manoeuvring is available.
✗
Question 66. The role of information sharing among memoranda is?
Your Answer: (Not answered)
Correct Answer: D (makes deficiency and detention records visible across regions, preventing evasion)
💡 Shared data stops ships evading by changing trades and helps ports target high-risk vessels precisely.
✗
Question 67. The closed-loop requirement for issues found by supervision is?
Your Answer: (Not answered)
Correct Answer: D (assign owner and deadline, verify effectiveness and file evidence)
💡 Assign owners and deadlines, verify effectiveness and file evidence; unverified actions are not closed.
✗
Question 68. Smoke from self-heating cargo is found during discharge; you should?
Your Answer: (Not answered)
Correct Answer: D (stop work, seal and inert or apply water per plan and seek expert advice)
💡 Stop, seal and inert or fight carefully per the cargo emergency procedure, and seek expert advice ashore.
✗
Question 69. How should safety incentive work in the SMS?
Your Answer: (Not answered)
Correct Answer: A (tie safety performance to recognition and to resources, rather than to penalties alone)
💡 Incentive must point at the behaviour wanted: recognition, backed by resources (training time, spares, manning, working conditions), follows the number and quality of reports, drill performance, prompt correction of defects and improvement suggestions, while penalties stay reserved for deliberate breach and concealment. A penalty-only scheme, or a bonus paid on a clean accident figure, pushes near-misses back under the surface - fewer reports do not mean fewer incidents. Just culture, which separates honest error from reasonable risk from recklessness, is the foundation of the approach.
✗
Question 70. The main engine suddenly slows automatically at sea; you should?
Your Answer: (Not answered)
Correct Answer: B (find the alarm cause, inform the master and adopt a safe handling state)
💡 Automatic slowdown is protective; find the cause, tell master and chief engineer and adopt a safe speed.
✗
Question 71. The main legal risk of electronic logbooks is?
Your Answer: (Not answered)
Correct Answer: A (undetectable alteration and challenges to evidential value)
💡 E-logs need access control, timestamps, tamper-proof audit trails and flag acceptance to hold evidential value.
✗
Question 72. On what basis is the quantity of oil cargo normally measured?
Your Answer: (Not answered)
Correct Answer: C (volume reduced to the standard reference temperature, the buoyancy correction separating the two weights)
💡 Delivery is reckoned on volume at the standard reference temperature: the cargo's observed temperature and density are taken, the observed volume is reduced by the volume correction factor, and the weight follows from that; converting weight in vacuo to weight in air takes the buoyancy correction, the deduction of the air the cargo displaces, which is the arithmetic behind the customary gap between bill of lading and shore figures. Handing over the shore reading or the observed volume leaves the temperature difference in the account, and drafts will not give the cargo reliably, tide, dock water density and hull deformation being against them, so drafts serve only as a check. Where ship and shore disagree beyond what practice allows, the measurement method and the cargo data are gone over and what was done recorded.
✗
Question 73. In a narrow channel a large ship overtakes from astern; what applies?
Your Answer: (Not answered)
Correct Answer: A (hold course and speed and communicate, slowing to give room if needed)
💡 Overtaking room is limited; confirm intentions, stay predictable and slow to cooperate if needed.
✗
Question 74. With the ship disabled and towing requested, the master should first?
Your Answer: (Not answered)
Correct Answer: C (report the company and clarify contract type, cost and safety responsibility with the salvor)
💡 Clarify whether it is towage or salvage, with cost and liability, before agreeing, to avoid later disputes.
✗
Question 75. Navigation lights fail and cannot be repaired; you should?
Your Answer: (Not answered)
Correct Answer: C (show emergency substitute lighting, inform traffic and VTS and log it)
💡 Use backup or temporary lighting, strengthen the lookout, inform traffic and VTS, log it and repair promptly.
✗
Question 76. What does the system require on contracts and wage payment?
Your Answer: (Not answered)
Correct Answer: A (sign lawfully, pay in full and on time and keep signed receipts)
💡 Contracts and wages are inspection priorities: sign properly, pay on time and keep receipts.
✗
Question 77. Severe convective weather strikes while in port; the watchkeeper should?
Your Answer: (Not answered)
Correct Answer: B (increase patrols, adjust lines and report the master, standing by engines if needed)
💡 Convective weather changes line loads and scatters deck gear; patrol, adjust, report and stand by engines as needed.
✗
Question 78. The long-term strategy for managing incident-related public opinion is?
Your Answer: (Not answered)
Correct Answer: B (rebuild trust with safety performance and transparency)
💡 Long-term trust comes from real improvement and transparency, not from suppressing coverage.
✗
Question 79. The consequence of not holding management review on schedule is?
Your Answer: (Not answered)
Correct Answer: B (improvement lacks decision input, an SMS implementation non-conformity)
💡 Skipping review shows weak top-management involvement and is judged a system implementation non-conformity.
✗
Question 80. What is the standard for judging document effectiveness?
Your Answer: (Not answered)
Correct Answer: A (whether crews can follow it and achieve the intended result)
💡 Effectiveness means crews can follow it and get the intended result: workable, verifiable and effective.
✗
Question 81. The MLC requirement for onboard complaint procedures is?
Your Answer: (Not answered)
Correct Answer: A (shipboard procedures with escalation beyond master, recorded and answered)
💡 MLC requires fair, recorded procedures with escalation and confidentiality, answered within set times.
✗
Question 82. The relationship between SOLAS Chapter IX and the ISM Code?
Your Answer: (Not answered)
Correct Answer: B (SOLAS Chapter IX makes ISM mandatory)
💡 SOLAS Chapter IX incorporates the ISM Code, making it mandatory for applicable ships.
✗
Question 83. Before entering an enclosed space (empty tank, cofferdam), the mandatory requirement is?
Your Answer: (Not answered)
Correct Answer: A (test O2/toxic/explosive, ventilate, standby, permit; never enter alone)
💡 Enclosed spaces carry oxygen/toxic/explosive hazards; testing, stand-by and permit are mandatory.
✗
Question 84. Foreign objects are wedged between the hull and fenders alongside; you should?
Your Answer: (Not answered)
Correct Answer: B (clear the objects and adjust lines and fenders to prevent local damage)
💡 Wedged objects cause local crushing; clear them and adjust lines and fenders for even contact.
✗
Question 85. The international convention governing seafarer training and certification is?
Your Answer: (Not answered)
Correct Answer: A (the STCW Convention)
💡 Seafarer competence and certification are governed by STCW; MLC covers labour conditions, not competency.
✗
Question 86. Onboard repairs with hot work, enclosed space etc. require the SMS to?
Your Answer: (Not answered)
Correct Answer: A (permits, stand-by and joint yard/ship safety supervision)
💡 Repair-period accidents spike; joint supervision is mandatory.
✗
Question 87. A crew member reports someone threatening others' safety; the master should?
Your Answer: (Not answered)
Correct Answer: C (stop and separate at once, investigate and act per discipline and law)
💡 Stop and separate, protect others, gather evidence and handle per policy and law while reporting up.
✗
Question 88. The principle for slow or sailing vessels in traffic is?
Your Answer: (Not answered)
Correct Answer: C (not impede by slow speed or privilege, clear the route in time)
💡 Slow or privileged craft should still avoid impeding others and clear the way as needed.
✗
Question 89. Why is a ship-shore communications arrangement agreed before tanker operations begin?
Your Answer: (Not answered)
Correct Answer: A (both sides working to one set of calls and emergency stop signals so that a fault halts the pumps at once)
💡 The checklist completed before cargo work begins asks how the two sides will talk: which watches are kept, on which channel or by which signals, who may trigger an emergency stop and how the pumps are restarted, and who on each side is the person to reach. Arranged beforehand and tested, it lets either side halt the pumping the moment something is wrong, and the agreed way of confirming before starting again is what keeps a well-meant stop from turning into a rush. It is no substitute for the explosion-proof communication the hazardous area requires, and it is not written for an inspection or to divide liability afterwards; a channel or a watch changed without telling the other side empties the arrangement of meaning, and what was agreed belongs in the record.
✗
Question 90. A ballast tank level rises without apparent cause at sea; you should?
Your Answer: (Not answered)
Correct Answer: D (trace cross-flooding or ingress, monitor and report to assess stability)
💡 Rising level suggests valve leakage or hull ingress; find the source, monitor and compute stability, sheltering if needed.
✗
Question 91. Which best shows systematic ballast water management?
Your Answer: (Not answered)
Correct Answer: A (plan, duties, training, records and self-checks forming a closed loop)
💡 Systematic management means a closed loop of documents, duties, training, records and improvement, not equipment alone.
✗
Question 92. To test real capability, drills should occasionally?
Your Answer: (Not answered)
Correct Answer: A (be unannounced with injected variables to test improvisation)
💡 Surprise drills expose plan gaps and real skill—an improvement chance.
✗
Question 93. When the master or key crew is temporarily absent, the SMS requires?
Your Answer: (Not answered)
Correct Answer: C (a designated competent substitute with handover, no duty vacuum)
💡 Key posts need an authorised competent back-up to avoid a command gap.
✗
Question 94. Checking phase sequence before shore connection is?
Your Answer: (Not answered)
Correct Answer: A (a necessary connection check to prevent motors running in reverse)
💡 Wrong phase sequence reverses motors and damages plant; check sequence and earthing before connecting.
✗
Question 95. How can disputes over bunker quantity be prevented?
Your Answer: (Not answered)
Correct Answer: D (joint measurement before and after, sealed samples and signed documents)
💡 Disputes come from differing measurement; gauge jointly, seal samples and sign documents to support claims.
✗
Question 96. When ballast water exchange cannot be carried out, the ship should?
Your Answer: (Not answered)
Correct Answer: C (retain the water on board or use another approved method and report)
💡 If exchange is impossible, retain the water or use an approved alternative and report to the authority.
✗
Question 97. With a pilot aboard the master considers an order wrong; the correct handling is?
Your Answer: (Not answered)
Correct Answer: D (raise it on the spot, take over if needed and request a replacement if necessary)
💡 Clarify or correct immediately, take the conn if needed, and request a replacement while reporting up.
✗
Question 98. A bunker hose bursts during bunkering in port; you should?
Your Answer: (Not answered)
Correct Answer: B (stop pumping at once, close valves, contain and activate the spill plan)
💡 Stop and close valves, boom to contain, report port and company and start the spill plan, excluding ignition sources.
✗
Question 99. Once the company emergency response team (ERT) activates, its first task is?
Your Answer: (Not answered)
Correct Answer: C (establish the situation, stabilise shipboard conditions, protect personnel and coordinate resources)
💡 The ERT first supports the ship: establish facts, stabilise, protect lives and mobilise resources.
✗
Question 100. Hot work began in port without a permit and caused a small fire. The root cause is?
Your Answer: (Not answered)
Correct Answer: B (permit system not followed, weak supervision and training)
💡 Hot work demands permits, gas tests and isolation; skipping them signals systemic rather than chance failure.