Exam Home Website
中文 English
0
/100
FAIL
Correct: 0/100 Total Questions: 100 Time Spent: 60min0sec
Passing: 80
Retake History
Answer Review
✗
Question 1. When a newbuilding joins the Company SMS, it should?
Your Answer: (Not answered)
Correct Answer: D (complete familiarisation, procedure-equipment alignment and audit approval)
💡 Newbuilds must merge into the SMS and be approved, not run outside it.
✗
Question 2. Near the termination of a traffic separation scheme, what needs special attention?
Your Answer: (Not answered)
Correct Answer: B (traffic merges with complex flows here; look out and assess early)
💡 At terminations and junctions flows merge and cross; look out hard, assess early and keep a safe speed.
✗
Question 3. Verification after an equipment retrofit should be?
Your Answer: (Not answered)
Correct Answer: A (run functional and safety checks and update records before service)
💡 Test functions and safety, check interlocks and alarms, update drawings and instructions and confirm before service.
✗
Question 4. Medical first-aid drills should?
Your Answer: (Not answered)
Correct Answer: C (practice bleeding control, CPR, casualty handling and remote reporting)
💡 Hands-on drills make crew confident and capable in real casualties.
✗
Question 5. What should NOT appear in emergency drill records?
Your Answer: (Not answered)
Correct Answer: D (fabricated results or uniformly perfect times unlike reality)
💡 Records must be truthful with flaws and variations; fabrication hides problems and is easily detected in audit.
✗
Question 6. What is the purpose of trials or verification after repair?
Your Answer: (Not answered)
Correct Answer: B (confirm repair results and restored function)
💡 Verify restored function by trials after repair; do not resume normal service without confirmation.
✗
Question 7. After a blackout on the main switchboard, the first priority is?
Your Answer: (Not answered)
Correct Answer: D (restore emergency power, steering and comms then find the cause)
💡 Restore emergency power, steering and communications first, then load gradually and trace the cause.
✗
Question 8. What makes onboard safety meetings effective?
Your Answer: (Not answered)
Correct Answer: C (focused topics, participation by all and follow-up on previous items)
💡 Effective meetings focus on real risk, involve all ranks and track previous decisions into a closed loop.
✗
Question 9. The difference between safety observation and safety audit is?
Your Answer: (Not answered)
Correct Answer: B (observation targets daily behaviour with immediate feedback; audit targets conformity)
💡 Observation is routine peer or supervisor feedback; audit is planned verification of conformity and effectiveness.
✗
Question 10. Common causes of distorted performance data are?
Your Answer: (Not answered)
Correct Answer: B (targets tied to appraisal causing false or selective reporting)
💡 When metrics drive rewards or penalties, staff under-report or polish data; soften punitive use and cross-verify.
✗
Question 11. The Master's review and reporting obligation for the SMS is?
Your Answer: (Not answered)
Correct Answer: D (periodically review the SMS and report deficiencies to the Company)
💡 Rule 5.1.5: the Master shall periodically review the SMS and report any deficiencies to the Company.
✗
Question 12. When carrying deck cargo, the key considerations are?
Your Answer: (Not answered)
Correct Answer: C (control weight/height within limits, keep visibility and stability, lash securely)
💡 Limit height/weight, protect visibility and stability, lash per manual and re-check during voyage.
✗
Question 13. What does the system require for stowage and securing of stores?
Your Answer: (Not answered)
Correct Answer: A (sorted and secured stowage preventing movement or falling, with access kept clear)
💡 Sort and secure stores and keep passages and escape routes clear to prevent injury or blocked escape.
✗
Question 14. The main legal risk of electronic logbooks is?
Your Answer: (Not answered)
Correct Answer: A (undetectable alteration and challenges to evidential value)
💡 E-logs need access control, timestamps, tamper-proof audit trails and flag acceptance to hold evidential value.
✗
Question 15. What is a reasonable frequency for oil spill drills?
Your Answer: (Not answered)
Correct Answer: D (carried out periodically within the maximum interval set by the system)
💡 The system fixes a maximum interval and must comply so crews know duties and equipment before an incident.
✗
Question 16. What is the risk in electronic document management?
Your Answer: (Not answered)
Correct Answer: A (version confusion and unauthorised changes undermining control)
💡 Electronic files need permissions and version control against casual edits and old versions, with retrievable backups.
✗
Question 17. The correct way to correct an error in the deck logbook is?
Your Answer: (Not answered)
Correct Answer: C (strike through keeping the original legible, annotate and sign with date)
💡 Strike one line leaving the original readable, annotate and sign with date; never erase, tear or cover.
✗
Question 18. The relationship between PSC and flag State responsibility is?
Your Answer: (Not answered)
Correct Answer: C (PSC supplements flag implementation without releasing the flag)
💡 PSC complements flag oversight; the flag's certification and supervision duties remain.
✗
Question 19. What is the core role of the Ship Energy Efficiency Management Plan?
Your Answer: (Not answered)
Correct Answer: A (continuous improvement of efficiency through measures, monitoring and evaluation)
💡 The SEEMP drives improvement through plan-do-check-act with measurable measures and tracking.
✗
Question 20. The ship is tidied before an inspection. What is that for?
Your Answer: (Not answered)
Correct Answer: D (slippery appearance invites a deeper inspection, and the first impression counts)
💡 Rusted plating, rope coiled anyhow, passages blocked, engine-room floor plates still oily - the officer reads management out of that and moves from sampling to digging: maintenance records called for, a demonstration on the spot, a look at wastage below. A ship that is tidy, correctly marked and clear in her passages generally gets the normal scope. Tidying is therefore not for the photograph; it is about not handing the inspector the depth of his inspection at the start. These items are themselves safety requirements - passages, lighting, handrails, escape routes - so straightening them sweeps out hazards at the same time.
✗
Question 21. Who is authorised to make official logbook entries?
Your Answer: (Not answered)
Correct Answer: B (the watch officer and authorised crew per the SMS)
💡 Entry authority must be defined to preserve evidential weight.
✗
Question 22. The coordination requirement between COW and inert gas on tankers is?
Your Answer: (Not answered)
Correct Answer: D (COW requires inerted tanks with controlled O2)
💡 COW uses cargo oil to wash walls; it must run with inerted, oxygen-controlled tanks.
✗
Question 23. During cargo operations on a tanker, who is answerable on the spot?
Your Answer: (Not answered)
Correct Answer: D (the master carries the overall responsibility, the chief officer runs cargo operations, the chief engineer the machinery)
💡 The system states the responsibility plainly: the master carries overall responsibility for safety and pollution prevention on board, the chief officer normally commands cargo work (cargo control, valves and pressures, liaison with the shore), and the chief engineer answers for pumps, lines and power on the machinery side. The cargo control room operator works to the chief officer's arrangements; the bridge watchkeeper is responsible for navigation and lookout, not for directing cargo operations alongside, and the shore authority is bounded by the hose and the connection flange. Who gives orders on the spot, who can stop the operation and who is told when something goes wrong has to be written down and repeated at the pre-transfer conference.
✗
Question 24. How should the SMS handle flag State circulars and marine notices?
Your Answer: (Not answered)
Correct Answer: A (assess applicability, add to controlled list and brief for implementation)
💡 Flag circulars carry mandatory or advisory content; assess, list, revise procedures and train to avoid gaps.
✗
Question 25. How long should crew change documents and records be kept?
Your Answer: (Not answered)
Correct Answer: C (kept for the period set by company and law for inspection and disputes)
💡 Crew change records are evidence for inspection and disputes; keep them for the required period and retrievable.
✗
Question 26. On sudden critical-equipment failure, the SMS response is?
Your Answer: (Not answered)
Correct Answer: B (report, assess risk, limit damage, repair per procedure and record)
💡 Failure follows report-assess-limit-repair-record to prevent escalation.
✗
Question 27. At night a floating container is sighted ahead; what applies?
Your Answer: (Not answered)
Correct Answer: B (alter course to avoid it, slow down and report to VTS and following ships)
💡 A floating container is a serious collision hazard; avoid, slow and alert VTS and other ships so they do not hit it.
✗
Question 28. IMO intact stability requirements are usually verified via?
Your Answer: (Not answered)
Correct Answer: D (checking stability criteria for loading conditions in approved stability data)
💡 Approved stability data must show compliance of each loading condition with the criteria.
✗
Question 29. ISM Chapter 7 requires key shipboard operations to?
Your Answer: (Not answered)
Correct Answer: D (have procedures or instructions assigned to qualified personnel)
💡 Safety-critical operations need written procedures with assigned and qualified personnel.
✗
Question 30. When the Master's safety/pollution decision conflicts with existing SMS procedures?
Your Answer: (Not answered)
Correct Answer: C (the Master's decision is overriding and may depart from procedures)
💡 Rule 5.2: for safety/pollution, the Master's necessary decision is overriding and may depart from procedures.
✗
Question 31. On a major issue (casualty, major defect, security threat), the ship should first report to?
Your Answer: (Not answered)
Correct Answer: A (the Company/DPA, who coordinates resources and escalation)
💡 The DPA is the ship's escalation point, enabling upward info and downward support.
✗
Question 32. After major repairs, the SMS requires?
Your Answer: (Not answered)
Correct Answer: D (accept per standard, keep certificates/records, verify safe state restored)
💡 Acceptance closes the repair loop; operating unverified risks hidden defects.
✗
Question 33. The main use of the Medical First Aid Guide is to?
Your Answer: (Not answered)
Correct Answer: B (guide treatment of common injuries and illness without a doctor)
💡 It gives stepwise first-aid guidance where no doctor is aboard, used alongside shore medical advice.
✗
Question 34. Whether a crew member may work independently is ultimately judged by?
Your Answer: (Not answered)
Correct Answer: C (SMS-assessed competence and familiarisation, not the certificate alone)
💡 A certificate is a threshold; independent duty needs assessed competence.
✗
Question 35. Language requirement for key watch ratings (deck/engine) is?
Your Answer: (Not answered)
Correct Answer: B (enough to understand and execute working-language orders and emergency comms)
💡 Key ratings must read orders and join emergency comms; language is safety.
✗
Question 36. What should the master watch when signing a salvage contract?
Your Answer: (Not answered)
Correct Answer: D (understand the terms, report the company and avoid committing sums alone)
💡 Salvage terms matter greatly: understand them, report, and never sign blanks or commit guarantees alone.
✗
Question 37. The DPA must guarantee?
Your Answer: (Not answered)
Correct Answer: D (the ship can reach him at any time, including off-hours)
💡 24/7 reachability is mandatory; otherwise the emergency link breaks.
✗
Question 38. The Company's SMS manual should normally?
Your Answer: (Not answered)
Correct Answer: C (be written in language the crew understand and link to ship-specific procedures)
💡 The manual must be workable, understandable and ship-specific; a paper-only system is a PSC target.
✗
Question 39. Shore technical support to the ship should show in?
Your Answer: (Not answered)
Correct Answer: A (timely advice, repair plans and spares, tracking defect closure)
💡 Shore technical backing keeps equipment reliable.
✗
Question 40. When an ARPA target is lost, you should?
Your Answer: (Not answered)
Correct Answer: C (watch visually and on raw radar echoes and re-acquire)
💡 Loss is not disappearance: keep visual and raw video watch, re-acquire manually and cross-check.
✗
Question 41. Common causes of failed internal coordination are?
Your Answer: (Not answered)
Correct Answer: B (unclear duties, inconsistent terminology and no cross-checking)
💡 Failures come from unclear roles, mixed terminology and missing read-back; fix with muster lists, standard phrases and read-back.
✗
Question 42. What is the most effective language strategy on a multinational ship?
Your Answer: (Not answered)
Correct Answer: A (establish a common working language and require standard phrases for key orders)
💡 Set a common working language, use standard marine phrases for key orders and read back to avoid misunderstanding.
✗
Question 43. When undermanning is found, the audit should trace it to?
Your Answer: (Not answered)
Correct Answer: A (company manning policy and resourcing, a shore management duty)
💡 Undermanning usually stems from company staffing and budget decisions, so findings should point ashore.
✗
Question 44. Caught in sudden dense fog transiting a canal or narrow channel, what should be done?
Your Answer: (Not answered)
Correct Answer: A (slow with engines ready, sound fog signals, inform VTS and anchor if appropriate)
💡 Slow and ready engines, sound signals, inform VTS and anchor in a safe place if continuing is unsafe.
✗
Question 45. Whose responsibility are safety and pollution prevention?
Your Answer: (Not answered)
Correct Answer: C (on the Company: the owner, or the firm that has taken over the management of the ship)
💡 The rule lays this on the Company, and Company is not read off the register: it means the owner, or any organisation or person that has taken on the owner's responsibility and the functions of managing the ship, which may be a manager or a bareboat charterer. Whichever party signed on for that duty and holds the document covering this ship carries it, and no charter arrangement makes it disappear; under a bareboat the charterer in fact manages ship and crew and must build and maintain the system in his own name. The master's own overriding authority on safety and pollution is a separate provision and the two must not be confused - the shore sets the system up and puts resources into it, the ship works it and decides on the spot.
✗
Question 46. The main purpose of a fire patrol is to?
Your Answer: (Not answered)
Correct Answer: A (detect early signs, stop unsafe acts and verify fire systems)
💡 Patrols catch incipient signs and unsafe acts early and check escape routes—the cheapest prevention available.
✗
Question 47. What is the key step in accepting stores and spares?
Your Answer: (Not answered)
Correct Answer: C (check specification, model and certificates, inspect condition and quantity and sign)
💡 Acceptance checks specification, model, certificates, condition and quantity, preventing counterfeit parts on board.
✗
Question 48. A crew member refuses to carry out a safety order; the master should?
Your Answer: (Not answered)
Correct Answer: C (find out why, stop him working if needed and act under procedure)
💡 Control the risk, find the reason and act under disciplinary procedure while keeping records and evidence.
✗
Question 49. Modern SMS often uses "condition monitoring" to?
Your Answer: (Not answered)
Correct Answer: D (schedule maintenance by actual condition, avoiding over- or under-maintenance)
💡 Condition monitoring complements planned maintenance with data-driven decisions.
✗
Question 50. What applies to checking sacrificial anode consumption?
Your Answer: (Not answered)
Correct Answer: B (check remaining mass periodically on plan and renew in time)
💡 Consumed anodes stop protecting; check remaining mass on schedule and renew so the hull is never unprotected.
✗
Question 51. In fog a fog signal is heard near the beam and very close; you should?
Your Answer: (Not answered)
Correct Answer: D (slow or stop at once, act cautiously and avoid blind alteration)
💡 A close signal means a vessel is nearby; slow or stop first since blind turns may collide.
✗
Question 52. What is the basis for accepting repair work?
Your Answer: (Not answered)
Correct Answer: C (the approved scope, technical standards and survey acceptance)
💡 Accept against approved scope and standards with class or survey acceptance, not merely completion.
✗
Question 53. Upon receiving a non-conformity report, the master should?
Your Answer: (Not answered)
Correct Answer: B (confirm facts, organize correction, record and report to company)
💡 The master verifies, corrects, keeps evidence and reports up; major NCs also to the Administration.
✗
Question 54. Passing through fishing grounds at night requires attention to?
Your Answer: (Not answered)
Correct Answer: D (fishing boats show irregular lights and may show none; slow and look out)
💡 Fishing lights mix with working lights and may be absent; slow down, look out hard and keep clear.
✗
Question 55. If the charterer orders a port outside insurance or war-risk cover, what applies?
Your Answer: (Not answered)
Correct Answer: B (confirm additional cover with owners first, otherwise the master may decline)
💡 High-risk ports need war-risk cover arranged by owners; otherwise cover and liability have dangerous gaps.
✗
Question 56. What should structural maintenance records be?
Your Answer: (Not answered)
Correct Answer: C (complete and continuous, forming a traceable history for survey and decisions)
💡 Continuous records show corrosion and repair trends and support survey, budgeting and risk assessment.
✗
Question 57. The purpose of a post-emergency debrief is?
Your Answer: (Not answered)
Correct Answer: B (review decisions/actions, find gaps, revise plan and train)
💡 Debrief identifies gaps to revise the plan, upgrade gear and train the crew.
✗
Question 58. The purpose of a technical bulletin is?
Your Answer: (Not answered)
Correct Answer: D (inform the fleet of equipment failures, fixes and operational cautions)
💡 Bulletins spread one ship's failure and fix to sister ships quickly, preventing repeats across the fleet.
✗
Question 59. Sea suction blocked by frazil ice in ice-covered waters; you should?
Your Answer: (Not answered)
Correct Answer: A (switch to an alternate sea chest, back-flush and reduce load)
💡 Blocked suctions stop cooling; change chests or back-flush and reduce load to avoid overheating shutdown.
✗
Question 60. What does data governance in the SMS mainly refer to?
Your Answer: (Not answered)
Correct Answer: A (standardising collection, definitions, quality and ownership so data are reliable)
💡 Governance unifies definitions, assures sources and assigns ownership so reports genuinely support decisions.
✗
Question 61. What commonly causes loss of control over stores and provisions cost?
Your Answer: (Not answered)
Correct Answer: B (unplanned requisitions, waste and expiry losses)
💡 Poor planning and stock control cause duplicate buying, expiry and waste; control it through registers and planning.
✗
Question 62. What does the passage plan have to take on before ice?
Your Answer: (Not answered)
Correct Answer: A (arrangements for handling and lookout in ice, protection against freezing, clearing ice from deck, and a plan of refuge)
💡 What the plan takes on for ice: how far the ship's ice class and structure let her go into the ice, where the ice report and the forecast come from, the limits on speed and steering (a ship cannot be handled in ice as in open water), how lookout and the uncertainty of position are managed, protection against freezing of cooling water lines and deck piping, non-slip and ice clearing on deck, what fire and life-saving gear does at low temperature, the behaviour of fuel and lubricating oil in cold, the way out if heavy ice is met and where to take refuge, and the contact with icebreaker or escort. None of this is recovered by improvising on the spot, and every line needs both a man who can do it and the gear to do it with.
✗
Question 63. When ECDIS and radar disagree on a target's position, you should?
Your Answer: (Not answered)
Correct Answer: A (treat it as an alert discrepancy, cross-check and resume manual fixing)
💡 The mismatch signals position or target error; check GNSS source, offset and radar alignment, then navigate manually.
✗
Question 64. For tanker ship-to-ship (STS) transfer, the SMS specifically requires?
Your Answer: (Not answered)
Correct Answer: C (prior approval, compatibility assessment, joint emergency coordination, on-scene command)
💡 STS is high-risk; prior plan, compatibility and unified command are mandatory.
✗
Question 65. How are external documents (regulations, circulars) incorporated into the SMS?
Your Answer: (Not answered)
Correct Answer: D (identify applicability, update controlled list, brief and revise internal docs)
💡 Track new rules, assess applicability, update the list, brief staff and revise internal procedures.
✗
Question 66. How is the effect of an improvement verified?
Your Answer: (Not answered)
Correct Answer: B (compare indicators and observed practice before and after)
💡 Compare leading and lagging indicators plus on-site checks before and after, then standardise what genuinely works.
✗
Question 67. The response to GNSS failure is?
Your Answer: (Not answered)
Correct Answer: A (use celestial, terrestrial, radar fixes and dead reckoning to hold position)
💡 Revert to terrestrial, radar, depth comparison and DR, logging the event and exercising manual skills.
✗
Question 68. The relationship between STCW rest-hour records and MLC is?
Your Answer: (Not answered)
Correct Answer: C (both align; records kept in prescribed form and available for inspection)
💡 STCW and MLC align on rest hours; keep records in the prescribed form for PSC and flag inspection.
✗
Question 69. Involving front-line crew in drafting documents aims to?
Your Answer: (Not answered)
Correct Answer: C (make content realistic, operable and better accepted)
💡 Having operators review drafts exposes impractical clauses and ambiguity and builds ownership and compliance.
✗
Question 70. Complete accurate SMS records help insurance claims by?
Your Answer: (Not answered)
Correct Answer: D (proving due diligence, reducing or clearing liability)
💡 Records prove due care—key to defence and claims.
✗
Question 71. The IMO Assembly resolution that adopted the ISM Code is?
Your Answer: (Not answered)
Correct Answer: B (A.741(18))
💡 The ISM Code was adopted by IMO Assembly resolution A.741(18).
✗
Question 72. A cracked bollard is found on board in port; you should?
Your Answer: (Not answered)
Correct Answer: B (take it out of use, report for repair and adjust mooring arrangement)
💡 A cracked bollard may fail under load causing snap-back; stop using, adjust moorings and arrange proper repair.
✗
Question 73. What is the correct principle for cost saving?
Your Answer: (Not answered)
Correct Answer: A (save without lowering safety and compliance standards)
💡 Cut costs above the safety and compliance floor; saving at safety's expense always costs more later.
✗
Question 74. Record archiving should facilitate?
Your Answer: (Not answered)
Correct Answer: C (retrieval, audit traceability and trend analysis)
💡 Archive by category and label clearly for retrieval, audits and trend analysis in reviews.
✗
Question 75. The SMS consequence of falsifying records is?
Your Answer: (Not answered)
Correct Answer: A (destroys system integrity, escalating to major non-conformity and affecting certification)
💡 Falsification blinds the system and is treated as a major NC, risking certificate suspension and reputation.
✗
Question 76. The purpose of a draft survey is to?
Your Answer: (Not answered)
Correct Answer: B (compute loaded weight from draught corrected for density)
💡 It reads draughts, measures water density and corrects for trim to derive the loaded quantity.
✗
Question 77. A common cause of communication failure is?
Your Answer: (Not answered)
Correct Answer: D (vague wording, no read-back, authority gradient, language barriers)
💡 Ambiguity, missing read-back, steep authority gradients and language differences cause misunderstanding.
✗
Question 78. After boarding, the lifeboat should immediately?
Your Answer: (Not answered)
Correct Answer: B (clear the danger area quickly and maintain contact and grouping)
💡 Move clear of suction, fire and falling debris and stay in contact with the group for coordinated rescue.
✗
Question 79. Which operations are the critical ones that call for special control?
Your Answer: (Not answered)
Correct Answer: B (navigation in confined waters and in restricted visibility, heavy-weather handling, transfer of oil and entry into enclosed spaces)
💡 Critical operations are those where a mistake endangers people, the ship or the environment at once, and the company is to pick them out and write, for each, a procedure the ship can actually follow: navigation in confined waters and in fog, the relief of the watch and how the lookout is set, berthing and the use of tugs, cargo work and the transfer of oil, entry into enclosed spaces and hot work, work aloft and over the side, ballasting and the changes in stability. The control is the standing of duty, permit, check and record — what is examined and approved before the job, who watches, and how the job can be stopped — not the memory of an experienced man. Filed together with paperwork and the cleaning rota, the procedures lose all sense of risk and give nothing for an auditor to follow.
✗
Question 80. In port a mooring line is found let go without authority; what applies?
Your Answer: (Not answered)
Correct Answer: A (alarm, restore mooring and investigate the cause and safety impact)
💡 Unauthorised let-go can move the ship and cause accidents; restore, investigate and strengthen in-port patrols and security.
✗
Question 81. What is the point of having a designated person at all?
Your Answer: (Not answered)
Correct Answer: C (a way for the master to reach past the ordinary levels when what business wants and what safety needs pull against each other)
💡 The provision sits in the elements of the system because the ship's business is driven by cargo and schedule, while a safety requirement costs money and spends a voyage, and if the matter can only travel up one level at a time the master is left alone between the two. The company is therefore to designate someone on the shore side who can reach top management directly, who is answerable for the system being worked and kept right on its ships, and who can be got at from the ship at whatever hour. The channel is not there to speed orders downwards but to give the safety side a way up that does not pass through the level that cares about the schedule: refusing to sail in an unfit condition, asking for a repair or for a change of hands, sending a hazard report, none of these going through the traffic end first. The master's responsibility has not moved to the shore - his authority and his judgement on board are stated in the Convention as before - and the designated man is neither the auditor nor a substitute for the review. Whether a company has the post in earnest can be judged by whether the master's reports reach top management by any other road, and by whose decision stands when the two pull against each other.
✗
Question 82. To prove its SMS complies with ISM, a Company must obtain?
Your Answer: (Not answered)
Correct Answer: C (a Document of Compliance (DOC); each managed ship needs an SMC)
💡 The Company holds a DOC; each ship it manages holds an SMC — the pair evidences compliance.
✗
Question 83. A tanker Shipboard Oil Pollution Emergency Plan (SOPEP) must contain?
Your Answer: (Not answered)
Correct Answer: A (reporting procedure, spill steps, contacts, shore coordination)
💡 SOPEP must have reporting, response steps, equipment and contact lists; it is statutory and PSC-checked.
✗
Question 84. Crew familiarization with emergency stations and duties shall be?
Your Answer: (Not answered)
Correct Answer: B (completed before sailing; new crew within a set time)
💡 Crew must know emergency stations before sailing; new joiners complete familiarization within a set period.
✗
Question 85. Key actions in a master's takeover are?
Your Answer: (Not answered)
Correct Answer: A (check certificates and open items, learn people and equipment and complete records)
💡 Systematically check certificates, open NCs, equipment and people, sign the handover and note actions and risks.
✗
Question 86. Which figures measure whether the system works?
Your Answer: (Not answered)
Correct Answer: B (the count of casualties and near misses, deficiencies found at inspection, drills done on time, the trend in non-conformities)
💡 The figures that say something are in the working: how many casualties and how many near misses (more near misses reported usually means a better reporting culture, and the two belong together), the deficiencies found at port State and class inspection and what they were, whether drills were done on schedule, the number of non-conformities and how fast they were closed, crew turnover and training completed, breakdowns and maintenance overdue, detentions. These are what management review is fed. Hire rates, page counts and the size of the office tell other things, not whether the system works; one year proves little - the trend and the comparison with like ships matter.
✗
Question 87. The core elements of a permit to work are?
Your Answer: (Not answered)
Correct Answer: B (scope, duration, test data, precautions and issuing and accepting persons)
💡 State scope and period, gas tests or isolation, precautions, issuer and executor, plus completion sign-off.
✗
Question 88. Someone photographs vital equipment in port without leave. What do you do?
Your Answer: (Not answered)
Correct Answer: B (hold the man on the spot, make him delete what he took, then let him go)
💡 Unauthorised photography of vital areas is a security matter and the response stays inside the procedures: stop it courteously, note the time and place, establish who the person is and what he wants, report the master at once and inform the port facility security officer or the shore contact, write the event up as the ship security plan requires, and let the master decide whether to raise the security level or call the police. Detaining the man, seizing his kit or forcing the images deleted may be unlawful and will start a dispute, while looking away ignores possible reconnaissance.
✗
Question 89. The basic principle in communicating with families is?
Your Answer: (Not answered)
Correct Answer: D (timely, empathetic and truthful updates with support, avoiding an information vacuum)
💡 Update families promptly and honestly with dedicated support; silence breeds speculation and reputational damage.
✗
Question 90. Route monitoring alarm settings should consider?
Your Answer: (Not answered)
Correct Answer: A (deviation limits matched to leg risk, water width and ship handling)
💡 Set per leg: tight in narrow channels, wider offshore, avoiding nuisance alarms or loss of protection.
✗
Question 91. The greatest navigational risk introduced by e-Navigation is?
Your Answer: (Not answered)
Correct Answer: A (over-reliance on a single data source with less independent checking)
💡 Integration boosts efficiency but risks common-mode failure: one bad input corrupts several displays at once.
✗
Question 92. What determines the tug plan for berthing and unberthing?
Your Answer: (Not answered)
Correct Answer: C (ship size, wind and current, and berth conditions together)
💡 Tug numbers follow ship size, wind, current and berth with margin, not a fixed custom.
✗
Question 93. A crew member unable to state his own duties should be judged as?
Your Answer: (Not answered)
Correct Answer: C (familiarisation non-conformity, an SMS implementation gap)
💡 Inability to state duties means familiarisation failed; raise it systemically and correct the training.
✗
Question 94. What is the core content of the Shipboard Oil Pollution Emergency Plan?
Your Answer: (Not answered)
Correct Answer: B (reporting procedures, contact lists and onboard spill response measures)
💡 The SOPEP sets reporting lines, contacts and onboard containment measures for the first response.
✗
Question 95. What follows from an inaccurate estimate of the centre of gravity?
Your Answer: (Not answered)
Correct Answer: B (distorted results that may hide real stability deficiency)
💡 A wrong vertical centre of gravity directly distorts judgement; use reliable data and conservative values.
✗
Question 96. How should fatigue and rest be managed with a multinational crew?
Your Answer: (Not answered)
Correct Answer: B (record rest uniformly under rules and the system and watch actual sleep quality)
💡 Apply one standard with honest records, and watch sleep quality and work patterns so compliance is real, not on paper.
✗
Question 97. How do valid SMC/DOC affect hull insurance and P&I claims?
Your Answer: (Not answered)
Correct Answer: B (valid certificates and good records aid claims, lapses risk cover/exclusions)
💡 Valid ISM certificates support claims; lapses can jeopardize cover and invoke exclusions.
✗
Question 98. When bunkering and cargo work run simultaneously, the management focus is?
Your Answer: (Not answered)
Correct Answer: B (clear responsibility, segregation and comms with emergency readiness)
💡 Assign owners, patrol, keep unified comms and ensure emergency stop and spill response are instantly available.
✗
Question 99. Regarding the stevedoring programme arranged by the agent, the master should?
Your Answer: (Not answered)
Correct Answer: A (review effects on stability, strength and draught, requesting changes if needed)
💡 Loading sequence affects stress and stability, so review it and stop work that threatens safety, informing the company.
✗
Question 100. Valuing near misses matters because?
Your Answer: (Not answered)
Correct Answer: C (they are unrealised accidents, exposing SMS gaps early)
💡 Near misses are free warnings; reporting prevents accidents before they happen.