Question 1. What does SOLAS address regarding automatic and remote control of propulsion machinery?
Your Answer: (Not answered)
Correct Answer: B (The control system must have the necessary alarms, monitoring and protection, retaining basic manoeuvring capability if it fails)
💡 SOLAS requires the control system of the main propulsion machinery to have alarms and monitoring, such as fault and parameter deviation alarms, and to retain basic manoeuvring capability through local control or other means if the control system fails.
✗
Question 2. The emergency generator shall automatically start and, where necessary, be connected to the emergency switchboard within:
Your Answer: (Not answered)
Correct Answer: B (30 seconds)
💡 SOLAS II-1/42-43 requires automatic starting and connection of the emergency generator within 30 seconds after loss of the main source of power.
✗
Question 3. Which statement about cooperation with a marine casualty investigation is correct?
Your Answer: (Not answered)
Correct Answer: C (Provide information truthfully, preserve the scene and evidence and cooperate, without falsifying or concealing)
💡 In a marine casualty investigation the ship should provide information truthfully, preserve the scene and evidence such as VDR data, the official log book, bell and engine movement records and pollution samples, and cooperate. Falsifying, concealing or destroying evidence is a serious violation with legal consequences.
✗
Question 4. For how long shall the self-contained breathing apparatus of a fireman's outfit operate as a minimum?
Your Answer: (Not answered)
Correct Answer: A (30 minutes)
💡 SOLAS requires a minimum duration of 30 minutes for the self-contained breathing apparatus.
✗
Question 5. What does SOLAS require of an embarkation ladder?
Your Answer: (Not answered)
Correct Answer: A (It must extend from the deck to a point below the lightest waterline as prescribed, enabling persons to board the craft)
💡 SOLAS requires an embarkation ladder to extend from the stowage position or deck to a point below the lightest seagoing waterline, normally not less than 2 m, enabling persons to board the craft safely. Insufficient length forces people to jump.
✗
Question 6. A crew member's actual rank does not match the certificate held, a junior certificate being used for a senior post. The finding is?
Your Answer: (Not answered)
Correct Answer: A (Serving with a mismatched certificate is an illegal manning arrangement, a serious deficiency to be corrected)
💡 A crew member's certificate of competency should match the rank held. Using a lower-grade certificate for a higher post is an illegal manning arrangement. It weakens the capability of the post and violates the safe manning requirements. It is a serious deficiency to be corrected, normally by changing personnel or supplying properly certificated crew.
✗
Question 7. What is required for speed control when navigating in restricted visibility?
Your Answer: (Not answered)
Correct Answer: A (Proceed at a safe speed, that is a speed allowing timely stopping or avoidance in the visibility prevailing)
💡 COLREG Rules 6 and 19 require a safe speed in restricted visibility, being a speed at which appropriate and effective avoiding action can be taken and the vessel stopped within an appropriate distance, having regard to the visibility, traffic density and manoeuvrability.
✗
Question 8. What is the purpose of the voyage data recorder required by SOLAS V/19?
Your Answer: (Not answered)
Correct Answer: C (To provide data on the navigation and operation of the ship for accident investigation)
💡 The VDR records navigational and operational data for use in casualty investigation. The data is protected and must not be used for crew assessment or other purposes.
✗
Question 9. What does SOLAS require for air pipes and sounding pipes passing through watertight bulkheads?
Your Answer: (Not answered)
Correct Answer: A (Reliable means of closing and sealing must be provided to maintain watertight integrity)
💡 SOLAS requires reliable closing and sealing arrangements for air and sounding pipes crossing watertight bulkheads, maintaining watertight integrity. Open ends or a deck cap alone are not sufficient.
✗
Question 10. What is the legal status of annexes and attachments to statutory certificates under SOLAS?
Your Answer: (Not answered)
Correct Answer: D (They form part of the certificate, to be kept with it and produced for inspection)
💡 SOLAS requires annexes and attachments such as equipment records, exemption lists and survey records to form part of the certificate, kept with it and produced at port State inspection. Missing annexes make the certificate incomplete.
✗
Question 11. What does the structural strength information required on a bulk carrier include?
Your Answer: (Not answered)
Correct Answer: D (Allowable stresses, loading limitations and strength data for the main structure, for use in preparing loading plans)
💡 SOLAS XII requires a bulk carrier to carry structural strength information including allowable stresses, loading limitations such as maximum cargo weight per hold and restrictions on adjacent holds, and data for the main structure, for preparing and reviewing loading plans.
✗
Question 12. A lifeboat shall be provided with at least how many hand flares?
Your Answer: (Not answered)
Correct Answer: B (6)
💡 SOLAS III/34 requires at least six hand flares in a lifeboat.
✗
Question 13. How must key shipboard operations such as cargo handling, enclosed space entry and hot work be managed?
Your Answer: (Not answered)
Correct Answer: C (Plans and instructions must be established for key operations, with designated persons in charge and execution under the prescribed procedures)
💡 ISM Code 7 requires plans and instructions for key shipboard operations, with responsibilities and procedures defined. Operations involving several persons require a designated person in charge and maintained communication, preventing accidents from misunderstandings.
✗
Question 14. What is required for closing appliances on overboard discharges below the load line?
Your Answer: (Not answered)
Correct Answer: B (Effective closing appliances operable from above the bulkhead deck, preventing back flooding)
💡 SOLAS and the Load Line Convention require discharges and inlets below the load line to have effective closing appliances such as non-return valves or cocks, operable from above the bulkhead deck, preventing sea water from entering. Temporary plugs of wood are not reliable.
✗
Question 15. What should be done when a rescue coordination centre requests assistance?
Your Answer: (Not answered)
Correct Answer: D (Assess the ship's capability and situation, reply promptly and assist within the ship's capability)
💡 On receiving a request from a rescue coordination centre, the master should assess the ship's position, capability and own safety, reply promptly whether assistance can be given and cooperate to the extent possible, while ensuring the safety of his own ship.
✗
Question 16. How must records of servicing and inspection of life-saving appliances be handled under SOLAS III?
Your Answer: (Not answered)
Correct Answer: B (They must be kept on board and produced at statutory surveys)
💡 SOLAS III requires records of inspections and maintenance of life-saving appliances to be kept on board for verification at statutory and PSC inspections. Company-only records or oral reports are not sufficient.
✗
Question 17. During an alteration a machinery-space boundary bulkhead adjacent to a cargo hold is cut for cable penetrations and the original fire dampers are removed. Which statement about the requirements for that bulkhead is correct?
Your Answer: (Not answered)
Correct Answer: D (it must stay watertight as a limit face under II-1 and satisfy an A-60 division under II-2, penetrations being closed to equivalent fire and gas tightness)
💡 The point is that chapters II-1 and II-2 impose two separate duties: the bulkhead is a watertight limit face and, under the II-2 integrity table, an A-60 division against cargo spaces. Removing dampers and cutting penetrations weaken both, so any alteration must be approved and restored to equivalent performance.
✗
Question 18. A cargo ship safety equipment certificate expires while the ship is still at sea on her return voyage. What may the Administration do?
Your Answer: (Not answered)
Correct Answer: A (Grant an extension of not more than three months so the ship may reach her port of survey)
💡 SOLAS I/14 permits an extension of up to three months for a certificate expiring during a voyage, so that the ship may reach the port where she is to be surveyed.
✗
Question 19. Ships shall carry for distress communication:
Your Answer: (Not answered)
Correct Answer: A (radio personnel holding appropriate certificates, or watch officers with the required certificate)
💡 SOLAS IV/16 requires ships to carry radio personnel holding appropriate certificates for distress and safety communication.
✗
Question 20. What does SOLAS address regarding fire doors in an enclosed escape route?
Your Answer: (Not answered)
Correct Answer: C (Self-closing fire doors must be fitted, maintaining the fire integrity of the route)
💡 SOLAS requires self-closing fire doors in an enclosed escape route, allowing normal passage and closing automatically in a fire to preserve the fire integrity of the route. Ordinary or removed doors destroy that protection.
✗
Question 21. During a PSC inspection the lifeboat engine is started and fails several times in a row. The finding is?
Your Answer: (Not answered)
Correct Answer: B (The lifeboat cannot be used reliably, a serious deficiency that may lead to detention)
💡 A lifeboat engine should start reliably at any time, being essential for manoeuvring and clearing the casualty after abandonment. Repeated failure shows the lifeboat cannot be reliably put into use, a deficiency seriously affecting life-saving capability that may normally lead to detention.
✗
Question 22. What securing is required for vehicles carried as ro-ro cargo?
Your Answer: (Not answered)
Correct Answer: A (Secure using the lashings or chains specified in the securing manual, confirming brake and gear status)
💡 SOLAS and the CSS Code require ro-ro cargo to be secured with the lashing straps, chains or dedicated devices specified in the securing manual, with the vehicle confirmed braked and in a suitable gear and its fuel and battery condition acceptable, preventing movement and collision during the voyage.
✗
Question 23. What is required for periodic running of lifeboat engines?
Your Answer: (Not answered)
Correct Answer: B (Run at least once each week for not less than the prescribed period, checking the cooling and fuel systems)
💡 SOLAS requires the lifeboat engine to be run at least once each week for not less than the prescribed period, bringing it to normal operating condition and checking the cooling and fuel systems. Long neglect leads to difficulty in starting and the engine may not work when genuinely needed.
✗
Question 24. How many lifebuoys shall be fitted with self-igniting lights and self-activating smoke signals?
Your Answer: (Not answered)
Correct Answer: D (Two)
💡 At least two, capable of quick release from the bridge.
✗
Question 25. What emergency preparedness is required while the ship is at anchor?
Your Answer: (Not answered)
Correct Answer: A (The emergency organisation and equipment must remain available, with the ship's condition monitored under the anchor watch)
💡 At anchor the emergency organisation must remain effective and emergency equipment such as survival craft, firefighting appliances and emergency communications available, with the position, weather and surroundings monitored under the anchor watch, ready at all times to respond to the unexpected.
✗
Question 26. How shall cargo units be loaded and secured?
Your Answer: (Not answered)
Correct Answer: B (So as to withstand the forces expected during the voyage without shifting)
💡 So as to withstand expected forces without shifting.
✗
Question 27. With regard to the IMO Ship Identification Number, it shall be:
Your Answer: (Not answered)
Correct Answer: B (permanent and marked on the hull)
💡 SOLAS XI-1/3: a ship shall have a permanent IMO Ship Identification Number marked on the hull and shown on certificates.
✗
Question 28. What medical first aid guidance must a ship carrying dangerous goods carry?
Your Answer: (Not answered)
Correct Answer: C (MFAG, the Medical First Aid Guide for use in accidents involving dangerous goods)
💡 SOLAS requires MFAG for the treatment of poisoning and chemical injury, while the EmS Guide addresses fire and spill response. The two serve different purposes and neither replaces the other.
✗
Question 29. A certificate exempting a ship from certain convention requirements is called:
Your Answer: (Not answered)
Correct Answer: C (An Exemption Certificate)
💡 An Exemption Certificate is issued where special construction makes full compliance impracticable.
✗
Question 30. What does SOLAS address regarding earthing of the ship's electrical system?
Your Answer: (Not answered)
Correct Answer: B (Earth fault detection and protection must be provided to avoid electric shock and electrical fire)
💡 SOLAS requires means for earth fault detection and protection in the ship's electrical system, detecting insulation deterioration or earth faults in good time and preventing electric shock and electrical fire.
✗
Question 31. What length must a rescue boat have under SOLAS?
Your Answer: (Not answered)
Correct Answer: B (Not less than 3.8 m and not more than 8.5 m)
💡 SOLAS requires a rescue boat to be not less than 3.8 m and not more than 8.5 m in length, balancing carrying capability against the ability to be manoeuvred and recovered quickly. Too small gives insufficient capacity, too large hinders rapid handling.
✗
Question 32. What departure preparations do SOLAS and good seamanship require to be confirmed?
Your Answer: (Not answered)
Correct Answer: B (Certificates and equipment condition, the passage plan and chart corrections, cargo securing and the draught and stability condition)
💡 Before departure, valid certificates, availability of critical equipment, the passage plan, corrected charts and a cargo and ballast condition within stability and strength limits should all be confirmed. Any omission may become an incident at sea.
✗
Question 33. For how long at least should the backup power of an ECDIS keep it working?
Your Answer: (Not answered)
Correct Answer: B (At least thirty minutes)
💡 Under SOLAS V/19.2.6 an ECDIS should have a backup power supply able to keep it working for at least thirty minutes if the main or emergency source fails, so that essential navigational information is not interrupted. The condition of the backup supply such as a UPS should be included in checks and maintenance.
✗
Question 34. The inert gas system shall keep the oxygen content in cargo tanks below:
Your Answer: (Not answered)
Correct Answer: A (8%)
💡 Below 8% by volume.
✗
Question 35. If unable to assist, the master receiving a distress alert shall:
Your Answer: (Not answered)
Correct Answer: D (Endeavour to relay the alert to units able to assist)
💡 Endeavour to relay the alert to units able to render assistance.
✗
Question 36. On what basis may the Administration issue an exempted certificate?
Your Answer: (Not answered)
Correct Answer: A (Where the ship's particular voyage makes compliance unreasonable, provided the conditions are safe and consistent with the purpose of the Convention)
💡 SOLAS I/12 permits an exemption where the ship is not engaged on an international voyage and the circumstances of the voyage make compliance unreasonable or unnecessary, provided safety is assured.
✗
Question 37. A ship's AIS is found switched off while under way. The finding is?
Your Answer: (Not answered)
Correct Answer: B (AIS must be kept in operation as required and may be switched off only in the specified circumstances; failing to keep it on is a violation)
💡 The AIS should be kept in operation as required and may be switched off only in the specific cases permitted by the rules, such as where continuous operation would compromise the safety or security of the ship, and the reason should be recorded. Switching it off at will while under way is a violation that may lead to detention and investigation.
✗
Question 38. What is the purpose of the line-throwing appliance among life-saving appliances?
Your Answer: (Not answered)
Correct Answer: A (To throw a line over a required distance so that contact can be established with another ship or the shore)
💡 SOLAS requires a line-throwing appliance capable of throwing a line over a prescribed distance, normally not less than 230 m, to establish contact with a casualty or the shore.
✗
Question 39. What does SOLAS require regarding a look-out when the ship is under way?
Your Answer: (Not answered)
Correct Answer: A (A look-out must be posted when conditions require it, to assist the officer in maintaining a proper look-out)
💡 SOLAS and COLREG require a look-out to be posted when conditions demand it, such as in restricted visibility, dense traffic or narrow channels. The look-out's sole duty is to keep watch and report, without other tasks such as steering.
✗
Question 40. What protection does SOLAS require for electric and electrohydraulic steering gear?
Your Answer: (Not answered)
Correct Answer: A (Short circuit and overload protection, with an alarm for single phase failure)
💡 SOLAS II-1/30 requires electric and electrohydraulic steering gear to have short circuit and overload protection and to give an alarm in the event of a single phase failure, preventing sudden loss of steering.
✗
Question 41. What information must the master have before departure?
Your Answer: (Not answered)
Correct Answer: B (Approved stability information including damage stability)
💡 Approved stability information, including damage stability, shall be available to the master.
✗
Question 42. What is required when checking the rudder and oars of a lifeboat?
Your Answer: (Not answered)
Correct Answer: A (Check that the rudder and tiller are securely connected and that the oars are complete and secured)
💡 Checking the equipment should cover the rudder and tiller and the completeness and securing of the oars, ensuring the boat can still be handled by oars if the engine fails. A loose tiller or missing oars would directly affect survival after abandonment.
✗
Question 43. What is the master's responsibility under SOLAS V?
Your Answer: (Not answered)
Correct Answer: A (Ultimate responsibility for the safety of the ship and persons, which may not be assumed by others)
💡 The master bears ultimate responsibility for the safety of the ship and those on board.
✗
Question 44. What are the stowage requirements for paint and thinners?
Your Answer: (Not answered)
Correct Answer: A (Kept in a dedicated paint locker with closed containers and ventilation, not stored in quantity with other combustibles)
💡 SOLAS requires paint and thinners to be kept in a dedicated paint locker, with containers closed and the space ventilated and provided with extinguishing arrangements. Keeping them in the machinery space or accommodation greatly increases the risk of fire and poisoning.
✗
Question 45. A ship is found without a permit system or gas testing procedure for entry into enclosed spaces. The finding is?
Your Answer: (Not answered)
Correct Answer: C (A permit and testing procedure for enclosed space entry is required; absence is a serious safety deficiency)
💡 Entry into enclosed spaces requires a permit system with testing for oxygen, flammable gas and toxic gas before entry, ventilation and an attendant, in accordance with procedures. The absence of a permit and testing procedure directly threatens the lives of those entering. It is a serious safety deficiency that may normally lead to detention.
✗
Question 46. Double bottom spaces may be used:
Your Answer: (Not answered)
Correct Answer: B (as ballast or fuel oil tanks, subject to restrictions on fuel oil tank location)
💡 SOLAS II-1/9 permits double bottom spaces to be used for ballast or fuel, subject to restrictions on fuel oil tanks.
✗
Question 47. What performance must survival craft achieve in respect of wind and sea conditions under SOLAS?
Your Answer: (Not answered)
Correct Answer: A (They must float safely and retain their performance under the prescribed wind and sea conditions)
💡 SOLAS requires survival craft designed for the prescribed wind and sea conditions, able to float safely and maintain their essential performance in heavy weather. A declaration for calm water alone does not meet the needs after abandonment.
✗
Question 48. What records are required for ballast water operations?
Your Answer: (Not answered)
Correct Answer: A (Record the time, tanks, quantity and purpose, enabling stability to be checked and the ballast water management requirements to be met)
💡 Ballast water operations should be recorded with the time, tanks and quantity, enabling the ship's stability and draught condition to be verified, meeting the record requirements of the ballast water management convention and allowing the operations to be traced if something abnormal occurs. Missing records hamper investigation and compliance checks.
✗
Question 49. What do SOLAS and good practice address regarding fire safety in boiler spaces?
Your Answer: (Not answered)
Correct Answer: C (Quick closing valves and ventilation shut-off arrangements, with guarding and alarms around the boiler)
💡 SOLAS requires quick closing valves and ventilation shut-off arrangements in boiler spaces, with guarding around the boiler, preventing leaking fuel from being ignited by heat. The boiler space is a high fire risk location in the machinery space.
✗
Question 50. For power-operated sliding watertight doors, control shall be possible from:
Your Answer: (Not answered)
Correct Answer: C (both the navigation bridge and a position above the bulkhead deck)
💡 SOLAS II-1/10 requires power-operated sliding watertight doors to be operable from the navigation bridge and from a position above the bulkhead deck, as well as locally.
✗
Question 51. What is the initial response of the officer of the watch in an emergency?
Your Answer: (Not answered)
Correct Answer: C (Take the necessary action immediately to avoid danger and inform the master at once, without delay)
💡 STCW requires the officer of the watch in an emergency to take immediate action to avoid danger and to inform the master at once. Delay to seek instructions is often the reason an incident escalates.
✗
Question 52. What are the key points in using a portable extinguisher?
Your Answer: (Not answered)
Correct Answer: D (Pull the pin, aim the nozzle at the base of the fire and sweep while pressing the lever)
💡 Using a portable extinguisher involves pulling the pin, holding the nozzle and aiming at the base of the fire, that is the burning surface, then sweeping while pressing the lever. Aiming at the top of the flames is ineffective, and the position should allow a line of retreat.
✗
Question 53. What is the basic SOLAS II-1 requirement for the position of the collision bulkhead on a cargo ship?
Your Answer: (Not answered)
Correct Answer: A (At a distance from the forward perpendicular of not less than 5 per cent of the ship's length, or 10 m, whichever is the less)
💡 SOLAS II-1 requires the collision bulkhead to be not less than 5 per cent of the ship's length or 10 m, whichever is less, from the forward perpendicular, so that flooding forward protects the spaces abaft.
✗
Question 54. For a ship loading grain, what should its stability mainly address?
Your Answer: (Not answered)
Correct Answer: D (The heel and stability loss caused by grain shift, with stability calculated as required and measures taken to restrain movement)
💡 Under SOLAS VI/6 and the International Grain Code, when loading grain the assumed heel and stability loss caused by grain shift should be calculated and measures taken such as trimming, longitudinal divisions or strapping to restrain movement, ensuring the required stability criteria are met during the voyage. Grain flows, so it is a focus of stability.
✗
Question 55. A company is reviewing the scope statement of a Cargo Securing Manual. Which wording should be adopted?
Your Answer: (Not answered)
Correct Answer: A (the securing of cargo units such as containers, vehicles and portable tanks; solid and liquid bulk fall under their own codes, the manual being Administration-approved and available on board)
💡 The manual covers cargo units; solid and liquid bulk cargoes fall under their own codes and cannot be mixed in. It must be approved and kept available on board, and it does not replace the loading calculation. Narrowing it to one ship type, or leaving it to the Master's discretion, fails VI/5.
✗
Question 56. What does routine checking of the bilge system include?
Your Answer: (Not answered)
Correct Answer: C (Strainers free of blockage, valves operating freely and pumps priming properly, with records kept)
💡 Routine checks of the bilge system should cover strainers and mud boxes for blockage and cleanliness, valves for free and correct operation and pumps for starting and priming, with records kept. Checking only in dry dock would leave the system failing in service without anyone knowing.
✗
Question 57. What is the emergency bilge suction for?
Your Answer: (Not answered)
Correct Answer: B (Dewatering the machinery space using the main engine cooling pump)
💡 It allows the machinery space to be dewatered using the main cooling or sea water pump.
✗
Question 58. What are the key points in testing fire pumps during a drill?
Your Answer: (Not answered)
Correct Answer: C (Start the pumps in practice and check output and pressure, testing the emergency fire pump as well)
💡 In a fire drill the fire pumps should actually be started and the output and pressure checked against the requirement, with the starting and water supply capability of the emergency fire pump tested as well, so that the crew is familiar with the operation and the equipment is verified.
✗
Question 59. The function of a hydrostatic release unit for a liferaft is to:
Your Answer: (Not answered)
Correct Answer: B (release the liferaft automatically when the ship sinks to a certain depth)
💡 SOLAS III/13 requires a hydrostatic release unit to release the liferaft automatically when the ship sinks.
✗
Question 60. What should be checked on hatch covers before loading a bulk carrier?
Your Answer: (Not answered)
Correct Answer: C (That the seals, cleats and drain channels are sound, with a hose test to verify watertightness if necessary)
💡 Before loading, the hatch cover seals should be checked for ageing or damage, the cleats for completeness and effectiveness and the drain channels and non-return devices for clearance, with a hose test to verify watertightness where necessary. Hatch cover failure is the principal cause of flooding in bulk carriers.
✗
Question 61. Who approves a permit to work?
Your Answer: (Not answered)
Correct Answer: C (The master or an authorised person, with the risk assessment and safety measures confirmed before the work starts)
💡 A permit to work should be approved by the master or an authorised responsible person, the approval being given after confirming that the risk assessment is complete and the safety measures, including gas testing, ventilation, standby, protection and emergency preparation, are in place and conditions are suitable, remaining valid and supervised while the work proceeds.
✗
Question 62. With regard to charts, which requirement is correct?
Your Answer: (Not answered)
Correct Answer: A (up-to-date charts covering the intended voyage shall be carried)
💡 SOLAS V/27 requires up-to-date charts covering the intended voyage.
✗
Question 63. What shall the bridge visibility design ensure?
Your Answer: (Not answered)
Correct Answer: C (A continuous view of the sea surface ahead and around from the conning position)
💡 An uninterrupted view of the sea surface from the conning position.
✗
Question 64. What does SOLAS address regarding records of inspection and maintenance of life-saving appliances?
Your Answer: (Not answered)
Correct Answer: C (Records of inspection, maintenance and servicing must be kept for verification at surveys and by PSC)
💡 SOLAS requires records of inspection, maintenance and servicing of life-saving appliances to be kept on board for verification at statutory surveys and by PSC. Missing records are treated as a deficiency in the management of equipment and the working of the system.
✗
Question 65. A ship has double side skin, a single deck, top side tanks and hopper side tanks and carries ore in bulk. What is she under SOLAS XII/1?
Your Answer: (Not answered)
Correct Answer: D (A bulk carrier subject to the requirements of Chapter XII)
💡 SOLAS XII/1 defines a bulk carrier as a ship with a single deck, top side tanks and hopper side tanks intended primarily to carry dry cargo in bulk. An ore carrier meets the definition and must comply with Chapter XII.
✗
Question 66. What is the correct action if a pan of oil catches fire in the galley?
Your Answer: (Not answered)
Correct Answer: A (Shut off the heat, smother with a lid or fire blanket and use the galley fixed extinguishing system)
💡 Oil burning in a pan should be dealt with by shutting off the heat and smothering with a lid or fire blanket, or by releasing the galley fixed extinguishing system. Water makes hot oil splash and spreads the fire, and carrying a burning pan out is even more dangerous.
✗
Question 67. A portable gas detector is found beyond its calibration validity. The finding is?
Your Answer: (Not answered)
Correct Answer: C (An uncalibrated detector gives untrustworthy readings, a deficiency affecting enclosed space safety)
💡 A portable gas detector is essential for judging whether the atmosphere is safe before entering an enclosed space or carrying out hot work. Beyond its calibration validity its readings cannot be trusted and may lead to a wrong judgement that endangers personnel. It is a deficiency to be corrected.
✗
Question 68. What is required for emergency steering drills carried out by the crew?
Your Answer: (Not answered)
Correct Answer: D (At least once every three months, including direct control from the steering gear compartment)
💡 SOLAS III/19 requires emergency steering drills at least every three months, including direct steering from the steering gear compartment and the communication procedure with the bridge. A briefing is not a substitute.
✗
Question 69. What safety is required for work at height at sea?
Your Answer: (Not answered)
Correct Answer: C (Use of safety harness and fall arrest equipment, warning signs and a standby person, taking account of ship movement)
💡 Work at height such as on masts, cranes and hatch coamings requires a safety harness and fall arrest equipment secured to a reliable point, warning signs and a standby person, with account taken of ship movement and wind. Hazardous work in heavy weather is prohibited.
✗
Question 70. What is the relationship between the emergency switchboard and the main switchboard under SOLAS?
Your Answer: (Not answered)
Correct Answer: C (The emergency switchboard is supplied from the emergency source, normally the emergency generator or battery, with appropriate interconnection to the main switchboard)
💡 SOLAS requires the emergency switchboard to be supplied from the emergency source, the emergency generator or battery, with appropriate interconnection to the main switchboard for normal conditions, while remaining independently supplied if the main source fails.
✗
Question 71. Which systems shall be used to receive navigational warnings?
Your Answer: (Not answered)
Correct Answer: C (Maritime safety information systems such as NAVTEX and SafetyNET)
💡 Systems such as NAVTEX and SafetyNET.
✗
Question 72. On what is the safe speed a ship should be carrying at a given moment determined?
Your Answer: (Not answered)
Correct Answer: D (speed settled by visibility, traffic density, manoeuvring performance, wind and sea, draught and background light, so that the ship can stop in the distance appropriate to the conditions)
💡 Rule 6 makes safe speed a capability rather than a figure: ability to stop within the distance appropriate to the conditions and to take effective collision action. Visibility, traffic density, the ship's own stopping distance and turning ability, background lighting by night, wind, sea and rain, draught against the available depth, all count, and engines must be ready in a narrow channel or in fog. A port limit is an extra constraint: keeping under it is not the same as keeping Rule 6, and keeping Rule 6 may call for less than the limit.
✗
Question 73. Which statement about the purpose of the international shore connection is correct?
Your Answer: (Not answered)
Correct Answer: A (To enable water to be supplied to the ship's fire main from the shore or another ship if necessary, its dimensions being internationally standardised)
💡 Under SOLAS II-2/10 the relevant ships should carry at least one international shore connection so that, if necessary, the ship's fire main can be connected to the fire system of the shore or another ship for an external supply of water. Its dimensions should be standardised and its accessories such as bolts and gaskets complete and properly stowed.
✗
Question 74. Under what speed and draught conditions is the capability of the main steering gear determined?
Your Answer: (Not answered)
Correct Answer: D (At maximum service speed and deepest seagoing draught)
💡 SOLAS determines the required capability of the main steering gear at maximum service speed and deepest seagoing draught, which forms the basis of its design.
✗
Question 75. The purpose of a thermal protective aid is to:
Your Answer: (Not answered)
Correct Answer: A (reduce body heat loss of a person in water or after rescue)
💡 SOLAS III/32 requires thermal protective aids to reduce body heat loss.
✗
Question 76. For the discharge of bilge water treated by an oily water separator, what is the general oil content limit?
Your Answer: (Not answered)
Correct Answer: B (15 parts per million)
💡 Under MARPOL Annex I, bilge water treated by an oily water separator may generally be discharged only if its oil content does not exceed fifteen parts per million, with the 15ppm alarm and automatic stopping device. Tankers are subject to stricter distance and monitoring requirements.
✗
Question 77. What do SOLAS and good practice recommend for the handling of survival craft after abandonment?
Your Answer: (Not answered)
Correct Answer: B (Move clear of the ship as soon as possible, avoiding suction by the sinking ship or being trapped by burning oil)
💡 After abandonment, survival craft should be moved clear of the ship as soon as possible, avoiding the suction of a sinking ship, falling debris or being surrounded by burning oil. Remaining close to the ship greatly increases the danger.
✗
Question 78. What is the purpose of a radar reflector or similar device?
Your Answer: (Not answered)
Correct Answer: D (Enhancing the radar echo so other vessels can detect the ship)
💡 To strengthen the radar echo so other vessels can detect the ship.
✗
Question 79. What is the requirement for the international shore connection?
Your Answer: (Not answered)
Correct Answer: B (At least one must be carried on board with gasket, bolts and other fittings)
💡 SOLAS II-2/19 requires at least one standard international shore connection with fittings to be carried on board so that water can be supplied from shore or another ship. The ship cannot rely on the port providing it.
✗
Question 80. The inert gas system shall be capable of delivering inert gas at a total capacity of at least what percentage of the maximum discharge rate?
Your Answer: (Not answered)
Correct Answer: C (125%)
💡 SOLAS II-2/5 requires the inert gas system to deliver inert gas at not less than 125% of the maximum discharge rate.
✗
Question 81. How must the safety management system and emergency plans be linked?
Your Answer: (Not answered)
Correct Answer: D (The plans must be consistent with the documentation, with drills testing their effectiveness and revisions made accordingly)
💡 The ship's emergency plans, covering fire, abandonment, pollution and enclosed space rescue, should be consistent with the documentation of the safety management system, tested for practicability and effectiveness in drills, with revisions made to the plans and documentation when problems are found, avoiding a gap between what is written and what is done.
✗
Question 82. What are common reasons for a finding of ISM system failure during a PSC inspection?
Your Answer: (Not answered)
Correct Answer: B (Repeated serious deficiencies of the same kind, records seriously inconsistent with the ship, or the crew unfamiliar with key operations or emergency duties)
💡 Findings of system failure commonly rest on the recurrence of serious deficiencies of the same kind, showing corrective action has been ineffective, records seriously inconsistent with the ship, such as falsified drill records, the crew unfamiliar with the equipment they operate or with their emergency duties, and critical equipment long out of repair, all showing that the system is not being implemented effectively.
✗
Question 83. After overhaul of launching appliances, what further test does SOLAS III/35 require?
Your Answer: (Not answered)
Correct Answer: A (A load test with the full complement at intervals of not more than five years)
💡 SOLAS III/35 requires that launching appliances be subjected to a test with the full complement on board at intervals of not more than five years, to verify performance under rated load.
✗
Question 84. What is the purpose of a ship reporting system?
Your Answer: (Not answered)
Correct Answer: A (To provide shore stations with information on the ship's movement in support of search and rescue, navigational safety and security)
💡 A ship reporting system requires vessels entering a specified area to report position, course, speed and the nature of cargo to shore stations, supporting search and rescue coordination, navigational safety, pollution prevention and security. Failure to report as required may hinder rescue and amount to non-compliance.
✗
Question 85. Each lifeboat shall be launched during an abandon-ship drill at least every:
Your Answer: (Not answered)
Correct Answer: A (three months)
💡 SOLAS III/19 requires each lifeboat to be launched in a drill at least every three months.
✗
Question 86. What readiness of survival craft is required while the ship is in port?
Your Answer: (Not answered)
Correct Answer: C (Kept serviceable and ready; security measures may be applied but must be capable of rapid removal)
💡 While in port survival craft should remain serviceable and ready. Measures against theft may be taken, but they must be capable of being removed quickly to restore use. Locking them up completely or dismantling them would leave persons without the appliances in an emergency.
✗
Question 87. What does SOLAS require for each fire hose?
Your Answer: (Not answered)
Correct Answer: D (Each hose must have a nozzle and be stowed near its hydrant ready for use)
💡 SOLAS requires each fire hose to be fitted with a nozzle and stowed near its hydrant so that it can be connected and used at once. Stowing hoses and nozzles separately delays firefighting.
✗
Question 88. Which of the following is dynamic information provided by AIS?
Your Answer: (Not answered)
Correct Answer: A (Position, course over ground and speed over ground)
💡 AIS dynamic information updates continuously with the ship's movement, comprising position, course over ground, speed over ground and navigational status. Name and call sign are static; destination and ETA are voyage related.
✗
Question 89. What does SOLAS address regarding lighting and marking of survival craft stowage?
Your Answer: (Not answered)
Correct Answer: D (Lighting and markings at the stowage positions and embarkation stations, enabling identification and operation at night)
💡 SOLAS requires the stowage positions of survival craft and the embarkation stations to be provided with lighting and clear markings such as signs or reflective tape, enabling persons to find the boarding positions and appliances quickly at night or in dense smoke.
✗
Question 90. What are the requirements for the position of the satellite EPIRB on board?
Your Answer: (Not answered)
Correct Answer: C (Readily accessible, capable of floating free and activating automatically if the ship sinks)
💡 SOLAS requires the EPIRB to be mounted where it is readily accessible manually, will float free and activate automatically if the ship sinks. Keeping it locked in a room or drawer does not comply.
✗
Question 91. What should the first aid kit in a lifeboat normally contain?
Your Answer: (Not answered)
Correct Answer: D (Items for stopping bleeding and dressings, burn dressings, antiseptic, pain relief and common first aid medicines)
💡 SOLAS requires the lifeboat first aid kit to contain suitable items: tourniquet and dressings, burn dressings, antiseptic, pain relief and common first aid medicines, scissors and forceps, with periodic checks and replacement of expired items, so that basic first aid can be given after abandonment.
✗
Question 92. What do SOLAS and the related standards require regarding VHF transmitter power?
Your Answer: (Not answered)
Correct Answer: C (Power adequate for the required range, with adjustable power for close and longer range communication)
💡 SOLAS and the Radio Regulations require VHF equipment to have adequate power, normally not exceeding 25 watts, with adjustment available: low power close to shore to reduce interference and high power for longer range.
✗
Question 93. What is the SOLAS requirement regarding independence of means for transmitting distress alerts?
Your Answer: (Not answered)
Correct Answer: B (At least two separate and independent means shall be available)
💡 SOLAS IV/4: at least two separate and independent means shall be available for transmitting distress alerts.
✗
Question 94. Emergency lighting shall be capable of operating for at least:
Your Answer: (Not answered)
Correct Answer: B (18 hours)
💡 SOLAS II-1/42 requires the emergency source to provide emergency lighting for at least 18 hours.
✗
Question 95. If the master finds a defect affecting safe navigation that cannot be repaired on board, the first action is to:
Your Answer: (Not answered)
Correct Answer: A (Report to the Company and arrange repair)
💡 The master should report to the Company so that repair can be arranged and the voyage adjusted.
✗
Question 96. Radio equipment shall be checked for proper performance:
Your Answer: (Not answered)
Correct Answer: B (daily)
💡 SOLAS IV/10 requires daily checks of radio equipment performance.
✗
Question 97. What frequency does a satellite EPIRB use?
Your Answer: (Not answered)
Correct Answer: A (406 MHz)
💡 406 MHz.
✗
Question 98. What is required for operating in ice in polar waters?
Your Answer: (Not answered)
Correct Answer: A (Control speed, enhance the look-out and monitor hull stress and changing ice conditions, stopping if conditions exceed the ship's capability)
💡 The Polar Code requires ice operations to control speed and course, enhance the look-out by radar and sight, continuously monitor hull stress and changes in the ice and stop or alter course if conditions exceed the ship's capability or the hull is damaged. Continuing regardless is not acceptable.
✗
Question 99. What is the function of the inert gas system on a tanker's cargo tanks?
Your Answer: (Not answered)
Correct Answer: B (To keep the oxygen content below the prescribed limit and prevent explosion of cargo vapour)
💡 The inert gas system keeps the oxygen content in the tanks below the prescribed limit, removing the condition necessary for explosion of hydrocarbon vapour.
✗
Question 100. What is sea area A1?
Your Answer: (Not answered)
Correct Answer: D (An area within coverage of at least one VHF coast station)
💡 An area within coverage of at least one VHF coast station with DSC.