Question 1. Regarding fatigue and watchkeeping, the SMS should?
Your Answer: (Not answered)
Correct Answer: B (control hours, ensure rest, avoid fatigue-induced errors)
💡 Fatigue is a leading accident cause; the SMS must manage rest to protect lookout and operations.
✗
Question 2. Abandoning ship but the lifeboat cannot be released; you should?
Your Answer: (Not answered)
Correct Answer: B (use liferafts and other flotation and call for help)
💡 Launch rafts and other flotation, activate EPIRB and distress calls; never waste time at a failed boat.
✗
Question 3. A warning of cargo self-heating is received at sea; what applies?
Your Answer: (Not answered)
Correct Answer: C (ventilate or seal and inert as appropriate, monitor temperature closely and report)
💡 Respond by ventilating or sealing and inerting as the cargo requires, monitor temperature, report and divert if needed.
✗
Question 4. What is the Tonnage Certificate used for?
Your Answer: (Not answered)
Correct Answer: A (states gross and net tonnage for dues and regulatory thresholds)
💡 Tonnage is used for port and canal dues and determines applicability of certain conventions.
✗
Question 5. How should the complaint channel be set in the system?
Your Answer: (Not answered)
Correct Answer: B (provide onboard and ashore channels with protection from retaliation and record outcomes)
💡 Complaints need onboard and ashore routes with non-retaliation and documented outcomes, showing compliance.
✗
Question 6. Involving front-line crew in drafting documents aims to?
Your Answer: (Not answered)
Correct Answer: C (make content realistic, operable and better accepted)
💡 Having operators review drafts exposes impractical clauses and ambiguity and builds ownership and compliance.
✗
Question 7. The most common error in crisis communication is?
Your Answer: (Not answered)
Correct Answer: A (delaying and leaving an information vacuum)
💡 Delay is the worst sin; silence reads as admission, so state known facts and actions promptly.
✗
Question 8. If statutory surveys (class, safety equipment) lapse, the direct consequence is?
Your Answer: (Not answered)
Correct Answer: A (certificates become invalid, risking detention by PSC)
💡 Statutory surveys sustain certificate validity; lapse invalidates them and invites detention.
✗
Question 9. The main risk of alternate hold loading on bulk carriers is?
Your Answer: (Not answered)
Correct Answer: B (increased loads on hatch covers and tank tops with structural damage risk)
💡 Alternate loading raises tank top and hatch loads and longitudinal stress; verify strength and follow the rules.
✗
Question 10. When a non-conformity is investigated, how far should the root cause analysis go?
Your Answer: (Not answered)
Correct Answer: D (down to the management system, asking why procedure, training, supervision and resources let it happen)
💡 A signature missing from one form or a drill not held on the day is the symptom, not the cause. The questions worth asking are why the checking stage let it pass, whether the training told the man what he was meant to do, whether the load of work and the way inspections are arranged let the thing run on, and whether the last corrective action actually worked. Fixing it on the person who signed, rewording the clause, or pleading the weather of that day leaves the cause in place and the same finding comes back under another name and in another department. What the analysis concludes, the action, the owner and the date are written up and then followed to verification, and the review by management asks once more whether it has gone; where a class of finding keeps recurring the reason usually sits in the system rather than in the hands that were on the job.
✗
Question 11. What is the main role of telemedical assistance?
Your Answer: (Not answered)
Correct Answer: C (shore doctors give diagnosis and treatment advice to guide onboard care)
💡 Telemedicine gives shore guidance on treatment and drugs and helps decide evacuation, a key support at sea.
✗
Question 12. For ice navigation, what should the system add?
Your Answer: (Not answered)
Correct Answer: B (ice operating instructions, anti-freezing of equipment, personal protection and emergency contacts)
💡 Ice navigation brings hull, steering, equipment and cold risks; add instructions, anti-freeze measures and contacts.
✗
Question 13. The role of operations scheduling within the SMS should be?
Your Answer: (Not answered)
Correct Answer: C (optimise the schedule within safety constraints and consult the master)
💡 Scheduling works within legal and SMS limits and consults the master; commerce never overrides safety.
✗
Question 14. At Level 3, control of restricted areas should?
Your Answer: (Not answered)
Correct Answer: D (tighten further: lock, assign, continuous monitor)
💡 High level needs physical plus human control of restricted areas.
✗
Question 15. Seeing three vertical red all-round lights, the OOW should identify?
Your Answer: (Not answered)
Correct Answer: A (a vessel constrained by her draught)
💡 Three vertical red all-round lights indicate a vessel constrained by draught, which must still navigate with care.
✗
Question 16. A management company operates a 420 GT dry-cargo ship, flagged of convenience and trading continuously on international voyages. Which statement about the scope of the ISM Code is correct?
Your Answer: (Not answered)
Correct Answer: B (Does not apply — for cargo ships the ISM threshold is 500 gross tonnage and upwards, and this ship is below it)
💡 On the cargo-ship side the threshold is 500 gross tonnage and upwards (plus passenger ships and mobile offshore drilling units). The 400 GT figure belongs to other instruments and is a frequent source of confusion; the measure is gross tonnage, not deadweight.
✗
Question 17. Which figures measure whether the system works?
Your Answer: (Not answered)
Correct Answer: B (the count of casualties and near misses, deficiencies found at inspection, drills done on time, the trend in non-conformities)
💡 The figures that say something are in the working: how many casualties and how many near misses (more near misses reported usually means a better reporting culture, and the two belong together), the deficiencies found at port State and class inspection and what they were, whether drills were done on schedule, the number of non-conformities and how fast they were closed, crew turnover and training completed, breakdowns and maintenance overdue, detentions. These are what management review is fed. Hire rates, page counts and the size of the office tell other things, not whether the system works; one year proves little - the trend and the comparison with like ships matter.
✗
Question 18. What are the legal consequences of tampering with ship monitoring systems?
Your Answer: (Not answered)
Correct Answer: B (unlawful, with fines, ship arrest and personal criminal liability)
💡 Tampering is a deceptive shipping practice: fines, arrest and criminal liability, an absolute red line.
✗
Question 19. Cargo has shifted and the ship lists. What is the order of doing things?
Your Answer: (Not answered)
Correct Answer: B (the motion eased first by course and speed, the stability then worked out and the cargo or the ballast dealt with)
💡 The order is first to stop it getting worse, then to see what is left of the margin. When a list comes from a shift, the motion is what shifts more, so course and speed go over at once to bring the ship out of the head or beam sea, the openings are shut and the angle is watched to see if it still grows. Then the figures: the list, the free surfaces, the righting lever and what is left of dynamic stability in the sea there is now, from which follows restowing, whether part can be landed, or how ballast and free surfaces are worked. To force the list back by running water in before the sum is done invites the loss of what righting arm remains, the load centre having already moved. Abandoning is the last thing. What happened and what was done is logged and reported, and why the stow and the lashing let it come is looked into afterwards.
✗
Question 20. What is the risk of using non-original substitute parts?
Your Answer: (Not answered)
Correct Answer: B (mismatch in performance and material may cause failure and affect survey and warranty)
💡 Substitutes need assessment of performance and material; otherwise failure at a critical moment and class or warranty problems.
✗
Question 21. PSC SMS inspection often includes?
Your Answer: (Not answered)
Correct Answer: D (certificates, drill records, familiarisation, equipment, ship-shore link)
💡 SMS checks blend documents, records, equipment and people.
✗
Question 22. The principle of waste heat recovery for saving energy is?
Your Answer: (Not answered)
Correct Answer: C (use exhaust and jacket water heat to raise steam or generate power)
💡 Exhaust boilers and turbo generators recover heat for steam or power, cutting auxiliary fuel use.
✗
Question 23. Preparation before an annual survey should include?
Your Answer: (Not answered)
Correct Answer: C (organise records, pre-check key items and arrange support staff)
💡 Prepare certificates and records, self-check firefighting, lifesaving and openings, gather reports and assign escorts.
✗
Question 24. The significance of complete documentation for cargo claims is?
Your Answer: (Not answered)
Correct Answer: B (reconstructs condition and handling, supporting defence against claims)
💡 Bill remarks, stowage plans and hold records reconstruct the voyage and help allocate liability for cargo damage.
✗
Question 25. The fundamental purpose of a marine casualty investigation is?
Your Answer: (Not answered)
Correct Answer: C (find causes, learn lessons, prevent recurrence, not just blame)
💡 Investigation aims to learn and prevent, with accountability secondary, per IMO casualty rules.
✗
Question 26. The correct company response to deficiencies raised is?
Your Answer: (Not answered)
Correct Answer: A (analyze causes, plan, verify and prevent recurrence)
💡 Manage deficiencies as non-conformities with owners, deadlines, verification and trend analysis.
✗
Question 27. The purpose of a toolbox talk before high-risk work is?
Your Answer: (Not answered)
Correct Answer: D (brief risks, roles and emergency measures and confirm understanding)
💡 A short briefing clarifies hazards, duties, protection and emergency steps for all at low cost and high value.
✗
Question 28. What evidence should be preserved first after an accident?
Your Answer: (Not answered)
Correct Answer: C (deck log, engine movement book, voyage data recorder data and communications)
💡 Logs, movement books and VDR data are central to reconstruction; secure them at once against overwrite or alteration.
✗
Question 29. What applies to checking sacrificial anode consumption?
Your Answer: (Not answered)
Correct Answer: B (check remaining mass periodically on plan and renew in time)
💡 Consumed anodes stop protecting; check remaining mass on schedule and renew so the hull is never unprotected.
✗
Question 30. During cargo operations on a tanker, who is answerable on the spot?
Your Answer: (Not answered)
Correct Answer: D (the master carries the overall responsibility, the chief officer runs cargo operations, the chief engineer the machinery)
💡 The system states the responsibility plainly: the master carries overall responsibility for safety and pollution prevention on board, the chief officer normally commands cargo work (cargo control, valves and pressures, liaison with the shore), and the chief engineer answers for pumps, lines and power on the machinery side. The cargo control room operator works to the chief officer's arrangements; the bridge watchkeeper is responsible for navigation and lookout, not for directing cargo operations alongside, and the shore authority is bounded by the hose and the connection flange. Who gives orders on the spot, who can stop the operation and who is told when something goes wrong has to be written down and repeated at the pre-transfer conference.
✗
Question 31. Before closing a corrective action, one must?
Your Answer: (Not answered)
Correct Answer: A (verify it removed the root cause without new risk)
💡 Verification prevents fake fixes; confirm effect, not paper.
✗
Question 32. If an equipment defect is found unrecorded at handover, what applies?
Your Answer: (Not answered)
Correct Answer: B (require it to be recorded and reported and entered into the defect list)
💡 Defects must be recorded and reported in writing; verbal handover breaks the tracking chain.
✗
Question 33. How should onboard medical records be managed?
Your Answer: (Not answered)
Correct Answer: B (record symptoms, treatment and drugs truthfully, keep confidential)
💡 Record complaints, findings, treatment and medication accurately, stored confidentially for continuity and inquiry.
✗
Question 34. When the review is closed, what should it leave behind?
Your Answer: (Not answered)
Correct Answer: C (decisions on improving the system, the resources and targets they imply, with named owners and dates)
💡 A management review outputs things that get executed: a judgement on the effectiveness of the system, the specific decisions to improve it, the resources and budget implied, revisions to policy and targets, a named owner and date for each measure, and a check on whether last round's measures were carried out. These pass into a follow-up list and are compared item by item next time. Minutes, attendance sheets and compliments are records, not outputs; a review comment with no owner and no date reappears untouched in next year's report.
✗
Question 35. Which is NOT a resource requirement of the system?
Your Answer: (Not answered)
Correct Answer: B (providing the ship with marketing staff)
💡 The system secures resources for safety and pollution prevention: people, stores and shore support, not marketing staff.
✗
Question 36. The master finds enclosed-space work without a permit; he should?
Your Answer: (Not answered)
Correct Answer: A (stop work at once and require a permit and satisfactory tests before entry)
💡 Unpermitted entry is potentially fatal; withdraw the team and require permit, ventilation and testing first.
✗
Question 37. The key to personal protective equipment management is?
Your Answer: (Not answered)
Correct Answer: D (right type, good condition, replaced periodically and training in correct use)
💡 Select by hazard, inspect and replace routinely and train correct use, or the equipment protects nobody.
✗
Question 38. A crew member falls asleep on watch from fatigue; the master should?
Your Answer: (Not answered)
Correct Answer: C (relieve him at once, review rest and scheduling and report)
💡 Sleeping on watch is a fatigue warning; relieve him, check rest hours and adjust the plan to fix the system cause.
✗
Question 39. If a ship fails PSC re-inspection after deficiencies, the consequence is?
Your Answer: (Not answered)
Correct Answer: B (stay detained with possible expanded inspection until cleared)
💡 Failed re-check means inadequate fixes; detention continues with closer scrutiny and higher cost.
✗
Question 40. If PSC finds the ballast record inconsistent with actual operations, the likely result is?
Your Answer: (Not answered)
Correct Answer: B (a deficiency or detention and follow-up on company system responsibility)
💡 Inconsistent records are a serious system deficiency leading to deficiency, detention and possible expanded inspection.
✗
Question 41. The inspection focus for fire divisions (Class A/B) is?
Your Answer: (Not answered)
Correct Answer: B (fire integrity, self-closing devices and sealing of penetrations)
💡 Verify divisions are intact, doors self-close and penetrations are fire-stopped; breaches void the fire zone.
✗
Question 42. What should the dangerous goods emergency procedure contain?
Your Answer: (Not answered)
Correct Answer: B (specific response, protection and first aid for leakage or fire by class)
💡 Procedures must give class-specific actions, protective equipment and first aid, not just phone numbers.
✗
Question 43. MLC 2006 mainly applies to?
Your Answer: (Not answered)
Correct Answer: B (seafarers' working and living conditions aboard)
💡 MLC 2006 covers seafarers' employment, accommodation, food, health protection, medical care and welfare.
✗
Question 44. A muster list not updated for crew changes, new crew absent from it, is a?
Your Answer: (Not answered)
Correct Answer: B (emergency-preparedness non-conformity affecting response)
💡 The muster list must reflect current crew; stale lists cause chaos in emergencies.
✗
Question 45. Fire drills should cover?
Your Answer: (Not answered)
Correct Answer: B (alarm, locate, isolate, extinguish, ventilate and search)
💡 Fire drills are end-to-end: alarm to search, testing organisation and gear.
✗
Question 46. The Company may delegate tasks, but it cannot delegate?
Your Answer: (Not answered)
Correct Answer: A (its ultimate responsibility for safety and pollution prevention)
💡 Duties may be delegated, but ultimate accountability stays with the Company.
✗
Question 47. Which instrument is the source of the requirement for a double bottom and double sides in a tanker's cargo tank region?
Your Answer: (Not answered)
Correct Answer: B (MARPOL Annex I, which settles the tank arrangement and the widths it requires out of an assumed damage)
💡 Two sister requirements are here, and each does a different job. The SOLAS chapter on subdivision and damage stability asks whether the ship will still float and stay upright after a breach, and works in terms of the margin and the residual stability. Setting the cargo tanks a given width in from the side and above the bottom asks a different question, whether under the same damage the oil will pour out, and belongs to the pollution Annex's provisions on the arrangement of tankers, its test being an assumed side and bottom damage looked at against the tanks, with the ballast water spaces placed to serve it. Which set applies turns on the delivery date and the oil carried, single-hull ships having been phased out by date and condition. On the certificate side what is seen is the IOPP certificate and its annex, the annex recording the type and the arrangement this ship is built to, and the surveyor checks against it rather than making a standard of his own.
✗
Question 48. The value of a damage control / flooding drill is?
Your Answer: (Not answered)
Correct Answer: A (verify plugging gear, dewatering and watertight closure effectiveness)
💡 It tests plugging, pumping and watertight closure that decide whether flooding is contained.
✗
Question 49. During bunkering the terminal asks to raise the rate; the watchkeeper should?
Your Answer: (Not answered)
Correct Answer: C (keep to the safe rate and refuse excessive pressure or rate, reporting it)
💡 Higher rates bring spill and static risk; hold the agreed safe rate, record and assess any request first.
✗
Question 50. Modern SMS increasingly attends to crew?
Your Answer: (Not answered)
Correct Answer: D (mental health and fatigue, as part of human-factor safety)
💡 Mental health and fatigue affect judgement—a growing human-factor focus.
✗
Question 51. When safety spend conflicts with profit, the SMS requires?
Your Answer: (Not answered)
Correct Answer: C (safety floor first, resources tilted to major risks)
💡 Safety is a non-negotiable floor, never sacrificed to short-term profit.
✗
Question 52. The purpose of adjusting course and speed in heavy weather is?
Your Answer: (Not answered)
Correct Answer: D (reduce synchronous rolling and slamming to limit hull damage)
💡 Reducing speed or changing heading avoids resonance and slamming, cutting structural stress and cargo shift.
✗
Question 53. What is the fundamental test of whether the system works?
Your Answer: (Not answered)
Correct Answer: B (whether the ship really works to the system on scene and risk is reduced)
💡 Certificates and audits are form; effectiveness means real implementation on scene and reduced risk.
✗
Question 54. The key to spreading best practice is?
Your Answer: (Not answered)
Correct Answer: C (prove effectiveness, standardise, train and track adoption)
💡 Validate first, standardise, train and track adoption on board—only then is a practice truly spread.
✗
Question 55. What should the written handover record be?
Your Answer: (Not answered)
Correct Answer: B (concise and complete, signed by both with time and key items)
💡 The record shows time, position, movement and key items, signed by both, for accountability and traceability.
✗
Question 56. Whether crew are competent, the Company should base on?
Your Answer: (Not answered)
Correct Answer: B (SMS-defined standards and periodic assessment records)
💡 Competence needs standards and evidence; assessments support compliance.
✗
Question 57. How should AIS be handled when transiting a high risk area?
Your Answer: (Not answered)
Correct Answer: C (decide visibility per company risk assessment and naval guidance)
💡 Decide AIS on the company risk assessment and naval advice; blind switching off forfeits friendly identification.
✗
Question 58. What should be done for a suspected infectious disease case?
Your Answer: (Not answered)
Correct Answer: D (isolation, reporting, protection and disinfection with notification per port rules)
💡 Isolate, protect, disinfect and notify as required to stop rapid spread in a closed ship environment.
✗
Question 59. Company communication with crew about an incident should?
Your Answer: (Not answered)
Correct Answer: B (transparent, timely with follow-up actions to maintain trust)
💡 Brief the crew transparently on developments and safeguards to prevent rumours and preserve trust.
✗
Question 60. If abnormal deformation is found during hull inspection, what applies?
Your Answer: (Not answered)
Correct Answer: A (record position and size, photograph and report company and class for assessment)
💡 Deformation may mean buckling or overload; record, report and have it assessed, never handle it yourself or delay.
✗
Question 61. To whom is the Document of Compliance (DOC) issued?
Your Answer: (Not answered)
Correct Answer: A (issued to a company, one copy per ship type)
💡 The DOC is issued to the company per ship type, evidencing SMS compliance with ISM.
✗
Question 62. The purpose of sampling in an SMS audit is?
Your Answer: (Not answered)
Correct Answer: D (infer overall performance from limited samples, controlling cost)
💡 Audits cannot cover everything; sample recent, higher-risk and problem areas to infer overall effectiveness.
✗
Question 63. To prove its SMS complies with ISM, a Company must obtain?
Your Answer: (Not answered)
Correct Answer: C (a Document of Compliance (DOC); each managed ship needs an SMC)
💡 The Company holds a DOC; each ship it manages holds an SMC — the pair evidences compliance.
✗
Question 64. Who approves the loading/stowage plan?
Your Answer: (Not answered)
Correct Answer: A (master approves, chief officer prepares with terminal coordination)
💡 The chief officer prepares and the master approves it, covering stability, strength, segregation and port order.
✗
Question 65. The Company should consolidate casualty lessons and best practice into?
Your Answer: (Not answered)
Correct Answer: C (a knowledge base disseminated fleet-wide to avoid repeating mistakes)
💡 Knowledge management turns individual lessons into organisational capability.
✗
Question 66. The main risk of reducing manning levels is?
Your Answer: (Not answered)
Correct Answer: A (accumulated fatigue, weaker emergency response and more errors)
💡 Cutting crew raises fatigue and weakens response, with post-incident costs far exceeding savings and possible manning breaches.
✗
Question 67. Which is NOT the value of near-miss reporting?
Your Answer: (Not answered)
Correct Answer: A (to hold the reporter accountable)
💡 Near-miss reporting finds gaps and shares lessons; using it to punish stops reporting and blinds the system.
✗
Question 68. The master's authority over non-safety matters (e.g. commercial contracts) is?
Your Answer: (Not answered)
Correct Answer: A (bounded by charter/Company for commerce, but absolute on safety)
💡 The master's absolute power is limited to safety/pollution; commerce follows contract.
✗
Question 69. During bunkering, the barge figures differ markedly from the ship's; what applies?
Your Answer: (Not answered)
Correct Answer: A (suspend, recheck jointly and note a reservation on the document)
💡 Suspend and recheck, note the reservation and if needed refuse or sample for testing, never sign by default.
✗
Question 70. The company orders on-time arrival but a severe typhoon is forecast ahead. What should the master do?
Your Answer: (Not answered)
Correct Answer: C (divert or heave to by safety judgement, reporting the rationale)
💡 The master's safety authority is final: take avoiding action and report with reasons; the company cannot compel risk.
✗
Question 71. If the Company or charterer demands an unsafe act, the master should?
Your Answer: (Not answered)
Correct Answer: D (refuse and follow safe judgement, reporting to the DPA if needed)
💡 The master's safety judgement overrides commercial orders; refusal is authorised.
✗
Question 72. The preparation and approval of a repair list should?
Your Answer: (Not answered)
Correct Answer: B (department raises, C/E or master reviews, company approves and tracks)
💡 Repair lists are raised by departments, reviewed by C/E or master, approved and tracked by the company.
✗
Question 73. Personnel in key safety roles (helmsman, OOW) shall?
Your Answer: (Not answered)
Correct Answer: C (hold appropriate certificates and know the post's SMS instructions)
💡 Key roles require certificates of competency and familiarity with SMS instructions and emergency duties.
✗
Question 74. Through which channel should a request for maritime assistance be made?
Your Answer: (Not answered)
Correct Answer: B (via coast station, regional RCC or the distress calling channel)
💡 Use official channels such as coast stations, the RCC or channel 16 to enter the formal SAR system quickly.
✗
Question 75. How are dangerous-goods containers stowed on board?
Your Answer: (Not answered)
Correct Answer: A (segregated by class, clear of heat and accommodation, carried on a declared manifest and plated)
💡 Stowage starts from class and nature: incompatible goods separated per the segregation table, kept clear of heat, ignition sources and accommodation, those needing ventilation stowed accordingly and some only on deck, light-sensitive or temperature-limited goods handled to their own requirement, certain classes also away from machinery space and bridge ends. The container must match its declaration and manifest - proper shipping name, UN number, class, plates - with its slot shown on the stowage plan, emergency information on board and exchanged with the port as agreed. Missing declarations, plates that disagree with the papers, a deck-cargo class booked under cover, and two incompatible classes as neighbours are the findings made most often. A whole seal answers nothing about the slot, and deck stowage cooks cargo that must not be exposed.
✗
Question 76. The role of periodic medical examination for crew is?
Your Answer: (Not answered)
Correct Answer: B (detect occupational disease early and confirm fitness for duty)
💡 Regular medicals detect hearing, respiratory and cardiovascular problems early and confirm fitness for sea service.
✗
Question 77. Flooding in a cargo hold is discovered at sea; what applies?
Your Answer: (Not answered)
Correct Answer: C (sound the alarm, start pumping, assess stability and divert or request help if needed)
💡 Alarm, pump, assess stability and flooding rate, then divert to the nearest safe place and request assistance as needed.
✗
Question 78. The core STCW requirement for navigational watch is?
Your Answer: (Not answered)
Correct Answer: A (maintain a proper look-out and safe speed with continuous monitoring)
💡 Proper look-out and safe speed are fundamental; monitoring must be continuous.
✗
Question 79. Tokyo and Paris MoUs are examples of?
Your Answer: (Not answered)
Correct Answer: A (regional PSC memoranda sharing deficiency/detention data)
💡 MoUs are regional PSC networks (Tokyo, Paris, etc.) sharing inspection and detention data.
✗
Question 80. To enable effective crew performance onboard, the Company must provide?
Your Answer: (Not answered)
Correct Answer: C (adequate shore resources (info, spares, experts, training))
💡 Rules 4/6: the Company provides shore resources via the DPA to support crew performance.
✗
Question 81. The benefit of crew job rotation is?
Your Answer: (Not answered)
Correct Answer: A (broadens skills, reduces monotony and improves team backup)
💡 Rotation builds versatile crew and reduces fatigue while ensuring key posts stay certified and competent.
✗
Question 82. When the security level is lowered, a ship should?
Your Answer: (Not answered)
Correct Answer: B (confirm, stand down measures to normal and record the change)
💡 Verify the source first, then stand down extra controls per the SSP and log the level change and timing.
✗
Question 83. The correct approach under laytime pressure is?
Your Answer: (Not answered)
Correct Answer: A (cooperate within safe limits without sacrificing safe operations for schedule)
💡 Never breach safety for schedule; log non-ship causes of delay to protect the vessel's position.
✗
Question 84. The foundation of corrosion protection is?
Your Answer: (Not answered)
Correct Answer: A (proper surface preparation, correct coating system and timely touch-ups)
💡 Protection depends on surface prep, primer, system and film thickness plus prompt repair, not topcoat alone.
✗
Question 85. In an emergency the master's decision bottom line is?
Your Answer: (Not answered)
Correct Answer: B (prioritise life, ship, environment over commercial loss)
💡 The maritime order: life > ship > environment > cargo/commerce.
✗
Question 86. Obvious deformation is found in a cargo hold structure during work; you should?
Your Answer: (Not answered)
Correct Answer: D (stop work at once, report and request survey assessment)
💡 Deformation may affect strength and stability; stop, report company and class and request an occasional survey.
✗
Question 87. In technical management what must the master most guard against?
Your Answer: (Not answered)
Correct Answer: B (running with defects and concealing them)
💡 Running defective and concealing faults leads straight to accidents and detention and must be firmly prevented.
✗
Question 88. What is special about work on high voltage equipment?
Your Answer: (Not answered)
Correct Answer: C (specialist training and authorisation, dedicated tools and a permit-to-work)
💡 High voltage carries arc-flash risk; only authorised staff with dedicated tools and permits may work on it.
✗
Question 89. When port reception facilities are inadequate, what applies?
Your Answer: (Not answered)
Correct Answer: A (report the inadequacy and keep evidence; never discharge as a result)
💡 Report to port or flag with evidence and store properly; inadequate facilities never justify illegal discharge.
✗
Question 90. How often is an abandon-ship drill required on a cargo ship?
Your Answer: (Not answered)
Correct Answer: D (at least monthly)
💡 SOLAS requires monthly abandon-ship and fire drills on cargo ships, weekly on passenger ships.
✗
Question 91. Qualification and handover of key personnel should follow?
Your Answer: (Not answered)
Correct Answer: A (proper certificate and experience, thorough recorded handover)
💡 Key posts need certificates; handover covers SMS, equipment and open items, confirmed in writing.
✗
Question 92. The role of emergency lighting and backup power is?
Your Answer: (Not answered)
Correct Answer: A (maintain lighting and comms or steering in key spaces when main power fails)
💡 After blackout they keep escape routes, muster stations, bridge and comms working—basic for regaining control.
✗
Question 93. The ultimate purpose of risk management is?
Your Answer: (Not answered)
Correct Answer: D (keep risk at an acceptable level protecting life, environment and assets)
💡 It does not seek zero risk but acceptable levels, prioritising life, the environment and company assets.
✗
Question 94. What applies to a newbuild or newly taken-over ship?
Your Answer: (Not answered)
Correct Answer: C (adapt the system, familiarise crew and make necessary interim arrangements)
💡 New ships need document adaptation, familiarisation and interim arrangements so they operate within the system from day one.
✗
Question 95. Who should be reported to when fuel quality is disputed after bunkering?
Your Answer: (Not answered)
Correct Answer: D (company, supplier and P&I club, retaining samples and documents)
💡 Report to company, supplier and club while preserving samples, bunker notes and measurements as evidence.
✗
Question 96. How are key operations identified?
Your Answer: (Not answered)
Correct Answer: B (by the consequence if it fails such as injury, pollution or damage)
💡 Judge by consequences: if failure could injure, pollute or cause major loss, manage it by procedure.
✗
Question 97. Under the ISPS Code and the ship security plan, what counts as a "restricted area" on board?
Your Answer: (Not answered)
Correct Answer: A (security-sensitive spaces entry to which needs approval, such as the bridge, engine room, cargo control and fire control station)
💡 The test is security, not working safety: unauthorised entry to such spaces threatens navigation, the cargo or emergency response, so they are marked, locked, controlled by entry log, and manned at the higher security levels. A closed-up conversion space, a no-smoking corner and a port-side restricted area belong to other regimes.
✗
Question 98. Where do technical management and the safety system actually interlock?
Your Answer: (Not answered)
Correct Answer: B (technical status enters the system through maintenance and reports, and the system secures it by procedure and supervision)
💡 Equipment status, surveys and repairs feed the system, and the system in turn presses the technical measures back into execution through procedures, resources and supervision; the two carry each other. Without the first the system spins on paper alone; without the second a measure holds for one voyage only and the next crew drifts back. The usual shortfall on board is the split itself - machinery running its own maintenance while the office keeps its own records - and what has to be looked at is whether those records bring out the real state of the equipment, and whether the shore acts on them with men and money.
✗
Question 99. The particular risk of a free-fall lifeboat is?
Your Answer: (Not answered)
Correct Answer: D (injury from poor entry attitude, occupants must be secured)
💡 Free-fall impact is severe; sit correctly and strap in with head supported to prevent neck and spine injury.
✗
Question 100. The ship is tidied before an inspection. What is that for?
Your Answer: (Not answered)
Correct Answer: D (slippery appearance invites a deeper inspection, and the first impression counts)
💡 Rusted plating, rope coiled anyhow, passages blocked, engine-room floor plates still oily - the officer reads management out of that and moves from sampling to digging: maintenance records called for, a demonstration on the spot, a look at wastage below. A ship that is tidy, correctly marked and clear in her passages generally gets the normal scope. Tidying is therefore not for the photograph; it is about not handing the inspector the depth of his inspection at the start. These items are themselves safety requirements - passages, lighting, handrails, escape routes - so straightening them sweeps out hazards at the same time.