Question 1. When navigating in or near an area of restricted visibility, which action is required?
Your Answer: (Not answered)
Correct Answer: A (Proceed at a safe speed, have engines ready, sound fog signals, stop if necessary and take avoiding action in ample time)
💡 Under the collision regulations a vessel navigating in or near an area of restricted visibility should proceed at a safe speed, have engines ready for immediate manoeuvre, sound fog signals, stop if necessary and take avoiding action in ample time for detected targets. On hearing a fog signal apparently forward of the beam, speed should be reduced or the vessel stopped.
✗
Question 2. What is addressed regarding the setting of the machinery space bilge alarm?
Your Answer: (Not answered)
Correct Answer: D (Alarm on the bilge reaching a certain level, with the alarm point arranged to attract the watchkeeper's attention in good time)
💡 The bilge alarm should operate as soon as water reaches a certain level, normally above the bilge wells, so abnormal accumulation is noticed promptly. A high setting delays the response, and with unattended machinery the alarm should be transmitted to the bridge.
✗
Question 3. Who approves the Ship Security Plan?
Your Answer: (Not answered)
Correct Answer: C (The Administration or its recognized security organization)
💡 ISPS Code Part A/9: the SSP must be approved by the Administration or its RSO.
✗
Question 4. What does SOLAS XI-1/7 require regarding asbestos?
Your Answer: (Not answered)
Correct Answer: A (Installation of materials containing asbestos on new equipment is prohibited, and a declaration or certificate of no asbestos must be held)
💡 SOLAS XI-1/7 prohibits the installation of materials containing asbestos on all ships and requires a declaration or certificate of no asbestos, protecting seafarers from the health hazard.
✗
Question 5. What do SOLAS and good practice address regarding safety at the purifier?
Your Answer: (Not answered)
Correct Answer: C (Adequate ventilation and guarding, preventing accumulation of oil mist and the risk of fire from spray)
💡 The purifier room should be well ventilated with guards and an oil mist alarm, preventing oil mist from accumulating and being ignited, and should be provided with fixed or portable extinguishing equipment. It is one of the higher fire risk locations in a machinery space.
✗
Question 6. How many rocket parachute flares shall each lifeboat or liferaft carry?
Your Answer: (Not answered)
Correct Answer: B (4)
💡 SOLAS III/7.1: each survival craft shall carry 4 rocket parachute flares.
✗
Question 7. What shall be done if radio equipment fails?
Your Answer: (Not answered)
Correct Answer: D (Repair it as soon as practicable and report as required)
💡 It shall be repaired as soon as practicable and reported as required.
✗
Question 8. What is the initial response of the officer of the watch in an emergency?
Your Answer: (Not answered)
Correct Answer: C (Take the necessary action immediately to avoid danger and inform the master at once, without delay)
💡 STCW requires the officer of the watch in an emergency to take immediate action to avoid danger and to inform the master at once. Delay to seek instructions is often the reason an incident escalates.
✗
Question 9. What is the purpose of the boat hook among the lifeboat equipment?
Your Answer: (Not answered)
Correct Answer: A (To pull or push the boat when coming alongside, recovering floating objects or landing)
💡 The boat hook is used to pull or push the boat when coming alongside, recovering floating objects or landing, a common handling tool whose absence reduces the boat's handling and rescue capability.
✗
Question 10. What should be noted about launching lifeboats while the ship has headway?
Your Answer: (Not answered)
Correct Answer: A (Reduce speed or stop if possible before launching, avoiding the boat being swept away or striking the hull)
💡 A lifeboat should be launched with speed reduced or the ship stopped where possible, since headway produces a flow that can sweep the boat away or dash it against the hull. If stopping is impossible in an emergency, the boat should be launched on the lee side with due preparation.
✗
Question 11. What is the general requirement for the location of embarkation stations?
Your Answer: (Not answered)
Correct Answer: A (Where persons can board safely, as far as practicable from the propulsion plant and dangerous goods)
💡 SOLAS requires embarkation stations to be located where persons can board safely, taking account of the need to be clear of propellers, thrusters, exhausts and dangerous goods, so that persons are not injured while boarding and the operation is possible even if the ship still has headway.
✗
Question 12. What reward mechanisms for crew suggestions may be used?
Your Answer: (Not answered)
Correct Answer: D (Rewards and recognition may encourage the crew to propose improvements, driving continual refinement)
💡 The ISM system encourages mechanisms of reward, recognition and inclusion in appraisal for crew who put forward effective improvements or detect significant hazards in time, giving them an incentive to take part in safety management and driving continual enhancement and genuine effectiveness of the system.
✗
Question 13. The crew rest hour records are found clearly inconsistent with the watchkeeping arrangements. The finding is?
Your Answer: (Not answered)
Correct Answer: C (Rest hours must be truthfully recorded and meet the minimum; inconsistency is a violation)
💡 Crew rest hours should meet the minimum requirements and be truthfully and completely recorded. Inconsistency with the watchkeeping arrangements may conceal insufficient rest and endanger the safety of watchkeeping. It is a deficiency against the rest hour rules to be investigated and corrected.
✗
Question 14. Which material is prohibited for bulkheads on board?
Your Answer: (Not answered)
Correct Answer: B (Combustible material (other than as provided))
💡 Combustible materials are restricted; non-combustible material shall generally be used.
✗
Question 15. For a cargo ship of 100 m and above, the number of lifebuoys with self-igniting lights shall be not less than:
Your Answer: (Not answered)
Correct Answer: B (8)
💡 SOLAS III/32 requires not less than eight lifebuoys with self-igniting lights for cargo ships of 100 m and above.
✗
Question 16. When must the first drill after leaving port be held?
Your Answer: (Not answered)
Correct Answer: D (Within 24 hours of leaving port, including abandon ship and fire drills)
💡 SOLAS III/19 requires the first drill, including abandon ship and fire drills and, on passenger ships, the participation of passengers, to be held within 24 hours of the ship leaving port, so that newly joined personnel and the whole crew have their emergency duties clear from the start of the voyage.
✗
Question 17. What does sea area A3 denote in the GMDSS?
Your Answer: (Not answered)
Correct Answer: A (An area within Inmarsat geostationary satellite coverage, excluding A1 and A2)
💡 Sea area A3 is within Inmarsat coverage, excluding sea areas A1 and A2, where continuous alerting is available.
✗
Question 18. Each ship shall carry at least how many sets of firefighter's outfits?
Your Answer: (Not answered)
Correct Answer: C (2)
💡 SOLAS II-2/10: each ship shall carry at least two sets of firefighter's outfits.
✗
Question 19. What does SOLAS address regarding the watertight integrity of spaces above the bulkhead deck?
Your Answer: (Not answered)
Correct Answer: C (Openings must be fitted with effective closing appliances to prevent sea water entering the hull through them)
💡 SOLAS requires openings such as doors, side scuttles and ventilators above the bulkhead deck to have effective closing appliances, preventing sea water from entering the hull and causing loss of stability.
✗
Question 20. In which spaces must ceilings and linings be of non-combustible material?
Your Answer: (Not answered)
Correct Answer: A (In enclosures of stairways and corridors forming escape routes)
💡 SOLAS requires non-combustible linings and ceilings in critical spaces such as stairway enclosures and corridors serving as escape routes, limiting the spread of fire and keeping the escape route safe.
✗
Question 21. What do SOLAS and the Load Line Convention address regarding the height of coamings at openings in the freeboard deck?
Your Answer: (Not answered)
Correct Answer: A (Coamings must reach the prescribed height to prevent sea water entering spaces below)
💡 SOLAS and the Load Line Convention require openings in the freeboard deck leading to spaces below to have coamings of the prescribed height with effective closing appliances, preventing water shipped on deck from entering and affecting stability.
✗
Question 22. The main steering gear shall be capable, at maximum ahead service speed, of:
Your Answer: (Not answered)
Correct Answer: B (completing the full rudder movement within the prescribed time)
💡 SOLAS II-1/29 requires the main steering gear to complete the 35°-to-35° movement within the prescribed time at maximum ahead service speed.
✗
Question 23. What does SOLAS II-2 require for paint lockers and flammable liquid lockers?
Your Answer: (Not answered)
Correct Answer: C (A suitable fire-extinguishing arrangement, such as a fixed system or equivalent)
💡 SOLAS II-2/15 requires paint and flammable liquid lockers to be provided with a suitable extinguishing arrangement because of the high fire load and rapid spread in such spaces.
✗
Question 24. The deck foam system of a tanker shall be capable of supplying foam over the protected deck area within:
Your Answer: (Not answered)
Correct Answer: A (30 minutes)
💡 SOLAS II-2/20: the deck foam system shall be capable of supplying foam over the protected deck area within 30 minutes.
✗
Question 25. What does SOLAS address regarding the arrangement of ventilation inlets and outlets in machinery spaces?
Your Answer: (Not answered)
Correct Answer: D (They must be arranged to avoid short circuiting and ensure effective air change)
💡 SOLAS requires the inlets and outlets of machinery space ventilation to be arranged to avoid short circuiting and ensure effective air change, preventing excessive temperature or accumulation of flammable gas, both of which affect equipment and safety.
✗
Question 26. Change-over between automatic pilot, manual steering and emergency steering shall be:
Your Answer: (Not answered)
Correct Answer: A (rapid and reliable, and hand steering shall be immediately available at all times)
💡 SOLAS V/19: change-over between automatic pilot, manual steering and emergency steering shall be rapid and reliable, and hand steering shall be immediately available at all times.
✗
Question 27. What do the blind sector limitations of SOLAS V/22 principally concern?
Your Answer: (Not answered)
Correct Answer: A (The total arc and individual arcs of blind sectors ahead as seen from the conning position)
💡 SOLAS V/22 limits the number and total arc of blind sectors ahead from the conning position so that the look-out remains effective. It does not deal with radar shadows or window reflection.
✗
Question 28. Within what time shall the emergency generator start and supply power automatically on loss of the main supply?
Your Answer: (Not answered)
Correct Answer: D (30 seconds)
💡 SOLAS II-1/44: the emergency generator shall start automatically within 30 seconds.
✗
Question 29. A PSCO tested ventilation closing devices and found some seized. What does SOLAS address?
Your Answer: (Not answered)
Correct Answer: A (Closing devices of machinery space ventilators must close rapidly to cut off ventilation and air supply)
💡 SOLAS II-2 requires machinery space ventilator closing devices to close rapidly and remain effective, cutting off the air supply in a fire. Seized devices or a lack of regular testing are common deficiencies.
✗
Question 30. When navigating in restricted visibility, what is required for look-out under SOLAS V and COLREG?
Your Answer: (Not answered)
Correct Answer: B (A proper look-out by sight and hearing as well as by radar, with an additional look-out posted forward)
💡 A proper look-out uses sight, hearing and radar together. In restricted visibility an additional look-out should be posted forward and a listening watch maintained. Radar does not replace the human look-out.
✗
Question 31. What must be confirmed before releasing a fixed extinguishing system?
Your Answer: (Not answered)
Correct Answer: A (That all persons have left the space and been accounted for, that ventilation is closed and that the system is in working order)
💡 Before releasing a fixed extinguishing system such as CO2, it must be confirmed that all persons have left the space and been accounted for, that ventilation and openings are closed to prevent loss of gas and that the pressure or weight of the system is correct. Any omission could cause fatalities or failure of the system.
✗
Question 32. What alternative measures are required if a fire detection system fails?
Your Answer: (Not answered)
Correct Answer: B (Repair promptly; pending repair, increase patrols of the affected spaces under the procedure and keep records)
💡 If a detection system fails it should be repaired promptly and, pending repair, patrols of the affected spaces increased under the procedure with records kept, preventing a fire from going unnoticed while the system is out of action.
✗
Question 33. An EPIRB was found with an expired battery. What is the finding?
Your Answer: (Not answered)
Correct Answer: B (A deficiency; the battery must be within its expiry date, as an expired battery affects distress alerting capability)
💡 An expired EPIRB battery means the equipment cannot sustain the prescribed transmission period, normally not less than 48 hours, in a distress. This is a deficiency affecting distress alerting capability, and the battery or the equipment should be replaced at once with the release mechanism checked.
✗
Question 34. What do SOLAS and good practice address regarding the arrangement of GMDSS antennas?
Your Answer: (Not answered)
Correct Answer: C (Arranged so that equipment does not interfere with one another and essential communication capability remains if damage occurs)
💡 SOLAS and good practice require GMDSS antennas to be arranged to avoid interference between transmitting antennas and to retain back-up capability if the main antenna is damaged. Grouping them together means one failure disables all.
✗
Question 35. What fire rating does SOLAS normally require for the boundary between a category A machinery space and accommodation spaces?
Your Answer: (Not answered)
Correct Answer: D (A-60 class division)
💡 SOLAS normally requires A-60 class boundaries between category A machinery spaces and accommodation and service spaces because of the high fire risk in machinery spaces.
✗
Question 36. What securing is required for vehicles carried as ro-ro cargo?
Your Answer: (Not answered)
Correct Answer: A (Secure using the lashings or chains specified in the securing manual, confirming brake and gear status)
💡 SOLAS and the CSS Code require ro-ro cargo to be secured with the lashing straps, chains or dedicated devices specified in the securing manual, with the vehicle confirmed braked and in a suitable gear and its fuel and battery condition acceptable, preventing movement and collision during the voyage.
✗
Question 37. What fire precautions are required before bunkering?
Your Answer: (Not answered)
Correct Answer: A (Confirm firefighting equipment in place, close relevant openings, clear deck of oil and establish communication with the barge)
💡 Before bunkering, firefighting equipment such as extinguishers, hoses and absorbents should be in place, openings through which oil could enter should be closed and the deck kept free of oil, with communication and an agreed emergency stop arranged with the supplier, preventing overflow and fire.
✗
Question 38. Which MF frequency is used for DSC distress alerting?
Your Answer: (Not answered)
Correct Answer: A (2187.5 kHz)
💡 The MF DSC distress frequency is 2187.5 kHz. 2182 kHz is the MF radiotelephony distress frequency and 2174.5 kHz is used for NBDP distress traffic.
✗
Question 39. Regarding ventilation of cargo tank areas on a tanker:
Your Answer: (Not answered)
Correct Answer: D (adequate ventilation shall be provided with inlets and outlets arranged to prevent accumulation of vapour)
💡 SOLAS II-2/4 requires adequate ventilation arranged to prevent accumulation of vapour.
✗
Question 40. What does SOLAS and the Polar Code require regarding manning and training for polar waters?
Your Answer: (Not answered)
Correct Answer: A (The master and officers in charge of a navigational watch must have completed appropriate polar waters training and gained the required experience)
💡 SOLAS XIV and STCW require the master and officers in charge of a navigational watch of a ship in polar waters to have completed polar waters training appropriate to the ship's category and to have the prescribed seagoing experience, ensuring the ability to operate in polar conditions.
✗
Question 41. What do SOLAS and the related standards require for the cylinders of a fixed CO2 system?
Your Answer: (Not answered)
Correct Answer: D (Periodic checks of cylinder pressure and weight and verification that the piping is clear)
💡 SOLAS and the related standards require periodic checks of cylinder pressure and weight to detect leakage, and verification that piping and nozzles are clear. A visual check alone will not reveal internal leakage or blockage.
✗
Question 42. The voyage plan shall include:
Your Answer: (Not answered)
Correct Answer: A (a berth-to-berth plan giving due consideration to navigational hazards including safe speed)
💡 SOLAS V/34: the voyage plan covers the whole passage from berth to berth, giving due consideration to navigational hazards and safe speed.
✗
Question 43. What is the core principle SOLAS requires for the arrangement of ballast and bilge piping?
Your Answer: (Not answered)
Correct Answer: B (Bilge water from one compartment must not be able to pass through the piping system into another compartment)
💡 SOLAS requires bilge and ballast piping to be arranged so that water cannot pass from one compartment to another through the system, causing inadvertent flooding or cargo contamination. The arrangement is subject to approval.
✗
Question 44. What does SOLAS address regarding action if the inert gas system fails?
Your Answer: (Not answered)
Correct Answer: C (Stop the relevant operations immediately and notify the terminal and take emergency measures)
💡 SOLAS and industry guidance require the relevant operations to stop at once if the inert gas system fails, with the terminal informed and emergency measures taken, preventing explosion from carrying on operations with inerting lost.
✗
Question 45. Indication of propeller pitch and speed shall show:
Your Answer: (Not answered)
Correct Answer: B (pitch (where applicable), propeller speed and direction of rotation)
💡 SOLAS V/19: the bridge shall be provided with indicators for pitch (where applicable), propeller speed and direction of rotation.
✗
Question 46. When encountering ice or icebergs, a ship shall:
Your Answer: (Not answered)
Correct Answer: B (navigate with caution, report as necessary and keep a safe distance)
💡 SOLAS V/31-32 requires monitoring of ice, cautious navigation and reporting.
✗
Question 47. What is the principle of zoning for a fixed fire detection and fire alarm system?
Your Answer: (Not answered)
Correct Answer: A (The system should detect by zone and indicate the affected zone so that the fire can be quickly located and action taken)
💡 Under SOLAS II-2/7 a fixed fire detection and fire alarm system should be arranged in sections so that the alarm indicates the section in which a fire or fault has occurred, enabling the crew quickly to locate the fire and take action. A fault in the detection system should be capable of being indicated, isolated and reset.
✗
Question 48. What does SOLAS address regarding gravity davits?
Your Answer: (Not answered)
Correct Answer: B (The craft must be launched by gravity without power and capable of being released from within the craft)
💡 SOLAS requires a gravity davit to launch the craft by gravity without power and to be capable of release from within the craft, so that abandonment can still be carried out if power is lost or personnel are dispersed.
✗
Question 49. On the navigation bridge, the main propulsion machinery shall be provided with:
Your Answer: (Not answered)
Correct Answer: A (indications of speed and direction of rotation and the necessary communication)
💡 SOLAS II-1/31 requires indications of propeller speed and direction and necessary communication on the bridge.
✗
Question 50. What do SOLAS and the IMSBC Code require when carrying cargoes that may release flammable gas?
Your Answer: (Not answered)
Correct Answer: D (Suitable gas detecting instruments with testing as required, and the elimination of possible sources of ignition)
💡 SOLAS and the IMSBC Code require suitable gas detecting instruments when carrying cargoes that may release flammable gas, testing the atmosphere of the holds and adjacent spaces as required and eliminating possible sources of ignition, preventing ignition of the gas.
✗
Question 51. What is the main purpose of establishing restricted areas under the ship security plan?
Your Answer: (Not answered)
Correct Answer: C (To prevent unauthorised access and the introduction of weapons or dangerous articles)
💡 ISPS Code Part A/10 requires restricted areas to be identified and controlled in order to prevent unauthorised access and the introduction of weapons or dangerous articles on board. Convenience of operations is not the purpose.
✗
Question 52. Pipes passing through the collision bulkhead shall be fitted with:
Your Answer: (Not answered)
Correct Answer: C (a valve operable from above the bulkhead deck, with the valve chest inside the forepeak)
💡 SOLAS II-1/12 requires pipes through the collision bulkhead to be fitted with a valve operable from above the bulkhead deck.
✗
Question 53. What number of thermal protective aids must a lifeboat carry under SOLAS?
Your Answer: (Not answered)
Correct Answer: C (10 per cent of the rated number of persons, and not fewer than two)
💡 SOLAS requires a lifeboat to carry thermal protective aids for 10 per cent of the rated number of persons, and not fewer than two. An insufficient number leaves some persons without thermal protection in cold conditions.
✗
Question 54. Within what period after last servicing shall the hydrostatic release unit of an inflatable liferaft be serviced or replaced?
Your Answer: (Not answered)
Correct Answer: B (12 months)
💡 SOLAS III/20: hydrostatic release units are serviced at intervals not exceeding 12 months.
✗
Question 55. What performance must survival craft achieve in respect of wind and sea conditions under SOLAS?
Your Answer: (Not answered)
Correct Answer: A (They must float safely and retain their performance under the prescribed wind and sea conditions)
💡 SOLAS requires survival craft designed for the prescribed wind and sea conditions, able to float safely and maintain their essential performance in heavy weather. A declaration for calm water alone does not meet the needs after abandonment.
✗
Question 56. What are the principal risks the officer of the watch should consider when navigating in coastal waters?
Your Answer: (Not answered)
Correct Answer: C (High traffic density, many fishing and small craft, crossing routes and shoal water, and fishing gear or aquaculture installations)
💡 Coastal waters have dense traffic, frequent fishing and small craft, crossing routes, fishing gear and aquaculture installations, while shoal water affects under-keel clearance. The officer must enhance the look-out, manoeuvre prudently and keep a safe speed.
✗
Question 57. A ship's AIS is found switched off while under way. The finding is?
Your Answer: (Not answered)
Correct Answer: B (AIS must be kept in operation as required and may be switched off only in the specified circumstances; failing to keep it on is a violation)
💡 The AIS should be kept in operation as required and may be switched off only in the specific cases permitted by the rules, such as where continuous operation would compromise the safety or security of the ship, and the reason should be recorded. Switching it off at will while under way is a violation that may lead to detention and investigation.
✗
Question 58. What does SOLAS require regarding the scenarios used in fire drills?
Your Answer: (Not answered)
Correct Answer: C (Scenarios should be planned to reflect the different situations realistically possible, avoiding the same assumption each time)
💡 SOLAS and good practice require fire drill scenarios to be based on the actual risk assessment and to vary, such as fires in the machinery space, a cargo hold or different parts of the accommodation. Always using the same scenario leaves the crew unprepared for the real event.
✗
Question 59. On what is the safe speed a ship should be carrying at a given moment determined?
Your Answer: (Not answered)
Correct Answer: D (speed settled by visibility, traffic density, manoeuvring performance, wind and sea, draught and background light, so that the ship can stop in the distance appropriate to the conditions)
💡 Rule 6 makes safe speed a capability rather than a figure: ability to stop within the distance appropriate to the conditions and to take effective collision action. Visibility, traffic density, the ship's own stopping distance and turning ability, background lighting by night, wind, sea and rain, draught against the available depth, all count, and engines must be ready in a narrow channel or in fog. A port limit is an extra constraint: keeping under it is not the same as keeping Rule 6, and keeping Rule 6 may call for less than the limit.
✗
Question 60. What electrical equipment is required in a pump room on a tanker?
Your Answer: (Not answered)
Correct Answer: B (Explosion-protected equipment, with the number of items and wiring minimised)
💡 A pump room is a high-risk space where hydrocarbon vapour can accumulate. SOLAS and the IBC Code require explosion-protected equipment with the number of items and wiring kept to a minimum, preventing electrical sparks from igniting vapour.
✗
Question 61. How must records of servicing and inspection of life-saving appliances be handled under SOLAS III?
Your Answer: (Not answered)
Correct Answer: B (They must be kept on board and produced at statutory surveys)
💡 SOLAS III requires records of inspections and maintenance of life-saving appliances to be kept on board for verification at statutory and PSC inspections. Company-only records or oral reports are not sufficient.
✗
Question 62. Which body is responsible for type approval of shipborne radio equipment?
Your Answer: (Not answered)
Correct Answer: D (The Administration or its recognized organization)
💡 Type approval is carried out by the Administration or its recognized organization.
✗
Question 63. What is the principal cause of deviation error in a magnetic compass?
Your Answer: (Not answered)
Correct Answer: C (The effect of the ship's steel and electrical equipment)
💡 Deviation is caused by the ship's own steel and electrical equipment; deviation tables must be applied.
✗
Question 64. The Continuous Synopsis Record (CSR) is intended to:
Your Answer: (Not answered)
Correct Answer: C (record the history and major events of the ship such as changes of name, owner and class)
💡 SOLAS XI-1/3: the Continuous Synopsis Record records the history and major events of the ship such as changes of name, owner and class.
✗
Question 65. A PSC inspection found escape routes from accommodation to the embarkation station obstructed by stores. What does SOLAS require?
Your Answer: (Not answered)
Correct Answer: B (Escape routes must be kept clear and unobstructed; any obstruction is a deficiency)
💡 SOLAS II-2/13 requires means of escape to be kept clear and usable at all times. Any stowage or obstruction could cause casualties during an emergency evacuation and is a serious deficiency.
✗
Question 66. What is the most important requirement in the stowage and securing of a liferaft?
Your Answer: (Not answered)
Correct Answer: B (That it can be released very quickly)
💡 A liferaft must be capable of quick release; excessive chocking impedes access.
✗
Question 67. What preparation of equipment is required before an inspection?
Your Answer: (Not answered)
Correct Answer: D (Confirm critical equipment is serviceable, including testing emergency equipment, and be ready to demonstrate its operation)
💡 Before an inspection, critical equipment such as fire pumps, the emergency fire pump, the emergency generator, the steering gear, lifeboat engines and the fire detection system should be confirmed serviceable and ready to demonstrate, with emergency equipment tested and records kept. Equipment that does not work becomes an immediate deficiency.
✗
Question 68. What is required for updating the fire control plan?
Your Answer: (Not answered)
Correct Answer: B (Updated promptly when the arrangement or fire protection changes, keeping it consistent with the ship)
💡 SOLAS requires the fire control plan to be updated promptly when the arrangement, fire divisions or extinguishing equipment change, keeping it consistent with the ship. A plan not matching the ship would lead shore firefighters to a wrong appreciation on boarding.
✗
Question 69. What is the definition of GMDSS sea area A2?
Your Answer: (Not answered)
Correct Answer: A (An area within MF coast station DSC coverage)
💡 In the GMDSS, sea area A2 is an area within MF coast station continuous digital selective calling coverage, excluding A1. The provision of MF DSC equipment and the corresponding distress alerting means for the trading area is a basic requirement of fitness for that area.
✗
Question 70. With regard to bridge visibility, SOLAS requires that:
Your Answer: (Not answered)
Correct Answer: B (a clear view of the sea surface forward shall be available from the conning position, not obstructed by cargo or structure)
💡 SOLAS V/22 requires a clear forward view from the conning position, unobstructed by cargo or structure.
✗
Question 71. A watertight door open/closed indicator at the central control station shows the wrong state, a door actually open being indicated as closed. The finding is?
Your Answer: (Not answered)
Correct Answer: D (A wrong indication may mislead the bridge as to the subdivision state; a deficiency to be corrected)
💡 The open/closed indicator at the central control station is an important basis for judging the actual state of each watertight door and deciding on closing measures. A wrong indication misleads the bridge as to subdivision integrity and may delay closure in the event of flooding. It is a deficiency to be corrected.
✗
Question 72. What checking of embarkation ladders is required?
Your Answer: (Not answered)
Correct Answer: D (Check the steps, ropes and securing arrangements for damage and deterioration and that it is stowed for ready use)
💡 An embarkation ladder should have its steps checked for splitting, its ropes for corrosion and wear, its securing and connecting arrangements for reliability and its stowage for being readily available and quick to rig. A failed ladder causes a person to fall while boarding, so it is critical life-saving equipment.
✗
Question 73. What checking of fire pump suction strainers is required?
Your Answer: (Not answered)
Correct Answer: D (Check them for blockage and damage and clean them periodically)
💡 If the strainer at the fire pump suction, in the sea chest, is blocked by marine growth, mud or debris, the pump will draw insufficient water and the pressure will fall. It should be checked and cleaned periodically. A damaged strainer allows debris into the pump and piping and causes damage. Both require prompt attention.
✗
Question 74. For free-fall lifeboats, drills shall include:
Your Answer: (Not answered)
Correct Answer: D (a free-fall launch at the required interval or an equivalent approved method)
💡 SOLAS III/19 requires free-fall lifeboats to be free-fall launched at the prescribed interval or by an approved equivalent method.
✗
Question 75. Which is the 4 MHz band DSC distress frequency among the HF frequencies?
Your Answer: (Not answered)
Correct Answer: A (4207.5 kHz)
💡 HF DSC distress frequencies are 4207.5, 6312, 8414.5, 12577 and 16804.5 kHz. 2187.5 kHz is an MF frequency and 6312 kHz belongs to the 6 MHz band.
✗
Question 76. The storage medium of a VDR shall be:
Your Answer: (Not answered)
Correct Answer: C (shock-resistant, fire-resistant and penetration-resistant for later recovery)
💡 SOLAS V/20: the VDR storage medium shall be shock-resistant, fire-resistant and penetration-resistant for later recovery.
✗
Question 77. Who fixes the minimum safe manning document and how is it used on board?
Your Answer: (Not answered)
Correct Answer: A (settled and issued by the flag administration for the type of ship and the trade)
💡 The figure is the flag's to fix: taking the type of ship, her tonnage and machinery power, the trade she plies and her organisation, with the automation she carries, and following the international guidelines on the subject, the administration settles the least number and the grades needed and sends the document to the ship. She is then manned to it, and those actually on board are not below what it asks; if the two disagree the discrepancy is a deficiency however the work is being done. The port State does not as a rule substitute its own calculation, but where it judges the people on board too few or too untalented for her ordinary and emergency working it may consult the flag. To give the number to the society or to leave it with the company crosses a line: the society surveys hull, machinery and equipment, and what the ship costs to man cannot change the least she needs.
✗
Question 78. Fuel oil used in machinery spaces shall generally have a flash point (closed cup) of not less than:
Your Answer: (Not answered)
Correct Answer: A (60 °C)
💡 SOLAS II-2/4 generally requires a flash point of not less than 60 °C, except emergency generators may use fuel with a flash point of not less than 43 °C.
✗
Question 79. Control stations shall be bounded by which type of division for protection in a fire?
Your Answer: (Not answered)
Correct Answer: A (A class divisions)
💡 SOLAS II-2/9 requires control stations to be bounded by A class divisions.
✗
Question 80. What is the relationship between lifejackets and immersion suits in survival craft?
Your Answer: (Not answered)
Correct Answer: A (A lifejacket provides buoyancy while an immersion suit provides thermal protection and buoyancy; they have different functions)
💡 A lifejacket principally provides buoyancy and a face-up attitude in the water, while an immersion suit provides both thermal protection and buoyancy. Their functions differ. In cold waters the ship should carry immersion suits while lifejackets remain required for every person; the two are used together.
✗
Question 81. A PSCO asks how many separate means of escape each main vertical zone must have. What is the correct answer?
Your Answer: (Not answered)
Correct Answer: C (At least two)
💡 SOLAS II-2/13 requires at least two means of escape from each main vertical zone or similar space, remote from each other, so that one route is not cut off by fire or smoke.
✗
Question 82. What should the marking and nameplate of life-saving appliances include?
Your Answer: (Not answered)
Correct Answer: C (The maker, date of manufacture, number of persons it is intended for and the date of service, to assist management and inspection)
💡 Under SOLAS III/9 and similar requirements the marking and nameplate of life-saving appliances should show the maker, date of manufacture, the number of persons intended such as for survival craft, and the date of service or inspection, to assist identification, management and timely servicing. The markings should be clear and not easily detached.
✗
Question 83. What is required where ventilation ducts pass through a fire division?
Your Answer: (Not answered)
Correct Answer: C (Fire flaps or equivalent measures should be fitted at the penetration to prevent flame and smoke spreading along the duct)
💡 Under SOLAS II-2/9 where a ventilation duct passes through an A-class or B-class division fire flaps or equivalent measures should be fitted, with means of automatic and manual operation where necessary, to prevent flame and smoke spreading through the duct between spaces. The operability of the flaps should be maintained.
✗
Question 84. What does SOLAS provide regarding combining different types of drill?
Your Answer: (Not answered)
Correct Answer: B (Drills of different kinds may be combined where reasonable and practicable, provided the objectives of each are met)
💡 SOLAS permits drills of different kinds, such as abandon ship and fire drills, to be combined where reasonable and practicable, provided that the training objectives of each are achieved. Combining must not mean omitting essential elements.
✗
Question 85. In addition to intact stability, a passenger ship must also satisfy:
Your Answer: (Not answered)
Correct Answer: B (Damage stability)
💡 SOLAS II-1/7: passenger ships must comply with both intact and damage stability requirements.
✗
Question 86. What does SOLAS address regarding the fire and weathertight requirements for ventilators?
Your Answer: (Not answered)
Correct Answer: D (Closing devices must be fitted, able to shut off ventilation when required and maintain weathertightness)
💡 SOLAS requires ventilators to have closing devices that both shut off ventilation to control a fire and maintain weathertightness against the entry of sea water. A rain hood alone meets neither requirement.
✗
Question 87. If more than the specified proportion of the crew of a cargo ship is changed, when should abandon-ship and fire drills be held?
Your Answer: (Not answered)
Correct Answer: C (Within 24 hours after leaving port if more than 25 per cent of the crew has changed)
💡 Under SOLAS III/19, if more than twenty-five per cent of the crew has been changed, abandon-ship and fire drills should be held within twenty-four hours after the ship leaves port. This ensures that newly joined crew quickly become familiar with their emergency duties without waiting for the routine monthly drill.
✗
Question 88. Which high risk areas do SOLAS and the ESP require to be examined on a bulk carrier?
Your Answer: (Not answered)
Correct Answer: A (Hatch covers, the internal structure of top side and hopper side tanks and the corrosion and cracking of bulkheads and side structure)
💡 The ESP and SOLAS require close-up examination and thickness measurement of hatch covers, the internal structure of top side and hopper side tanks and the stiffening of bulkheads and sides, since these areas corrode readily and directly affect the longitudinal strength of the hull.
✗
Question 89. How many hand flares must each survival craft carry?
Your Answer: (Not answered)
Correct Answer: A (Six)
💡 SOLAS III requires six hand flares in each survival craft, in addition to the four rocket parachute flares required separately. The two numbers are different.
✗
Question 90. Which statement about the enhanced programme of inspections for tankers and bulk carriers is correct?
Your Answer: (Not answered)
Correct Answer: B (It prescribes stricter close-up examination and thickness measurement, and requires a survey planning document)
💡 The ESP requires a survey planning document identifying the extent of close-up surveys and thickness measurements, and is stricter than routine surveys. Its application is not determined solely by an age of 20 years.
✗
Question 91. To which new bulk carriers does the double side skin requirement apply?
Your Answer: (Not answered)
Correct Answer: C (a new single-side-skin bulk carrier of 150 m and up carrying solid bulk of a density of 1000 kg/m3 and above)
💡 The requirement addresses new single-side-skin bulk carriers of 150 m and over intended to carry solid bulk cargoes of a density of 1000 kg/m3 and above, the inner skin being supported by the double side when cargo is discharged and in the event of damage; it does not apply to every bulk carrier. Chapter XII carries other structural requirements taking 100 m as their threshold, the two lengths covering different things, and running them together is the commonest error; the numbering and scope of the provisions have been revised, so the text carried on board governs, and this item makes no reference to a particular sub-regulation. Both the length and the density must be met, so "any bulk carrier" and "the cargo decides" alike fail.
✗
Question 92. After a fixed gas system is released, what is required before entering the space?
Your Answer: (Not answered)
Correct Answer: A (Sufficient time for the fire to be extinguished and the gas to disperse, then ventilation and testing before entry)
💡 SOLAS and the related guidance require a sufficient period after release for the fire to be extinguished and the gas to disperse, followed by ventilation and testing of the atmosphere before entry. Immediate entry risks asphyxiation or poisoning by residual gas.
✗
Question 93. A self-igniting light on a lifebuoy is found inoperative because its battery has failed. The finding is?
Your Answer: (Not answered)
Correct Answer: C (The lifebuoy has lost its night-marking capability, a life-saving equipment deficiency to be replaced)
💡 The self-igniting light is used at night to mark the position of a person overboard and is a key attachment of the lifebuoy. A failed battery makes the lifebuoy unidentifiable at night. This is a functional deficiency of life-saving equipment; the battery or light should be replaced so that it is always ready for use.
✗
Question 94. What records and reporting are required for injury and illness?
Your Answer: (Not answered)
Correct Answer: B (Record the time, symptoms, treatment given and outcome and report to the company as required, including for work injuries)
💡 An injury or illness on board should be recorded with the time, how it happened, the symptoms, the first aid and treatment given, the outcome and the follow-up, and reported to the company as the system and regulations require, promptly for a work related injury, occupational disease or serious illness, providing a basis for claims and improvement.
✗
Question 95. What is the basic requirement for navigation lights used at night or in restricted visibility?
Your Answer: (Not answered)
Correct Answer: B (They must be displayed in accordance with the requirements, with indicators or failure alarms on the bridge)
💡 SOLAS V/19 requires navigation lights to comply with COLREG and to have indicators or failure alarms on the bridge, so that the ship can be identified at night and in restricted visibility.
✗
Question 96. What does SOLAS require regarding the marking of the rated capacity of survival craft?
Your Answer: (Not answered)
Correct Answer: B (It must be clearly marked on the craft and must not be exceeded)
💡 SOLAS requires the rated capacity to be clearly marked on the craft and not to be exceeded. Overloading seriously affects buoyancy and stability.
✗
Question 97. On a passenger ship, each space shall be provided with at least how many means of escape?
Your Answer: (Not answered)
Correct Answer: D (2)
💡 SOLAS II-2/13 requires at least two widely separated means of escape from each space on a passenger ship.
✗
Question 98. What is checked regarding the donning of personal equipment in a fire drill?
Your Answer: (Not answered)
Correct Answer: A (That the firefighter's outfit is correctly worn, the breathing apparatus airtight and communication working)
💡 A fire drill should check that the firefighter's outfit is correctly worn, including helmet, protective clothing, boots and gloves, that the breathing apparatus face mask is airtight and tested and that communication between the team members and with the bridge works, so that actual operations are safe and effective.
✗
Question 99. What preparation is required before new equipment is brought into use?
Your Answer: (Not answered)
Correct Answer: A (Familiarisation training completed, procedures and checklists revised and the item included in the maintenance programme)
💡 Before new or replacement equipment is brought into use, the crew should complete familiarisation training covering operation, emergencies and maintenance, the relevant procedures and checklists be revised, the item included in the maintenance programme and the effect on the system documentation considered, preventing errors from unfamiliarity.
✗
Question 100. Charts shall be corrected:
Your Answer: (Not answered)
Correct Answer: B (in accordance with the latest notices to mariners)
💡 SOLAS V/27 requires charts and publications to be corrected up to date from notices to mariners.