船舶: -
演习日期: 2026-05-22
类型: abandon_ship
地点: LXH - At Sea / Port
开始时间: 14:00:00
结束时间: 15:40:00
时长(分): 100
指挥官: CAPT LI JINHU / C/O LI QIANG
参与人数: 26
描述: [1400.0] Deck crew and C.E / 4TH Engineer / ETO muster at lifeboat stations, and prepare for lifeboat launching and manoeuvring in water with assigned operating crew only
[1402.0] Lifeboat No.1 prepared for launching . Disengage lashings/gripes/securing devices. Visual check of davit, wire falls, sheaves, limit switch and on-load release hooks carried out. All found in good order.
[1406.0] Drain plug confirmed closed. Boat equipment quick-check done (fuel, oars, painter, lamp, EPIRB/SART).
[1408.0] Boat turned out from stowed position; lowered to embarkation position (just above water). Brake test / hold function verified no slip observed.
[1412.0] Embarkation ladder rigged and checked. Assigned operating crew (3/O Off. / 4Th Eng. / 2 AB) embarked via embarkation ladder ONLY; seated and secured themselves with safety lanyards.
[1415.0] Embarkation ladder recovered and secured. Drain plug re-checked (closed). Final comms check between boat and deck party.
[1417.0] Lifeboat lowered into water UNDER CONTROL, release gear operated, hooks disengaged. Lifeboat afloat, clear of falls.
[1418.0] Engine started: idle → ahead → astern → rudder hard-over both sides → return to idle.
[1430.0] Lifeboat manoeuvred back under davit position. Falls lowered, hooks re-engaged
[1435.0] Operating crew disembarked via embarkation ladder; ladder recovered.
[1448.0] No.1 Lifeboat hoisted, returned to stowed position, re-lashed / griped / securing pins re-inserted. Drain plug removed for ventilation. Battery charger connected.Equipment reset complete.
[1519.0] No.2 Lifeboat lower to water manoeuvring test same as No.1 boat procedure.
[1532.0] No.2 Lifeboat ahoisted, returned to stowed position, re-lashed / griped / securing pins re-inserted. Drain plug removed for ventilation. Battery charger connected.Equipment reset complete.
[1540.0] Drill and debriefing concluded. All equipment confirmed restored to standby.
评估: The abandon ship drill was conducted in full compliance with SOLAS Chapter III, Regulation 19.3.3 (Abandon ship drills) and SQP-06 Section 5.4(A). Performance rated satisfactory. Recommendation: schedule additional immersion suit donning practice to reduce donning time.
不足: -
状态: completed
证据路径: DRILL RECORD/2605/2605010-CO-015 lifeboat lower to water test.XLS
创建时间: 2026-06-17 06:26:13