船舶: -
演习日期: 2026-07-15
类型: MOB Drill
地点: Bridge / Main Deck / Rescue Boat
开始时间: -
结束时间: -
时长(分): -
指挥官: Chief Officer
参与人数: 27
描述: Man Overboard
评估: MOB drill in compliance with SOLAS Ch.III Reg.17 and SQP-06 §5.4(F). All 6 items per SQP-06 §5.4(F.1-F.6) covered: recovery equipment and PPE (F.1), comms (F.2), davit operation (F.3), rescue boat release/engine/manoeuvring (F.4), MOB recovery simulation (F.5), first aid/CPR/hypothermia (F.6). Williamson turn correctly executed. Response within 2 min. Areas noted: rescue boat manoeuvring speed to be adjusted.
不足: -
状态: completed
证据路径: -
创建时间: 2026-07-26 10:19:34