Question 1. What should the ship prioritise when preparing for survey?
Your Answer: (Not answered)
Correct Answer: D (self-check key items, sort certificates and records and rehearse equipment demonstrations)
💡 Preparation must be substantive: self-check, organise records and rehearse demonstrations to avoid exposing systemic gaps.
✗
Question 2. With sudden main engine failure in a narrow channel, the master's first action is?
Your Answer: (Not answered)
Correct Answer: A (show NUC signals, alert VTS and traffic, control speed and heading)
💡 Show NUC signals, alert VTS and nearby ships, then manage position with remaining speed, anchors and tugs.
✗
Question 3. Which is NOT a purpose of the ship's technical files?
Your Answer: (Not answered)
Correct Answer: B (replacing on-scene inspection and judgement)
💡 Technical files support decisions but never replace on-scene inspection and professional judgement.
✗
Question 4. The ship is found discharging sewage without permission in port; the master should?
Your Answer: (Not answered)
Correct Answer: A (stop at once, report and cooperate with investigation and evidence)
💡 Stop, report port and company, cooperate, preserve records and never flee or conceal, which worsens outcomes.
✗
Question 5. What does the ISM-required internal audit mainly cover?
Your Answer: (Not answered)
Correct Answer: D (all ISM elements, shore departments and ship activities)
💡 Internal audit covers all ISM elements and activities to verify compliance and effectiveness.
✗
Question 6. After the Master uses overriding authority to depart from procedures, the Master should?
Your Answer: (Not answered)
Correct Answer: A (record the rationale and circumstances and report to the Company afterwards)
💡 Document the departure with rationale and report it, supporting review and accountability.
✗
Question 7. A crew member reports someone threatening others' safety; the master should?
Your Answer: (Not answered)
Correct Answer: C (stop and separate at once, investigate and act per discipline and law)
💡 Stop and separate, protect others, gather evidence and handle per policy and law while reporting up.
✗
Question 8. What does a "questioning attitude" in communication mean?
Your Answer: (Not answered)
Correct Answer: D (stay sceptical of anomalies, verify instead of blind compliance)
💡 A questioning attitude invites crew to verify anomalies and leaders to welcome questions as a safety barrier.
✗
Question 9. Safety management of potable water on board includes?
Your Answer: (Not answered)
Correct Answer: A (periodic residual chlorine and microbiological testing plus tank cleaning)
💡 Test microbes and chlorine residual, clean and disinfect tanks with records to prevent waterborne outbreaks.
✗
Question 10. Before a new SMS goes live, one should arrange?
Your Answer: (Not answered)
Correct Answer: A (a trial run, training and internal audit to verify before formal use)
💡 Trial runs expose gaps before the SMS is formally enforced.
✗
Question 11. Key actions an oil spill drill should cover are?
Your Answer: (Not answered)
Correct Answer: B (reporting, stopping operations, containment and recovery plus shore contact)
💡 Practise alarms and reporting, stop valves, boom deployment and recovery, and test shore and agent contact.
✗
Question 12. How should the loading plan approval process work?
Your Answer: (Not answered)
Correct Answer: B (prepared and checked on board, with company or shore review where required before execution)
💡 The plan is prepared and checked on board, with shore review for complex or high-risk cargo to secure stability and strength.
✗
Question 13. What risk does poor communication between ratings and officers carry?
Your Answer: (Not answered)
Correct Answer: C (misunderstanding of tasks causing operational error and accidents)
💡 Misunderstood orders become wrong actions, especially dangerous in mooring, enclosed spaces and emergencies.
✗
Question 14. In practice the DPA is often also the?
Your Answer: (Not answered)
Correct Answer: B (Company Security Officer (CSO), unifying safety and security)
💡 Unifying safety and security, DPA-as-CSO avoids fragmentation—common and accepted.
✗
Question 15. The value of equipment history files is?
Your Answer: (Not answered)
Correct Answer: B (support trend analysis, life assessment and renewal decisions)
💡 Histories reveal repeat failures and degradation rates, guiding strategy and renewal decisions.
✗
Question 16. Before the pilot leaves after berthing, the master should?
Your Answer: (Not answered)
Correct Answer: D (confirm mooring is secure, complete handover and sign necessary documents)
💡 Confirm mooring, complete handover and paperwork and ensure nothing is outstanding before the pilot leaves.
✗
Question 17. The core duty of the DPA in ship-shore communication is?
Your Answer: (Not answered)
Correct Answer: B (monitor safety/pollution per ship, ensure resources, access top management)
💡 The DPA links ship and board to monitor operations, secure resources and support the master.
✗
Question 18. A specific risk of multinational crews is?
Your Answer: (Not answered)
Correct Answer: B (language/culture misunderstanding causing order and coordination errors)
💡 Cultural gaps cause "words without meaning"; need common language.
✗
Question 19. When should the emergency generator start automatically?
Your Answer: (Not answered)
Correct Answer: B (when the main source fails, starting and supplying within the required time)
💡 It must start and supply emergency loads within the required time on main power failure, verified by regular testing.
✗
Question 20. Drinking water tastes or smells odd while in port; you should?
Your Answer: (Not answered)
Correct Answer: D (stop using it, sample for testing and clean tanks and lines)
💡 Stop use, sample and clean and disinfect tanks and lines, find the source and only then resume use.
✗
Question 21. What is the basic concept of general average?
Your Answer: (Not answered)
Correct Answer: D (extraordinary sacrifice or expenditure for common safety, shared by all interests)
💡 General average covers deliberate sacrifice for common safety, apportioned among ship, cargo and freight interests.
✗
Question 22. An internal audit should cover?
Your Answer: (Not answered)
Correct Answer: A (both shore-side management and each ship's SMS operation (sampled))
💡 Internal audit covers Company and fleet, sampled by risk and cycle.
✗
Question 23. Port inspection finds the lifeboat engine will not start; you should?
Your Answer: (Not answered)
Correct Answer: C (report for repair, track as a critical defect and request re-inspection)
💡 Engine failure is critical: repair and verify before sailing with re-inspection, and inform the company.
✗
Question 24. How should a rise in near-miss reports be interpreted?
Your Answer: (Not answered)
Correct Answer: D (usually a positive sign of better reporting culture, not worsening safety)
💡 More near-miss reports usually mean speaking up is safer; analyse them for hotspots rather than punish reporters.
✗
Question 25. The ship becomes fouled by fishing nets at sea; what applies?
Your Answer: (Not answered)
Correct Answer: B (stop to assess, report and take measures to clear it, avoiding blind manoeuvring)
💡 Blind manoeuvring worsens fouling and damages shafting; stop, assess, report and clear it safely.
✗
Question 26. When must familiarization training be completed for new or transferred crew?
Your Answer: (Not answered)
Correct Answer: B (before sailing/assignment for key safety, equipment needs certification)
💡 New crew must be familiar with safety/alarm duties before sailing; critical equipment needs certified training.
✗
Question 27. How shall the Company's Safety and Environmental Protection Policy be communicated onboard?
Your Answer: (Not answered)
Correct Answer: B (documented into the SMS and made known to all crew)
💡 The policy must be documented in the SMS and made known to all crew through training and familiarization.
✗
Question 28. What makes the hand-over of the navigational watch complete?
Your Answer: (Not answered)
Correct Answer: C (the relieving officer being on the bridge and having himself grasped the position, the traffic and the orders)
💡 It begins with the relieving officer being on the bridge and fit to take it: if the master or the officer handing over doubts his fitness the watch is not passed and the master is told, and until it is properly accepted the officer on watch does not leave. What passes is not only what the ship is doing but what she is standing in - the position and how it was got, the course and the speed, the draughts and the ballast, weather and sea, the traffic about her and what has already been done about it, the state of the aids and the communications with any known defect, the errors of the compasses, the track to be kept and the cautions for this watch, the master's and the engineer's orders, and any work running. This is said where the relieving man can see the instruments and the chart, not through a cabin door. If he is not satisfied he asks before he takes it, and if need be the other keeps the watch a little longer; handing a watch to somebody who has not got the picture starts the risk counting again from that minute.
✗
Question 29. The "easy access" principle for shipboard documents is?
Your Answer: (Not answered)
Correct Answer: C (users find the latest version quickly where needed)
💡 Store documents near where they are used; distant safes or electronic-only copies weaken them in emergencies.
✗
Question 30. What is the cycle of continual improvement?
Your Answer: (Not answered)
Correct Answer: A (plan, do, check, act and repeat with rising performance)
💡 Improvement follows plan, do, check, act, each round lifting performance.
✗
Question 31. Forged or missing Oil Record Book entries may lead to?
Your Answer: (Not answered)
Correct Answer: A (PSC penalties, civil damages even criminal liability)
💡 Oil records touch pollution law; forgery is unlawful, beyond SMS issues.
✗
Question 32. What is the management point for shore power use?
Your Answer: (Not answered)
Correct Answer: B (confirm voltage, frequency and interface and have a changeover procedure)
💡 Shore connection needs parameter checks, a changeover and emergency procedure and trained staff to avoid blackouts.
✗
Question 33. Management of onboard first aid kits and medicines should?
Your Answer: (Not answered)
Correct Answer: D (kept by a responsible person, expiry checked and restocked, prescription drugs on medical advice)
💡 A designated officer checks expiry and stock with records; controlled drugs need dual custody and medical advice.
✗
Question 34. Before entering port the pilot ladder is found damaged; what applies?
Your Answer: (Not answered)
Correct Answer: B (replace or repair it and report; it must not be used while defective)
💡 A defective pilot ladder risks injury, complaints and detention; replace or repair, report and confirm it is serviceable.
✗
Question 35. An SOPEP drill should cover?
Your Answer: (Not answered)
Correct Answer: B (reporting procedures, containment deployment, recovery and shore contact)
💡 It exercises reporting, boom deployment, recovery gear and team roles with timings recorded.
✗
Question 36. Hot work began in port without a permit and caused a small fire. The root cause is?
Your Answer: (Not answered)
Correct Answer: B (permit system not followed, weak supervision and training)
💡 Hot work demands permits, gas tests and isolation; skipping them signals systemic rather than chance failure.
✗
Question 37. The purpose of a draft survey is to?
Your Answer: (Not answered)
Correct Answer: B (compute loaded weight from draught corrected for density)
💡 It reads draughts, measures water density and corrects for trim to derive the loaded quantity.
✗
Question 38. Under ISM, a "critical operation" means?
Your Answer: (Not answered)
Correct Answer: C (an operation whose error would immediately endanger safety or cause pollution)
💡 Rule 7: critical operations are those whose error would immediately threaten safety or cause pollution.
✗
Question 39. The purpose of read-back of orders on the bridge is?
Your Answer: (Not answered)
Correct Answer: C (confirm correct reception and avoid mishearing or misunderstanding)
💡 Read-back lets the giver verify the order landed correctly, vital under noise, accents and stress.
✗
Question 40. The effect of fatigue on night watchkeeping is?
Your Answer: (Not answered)
Correct Answer: A (lowers alertness, slows reaction and causes missed targets)
💡 Circadian rhythms make pre-dawn the lowest alertness; counter with rotation, movement, lighting and cross-checks.
✗
Question 41. The fundamental difference between an "observation" and a "non-conformity" in an audit is?
Your Answer: (Not answered)
Correct Answer: D (an observation is a potential weakness noted in operation, not yet a deviation from a requirement)
💡 An observation flags a potential weakness, not an actual deviation, so it is not counted as a non-conformity but may become one if ignored.
✗
Question 42. Language requirement for key watch ratings (deck/engine) is?
Your Answer: (Not answered)
Correct Answer: B (enough to understand and execute working-language orders and emergency comms)
💡 Key ratings must read orders and join emergency comms; language is safety.
✗
Question 43. The relationship between the ISM annual audit and the intermediate audit?
Your Answer: (Not answered)
Correct Answer: B (annual maintains DOC, intermediate maintains the five-year SMC)
💡 The company DOC is audited annually; the ship SMC needs one intermediate audit in five years.
✗
Question 44. The voyage plan should be kept on board and?
Your Answer: (Not answered)
Correct Answer: C (accessible, familiar, amended with master sign-off)
💡 Keep it accessible, ensure familiarity, and amend with master's confirmation.
✗
Question 45. Stowaways are found on board. What comes first?
Your Answer: (Not answered)
Correct Answer: D (controlling and isolating them under the security plan and reporting to the company, the coastal State and the next port)
💡 What the security plan says about stowaways is followed: the people are held somewhere safe where they can move freely neither to the ship's work nor to harm themselves, the ship is searched once more, the time, place, number and circumstances are written down, and the master, the company, the coastal or flag State and the authorities of the next port are told, so that identification and what follows of removal can be arranged. To pass them to another ship, to shut them in a hold, or to say nothing, spoils the position of everyone on board and the administrative process at once. The channel they came in by needs watching as well: the gangway, the moorings, cargo-space ventilators and the lookout are tightened, and the search before entering port is done again. Food, water and any medical attention go in the record too.
✗
Question 46. What capability should a damage control drill mainly test?
Your Answer: (Not answered)
Correct Answer: D (retrieving plugging gear, pumping capacity and speed of closing compartments)
💡 Practise plugs and shores, start pumps, shut watertight doors and time it to see if flooding is contained.
✗
Question 47. What does the designated person do from day to day?
Your Answer: (Not answered)
Correct Answer: A (following how the system runs on board, reading what the ships report, arranging the shore support and putting the questions to management)
💡 What the rules lay down for this post is that somebody on the shore side must be able to reach top management whenever needed, must see that the system is worked as written and stays effective, and must be reachable from the ship at any hour. Day to day that means reading the reports and the records each ship sends, keeping track of where deficiencies, accidents, near misses, non-conformities and observations are piling up, pushing the things a ship cannot fix itself - spares, a repair, training, another hand - up to the level that will pay for them, and carrying a safety or pollution risk past the ordinary chain of meetings. Auditing belongs to the auditor, fuel and freight to the commercial department, and the handling of a ship in distress to the master; count all three to the designated person and the post is confused with the others. What is worth watching is whether he has the channel, whether anyone has given it to him, and whether the ship knows whom to call.
✗
Question 48. In an emergency the master cannot carry the decision alone. What supports him?
Your Answer: (Not answered)
Correct Answer: B (delegation settled beforehand, rehearsed plans, shore support, and a just culture)
💡 In an emergency the master works under incomplete information, crowded communications and time pressure, and the quality of his judgement falls as the load rises. The system lightens it in advance: plans standardise the steps and the conditions that start them, delegation lets the officer of the watch, a tug or the shore act first within stated limits, the shore emergency centre supplies data, communications and outside co-ordination, and just culture keeps the ship willing to say the situation is worse than the master assumed. Loading everything onto the master afterwards teaches concealment for the next event, and pulling extra people onto the bridge to debate crowds the con.
✗
Question 49. Asked about SMS documents kept in the master's cabin, you should?
Your Answer: (Not answered)
Correct Answer: B (fetch them promptly for inspection, never rely on memory or delay)
💡 Produce documents at once; relying on memory or delaying suggests poor document control and raises findings.
✗
Question 50. On taking over a ship, the new master should?
Your Answer: (Not answered)
Correct Answer: D (familiarise with SMS, ship, crew and key risks, complete handover)
💡 A new master must hand over and familiarise before safe command.
✗
Question 51. High crew turnover affects the SMS by?
Your Answer: (Not answered)
Correct Answer: D (raising unfamiliarity risk, needing stronger handover and training)
💡 Turnover fluctuates familiarity; the SMS counters with handover and training.
✗
Question 52. Finding the radar failed before entering a busy traffic separation scheme, the master should?
Your Answer: (Not answered)
Correct Answer: A (assess the risk and divert or wait for repair rather than enter with the defect)
💡 Radar failure in dense traffic is a major defect; divert or wait for repair rather than raise collision risk.
✗
Question 53. Evidence quality underpinning management review is reflected in?
Your Answer: (Not answered)
Correct Answer: D (complete data, reliable sources, consistent definitions and traceability)
💡 Conclusions must rest on complete, reliable and traceable data; otherwise the review is ritual, not real.
✗
Question 54. Record retention periods should be?
Your Answer: (Not answered)
Correct Answer: A (set by the SMS meeting statutory minimums, destroy only after)
💡 Retention must meet law and traceability; early destruction invites risk.
✗
Question 55. What is the legal basis of port State control?
Your Answer: (Not answered)
Correct Answer: D (the inspection and correction powers the conventions give the port State, with the relevant provisions of the law of the sea convention)
💡 The power rests on general international law and on the conventions: a coastal State may inspect a foreign ship in its ports against the requirements of safety, pollution prevention and the conditions of work and living on board, and call for the defects to be remedied, the provisions on protecting the marine environment in the law of the sea convention supporting this. SOLAS, MARPOL, STCW and the labour convention supply the standards and the certificates; the regional memoranda organise how ships are selected, how the inspection is run, what is exchanged between authorities and when a ship may be detained, so that one port sees what another found. Neither usage nor the class rules stand in its place. The flag State carries the primary duty and the port State controls how that duty is being discharged, with the right to board outside the normal interval when the deficiencies are plain.
✗
Question 56. How does the Company verify the DPA truly performs?
Your Answer: (Not answered)
Correct Answer: A (via internal audit, ship feedback and review of contact records)
💡 Performance needs evidence: contact logs, ship feedback, audit findings.
✗
Question 57. What is NOT covered by document control?
Your Answer: (Not answered)
Correct Answer: C (restricting verbal communication among crew)
💡 Document control governs documents, not normal working communication; it covers versions, revision and distribution.
✗
Question 58. Relieving, the master finds good operation but key certificates expiring soon; he should?
Your Answer: (Not answered)
Correct Answer: D (raise the alert, report to the company and plan renewal or interim cover)
💡 Expiry is a compliance risk: alert early, arrange surveys or relief crew and ensure no gap in validity.
✗
Question 59. After new equipment is fitted, the SMS should?
Your Answer: (Not answered)
Correct Answer: B (update procedures and training, revise drawings and add it to the PMS)
💡 Update instructions, drawings and the PMS and train the crew, or a management gap appears immediately.
✗
Question 60. Priority items to take when abandoning ship include?
Your Answer: (Not answered)
Correct Answer: A (logbook and essential certificates, EPIRB and drinking water)
💡 Take statutory documents, EPIRB, handheld radio, water and first aid; life takes precedence over property.
✗
Question 61. What mainly determines whether a spare is critical?
Your Answer: (Not answered)
Correct Answer: D (whether failure would cause loss of control, detention or an accident)
💡 Critical spares are judged by consequence: propulsion, steering, fire, lifesaving and pollution prevention.
✗
Question 62. A complete set of SMS records should form?
Your Answer: (Not answered)
Correct Answer: B (a closed-loop evidence chain from plan, execution to verification)
💡 A closed loop proves the SMS truly runs—for audit and law.
✗
Question 63. How do annual, intermediate and special surveys relate?
Your Answer: (Not answered)
Correct Answer: A (special survey every five years, intermediate at mid-term, annual every year)
💡 Certificates run five years with annual surveys each year, one intermediate survey and a special survey for renewal.
✗
Question 64. What characterises discharge restrictions in Special Areas?
Your Answer: (Not answered)
Correct Answer: B (stricter, with most oil and garbage discharges fully banned)
💡 Special areas such as the Mediterranean, Baltic and Antarctic impose tighter rules that must be known in advance.
✗
Question 65. What is the right way for the master to handle crew error?
Your Answer: (Not answered)
Correct Answer: D (distinguish inadvertent error from violation, focusing on correction and learning)
💡 Most errors come from system or training gaps, so fix causes; deliberate breaches need formal action, and the two must not be confused.
✗
Question 66. PSC SMS inspection often includes?
Your Answer: (Not answered)
Correct Answer: D (certificates, drill records, familiarisation, equipment, ship-shore link)
💡 SMS checks blend documents, records, equipment and people.
✗
Question 67. During cargo work shore and ship figures differ; what applies?
Your Answer: (Not answered)
Correct Answer: A (suspend and reconcile jointly, confirming in writing before continuing)
💡 Suspend and reconcile jointly with written confirmation to avoid later disputes and document risk.
✗
Question 68. What does extending corrective action fleet-wide mean?
Your Answer: (Not answered)
Correct Answer: C (extend cause checks and fixes to other ships or departments with the same risk)
💡 After fixing one case, check other ships for the same risk and act so problems do not rotate around the fleet.
✗
Question 69. The company instructs the master to conceal a minor incident; he should?
Your Answer: (Not answered)
Correct Answer: B (refuse and report truthfully as required, keeping the correspondence)
💡 Concealment breaches the SMS and law; refuse, report per procedure and keep correspondence as protection.
✗
Question 70. In dense fog a whistle is heard ahead but its direction is unclear; you should?
Your Answer: (Not answered)
Correct Answer: B (reduce to the minimum steerageway or stop and navigate with caution)
💡 A whistle of uncertain bearing signals danger: slow to minimum or stop, post extra lookout and act with caution.
✗
Question 71. Under coercion the crew activate the ship security alert system. How does that system raise the alert?
Your Answer: (Not answered)
Correct Answer: A (alerting the authority and the company in silence, nothing being shown or sounded on this ship or nearby)
💡 Covert is the design point: trigger switches where a crew under control can still work them in secret; the message carries the ship's identity, position and the nature of the threat; there is no confirmation on board and no broadcast to neighbours, since anyone who noticed would cut the alert or destroy the equipment. The authority and the company receive it and start the shore response. Sounding the alarm, broadcasting, or showing a confirmation on the display all defeat that purpose.
✗
Question 72. In a MARPOL "special area", pollution requirements are generally?
Your Answer: (Not answered)
Correct Answer: C (stricter than normal waters, tighter discharge limits)
💡 Special areas (Med, Baltic, Antarctic) are ecologically sensitive; limits tighten.
✗
Question 73. When is a Declaration of Security (DoS) normally signed?
Your Answer: (Not answered)
Correct Answer: A (when interface security requirements differ or levels are high)
💡 DoS is signed at ship/port interfaces when levels differ or the risk warrants agreed measures.
✗
Question 74. If the voyage history shows unexplained gaps, what applies?
Your Answer: (Not answered)
Correct Answer: D (investigate the cause, assess compliance risk and decline the voyage if needed)
💡 Gaps may hide calls or transfers; investigate and assess rather than ignore or fill them in.
✗
Question 75. What is the basis for familiarisation training for joining crew?
Your Answer: (Not answered)
Correct Answer: B (system requirements for familiarisation and the duty list)
💡 Familiarisation follows system content and the duty list, covering emergency duties, equipment and procedures, with signatures.
✗
Question 76. When the estimated time of arrival changes, one should?
Your Answer: (Not answered)
Correct Answer: D (inform agent, terminal and company promptly to re-plan)
💡 Report changes early so berth, pilot and gangs can be rescheduled, and inform the company to avoid delays.
✗
Question 77. On changing the DPA, the SMS should?
Your Answer: (Not answered)
Correct Answer: C (promptly notify all ships and update documents for seamless handover)
💡 DPA change must be broadcast and handed over to avoid a contact gap.
✗
Question 78. Crude oil washing (COW) requires which precondition?
Your Answer: (Not answered)
Correct Answer: D (inerted tanks, certified system, approved procedure)
💡 COW needs inerted tanks, certified equipment and an approved procedure.
✗
Question 79. A company monthly safety report should contain?
Your Answer: (Not answered)
Correct Answer: C (key indicator trends, significant events, corrective progress and focus areas)
💡 Summarise trends, incidents, corrective progress and next focus areas to support management decisions.
✗
Question 80. A crew member has been low in mood for a long time; the master should?
Your Answer: (Not answered)
Correct Answer: B (care and talk with him, review his work arrangement and report the company for support)
💡 Persistent low mood may signal psychological problems; care, communicate, adjust duties and report for support.
✗
Question 81. At the closing meeting the master disagrees with a finding; he should?
Your Answer: (Not answered)
Correct Answer: A (raise the basis politely then appeal in writing with evidence)
💡 Present the basis politely; if unresolved annotate the report and appeal in writing while signing for receipt.
✗
Question 82. When a man-overboard is not noticed immediately, afterwards you should?
Your Answer: (Not answered)
Correct Answer: A (act at once on MOB procedures, alert others and organise a search)
💡 Even if late, start MOB procedures, mark the position, alert VTS and nearby ships and search without delay.
✗
Question 83. PSC finds signs of use on the bypass line of the oily water separator; it should be regarded as?
Your Answer: (Not answered)
Correct Answer: D (a serious deficiency possibly leading to detention and liability for company and master)
💡 Use of the bypass points to illegal discharge: a serious deficiency triggering expanded inspection and liability.
✗
Question 84. Why is garbage sorted on board?
Your Answer: (Not answered)
Correct Answer: D (to enable lawful handling and shore reception and cut illegal discharge risk)
💡 Sorting is the prerequisite for lawful handling, letting each category follow its rule and cutting mis-discharge risk.
✗
Question 85. How many functional requirements (elements) does ISM Section 1 set out for the SMS?
Your Answer: (Not answered)
Correct Answer: C (13)
💡 ISM Section 1.2 lists 13 functional requirements covering policy, responsibility, resources, operations, emergencies, non-conformity, audits and certificates.
✗
Question 86. The relationship between interim and permanent measures is?
Your Answer: (Not answered)
Correct Answer: A (interim measures control risk first; permanent ones remove the cause and replace them)
💡 Control risk temporarily first such as speed limits or isolation, then apply permanent fixes and verify.
✗
Question 87. The purpose of a NAVTEX receiver is to?
Your Answer: (Not answered)
Correct Answer: B (automatically receive and print navigational and meteorological warnings)
💡 NAVTEX broadcasts coastal safety information automatically on 518 kHz and other designated frequencies.
✗
Question 88. The purpose of a close-up survey is?
Your Answer: (Not answered)
Correct Answer: B (inspect structural details closely for cracking, corrosion and deformation)
💡 It lets the surveyor inspect welds, brackets and stress areas closely, finding damage general surveys miss.
✗
Question 89. After a plant item has failed and been restored by corrective repair, how do corrective and preventive maintenance stand in the maintenance system?
Your Answer: (Not answered)
Correct Answer: B (preventive work lowers the chance of failure, corrective work restores function after it, and the system needs both)
💡 Preventive work earns its keep before the failure: opening, greasing and testing on running hours or calendar reduces how often things break. Corrective work comes afterwards, costs more, and often waits on spares and a port. A planned maintenance system holds both, the intervals coming from manuals and experience while the fault history feeds back into them. Converting the plan into run-to-repair saves labour today and buys lost time and risk later.
✗
Question 90. Why recheck tide and under-keel clearance for a port call?
Your Answer: (Not answered)
Correct Answer: A (prevent touching bottom on entry, berthing or departure, especially loaded and in shallow ports)
💡 Compute clearance at the worst moment with tide and draught plus a margin to avoid touching in channels or berths.
✗
Question 91. The core limit for engine-room bilge discharge is?
Your Answer: (Not answered)
Correct Answer: D (treated by a 15 ppm oil-content monitor, not in prohibited zones)
💡 Oily bilge needs a 15 ppm separator/monitor; zero discharge in prohibited zones.
✗
Question 92. Ship manning should satisfy?
Your Answer: (Not answered)
Correct Answer: C (the Minimum Safe Manning Certificate and match SMS duties)
💡 Manning needs a valid MSMC and enough to cover all key SMS duties.
✗
Question 93. What is the purpose and risk of synthetic tails on mooring lines?
Your Answer: (Not answered)
Correct Answer: A (add elasticity to absorb shock but need periodic renewal and protection from chafing)
💡 Tails improve elasticity but age and fatigue; renew on schedule, avoid chafing and include them in inspections.
✗
Question 94. The main difference between CII and EEXI is?
Your Answer: (Not answered)
Correct Answer: D (CII grades actual operational carbon intensity annually)
💡 EEXI is one-off and design-based; CII rates actual yearly performance A–E, with required action for low ratings.
✗
Question 95. If the Company or charterer demands an unsafe act, the master should?
Your Answer: (Not answered)
Correct Answer: D (refuse and follow safe judgement, reporting to the DPA if needed)
💡 The master's safety judgement overrides commercial orders; refusal is authorised.
✗
Question 96. Common causes of distorted performance data are?
Your Answer: (Not answered)
Correct Answer: B (targets tied to appraisal causing false or selective reporting)
💡 When metrics drive rewards or penalties, staff under-report or polish data; soften punitive use and cross-verify.
✗
Question 97. How should fault reporting and correction close the loop in PMS?
Your Answer: (Not answered)
Correct Answer: A (report, analyze, repair, verify, record to prevent recurrence)
💡 Faults go report→analyze→repair→verify→record; repeats signal PMS gaps.
✗
Question 98. After a change of flag, how should statutory certificates be handled?
Your Answer: (Not answered)
Correct Answer: B (re-issue under the new flag with interim certificates during transition)
💡 A new flag means a new Administration: re-issue certificates, use interim ones meanwhile and update SMS documents.
✗
Question 99. In a narrow channel another ship signals for you to go first. What does the master do?
Your Answer: (Not answered)
Correct Answer: B (judge it under the rules - his signal does not shift the duty that is yours)
💡 Another ship's sound signal, light or radio message states an intention or gives agreement; it does not make the judgement the rules ask of you. Inside a narrow channel the obligations to keep to the starboard side, not to impede passage and to obtain agreement before overtaking still stand on their own terms. Whether taking precedence is safe depends on your draught against the available water, engine and rudder response, the distance at which you would meet and the visibility; if going first means emerging off a bend or into a crowd, refuse and say why, briefly and in language that can be repeated back. A pilot on board shifts nothing - his advice neither alters the rules' demands on the ship nor takes the master's final authority.
✗
Question 100. A watchkeeper leaves his post in port without permission; the master should?
Your Answer: (Not answered)
Correct Answer: D (correct at once, act under discipline and review the in-port watch arrangement)
💡 An absent in-port watch means hazards go unseen; correct, act procedurally and review the arrangement.