Exam Home Website
中文 English
0
/100
FAIL
Correct: 0/100 Total Questions: 100 Time Spent: 60min0sec
Passing: 80
Retake History
Answer Review
✗
Question 1. A fuel oil mist leak is found in the engine room; what applies?
Your Answer: (Not answered)
Correct Answer: D (slow down and stop, remove ignition sources and find the leak)
💡 A fuel mist easily forms an explosive mixture; stop the equipment, remove ignition and locate and stop the leak.
✗
Question 2. Hot work began in port without a permit and caused a small fire. The root cause is?
Your Answer: (Not answered)
Correct Answer: B (permit system not followed, weak supervision and training)
💡 Hot work demands permits, gas tests and isolation; skipping them signals systemic rather than chance failure.
✗
Question 3. The key to IMDG dangerous goods stowage is?
Your Answer: (Not answered)
Correct Answer: A (segregate by class, arrange ventilation/temperature and keep declarations)
💡 Segregate by class and compatibility, meet ventilation/temperature rules and carry declarations.
✗
Question 4. Engine-room fire root causes in the SMS are often?
Your Answer: (Not answered)
Correct Answer: A (poor maintenance, hot work without permit, failed detection, weak drills)
💡 Fires are preventable; failure lies in maintenance and work permits.
✗
Question 5. When is an occasional survey normally requested?
Your Answer: (Not answered)
Correct Answer: B (after casualty, conversion, change of name or flag or related certificate changes)
💡 Request after damage, conversion, change of name, owner or flag, or when certificate details need amending.
✗
Question 6. Which is NOT a level of training evaluation?
Your Answer: (Not answered)
Correct Answer: A (the decoration level of the training room)
💡 Evaluation looks at reaction, learning, behaviour and results; room decoration is irrelevant to effectiveness.
✗
Question 7. Accident-prone organisations tend to have?
Your Answer: (Not answered)
Correct Answer: B (blame culture, information blackout, hollow procedures)
💡 Blame and concealment suppress reporting, letting hazards accumulate.
✗
Question 8. Bilge level in the engine room rises quickly at sea; what applies?
Your Answer: (Not answered)
Correct Answer: D (sound the alarm, find the leak and start emergency pumping and damage control)
💡 Rapid flooding needs alarm plus leak search, pumping and plugging to protect buoyancy and power, seeking help if needed.
✗
Question 9. Which is NOT a lawful way to deal with oily mixtures?
Your Answer: (Not answered)
Correct Answer: A (pumping overboard at night using the general service pump)
💡 Discharge without the filtering equipment is a serious offence; doing it at night aggravates the case.
✗
Question 10. What is the purpose of marking critical equipment?
Your Answer: (Not answered)
Correct Answer: A (identifying equipment whose failure seriously affects safety for priority maintenance)
💡 Marking guides maintenance and inspection effort to the equipment with the worst failure consequences.
✗
Question 11. Before a new SMS goes live, one should arrange?
Your Answer: (Not answered)
Correct Answer: A (a trial run, training and internal audit to verify before formal use)
💡 Trial runs expose gaps before the SMS is formally enforced.
✗
Question 12. ISM Chapter 8 requires emergency preparedness to?
Your Answer: (Not answered)
Correct Answer: A (identify potential emergencies with procedures, drills and review)
💡 Identify emergencies, plan responses and drill and review regularly so crews act correctly under stress.
✗
Question 13. What does the designated person do from day to day?
Your Answer: (Not answered)
Correct Answer: A (following how the system runs on board, reading what the ships report, arranging the shore support and putting the questions to management)
💡 What the rules lay down for this post is that somebody on the shore side must be able to reach top management whenever needed, must see that the system is worked as written and stays effective, and must be reachable from the ship at any hour. Day to day that means reading the reports and the records each ship sends, keeping track of where deficiencies, accidents, near misses, non-conformities and observations are piling up, pushing the things a ship cannot fix itself - spares, a repair, training, another hand - up to the level that will pay for them, and carrying a safety or pollution risk past the ordinary chain of meetings. Auditing belongs to the auditor, fuel and freight to the commercial department, and the handling of a ship in distress to the master; count all three to the designated person and the post is confused with the others. What is worth watching is whether he has the channel, whether anyone has given it to him, and whether the ship knows whom to call.
✗
Question 14. What applies to emergency towing arrangements and their inspection?
Your Answer: (Not answered)
Correct Answer: A (included in periodic system inspection and kept ready for use)
💡 Inspect and mark the gear so a connection can be made quickly when disabled, preventing escalation.
✗
Question 15. The locations most prone to fatigue cracking in hull structure are?
Your Answer: (Not answered)
Correct Answer: A (hatch corners and abrupt structural changes with high stress concentration)
💡 Cracks start at hatch corners, openings, bracket toes and abrupt changes—focus areas during structural surveys.
✗
Question 16. When the Master's safety/pollution decision conflicts with existing SMS procedures?
Your Answer: (Not answered)
Correct Answer: C (the Master's decision is overriding and may depart from procedures)
💡 Rule 5.2: for safety/pollution, the Master's necessary decision is overriding and may depart from procedures.
✗
Question 17. When a newbuilding joins the Company SMS, it should?
Your Answer: (Not answered)
Correct Answer: D (complete familiarisation, procedure-equipment alignment and audit approval)
💡 Newbuilds must merge into the SMS and be approved, not run outside it.
✗
Question 18. When a pilot gives an obviously dangerous order, the master should?
Your Answer: (Not answered)
Correct Answer: A (question it at once and take over with safe action if needed)
💡 The master has both the right and duty to question and take over, ensuring safety and reporting afterwards.
✗
Question 19. Lightning strikes during cargo work in port; you should?
Your Answer: (Not answered)
Correct Answer: C (suspend work and bunkering, clear heights and outboard workers and shut down non-essential equipment)
💡 Stop cargo and bunkering, clear aloft and outboard personnel and shut non-essential gear to prevent ignition or injury.
✗
Question 20. When using water for firefighting one should note?
Your Answer: (Not answered)
Correct Answer: A (conductivity and free-surface effects; never jet water on oil fires)
💡 Water suits solid fires but not oil or live plant; accumulation harms stability, so manage and drain it.
✗
Question 21. The fundamental purpose of an SMS audit is NOT to?
Your Answer: (Not answered)
Correct Answer: A (pick faults to fine, but to verify effectiveness and improve)
💡 Audits are constructive—finding weaknesses to improve, not to punish.
✗
Question 22. Ship security drills should?
Your Answer: (Not answered)
Correct Answer: A (periodically exercise SSP measures and coordination per level, and record)
💡 Security drills validate the SSP; frequency is set by the Company and watched by PSC.
✗
Question 23. What should the ship prioritise when preparing for survey?
Your Answer: (Not answered)
Correct Answer: D (self-check key items, sort certificates and records and rehearse equipment demonstrations)
💡 Preparation must be substantive: self-check, organise records and rehearse demonstrations to avoid exposing systemic gaps.
✗
Question 24. What is required for energy isolation before maintenance?
Your Answer: (Not answered)
Correct Answer: B (isolate, tag and lock out and verify zero energy before work)
💡 Apply lock-out tag-out and verify zero energy to prevent inadvertent energising or starting and personal injury.
✗
Question 25. For urgent evacuation ashore, the SMS should?
Your Answer: (Not answered)
Correct Answer: C (contact RCC/agent for helicopter or port, prepare medical handover)
💡 Fast evacuation buys golden time; handover ensures continuity.
✗
Question 26. The structural risk of loading high-density cargo such as iron ore is?
Your Answer: (Not answered)
Correct Answer: A (local overloading with shear and bending limits exceeded, even tank top damage)
💡 Concentrated dense cargo overloads locally and exceeds longitudinal limits; follow the loading manual.
✗
Question 27. What distance from land and depth apply to ballast water exchange?
Your Answer: (Not answered)
Correct Answer: B (at least two hundred nautical miles from land and two hundred metres deep)
💡 Exchange must occur at least two hundred miles from land in two hundred metres of water, failing which other options apply.
✗
Question 28. What is the basis for accepting repair work?
Your Answer: (Not answered)
Correct Answer: C (the approved scope, technical standards and survey acceptance)
💡 Accept against approved scope and standards with class or survey acceptance, not merely completion.
✗
Question 29. When are the oxygen and gas tests made?
Your Answer: (Not answered)
Correct Answer: B (test before entry, repeat at intervals while the work lasts, and record the readings and the times)
💡 Before anyone enters a cargo tank, and before hot work around the hatch, oxygen and combustible gas must be measured: oxygen commonly judged against a working range of 19.5% to 23.5%, gas readings against the percentage of the lower explosive limit, the instrument within its calibration and zeroed outside the tank before use. During the work the tests are repeated at intervals or carried on continuously, because ventilation, the progress of cleaning and the work itself all change the atmosphere. The nose cannot be relied on - some toxic gases stop being detectable at high concentration, and gas below the lower limit gives no warning by smell. Measuring points are taken high, middle and low and at the hatch and around the piping, and every reading, its position and its time are recorded.
✗
Question 30. No abandon-ship drill records exist for a long period; on taking over the master should?
Your Answer: (Not answered)
Correct Answer: C (hold a drill at once, record it, find the cause and report to the company)
💡 Run and record a genuine drill, investigate why records lapsed and report; never just back-fill paperwork.
✗
Question 31. After PSC raises deficiencies, the path is usually?
Your Answer: (Not answered)
Correct Answer: D (rectify within limit, request recheck to close; serious→detention)
💡 Deficiencies close by rectify plus verification; escalation if serious.
✗
Question 32. Fatigue management measures in the SMS include?
Your Answer: (Not answered)
Correct Answer: A (sensible watches, limit hours, ensure rest and log)
💡 The SMS limits hours, guarantees rest and logs it; fatigue is a leading human-error cause.
✗
Question 33. On what does the period for which system records are kept depend?
Your Answer: (Not answered)
Correct Answer: C (the conventions, the flag State and the company documents settling it, key records kept longer and not destroyed at will)
💡 The period is not the ship's to choose. Some records are fixed by the conventions themselves, the oil record book being kept for a stated time after the last entry, the garbage and ballast books having their own terms; the flag State sets what it wants for certificates, crew files and casualty material; and the company puts drills, the closing out of non-conformities and investigation papers into the class that must outlive the rest. Anything bound up with a casualty, a claim or an investigation is kept until that is done with, and destruction goes by the authority the documents name, with the fact of it recorded, not by a shortage of paper or the convenience of the person who clears the drawer. A list on board showing each record, its period, its keeper and where it lives belongs with the handover when the man changes.
✗
Question 34. Aging ships in the SMS should receive?
Your Answer: (Not answered)
Correct Answer: A (more frequent maintenance, inspection and assessment as risk rises with age)
💡 Risk rises with age; the SMS must tighten control.
✗
Question 35. The key to spreading best practice is?
Your Answer: (Not answered)
Correct Answer: C (prove effectiveness, standardise, train and track adoption)
💡 Validate first, standardise, train and track adoption on board—only then is a practice truly spread.
✗
Question 36. At night someone is seen climbing the ship's side; what applies?
Your Answer: (Not answered)
Correct Answer: A (activate the security alarm, increase lighting and patrols and report)
💡 Night climbing is a security event; raise the alarm, light up, patrol and report to prevent stowaways or attack.
✗
Question 37. When ship and port security levels differ, the ship should?
Your Answer: (Not answered)
Correct Answer: B (apply the higher level and sign a DoS to clarify duties)
💡 Apply the stricter level and clarify via DoS—the interface rule.
✗
Question 38. If a mooring load alarm sounds while alongside, the master should?
Your Answer: (Not answered)
Correct Answer: B (check loads and tide, adjust lines and inform the terminal)
💡 A load alarm warns of parting; check and adjust immediately and inform the terminal to prevent injury.
✗
Question 39. The main purpose of a fire patrol is to?
Your Answer: (Not answered)
Correct Answer: A (detect early signs, stop unsafe acts and verify fire systems)
💡 Patrols catch incipient signs and unsafe acts early and check escape routes—the cheapest prevention available.
✗
Question 40. The main risk of reducing manning levels is?
Your Answer: (Not answered)
Correct Answer: A (accumulated fatigue, weaker emergency response and more errors)
💡 Cutting crew raises fatigue and weakens response, with post-incident costs far exceeding savings and possible manning breaches.
✗
Question 41. Hull insurance normally does NOT cover which of the following?
Your Answer: (Not answered)
Correct Answer: B (loss from unseaworthiness at sailing or defects known to the owner)
💡 Hull cover includes collision and perils but excludes unseaworthiness at sailing or known unremedied defects.
✗
Question 42. What should be watched when adjusting stability with ballast?
Your Answer: (Not answered)
Correct Answer: D (balance strength, draught and free surface, avoiding solving one problem by creating another)
💡 Ballasting changes strength, draught and free surface together; check all before acting so one fix does not cause another problem.
✗
Question 43. After a major accident or major non-conformity involving the SMS, the Company should?
Your Answer: (Not answered)
Correct Answer: A (promptly conduct a dedicated review to find SMS defects and correct them)
💡 Major events trigger event-driven review to prevent recurrence.
✗
Question 44. In PSC, if emergency equipment is found failed or drills never held, the ship may be?
Your Answer: (Not answered)
Correct Answer: A (issued non-conformities or detained)
💡 Failed preparedness is a major ISM non-conformity; PSC may detain until corrected.
✗
Question 45. The significance of complete documentation for cargo claims is?
Your Answer: (Not answered)
Correct Answer: B (reconstructs condition and handling, supporting defence against claims)
💡 Bill remarks, stowage plans and hold records reconstruct the voyage and help allocate liability for cargo damage.
✗
Question 46. Measures to mitigate watchkeeper fatigue in BRM include?
Your Answer: (Not answered)
Correct Answer: D (rotation, task variation, movement plus ventilation and lighting)
💡 Rotate tasks, move about, keep air and light, but the real cure is compliant rest and workload control.
✗
Question 47. For shipyard workers, surveyors etc. boarding, the SMS requires?
Your Answer: (Not answered)
Correct Answer: A (identity register, safety briefing, permit and supervision)
💡 Visitors must be brought into the SMS to prevent their work causing incidents.
✗
Question 48. What does the inspection window mean?
Your Answer: (Not answered)
Correct Answer: A (the interval between periodic inspections, shorter for higher risk ships)
💡 It is the period for periodic inspection; high-risk ships have shorter windows and are flagged if overdue.
✗
Question 49. Unannounced scenarios a security drill may set include?
Your Answer: (Not answered)
Correct Answer: B (simulated suspicious boarding, bomb threat or hijack to test response)
💡 Surprise security drills test real response—a PSC focus.
✗
Question 50. The sign of a closed maintenance work order is?
Your Answer: (Not answered)
Correct Answer: C (repair done, tested satisfactory and signed off by the responsible person)
💡 Record symptoms, cause, action, parts and test result with sign-off; no test means not complete.
✗
Question 51. Which sea areas does GMDSS mainly cover?
Your Answer: (Not answered)
Correct Answer: A (areas A1, A2, A3 and A4)
💡 GMDSS divides oceans into A1 (VHF), A2 (MF), A3 (satellite) and A4 (polar) with different carriage requirements.
✗
Question 52. When the master has safety concerns about voyage instructions, he should?
Your Answer: (Not answered)
Correct Answer: D (raise the concern for company review while retaining final authority)
💡 The master raises concerns; the company assesses or amends. The master's final safety authority stands.
✗
Question 53. What matters in designing record forms?
Your Answer: (Not answered)
Correct Answer: D (complete but easy to complete, reflecting key control points)
💡 Forms should cover key points yet be practical; too many fields invite back-filling and undermine the record.
✗
Question 54. For ratings, the SMS should?
Your Answer: (Not answered)
Correct Answer: A (define duties, provide needed training, confirm competence)
💡 Ratings are the base executors; clear duties and basic training are essential.
✗
Question 55. The purpose of Notices to Mariners is to?
Your Answer: (Not answered)
Correct Answer: D (promulgate chart corrections and safety information for updating publications)
💡 Notices give permanent, temporary and preliminary corrections plus hazards, keeping publications current.
✗
Question 56. What distinguishes a special operation from a critical one?
Your Answer: (Not answered)
Correct Answer: A (an error shows no consequence at the moment; the harm accumulates out of sight)
💡 Both kinds have to be written up; they differ in when the consequence arrives. In a critical operation - anchoring and mooring, port entry and departure, bunkering, cargo lashing, enclosed-space entry - a mistake does its damage at once. In a special operation - structure and corrosion maintenance, spare gear and repairs, training and familiarisation, periodic testing of equipment - the ship keeps running and the cargo keeps flowing, and the fault shows up months later as a crack, wastage or a failure on demand. Because the result is not immediate, this is the work most likely to be squeezed, deferred and back-dated, which is exactly why the system asks for a plan, an owner, records and verification by the master and the shore, not repair after the fact.
✗
Question 57. What is the main role of telemedical assistance?
Your Answer: (Not answered)
Correct Answer: C (shore doctors give diagnosis and treatment advice to guide onboard care)
💡 Telemedicine gives shore guidance on treatment and drugs and helps decide evacuation, a key support at sea.
✗
Question 58. The precondition for electronic records being accepted is?
Your Answer: (Not answered)
Correct Answer: D (access control, audit trail and acceptance by the flag or Administration)
💡 E-records must prove tamper-resistance and traceability and be accepted by the Administration, or paper may be required.
✗
Question 59. How does unseaworthiness affect an insurance claim?
Your Answer: (Not answered)
Correct Answer: C (insurers may refuse the claim on grounds of unseaworthiness)
💡 Seaworthiness is an implied warranty; sailing unseaworthy may void cover, so the system must secure compliance before sailing.
✗
Question 60. Early identification of suspected pirate skiffs relies on?
Your Answer: (Not answered)
Correct Answer: D (a steady closing course, ladders/hooks aboard and crowded decks)
💡 Warning signs include a steady intercept course, persistent trailing, ladders or hooks aboard and crowded decks.
✗
Question 61. Quality control of contracted maintenance should be?
Your Answer: (Not answered)
Correct Answer: D (set standards, supervise the work and accept on completion)
💡 Outsourcing does not transfer duty: specify standards, supervise key steps and accept strictly.
✗
Question 62. After the company changes the DPA, the ship should?
Your Answer: (Not answered)
Correct Answer: A (update posted contact details and brief all crew again)
💡 Update posted and system contact details promptly and brief crew so reporting channels stay open.
✗
Question 63. After a collision, besides damage control, also?
Your Answer: (Not answered)
Correct Answer: D (assess the other vessel and casualties/pollution, send appropriate distress/report)
💡 Collisions involve mutual aid and liability; assess fully and report.
✗
Question 64. What evidence should the master keep regarding commercial versus safety disputes?
Your Answer: (Not answered)
Correct Answer: A (deck log, correspondence, written protest and factual port records)
💡 Keep logs, correspondence, protest letters and third-party records as a chain of evidence protecting all interests.
✗
Question 65. The key to managing a multinational crew is?
Your Answer: (Not answered)
Correct Answer: A (common working language, clear communication rules and cultural respect)
💡 Set a common language with standard phrases and read-back, respecting religious and cultural needs.
✗
Question 66. Which is NOT a duty of the designated person?
Your Answer: (Not answered)
Correct Answer: A (directly directing the ship's routine navigation)
💡 The DPA monitors, secures resources and links ship and shore, but does not direct routine navigation.
✗
Question 67. A healthy SMS culture encourages crew to?
Your Answer: (Not answered)
Correct Answer: A (proactively report hazards/near misses without fear of blame (just culture))
💡 A just culture surfaces hazards—the self-cleaning capability of the SMS.
✗
Question 68. Taking over a newbuild with missing equipment manuals, the master should?
Your Answer: (Not answered)
Correct Answer: C (request them from company and yard and defer operating that equipment)
💡 Do not operate blindly; obtain manuals, complete familiarisation, then file them in the SMS document register.
✗
Question 69. Training records signed by others or fabricated are a?
Your Answer: (Not answered)
Correct Answer: A (integrity and SMS-operation fraud, a serious non-conformity)
💡 Forged training records sever competence evidence; zero tolerance at PSC/audit.
✗
Question 70. Who first knows that something is wrong with the machinery?
Your Answer: (Not answered)
Correct Answer: B (the watchkeeper and those walking the rounds - whether they report and when decides whether the intervention comes before or after the failure)
💡 The first signs of a fault are usually with the watch, in the eye, ear and hand: temperature, vibration, a smell, a weep, a change of note. Whether they report and how quickly settles whether intervention falls before the failure or after it. What the system therefore has to supply is not feeling but a standard to judge by - the round sheet, the parameter limits - a report route that costs little to use, and an answer that shows the report went somewhere; after twice of reporting into silence nobody reports. An alarm covers only the quantities it was designed to see, and a sensor drifting or a part wasting below its threshold makes no sound. The monthly return shows averages, which is exactly the data that smooths an anomaly away.
✗
Question 71. Language requirement for key watch ratings (deck/engine) is?
Your Answer: (Not answered)
Correct Answer: B (enough to understand and execute working-language orders and emergency comms)
💡 Key ratings must read orders and join emergency comms; language is safety.
✗
Question 72. What is the risk of using non-original substitute parts?
Your Answer: (Not answered)
Correct Answer: B (mismatch in performance and material may cause failure and affect survey and warranty)
💡 Substitutes need assessment of performance and material; otherwise failure at a critical moment and class or warranty problems.
✗
Question 73. What is the core of a just culture?
Your Answer: (Not answered)
Correct Answer: D (the slip that was not meant and the breach that was being told apart, the first reportable without penalty)
💡 It is a problem about information: safety management runs on the things that nearly went wrong, and if speaking costs a man his rating and his next job he will not speak, leaving the system to see only what has already caused loss. The way through is to tell three things apart - the honest slip, inside what the person and the procedure could be asked to do, which is not met with sanction; the careless or knowing breach, which is dealt with because not doing it could have been asked; and the deliberate or reckless act, which still brings consequence and may bring the law. What was reported and what changed because of it go back to the ship, so that speaking is seen to have been worth it. Where that fails, reports thin out and the casualty figures do not improve; read the other way, as nothing ever being answered for, and the restraint on breaking the rule goes with it.
✗
Question 74. When should an oil tanker emergency shutdown be triggered?
Your Answer: (Not answered)
Correct Answer: D (leak, fire, overpressure or lost communications)
💡 Trigger ESD on leaks, fire, overpressure or lost communications—safety over schedule.
✗
Question 75. The correct use of a searchlight to aid night lookout is?
Your Answer: (Not answered)
Correct Answer: A (avoid dazzling other bridges; briefly illuminate own ship or hazards if needed)
💡 Use it to show presence or light hazards, but never dazzle another bridge and spoil their lookout.
✗
Question 76. The relationship between interim and permanent measures is?
Your Answer: (Not answered)
Correct Answer: A (interim measures control risk first; permanent ones remove the cause and replace them)
💡 Control risk temporarily first such as speed limits or isolation, then apply permanent fixes and verify.
✗
Question 77. What is the risk in electronic document management?
Your Answer: (Not answered)
Correct Answer: A (version confusion and unauthorised changes undermining control)
💡 Electronic files need permissions and version control against casual edits and old versions, with retrievable backups.
✗
Question 78. What should voyage accounting focus on?
Your Answer: (Not answered)
Correct Answer: A (the combined variance in fuel, port costs and time efficiency)
💡 Analyse fuel, port costs and time together to find what really affects results and improve it.
✗
Question 79. What is the focus of an engine room watch handover?
Your Answer: (Not answered)
Correct Answer: D (running parameters, work in progress and abnormal alarms)
💡 Hand over parameters, maintenance and isolation status, alarms and unfinished work; omissions risk plant and personal accidents.
✗
Question 80. The fundamental difference between an "observation" and a "non-conformity" in an audit is?
Your Answer: (Not answered)
Correct Answer: D (an observation is a potential weakness noted in operation, not yet a deviation from a requirement)
💡 An observation flags a potential weakness, not an actual deviation, so it is not counted as a non-conformity but may become one if ignored.
✗
Question 81. The three most common causes of shipboard fire are?
Your Answer: (Not answered)
Correct Answer: A (electrical faults, hot work and poor control of flammables)
💡 Fires mostly stem from electrical faults, hot work and poor flammable-material control; these are the priorities.
✗
Question 82. The purpose of a Ship Security Assessment (SSA) is?
Your Answer: (Not answered)
Correct Answer: A (identify security threats and vulnerabilities to underpin the plan)
💡 The SSA identifies threat scenarios and weaknesses, shaping measures in the SSP and updating as circumstances change.
✗
Question 83. Which is NOT a necessary condition for SMC issuance?
Your Answer: (Not answered)
Correct Answer: B (next voyage plan completed)
💡 Issuance needs a valid DOC, implemented SMS and a passed initial audit—not a voyage plan.
✗
Question 84. What does ISM Chapter 1 (General) mainly provide?
Your Answer: (Not answered)
Correct Answer: A (definitions, objectives, scope and certification link)
💡 Chapter 1 sets purpose, SMS definition, ship scope and the DOC/SMC certification link.
✗
Question 85. In a channel, VTS warns that the ship's position is abnormal; the OOW should?
Your Answer: (Not answered)
Correct Answer: B (verify position and course at once, correct and reply to VTS)
💡 A VTS warning is an external cross-check; verify and correct immediately and reply, never ignore it.
✗
Question 86. For identified hazards, the next step is?
Your Answer: (Not answered)
Correct Answer: B (assess likelihood and consequence (risk matrix), decide acceptable or needing control)
💡 Risk assessment ranks by likelihood × severity, guiding where to invest controls.
✗
Question 87. In a MARPOL "special area", pollution requirements are generally?
Your Answer: (Not answered)
Correct Answer: C (stricter than normal waters, tighter discharge limits)
💡 Special areas (Med, Baltic, Antarctic) are ecologically sensitive; limits tighten.
✗
Question 88. What is the common lesson from dangerous goods accidents?
Your Answer: (Not answered)
Correct Answer: B (failure in declaration, stowage or monitoring can cause an accident)
💡 Accidents come from combined failures in declaration, stowage and monitoring; any one can trigger serious results.
✗
Question 89. The relationship between equipment reliability and people is?
Your Answer: (Not answered)
Correct Answer: D (reliable equipment plus competent people form the real safety barrier)
💡 Reliable plant needs competent operation and maintenance; competent crews need reliable plant. Both make the barrier.
✗
Question 90. Failing to notify insurers promptly after an incident may cause?
Your Answer: (Not answered)
Correct Answer: D (prejudice the claim or refusal due to missed survey and mitigation)
💡 Late notice deprives insurers of survey, evidence and mitigation, a classic basis to reduce or deny cover.
✗
Question 91. While the ship is in for repair, who runs safety and pollution prevention?
Your Answer: (Not answered)
Correct Answer: B (the responsibility boundary between company, yard and ship has to be put down in writing)
💡 Repair time is high-risk time: hot work, tank entry, work at height and lifting run together on a ship that may still hold residues, gas and flammables. Before work starts the boundary between yard, ship and company is settled and written into the contract and the work permits - who authorises hot work, who tests the atmosphere and stands the fire watch, who controls extinguishing and alarms, who takes the waste oil, bilge and residue and issues the receipt, how tank entry is permitted. The ship's people join the rounds and the acceptance, and completed work is signed off against standard and test record rather than left to the yard's own quality check. Where the boundary is blurred, all three parties fail to explain the accident afterwards.
✗
Question 92. The link between crew career development and the SMS is?
Your Answer: (Not answered)
Correct Answer: D (clear progression and training raise competence and retention)
💡 Link competency training to progression to reduce turnover and keep competent people implementing the SMS.
✗
Question 93. Asked about SMS documents kept in the master's cabin, you should?
Your Answer: (Not answered)
Correct Answer: B (fetch them promptly for inspection, never rely on memory or delay)
💡 Produce documents at once; relying on memory or delaying suggests poor document control and raises findings.
✗
Question 94. The OOW finds the ship off track with charted depths shoaling; he should?
Your Answer: (Not answered)
Correct Answer: A (verify position, call the master and alter towards deeper water)
💡 Cross-check position, call the master and alter to safety while monitoring depth and clearance.
✗
Question 95. What is required when using the night order book?
Your Answer: (Not answered)
Correct Answer: D (set out the night's specific instructions and have the relieving officer read and sign)
💡 Night orders are specific to the night, read and signed by the relieving officer to avoid verbal misunderstanding.
✗
Question 96. The core objective of Bridge Resource Management is?
Your Answer: (Not answered)
Correct Answer: C (integrate people, equipment and information to avoid single-person error)
💡 BRM uses defined roles, communication, cross-checking and challenge to trap errors before they become casualties.
✗
Question 97. The danger of back-dating or writing records late is?
Your Answer: (Not answered)
Correct Answer: C (destroys authenticity, easily detected by inspection and inquiry, inviting severe penalty)
💡 Back-dating shows handwriting, ink and timeline contradictions, escalating a clerical issue into one of integrity.
✗
Question 98. The focus of monthly lifesaving equipment inspection is?
Your Answer: (Not answered)
Correct Answer: B (complete count, workable launching gear, rations/water and signals within expiry)
💡 Check monthly that boats, davits, releases, rations and pyrotechnics are complete and in date, with records.
✗
Question 99. The main function of DSC is to?
Your Answer: (Not answered)
Correct Answer: B (initiate distress, urgency and safety alerts with watchkeeping and addressing)
💡 DSC establishes distress alerts and routine calls quickly with watchkeeping, priority and identity features.
✗
Question 100. When shore guidance conflicts with a ship instruction, one should?
Your Answer: (Not answered)
Correct Answer: C (suspend the disputed part and seek clarification and revision from the DPA)
💡 Halt the disputed item, report to the DPA for a ruling and unified revision rather than improvising.