Exam Home Website
中文 English
0
/100
FAIL
Correct: 0/100 Total Questions: 100 Time Spent: 60min0sec
Passing: 80
Retake History
Answer Review
✗
Question 1. A cargo pump room on a tanker shall be protected by:
Your Answer: (Not answered)
Correct Answer: C (an approved fixed gas, foam or pressure water-spraying system)
💡 SOLAS II-2/10: a cargo pump room on a tanker shall be protected by an approved fixed gas, foam or pressure water-spraying system.
✗
Question 2. What does the Polar Code require regarding life-saving appliances in polar waters?
Your Answer: (Not answered)
Correct Answer: C (They must work at low temperature, with measures to extend survival time in the polar environment)
💡 The Polar Code requires life-saving appliances to function at low temperature and for measures to extend survival time, such as additional thermal protection, collective survival equipment and search aids.
✗
Question 3. What does SOLAS require for alarms in automated machinery spaces?
Your Answer: (Not answered)
Correct Answer: C (Alarms on abnormal critical parameters such as temperature, pressure and level, transmitted to the bridge or engineers' accommodation)
💡 SOLAS requires alarms on abnormal critical machinery parameters, transmitted to the bridge or the engineers' accommodation, so that abnormalities are detected during unattended periods and damage or loss of power is avoided.
✗
Question 4. Electrical equipment in a hazardous area: on what is the selection made?
Your Answer: (Not answered)
Correct Answer: B (matched to the zone in type of protection and temperature class, that protection surviving maintenance)
💡 The choice rests on two things: the classification of the space, and how easily the gas or vapour there can be lit. Zones run by how often a flammable mixture may appear, equipment by type of protection and temperature class, the marking on its certificate covering the zone it is put into and its temperature class staying below the ignition temperature of what may be there. After installation, maintenance can undo all of it: a bolt left out, a flame path scored, a wrong cable gland, a housing not made by the original maker, and a certified item is uncertified in the place that matters. Testing the atmosphere before hot work or entry is a separate defence and does not substitute for the selection.
✗
Question 5. Where shall the collision bulkhead be fitted and why?
Your Answer: (Not answered)
Correct Answer: B (Forward, to confine flooding from bow damage)
💡 The collision bulkhead limits flooding to the forward region after a collision.
✗
Question 6. What are the main items checked when an inflatable liferaft is serviced?
Your Answer: (Not answered)
Correct Answer: B (Tightness of the raft, the inflation system, the equipment, the weak link and the hydrostatic release unit)
💡 Servicing an inflatable liferaft covers a tightness test, the inflation system including cylinder pressure and valves, the completeness and expiry of the equipment and the condition of the weak link and hydrostatic release unit. Failure of any of these would affect use after abandonment.
✗
Question 7. What does SOLAS address regarding life-saving appliances when trading in cold climates?
Your Answer: (Not answered)
Correct Answer: C (The effect of low temperature on equipment performance and on survival must be considered, with insulating and warming provisions)
💡 SOLAS requires ships trading in cold climates to take account of the effect of low temperature on life-saving appliances, such as reduced battery capacity, difficulty in starting engines and changed equipment performance, and on survival, such as the risk of hypothermia, providing immersion suits, thermal protective aids and corresponding emergency supplies.
✗
Question 8. What is the total embarkation and launching time for survival craft on a passenger ship?
Your Answer: (Not answered)
Correct Answer: B (Not more than 30 minutes from the abandon ship signal)
💡 Within 30 minutes of the abandon ship signal.
✗
Question 9. What does SOLAS require for communication between the bridge and machinery space?
Your Answer: (Not answered)
Correct Answer: B (Reliable means must be provided so that the bridge and machinery space can communicate at all times)
💡 SOLAS requires reliable means of communication, such as telegraph or telephone, between the bridge and machinery space at all times. A mobile phone is not an acceptable compliant means.
✗
Question 10. What is the division of purpose between the damage control plan and the damage control booklet?
Your Answer: (Not answered)
Correct Answer: C (the plan permanently displayed on the bridge showing the boundaries of watertight divisions and the closing appliances, the booklet giving officers the flooding-control procedures)
💡 The plan gives the bridge a permanently displayed picture: the boundaries of the watertight divisions, the closing appliances at doors and sides, the cross-connections, so that on flooding the crew know what to secure and where to pump; the booklet sets the same material out in full for the officers responsible, in the language those officers work in. Both exist for use in an emergency, not for the file.
✗
Question 11. What is required for position monitoring when navigating in restricted waters?
Your Answer: (Not answered)
Correct Answer: B (Cross-check the position using several means such as visual bearings, radar and GPS, detecting any discrepancy early)
💡 SOLAS and good seamanship require the position in restricted waters to be cross-checked by several means, such as visual bearings, radar and GPS, detecting errors early. Reliance on a single means may lead to grounding through equipment error.
✗
Question 12. How should true and relative motion radar displays be chosen?
Your Answer: (Not answered)
Correct Answer: A (Choose the display suited to the appreciation required and be able to interpret the target's movement correctly)
💡 True and relative motion displays each have their use: relative motion allows the risk of collision and CPA to be judged quickly, while true motion shows the actual tracks of targets and the ship's position relative to them. The officer should be able to choose and interpret correctly, avoiding a wrong appreciation.
✗
Question 13. A cargo ship is licensed for sea areas A1, A2 and A3. Equipment requirements stack by area; what does A3 add on top of A1 and A2?
Your Answer: (Not answered)
Correct Answer: A (either an Inmarsat ship earth station or high-frequency radio equipment, for alerting and for receiving maritime safety information)
💡 Area A3 lies outside A1 and A2, where geostationary satellite coverage holds but high-frequency alerting is not assured; the Convention allows either an Inmarsat ship earth station or high-frequency equipment, one being enough, with safety information taken by EGC or NAVTEX. Reading A3 as demanding both services at once, or as satisfied by an extra very-high-frequency set, is the usual mistake on the equipment list.
✗
Question 14. What does SOLAS address regarding printing or display of NAVTEX messages?
Your Answer: (Not answered)
Correct Answer: D (Messages must be printed or stored automatically for the watchkeeper to consult and retain)
💡 SOLAS requires the NAVTEX receiver to print or store received navigational warnings and weather information automatically, so the watchkeeper can consult and retain them as required and important warnings are not missed.
✗
Question 15. Which Convention governs the ship's handling of ballast water?
Your Answer: (Not answered)
Correct Answer: B (The Ballast Water Management Convention)
💡 Ballast water is to be managed under the Ballast Water Management Convention.
✗
Question 16. What is the requirement for the stowage of lifebuoys?
Your Answer: (Not answered)
Correct Answer: D (They must be readily available, normally distributed on both sides and near survival craft muster stations)
💡 SOLAS requires lifebuoys to be readily available, distributed on both sides and near muster stations. Central stowage delays the rescue of a person overboard.
✗
Question 17. The packaging of dangerous goods shall:
Your Answer: (Not answered)
Correct Answer: C (comply with the packing requirements of the IMDG Code and be properly marked and labelled)
💡 SOLAS VII/3 requires packaging in accordance with the IMDG Code with proper marking and labelling.
✗
Question 18. What period should the fuel supply for the emergency generator (emergency source) generally be provided for?
Your Answer: (Not answered)
Correct Answer: C (Not less than eighteen hours, corresponding to the supply time of the emergency source)
💡 Under SOLAS II-1/42 the emergency source, including the emergency generator, should supply the specified emergency load for at least eighteen hours for a cargo ship, so its fuel reserve should meet the corresponding running time with reliable fuel supply and storage. Passenger ships have higher requirements.
✗
Question 19. What are the stowage and testing requirements for the emergency towing arrangement?
Your Answer: (Not answered)
Correct Answer: C (Stowed so as to be readily available and inspected at regular intervals)
💡 SOLAS requires the emergency towing arrangement to be stowed where it can be rapidly deployed and to be inspected regularly, so that it works in an emergency. Long-term stowage in a hold or neglect of inspection may delay assistance.
✗
Question 20. One space uses smoke detectors and another heat detectors. What is the main basis for choosing detector type?
Your Answer: (Not answered)
Correct Answer: A (The type and characteristics of fire likely in the space, such as smoke production or rapid temperature rise)
💡 SOLAS requires the detector type to suit the fire expected in the space: smoke detectors where smoke will be produced, heat detectors where rapid temperature rise without much smoke may occur. The wrong choice delays the alarm.
✗
Question 21. What must be considered in manning a ship for polar waters?
Your Answer: (Not answered)
Correct Answer: A (The greater difficulty of operations, the long search and rescue response times and the demands of working in low temperature)
💡 The Polar Code requires account to be taken of the greater difficulty of operations in polar regions, limited search and rescue resources with long response times and the demands of working and responding in low temperature, ensuring sufficient and trained personnel to cope in an emergency.
✗
Question 22. An inflatable liferaft shall be serviced at intervals not exceeding:
Your Answer: (Not answered)
Correct Answer: D (12 months)
💡 SOLAS III/36 (LSA Code) requires inflatable liferafts to be serviced at intervals not exceeding 12 months.
✗
Question 23. What does SOLAS address regarding action if the inert gas system fails?
Your Answer: (Not answered)
Correct Answer: C (Stop the relevant operations immediately and notify the terminal and take emergency measures)
💡 SOLAS and industry guidance require the relevant operations to stop at once if the inert gas system fails, with the terminal informed and emergency measures taken, preventing explosion from carrying on operations with inerting lost.
✗
Question 24. A PSCO found a lifeboat without a sea anchor. What is its function?
Your Answer: (Not answered)
Correct Answer: A (To reduce drift and keep the boat's head to wind and sea)
💡 The sea anchor controls drift and attitude in a seaway, keeping the boat's head to wind and reducing the risk of capsize. It is a key item for survival after abandonment, and its absence is a deficiency.
✗
Question 25. With regard to manoeuvring indications on the bridge:
Your Answer: (Not answered)
Correct Answer: A (propeller speed and direction of rotation shall be indicated on the bridge)
💡 SOLAS V/19 requires propeller speed and direction of rotation to be indicated on the bridge.
✗
Question 26. A pilot is boarding in a swell. What arrangement must the ship provide?
Your Answer: (Not answered)
Correct Answer: C (A pilot ladder complying with the standard, combined with an accommodation ladder where required)
💡 SOLAS V/23 requires the ship to provide safe means of embarkation and disembarkation for pilots, normally a compliant pilot ladder, combined with an accommodation ladder where the freeboard is large.
✗
Question 27. Ventilation closing appliances for machinery spaces shall be operable:
Your Answer: (Not answered)
Correct Answer: A (from a readily accessible position outside the machinery space)
💡 SOLAS II-2/8 requires ventilation closing appliances operable from outside the machinery space.
✗
Question 28. What does SOLAS and the Polar Code require regarding manning and training for polar waters?
Your Answer: (Not answered)
Correct Answer: A (The master and officers in charge of a navigational watch must have completed appropriate polar waters training and gained the required experience)
💡 SOLAS XIV and STCW require the master and officers in charge of a navigational watch of a ship in polar waters to have completed polar waters training appropriate to the ship's category and to have the prescribed seagoing experience, ensuring the ability to operate in polar conditions.
✗
Question 29. What safety is required in spaces adjacent to a hold containing cargo that may release harmful gas?
Your Answer: (Not answered)
Correct Answer: B (Monitor gas concentrations in adjacent spaces such as enclosed passages and stores, preventing gas ingress)
💡 For cargoes that may release harmful or flammable gas, the IMSBC Code requires monitoring not only inside the hold but also the possibility of gas entering adjacent enclosed spaces such as passages, stores and the machinery space through bulkheads, piping and access ways, preventing poisoning or the ignition of the gas.
✗
Question 30. What key information shall the shipper provide?
Your Answer: (Not answered)
Correct Answer: B (Cargo characteristics and the information needed for safe handling)
💡 Cargo characteristics and the information needed for safe carriage.
✗
Question 31. What is required when testing DSC or radio equipment in port?
Your Answer: (Not answered)
Correct Answer: A (Test on the prescribed channel or under the prescribed conditions, avoiding a false distress alert and taking precautions before testing)
💡 Testing radio equipment, especially DSC, should be carried out on the prescribed channel or under the prescribed conditions with precautions against transmitting a false distress alert, such as using the specific test setting and avoiding an actual distress alert. A false alert wastes search and rescue resources and may attract a penalty.
✗
Question 32. Which statement about the difference between passenger ship and cargo ship requirements in Chapter II-1 is correct?
Your Answer: (Not answered)
Correct Answer: B (Subdivision and damage stability requirements for passenger ships are generally more stringent, since they carry passengers and evacuation is more difficult)
💡 SOLAS II-1 generally imposes more stringent subdivision, damage stability and bulkhead requirements on passenger ships than on cargo ships of similar size, because they carry large numbers of passengers and evacuation is more difficult, requiring greater residual capability over a longer period.
✗
Question 33. Before departure the master shall ensure that:
Your Answer: (Not answered)
Correct Answer: D (the ship's stability and trim are satisfactory)
💡 SOLAS II-1/5 requires the master to verify stability and trim before departure.
✗
Question 34. After a marine casualty such as a collision or grounding with serious loss, what is required of the master as to reporting?
Your Answer: (Not answered)
Correct Answer: C (Report to the flag Administration as required and, where necessary, to the nearest coastal State, and preserve the relevant records and information)
💡 Under SOLAS I/21 and related requirements, after a marine casualty the ship should report to the flag Administration as required and, where necessary, to the nearest coastal State, and should preserve evidence, the official log book and related records for the investigation. Concealing or delaying a report aggravates liability.
✗
Question 35. What does SOLAS V require regarding the use of traffic separation schemes?
Your Answer: (Not answered)
Correct Answer: B (Ships must use the scheme in accordance with the relevant rules and navigate within the appropriate lane)
💡 SOLAS V and COLREG require ships to use traffic separation schemes in accordance with the rules, navigating within the appropriate lane in the established direction. Sailing against the flow or crossing at will is not permitted.
✗
Question 36. A cargo declared as steel is in fact scrap liable to self-heat. What should the master do?
Your Answer: (Not answered)
Correct Answer: B (Require accurate cargo information from the shipper and take measures suited to the true nature; refuse to load if the information is false)
💡 SOLAS VI/1 and the IMSBC Code require the shipper to provide accurate cargo information. Where the nature of the cargo differs from the declaration, the master should require correction, including the group, self-heating properties and hazards, and refuse to load where accurate information cannot be obtained or the cargo is not suitable, avoiding danger from self-heating.
✗
Question 37. What is the purpose of the automatic closing and hold-back release arrangements of fire doors?
Your Answer: (Not answered)
Correct Answer: D (To enable the doors to be held open for passage in normal service and to close automatically on a fire alarm to maintain the fire division)
💡 Under SOLAS II-2/9 fire doors required to be self-closing should be fitted with automatic closing arrangements and, where necessary, hold-back release arrangements that release the door on detection of a fire. The door may be held open in normal service for passage and ventilation and closes automatically on a fire alarm to maintain the fire division. The arrangements should be tested regularly.
✗
Question 38. Where a certificate expires and the ship is not in a port of survey, the Administration may extend the certificate for a period not exceeding:
Your Answer: (Not answered)
Correct Answer: A (5 months)
💡 SOLAS I/14: where a ship is not in a port of survey at expiry, the Administration may extend the certificate for a period not exceeding 5 months.
✗
Question 39. Life-saving appliances are kept on a planned maintenance schedule. How are the weekly and monthly checks divided?
Your Answer: (Not answered)
Correct Answer: C (weekly testing of the general alarm and of lighting at muster and embarkation stations, monthly examination of all appliances with their equipment confirmed complete and recorded)
💡 The Convention separates the two by object: weekly, the general emergency alarm system and the emergency lighting at muster and embarkation stations are tested; monthly, all life-saving appliances are examined, boats, rafts, their equipment, launching arrangements and engines being confirmed ready for immediate use, with defects logged. Shrinking the monthly check to one pass before the annual survey, or leaving rafts out of the ship's duties, is how equipment turns up missing when it is wanted.
✗
Question 40. Which Code governs the construction of ships carrying dangerous chemicals in bulk?
Your Answer: (Not answered)
Correct Answer: D (The IBC Code)
💡 The IBC Code.
✗
Question 41. What is the requirement for the safety lamp in a firefighter's outfit?
Your Answer: (Not answered)
Correct Answer: D (An electric safety lamp capable of continuous illumination for at least three hours)
💡 SOLAS requires an electric safety lamp giving continuous illumination for at least three hours, safe in smoke and flammable atmospheres. Ordinary torches and flame lamps are not acceptable.
✗
Question 42. What alternative measures are required if a fire detection system fails?
Your Answer: (Not answered)
Correct Answer: B (Repair promptly; pending repair, increase patrols of the affected spaces under the procedure and keep records)
💡 If a detection system fails it should be repaired promptly and, pending repair, patrols of the affected spaces increased under the procedure with records kept, preventing a fire from going unnoticed while the system is out of action.
✗
Question 43. What is the usual maximum validity of a Cargo Ship Safety Construction Certificate?
Your Answer: (Not answered)
Correct Answer: C (Five years, with annual and intermediate surveys)
💡 Under SOLAS I/12 the Cargo Ship Safety Construction Certificate has a usual validity of not more than five years, with annual and intermediate surveys within it. It remains valid only if the surveys are carried out and endorsed, otherwise it lapses.
✗
Question 44. What does loading high density cargo require regarding hopper and top side tanks on a bulk carrier?
Your Answer: (Not answered)
Correct Answer: A (Control the weight in each hold and the differences between adjacent holds according to the strength information, preventing excessive local stress)
💡 Loading high density cargo significantly stresses the tank top and hopper tanks. The weight in each hold, the sequence and the differences between adjacent holds should be controlled according to the structural strength information, preventing excessive local stress and deformation or failure of the hull.
✗
Question 45. In the subdivision of a passenger ship, what does the "subdivision load line" mean?
Your Answer: (Not answered)
Correct Answer: D (An assumed load line used to determine subdivision requirements, not the ship's actual service load line)
💡 The subdivision load line is an assumed load line used in determining subdivision requirements such as bulkhead positions and the subdivision index. It is a different concept from the summer or tropical load lines actually used in service.
✗
Question 46. What is required for the display of alarms from a fixed fire detection and fire alarm system?
Your Answer: (Not answered)
Correct Answer: A (The alarm must be displayed on the bridge or at a continuously manned central control station and indicate the space concerned)
💡 SOLAS requires fire alarms to be displayed on the bridge or at a continuously manned central control station and to indicate the space in which the alarm was initiated, so the fire can be located at once.
✗
Question 47. How does the number of firefighter's outfits differ between tankers and ordinary cargo ships?
Your Answer: (Not answered)
Correct Answer: B (Tankers normally require four outfits, ordinary cargo ships two)
💡 SOLAS II-2/10.10 requires at least two firefighter's outfits on cargo ships of 1000 GT and above. Tankers must carry additional outfits, normally four in total, with extra breathing apparatus.
✗
Question 48. What limitation must the officer of the watch bear in mind when using ARPA?
Your Answer: (Not answered)
Correct Answer: D (Target tracking may be lost or erroneous due to sea state, target manoeuvres or shadowing, so it cannot be relied upon entirely)
💡 ARPA tracking is affected by sea state, target manoeuvres, shadowing and input data accuracy, and targets may be lost or plotted in error. The officer must cross-check with the raw radar picture and visual look-out.
✗
Question 49. Magnetic compasses shall:
Your Answer: (Not answered)
Correct Answer: B (be adjusted periodically and a table of residual deviations provided)
💡 SOLAS V/19 requires periodic adjustment of magnetic compasses and a table of residual deviations.
✗
Question 50. A PSC inspection found escape routes from accommodation to the embarkation station obstructed by stores. What does SOLAS require?
Your Answer: (Not answered)
Correct Answer: B (Escape routes must be kept clear and unobstructed; any obstruction is a deficiency)
💡 SOLAS II-2/13 requires means of escape to be kept clear and usable at all times. Any stowage or obstruction could cause casualties during an emergency evacuation and is a serious deficiency.
✗
Question 51. A ship's enclosed escape route from the machinery space was used to store spare parts. What is the finding?
Your Answer: (Not answered)
Correct Answer: C (A serious deficiency, because the enclosed escape route must remain clear for evacuation)
💡 SOLAS requires the enclosed escape route to be kept clear for emergency evacuation. Using it to store articles obstructs evacuation and adds fire load, a deficiency seriously affecting safety.
✗
Question 52. Within what time shall the emergency generator start and supply power automatically on loss of the main supply?
Your Answer: (Not answered)
Correct Answer: D (30 seconds)
💡 SOLAS II-1/44: the emergency generator shall start automatically within 30 seconds.
✗
Question 53. The charts and nautical publications on board are found not corrected up to date by Notices to Mariners. The finding is?
Your Answer: (Not answered)
Correct Answer: C (Charts and publications should be corrected promptly; failure is a navigational safety deficiency)
💡 Charts, sailing directions, lists of lights, tide tables and other nautical publications on board should be corrected promptly in accordance with Notices to Mariners to keep the navigational information current. Failure means the crew navigate on outdated information, endangering safety. It is a deficiency to be corrected.
✗
Question 54. What arrangement does SOLAS require between the steering gear compartment and the navigation bridge?
Your Answer: (Not answered)
Correct Answer: C (Means of communication between the two, with provision for emergency stopping of the machinery from the steering gear compartment)
💡 SOLAS requires reliable communication between the steering gear compartment and the bridge, with provision for emergency action from the steering gear compartment, so that orders and feedback flow freely during emergency steering.
✗
Question 55. Under the ISM Code, non-conformities shall be:
Your Answer: (Not answered)
Correct Answer: B (analysed, corrected and prevented from recurring)
💡 SOLAS IX/9 (ISM) requires non-conformities to be analysed, corrected and prevented from recurring.
✗
Question 56. Which types of emergency source of power does SOLAS permit?
Your Answer: (Not answered)
Correct Answer: A (An emergency generator or a battery, supplying the emergency services for the prescribed period)
💡 SOLAS permits the emergency source to be an emergency generator or a battery. Where a battery is used its capacity must carry the emergency services, such as emergency lighting, communications and alarms, for the prescribed period.
✗
Question 57. What operating condition must be considered in designing the capacity of the main source of power?
Your Answer: (Not answered)
Correct Answer: A (It must carry the maximum normal load with margin for short overloads and starting currents)
💡 SOLAS requires the main source to carry the maximum normal load with allowance for short duration overloads such as motor starting. Insufficient capacity leads to tripping or failure to start equipment.
✗
Question 58. An ARPA (automatic radar plotting aid) shall be fitted on ships of:
Your Answer: (Not answered)
Correct Answer: D (10 000 GT and above)
💡 SOLAS V/19: ships of 10 000 GT and above shall be fitted with an ARPA.
✗
Question 59. On what basis is the extent of close-up survey determined?
Your Answer: (Not answered)
Correct Answer: A (Ship type, age, cargo characteristics and known high risk areas taken together)
💡 The ESP requires the extent of close-up survey to be determined by the ship type and age, the characteristics of the cargoes carried, such as the corrosive or abrasive effect of coal and ore, and the known high risk areas such as hatch coamings and hopper tanks, supported by a survey programme.
✗
Question 60. What confidentiality applies to the ship security plan?
Your Answer: (Not answered)
Correct Answer: C (Unauthorised access to its contents must be prevented, with the document marked and distribution restricted)
💡 The ISPS Code requires the ship security plan to be a confidential document, marked as such, with restricted distribution and protected against unauthorised access, including electronic versions, preventing the security measures from being circumvented. It may be shown to authorised persons on inspection.
✗
Question 61. What does SOLAS require regarding passenger drills on a passenger ship?
Your Answer: (Not answered)
Correct Answer: A (Held within 24 hours of embarkation, covering the use of lifejackets and the muster stations)
💡 SOLAS requires a passenger muster and drill within 24 hours of embarkation, covering the use of lifejackets, the muster stations and the emergency procedures. Passenger emergency instructions must also be provided, for example as a card in each cabin.
✗
Question 62. What do SOLAS and good practice address regarding watertight doors kept open while in port?
Your Answer: (Not answered)
Correct Answer: A (They may be opened as required for operations, but must remain capable of immediate closing with attention to changes in the ship's condition)
💡 Some watertight doors may be opened in port for cargo work or access, but must remain capable of being closed at once, with their status indicated on the bridge, and must be closed again if the ship's condition changes, such as draught change during cargo work, preventing inadvertent flooding.
✗
Question 63. In restricted visibility, which measure is NOT in accordance with SOLAS?
Your Answer: (Not answered)
Correct Answer: D (accelerate to pass through quickly)
💡 SOLAS V/8: in restricted visibility measures such as reducing speed, using radar and keeping a proper lookout shall be taken; accelerating is not permitted.
✗
Question 64. What does SOLAS IV/4 require regarding the independence of means for transmitting distress alerts?
Your Answer: (Not answered)
Correct Answer: B (At least two separate and independent means of transmitting a distress alert)
💡 SOLAS IV/4 requires the ship to be capable of transmitting distress alerts by at least two separate and independent means, so that failure of one device does not prevent the alert.
✗
Question 65. Means of escape from machinery spaces shall be:
Your Answer: (Not answered)
Correct Answer: A (clearly marked to indicate the escape direction, with emergency lighting where necessary)
💡 SOLAS II-2/13 requires means of escape to be clearly marked and provided with emergency lighting.
✗
Question 66. The pumping system requirement for bulk carriers applies to:
Your Answer: (Not answered)
Correct Answer: C (new bulk carriers, which shall be able to drain cargo holds under specified conditions)
💡 SOLAS XII/13: new bulk carriers shall be provided with a pumping system able to drain cargo holds under specified conditions.
✗
Question 67. What are the marking and labelling requirements for packaged dangerous goods?
Your Answer: (Not answered)
Correct Answer: B (The correct proper shipping name, UN number and class labels should be shown under the IMDG Code, clearly and durably)
💡 Under SOLAS VII and the International Maritime Dangerous Goods Code packaged dangerous goods should be correctly marked with the proper shipping name and UN number and labelled with the appropriate class and subsidiary risk labels, clearly, durably and conspicuously. Incorrect marking affects stowage, segregation and emergency response.
✗
Question 68. What is required when using electrical tools in a paint locker?
Your Answer: (Not answered)
Correct Answer: A (Confirm adequate ventilation and vapour concentration within safe limits and use explosion-protected or intrinsically safe tools, restricting the work if necessary)
💡 Flammable vapour may accumulate in a paint locker. Before using electrical or spark-producing tools, adequate ventilation and vapour concentration within safe limits should be confirmed and explosion-protected or intrinsically safe tools used, with the work prohibited inside the locker if necessary.
✗
Question 69. What is required for electrical equipment in areas of machinery spaces where flammable gas may accumulate?
Your Answer: (Not answered)
Correct Answer: B (Explosion-protected equipment or effective ventilation with gas detection, preventing ignition by electrical sparks)
💡 In spaces such as purifier rooms and fuel pump rooms where flammable gas may accumulate, explosion-protected equipment or effective ventilation with gas detection is required, preventing an electrical spark from becoming a source of ignition.
✗
Question 70. What authority does the master have in security matters?
Your Answer: (Not answered)
Correct Answer: D (To make security decisions that affect the safety of the ship)
💡 The master may make security decisions affecting the safety of the ship.
✗
Question 71. When must the engines be on standby?
Your Answer: (Not answered)
Correct Answer: B (In restricted visibility, dense traffic, narrow channels, when entering or leaving port and whenever immediate manoeuvring may be needed)
💡 The engine room should be given notice to stand by in restricted visibility, dense traffic, narrow channels, entering or leaving port and whenever immediate manoeuvring may be needed, so that the engine responds promptly. Without standby, manoeuvring may be delayed when it matters.
✗
Question 72. What closed-loop management of hazards is required?
Your Answer: (Not answered)
Correct Answer: B (Assign responsibility, measures and deadlines for each hazard found and track it to closure, with reasons recorded for items not completed)
💡 Hazards found at inspections, drills, reports and internal audits should be managed in a closed loop: assigning the person responsible and a deadline, implementing the measures, verifying the effect, closing the item and recording it. Items not completed on time should have the reason stated, the risk assessed and a new arrangement made, preventing hazards from persisting.
✗
Question 73. What are the requirements for managing notices to mariners on board?
Your Answer: (Not answered)
Correct Answer: D (Received and processed promptly, with charts and publications corrected and a record of corrections kept)
💡 SOLAS requires notices to mariners to be received continuously and used to correct charts and publications promptly, with a record kept. Accumulating them uncorrected or merely receiving them makes the charts unreliable.
✗
Question 74. What is one of the main functions of an Inmarsat-C ship earth station in GMDSS?
Your Answer: (Not answered)
Correct Answer: B (Transmitting and receiving distress alerts and enhanced group call maritime safety information)
💡 Inmarsat-C can transmit distress alerts, receive EGC SafetyNET information and provide two-way messaging, making it an important means of meeting GMDSS requirements in sea area A3.
✗
Question 75. In a crossing situation, what principle governs the stand-on vessel's action?
Your Answer: (Not answered)
Correct Answer: C (keep course and speed at first; but once it is clear the give-way vessel is not acting as the rules require, take avoiding action alone)
💡 Where one of two vessels is to keep out of the way the other keeps course and speed - not a bar on moving but a predictable target offered to the other. The keeping has a condition: as soon as the stand-on vessel finds the give-way vessel plainly not acting as the rules require, she should act alone in the way best to avoid collision, and a turn to starboard generally serves better than one to port, which would put her across his bow. When collision cannot be avoided by the give-way vessel's action alone, she may depart from the rules. Easing ahead across his bow, doing his keeping-out-of-the-way for him, or stopping on the spot all throw away the predictability.
✗
Question 76. What does SOLAS require regarding the authorisation of a recognised organisation by the Administration?
Your Answer: (Not answered)
Correct Answer: C (A written authorisation specifying its scope, together with the responsibilities and supervision of the organisation)
💡 SOLAS I/4 requires the authorisation to be in writing, specifying its scope, conditions and responsibilities, with supervision of the organisation. The Administration remains ultimately responsible for the Convention obligations.
✗
Question 77. What is the purpose of isolation valves on the fire main required by SOLAS?
Your Answer: (Not answered)
Correct Answer: B (To isolate a damaged section so the rest of the main can continue to supply water)
💡 SOLAS requires isolation valves on the fire main so that if a section, for example in the machinery space, is damaged, it can be isolated while the remainder still supplies the hydrants, preserving at least part of the firefighting capability.
✗
Question 78. Extension of a certificate is permitted:
Your Answer: (Not answered)
Correct Answer: B (only in special circumstances when the ship is not in a port of survey, as authorized by the Administration)
💡 SOLAS I/14: extension of a certificate is permitted only in special circumstances when the ship is not in a port of survey.
✗
Question 79. How must a ship respond to an increase in the security level?
Your Answer: (Not answered)
Correct Answer: C (Implement the additional measures for that level in the ship security plan and inform the crew and relevant parties)
💡 When the security level is raised the ship must apply the measures for that level in the ship security plan, such as tighter access control, monitoring of restricted areas, additional patrols, searching baggage and cargo and coordinating with the port facility security officer, informing the crew and relevant parties and reporting to the company where necessary.
✗
Question 80. What does SOLAS require for quick closing valves in the fuel oil system of a machinery space?
Your Answer: (Not answered)
Correct Answer: A (Quick closing valves at fuel tank outlets and at fuel pumps, remotely operable from outside the space)
💡 SOLAS requires quick closing valves at fuel tank outlets and at fuel pumps, capable of remote operation from a readily accessible position, normally outside the space, so the fuel supply can be cut off rapidly in a machinery space fire.
✗
Question 81. What does SOLAS and the related rules address regarding cargo ventilation?
Your Answer: (Not answered)
Correct Answer: B (Ventilating appropriately according to the nature of the cargo, preventing self-heating, harmful gas accumulation or condensation damage)
💡 SOLAS and the IMSBC Code require the method and timing of ventilation to suit the cargo: some need ventilation to remove heat, others must not be ventilated to avoid moisture uptake or increased self-heating. Ventilating blindly may make matters worse.
✗
Question 82. What is the purpose of the water ingress detection system required on a bulk carrier?
Your Answer: (Not answered)
Correct Answer: B (To give an alarm when water enters the cargo holds and fore and aft spaces, enabling the crew to detect and deal with it promptly)
💡 Under SOLAS XII/12 a bulk carrier should have water ingress detection and alarm systems for the cargo holds and the forepeak and similar spaces, giving an alarm on the bridge promptly when water enters so that the crew can detect the ingress early and take pumping, leak-hunting and damage control measures, preventing the situation from worsening. The testing of the system should be kept effective.
✗
Question 83. What does SOLAS require regarding the capacity of fire pumps on a cargo ship?
Your Answer: (Not answered)
Correct Answer: D (A value prescribed according to the ship's gross tonnage, with the total capacity meeting the two-jet requirement)
💡 SOLAS II-2/10.2 prescribes the total capacity of fire pumps and the minimum capacity of each pump according to the ship's gross tonnage, so that the fire main maintains pressure and reach with the required number of hydrants in use.
✗
Question 84. What is the principal safety hazard of a fixed CO2 system?
Your Answer: (Not answered)
Correct Answer: B (Asphyxiation of personnel)
💡 CO2 displaces oxygen, so personnel must be clear and alarms given before release.
✗
Question 85. What is required when comparing radar and AIS targets?
Your Answer: (Not answered)
Correct Answer: D (Compare the targets shown and establish the cause of any inconsistency, such as incorrect AIS data or radar shadowing)
💡 Where radar and AIS show different targets, such as an AIS target with no radar echo or a large positional difference, the cause should be established: an AIS data entry error, a target without AIS, radar shadowing or a false echo. Verifying promptly avoids a wrong appreciation.
✗
Question 86. What does SOLAS require as regards the language of certificates?
Your Answer: (Not answered)
Correct Answer: C (They must be drawn up in the official language of the issuing State with a translation into English, French or Spanish)
💡 SOLAS I/5 requires certificates to be in the official language of the issuing State with a translation into English, French or Spanish, so that port States can verify them. A single language alone does not comply.
✗
Question 87. What is the cycle for safety management system audits?
Your Answer: (Not answered)
Correct Answer: D (Internal audits normally not exceeding 12 months, annual verification of the DOC and intermediate verification of the SMC)
💡 The ISM Code requires internal audits at intervals not exceeding 12 months, annual verification of the Document of Compliance to keep it valid and intermediate verification of the Safety Management Certificate within its period of validity. Failure to verify in time affects the validity of the certificates.
✗
Question 88. Where must the valves of the bilge system be operable under SOLAS?
Your Answer: (Not answered)
Correct Answer: C (From a readily accessible position in the machinery space, and by remote operation when required)
💡 SOLAS requires bilge system valves to be arranged for operation from a readily accessible position and to be capable of remote operation where necessary, avoiding the need for personnel to enter a space that may be flooding or on fire.
✗
Question 89. What nautical publications must be carried under SOLAS V/27?
Your Answer: (Not answered)
Correct Answer: B (Sailing directions, lists of lights and fog signals, tide tables and notices to mariners as required for the voyage)
💡 SOLAS V/27 requires all nautical publications necessary for the voyage, including sailing directions, lists of lights, tide tables and notices to mariners, kept corrected. Charts alone do not satisfy the requirement.
✗
Question 90. May AIS be switched off while the ship is under way? What is the position of SOLAS V?
Your Answer: (Not answered)
Correct Answer: A (AIS must remain in operation; it may be switched off only where the master considers this necessary for safety or security, with the reason recorded)
💡 SOLAS V/19.2.10 requires AIS to remain in operation, permitting it to be switched off only where the master believes its operation might compromise the safety or security of the ship, with the reasons entered in the log.
✗
Question 91. What is meant by permeability in the subdivision calculation?
Your Answer: (Not answered)
Correct Answer: D (The proportion of the volume of a space that can be occupied by water)
💡 Permeability is the proportion of the volume of a space that can be occupied by water after damage. Its value differs for machinery spaces, accommodation and cargo spaces, and directly affects the volume of water entering and the calculation of residual stability.
✗
Question 92. A cargo ship of 85 m in length is equipping lifebuoys. Under SOLAS III/7.1, what is the minimum number required?
Your Answer: (Not answered)
Correct Answer: A (12)
💡 SOLAS III/7.1 sets bands by length: under 60 m — 8; 60 m and under 120 m — 12; 120 m and under 180 m — 18; 180 m and above — 24. At 85 m the second band applies.
✗
Question 93. How shall the number and capacity of lifeboats on a passenger ship be determined?
Your Answer: (Not answered)
Correct Answer: B (To accommodate the total number of persons on board)
💡 The total capacity shall accommodate all persons on board.
✗
Question 94. What is the principle for the food ration provided per person in the equipment of a lifeboat?
Your Answer: (Not answered)
Correct Answer: D (Not less than 10 000 kilojoules (about 2400 kilocalories) per person)
💡 Under SOLAS III/34 a lifeboat should carry a food ration of not less than ten thousand kilojoules, about twenty-four hundred kilocalories, for each person the boat is permitted to accommodate, to sustain them while awaiting rescue at sea after abandonment. The ration should be properly packed and within its shelf life.
✗
Question 95. What are the main requirements for air pipes on the freeboard deck?
Your Answer: (Not answered)
Correct Answer: D (Their openings should have effective closing appliances, and the pipes should be so arranged that water cannot enter the tanks when the ship heels)
💡 Air pipes ventilate the tanks and their opening height and closing appliances must meet the requirements, ensuring that in conditions of heeling and boarding seas water cannot enter the tanks and affect stability and liquid management. The closing appliances should be kept effective and closed as required.
✗
Question 96. What safety is required for deck work at sea?
Your Answer: (Not answered)
Correct Answer: D (Safe working procedures including risk assessment, use of protective equipment and restrictions in heavy weather)
💡 SOLAS and the ISM Code require deck work such as checking securing, chipping and maintenance to follow safe working practices: a risk assessment before starting, covering ship movement, wind and sea, work at height and enclosed spaces, correct use of personal protective equipment and restriction or suspension of the work in heavy weather.
✗
Question 97. What is the main purpose of ship reporting systems?
Your Answer: (Not answered)
Correct Answer: A (To provide information on ship movements for search and rescue and safety of navigation)
💡 SOLAS V/11 establishes ship reporting systems to supply movement information for search and rescue and safety of navigation, not for commercial or charging purposes.
✗
Question 98. On receiving a request for assistance coordinated by a rescue centre, the master should:
Your Answer: (Not answered)
Correct Answer: B (Proceed to assist so far as safety permits)
💡 The master shall proceed to assist so far as safety of his own ship and crew permit.
✗
Question 99. What is the relationship between the Document of Compliance and the Safety Management Certificate?
Your Answer: (Not answered)
Correct Answer: D (The DOC is issued to the company and the SMC to the ship, both valid for not more than five years with intermediate verification)
💡 ISM Code 13 provides that the DOC is issued to the company and the SMC to the ship, each valid for not more than five years with intermediate verification, including an annual verification of the DOC, to remain valid.
✗
Question 100. What should be done if an electronic aid such as GPS shows a jump in position?
Your Answer: (Not answered)
Correct Answer: D (Switch at once to other means such as radar or visual bearings for cross-checking, establish the cause and record and report the matter)
💡 If GPS shows a jump, drift or loss of signal, other means such as radar and visual bearings should be used at once to cross-check the position, the cause established, for example signal interference or equipment failure, and the matter recorded and reported, preventing grounding from an error in a single aid.