Exam Home Website
中文 English
0
/100
FAIL
Correct: 0/100 Total Questions: 100 Time Spent: 60min0sec
Passing: 80
Retake History
Answer Review
✗
Question 1. Which code governs the stability and heeling calculations for grain in bulk?
Your Answer: (Not answered)
Correct Answer: C (the grain code, with its stowage manual and the document of authorisation)
💡 Grain in bulk is dealt with on its own terms: the code gives the assumptions for the heeling caused by grain shifting, the stability criteria and what is required of a hold to be filled with grain, the ship carries a grain stowage manual and an authorisation to carry grain in bulk, and the calculation works out the heeling moment of each hold and checks the stability left after the shift. The solid bulk code answers mineral concentrates and coal, cargoes that may liquefy or react; packaged dangerous goods have their own code; the securing manual is about lashing and the forces in it. The mistake made by mixing the three is to treat grain as an ordinary bulk cargo and so leave out the heeling that comes from surface settlement and slope. Levelling and trimming before loading are done as required, and the booklets with the stability figures go to the master for signature.
✗
Question 2. How must revisions of system documentation be managed?
Your Answer: (Not answered)
Correct Answer: D (Approved by authorised persons, issued promptly, superseded versions withdrawn and the crew informed)
💡 The ISM Code requires revisions of system documentation to be approved by authorised persons and issued in a controlled way, with the version and effective date shown and superseded versions withdrawn or marked as obsolete, and the crew informed so that they work to the latest version. Uncontrolled amendment leaves different versions in use on board.
✗
Question 3. What is the principal purpose of port State control?
Your Answer: (Not answered)
Correct Answer: B (Ensuring compliance and eliminating substandard ships)
💡 Port State control aims to eliminate substandard shipping, not to raise revenue.
✗
Question 4. What is examined in testing a fixed fire detection and alarm system?
Your Answer: (Not answered)
Correct Answer: B (The alarm function of detectors tested point by point or by section, and that the display corresponds to the actual location)
💡 Testing a fixed detection and alarm system involves triggering detectors point by point or by section and confirming that the alarm sounds correctly and accurately indicates the space concerned, so that the watchkeeper can locate it quickly. Powering it on or listening for the sound alone does not confirm correct sectional indication.
✗
Question 5. With regard to the stability of a grain-laden ship:
Your Answer: (Not answered)
Correct Answer: C (the effect of grain shift shall be considered and the Grain Code stability requirements met)
💡 SOLAS VI/6 requires consideration of grain shift and compliance with the International Grain Code stability requirements.
✗
Question 6. What is the principal concern of SOLAS XII regarding cargo hatch covers of bulk carriers?
Your Answer: (Not answered)
Correct Answer: B (They must remain weathertight and structurally adequate, preventing sea water entering holds and causing structural failure)
💡 SOLAS XII requires hatch covers of bulk carriers to be weathertight and of adequate strength. Failure of hatch covers allowing sea water into the holds is a major cause of structural failure and loss of bulk carriers.
✗
Question 7. The stability information supplied to the master shall:
Your Answer: (Not answered)
Correct Answer: D (be approved and include stability for various loading conditions)
💡 SOLAS II-1/5 requires approved stability information covering various loading conditions.
✗
Question 8. The double bottom shall be fitted:
Your Answer: (Not answered)
Correct Answer: B (extending from the collision bulkhead to the afterpeak bulkhead)
💡 SOLAS II-1/9 requires the double bottom generally to extend from the collision bulkhead to the afterpeak bulkhead.
✗
Question 9. How do the fire protection requirements for the cargo area of a chemical tanker differ from those of an oil tanker?
Your Answer: (Not answered)
Correct Answer: D (The extinguishing medium must be chosen according to the properties of the chemicals carried, with water or foam prohibited for certain cargoes)
💡 Because chemicals vary greatly in reactivity, SOLAS and the IBC Code require the extinguishing medium to suit the cargo. Some cargoes react with water or liberate toxic gas, so water or foam is prohibited.
✗
Question 10. Communication between the engine room and bridge fails at sea so that telegraph orders cannot be confirmed. What does SOLAS II-1 require regarding control of the main machinery?
Your Answer: (Not answered)
Correct Answer: D (The main machinery must be controllable from the bridge, with an independent control position in the machinery space)
💡 SOLAS II-1 requires the main machinery to be operable from the navigation bridge while an independent control position is retained in the machinery space, so the machinery can still be controlled if bridge control fails.
✗
Question 11. Navigation equipment shall be capable of operating:
Your Answer: (Not answered)
Correct Answer: C (with an independent supply if the main and emergency sources fail)
💡 SOLAS V/19: navigation equipment shall have an independent supply where the main and emergency sources of electrical power fail.
✗
Question 12. What management is required at a crew change?
Your Answer: (Not answered)
Correct Answer: D (Hand over duties and the condition of equipment, provide familiarisation training and update the muster list and related documents)
💡 At a crew change the necessary handover should be completed, covering the duties of the post, the condition of equipment and unfinished matters, familiarisation training arranged for newly joined personnel before they take up duties, the muster list and related documents updated, and the competence and manning of critical positions ensured.
✗
Question 13. What factors must a voyage plan consider under SOLAS and good practice?
Your Answer: (Not answered)
Correct Answer: A (Prohibited and restricted areas, shoal water and draught limits, traffic density, weather and tides, and emergency shelter)
💡 A voyage plan should consider prohibited and exercise areas, shoal water and draught limitations, traffic density, weather and tidal conditions and emergency shelter anchorages and alternative routes, making the passage safe and practicable with contingency arrangements.
✗
Question 14. How does the scope of the renewal survey compare with that of an annual survey?
Your Answer: (Not answered)
Correct Answer: B (The renewal survey is more comprehensive, including detailed examination of structure, machinery and equipment)
💡 SOLAS requires the renewal survey to include a comprehensive inspection of structure, machinery and equipment with the prescribed items, whereas the annual survey is a more general overall inspection.
✗
Question 15. Stairways penetrating more than one deck within accommodation spaces shall generally be enclosed by:
Your Answer: (Not answered)
Correct Answer: A (A class divisions)
💡 SOLAS II-2/9 requires stairways penetrating two or more decks to be enclosed by A class divisions.
✗
Question 16. What are the requirements on the use of the emergency steering position?
Your Answer: (Not answered)
Correct Answer: A (steering taken on there quickly when bridge control fails, communication with the bridge kept, and the crew made familiar with the position and its handling by drill)
💡 The emergency position is in the steering gear space and exists so the ship can still be steered when control from the bridge has failed. It must be lit and fed from a supply that does not depend on the main source, have a sound means of communication with the bridge, show the position of the rudder, and be operated in a way the person on watch can take at once, direct control of the valves or the gear as the case may be, after practice. The drill programme covers the changeover from bridge control and how long it takes. To leave the work to the engineer alone with the officer writing down times, or to treat the position as a drill item never to be used in earnest, misses what it is there for.
✗
Question 17. How many lifebuoys shall be fitted with self-igniting lights and self-activating smoke signals?
Your Answer: (Not answered)
Correct Answer: D (Two)
💡 At least two, capable of quick release from the bridge.
✗
Question 18. What should be done if fuel oil drips onto a hot surface in the machinery space?
Your Answer: (Not answered)
Correct Answer: A (Stop or reduce the load at once, cut off the fuel and cool the area, preventing ignition)
💡 Oil dripping onto a hot surface such as an exhaust pipe or turbocharger may ignite at any moment. The fuel should be cut off at once, the load reduced or the engine stopped and the area cooled. Cleaning up the oil without removing the ignition condition remains highly dangerous.
✗
Question 19. What is the final means required by SOLAS if the main steering power is completely lost?
Your Answer: (Not answered)
Correct Answer: B (An approved alternative steering arrangement such as an emergency tiller or independent power-driven emergency steering)
💡 SOLAS requires an approved alternative steering arrangement, such as an emergency tiller or an independent power-driven emergency steering gear, usable in an emergency, with regular drills so the crew can operate it.
✗
Question 20. What does SOLAS III require regarding monthly inspection records of survival craft?
Your Answer: (Not answered)
Correct Answer: A (Records must be kept and produced at statutory surveys)
💡 SOLAS III requires monthly inspections of survival craft and launching appliances to be recorded and kept on board for verification by the surveyor and PSC. Records held only ashore are not sufficient.
✗
Question 21. What is the purpose of a compass corrector on board?
Your Answer: (Not answered)
Correct Answer: C (Eliminating residual deviation of the magnetic compass)
💡 A compass corrector compensates for residual deviation caused by the ship's magnetic field.
✗
Question 22. What does the periodic test of launching appliances at intervals not exceeding five years involve?
Your Answer: (Not answered)
Correct Answer: A (A launching test with the rated complement or prescribed load, verifying performance under load)
💡 SOLAS III/35 requires a test with load, at the rated complement or an equivalent, at intervals of not exceeding five years, actually verifying the reliability of the brake, release gear and structure under load. An empty or static test does not meet the requirement.
✗
Question 23. What power supply does SOLAS require for a fixed fire detection system?
Your Answer: (Not answered)
Correct Answer: B (Supplied from both the main and the emergency source, with automatic change-over if the main source fails)
💡 SOLAS requires the fixed fire detection system to be supplied from both the main and the emergency sources with automatic change-over if the main source fails, so that detection continues to work during a blackout.
✗
Question 24. What does the weekly inspection of a lifeboat require regarding the engine?
Your Answer: (Not answered)
Correct Answer: A (Start and run it for the prescribed period, checking starting, running and cooling)
💡 SOLAS requires the boat engine to be started and run for the prescribed period, normally not less than three minutes, during the weekly inspection, checking that it starts readily, runs smoothly and discharges cooling water properly. An appearance or level check alone would not reveal an actual fault.
✗
Question 25. What does the ISM Code require regarding maintenance of the ship and equipment?
Your Answer: (Not answered)
Correct Answer: A (The company must establish maintenance arrangements with inspections and servicing of critical equipment at the prescribed intervals, recorded)
💡 ISM Code 10 requires the company to establish planned maintenance arrangements, inspecting and servicing critical equipment at the prescribed intervals with records kept, preventing failures from lack of maintenance. Breakdown repair alone does not comply.
✗
Question 26. A fire drill must do more than muster and call names. What else has to happen?
Your Answer: (Not answered)
Correct Answer: D (mustering to the station bill and reporting, doors, dampers, outfits and communication examined, a fire simulated and water streamed)
💡 The drill has to be worked through for real: mustering to the station bill and reporting the numbers and the positions taken; fire doors and dampers closed and their closing confirmed; the firemen's outfits ready to be put on, the cylinders charged, the communication gear tested; a fire simulated, the way found and approached, the fire pump started and water streamed from a hydrant, so that pump, pipe, nozzle and people are proved together. A fire party drilling alone while the rest wait in their cabins, or a lecture in place of the exercise, tests nothing about the duties the station bill assigns and leaves a record no inspector can accept.
✗
Question 27. When is a Declaration of Security concluded?
Your Answer: (Not answered)
Correct Answer: D (When security levels differ between ship and port facility, or the interface risk is high)
💡 ISPS Code A/5: a DoS is concluded when levels differ or the security risk at the interface is high.
✗
Question 28. What must the relieving officer ensure at the handover of a navigational watch?
Your Answer: (Not answered)
Correct Answer: A (Important navigational information, the ship's condition and safety matters are fully handed over and acknowledged by the relieving officer)
💡 STCW and SOLAS require full handover of navigational information, position, course and speed and safety matters, with the relieving officer confirming before taking over. A greeting or a log entry alone does not comply.
✗
Question 29. How should hazard identification and risk assessment be carried out on board?
Your Answer: (Not answered)
Correct Answer: B (Identify hazards and assess risks for shipboard operations and equipment and take control measures accordingly)
💡 The ISM Code requires hazard identification and risk assessment on board for operations and equipment, covering routine and non-routine work and new equipment and new operations, from which control measures are decided and incorporated into procedures and checklists, bringing risks under control in advance.
✗
Question 30. What does SOLAS address regarding product certification of life-saving appliances?
Your Answer: (Not answered)
Correct Answer: C (Appliances must hold type approval or product certificates from a recognised body attesting compliance with the performance standards)
💡 SOLAS requires life-saving appliances to comply with the performance standards such as the LSA Code and to hold type approval or product certificates. Approval marks and certificates are checked at survey and PSC, and equipment without an approval mark may not be accepted.
✗
Question 31. Survival craft shall be capable of rapid launching:
Your Answer: (Not answered)
Correct Answer: B (under unfavourable conditions of trim and list)
💡 SOLAS III/16 requires rapid launching under unfavourable conditions of trim and list.
✗
Question 32. What is the purpose of a heading transmission system?
Your Answer: (Not answered)
Correct Answer: C (Transmitting heading information to radar, AIS and similar equipment)
💡 It transmits heading information to radar, AIS and similar equipment.
✗
Question 33. What happens to the statutory certificates when a ship changes to a new owner and flag?
Your Answer: (Not answered)
Correct Answer: B (The existing certificates cease to be valid and new ones must be issued by the new flag Administration or its authorised body after survey)
💡 SOLAS requires certificates to be issued by the Administration of the State whose flag the ship is entitled to fly. After a change of flag the existing certificates are no longer valid and new ones must be issued following survey by the new Administration. Using the old certificates is a serious deficiency.
✗
Question 34. What safety is required in operating ballast system valves?
Your Answer: (Not answered)
Correct Answer: B (Valves clearly identified and operated in order, preventing misoperation causing cross-connection or cargo contamination)
💡 SOLAS and good practice require the valves of the ballast and bilge systems to be clearly identified and operated in a proper sequence, normally following the ballast plan, preventing an inadvertent opening from cross-connecting ballast and cargo tanks, contaminating cargo or causing a sudden change in stability.
✗
Question 35. What protection is required for personnel handling chemicals and oils?
Your Answer: (Not answered)
Correct Answer: C (Appropriate personal protective equipment provided and correctly used, with prompt washing after contact and health surveillance where necessary)
💡 Personnel handling chemicals, oils or paints should be provided with and correctly use personal protective equipment as the safety data sheets require, including eye and face protection, gloves, protective clothing and respiratory protection, washing promptly after contact, with health surveillance and records where exposure is prolonged or symptoms appear.
✗
Question 36. How does the number of firefighter's outfits differ between tankers and ordinary cargo ships?
Your Answer: (Not answered)
Correct Answer: B (Tankers normally require four outfits, ordinary cargo ships two)
💡 SOLAS II-2/10.10 requires at least two firefighter's outfits on cargo ships of 1000 GT and above. Tankers must carry additional outfits, normally four in total, with extra breathing apparatus.
✗
Question 37. What do SOLAS and good seamanship emphasise when navigating in a narrow channel or confined waters?
Your Answer: (Not answered)
Correct Answer: D (Reduce speed, keep engines ready, enhance the look-out and request a pilot if necessary)
💡 Navigation in confined waters requires reduced speed, engines ready for immediate manoeuvre, an enhanced look-out and readiness to manoeuvre, with a pilot requested if appropriate. High speed greatly increases the risk of collision and grounding.
✗
Question 38. What are the validity and intermediate audit requirements of the Safety Management Certificate (SMC)?
Your Answer: (Not answered)
Correct Answer: A (Validity generally not more than five years with an intermediate audit between the second and third anniversaries)
💡 Under the ISM Code the Safety Management Certificate has a usual validity of not more than five years, with an intermediate audit between the second and third anniversaries to confirm the continued effective operation of the system. Failure to audit on time invalidates the certificate.
✗
Question 39. A Document of Compliance (DOC) shall be issued for a period not exceeding:
Your Answer: (Not answered)
Correct Answer: C (5 years)
💡 SOLAS IX/4: a Document of Compliance shall be issued for a period not exceeding 5 years.
✗
Question 40. A certificate exempting a ship from certain convention requirements is called:
Your Answer: (Not answered)
Correct Answer: C (An Exemption Certificate)
💡 An Exemption Certificate is issued where special construction makes full compliance impracticable.
✗
Question 41. Which of the following defines sea area A2?
Your Answer: (Not answered)
Correct Answer: D (The area, excluding sea area A1, within the coverage of at least one MF coast station with DSC alerting)
💡 A1 is within coverage of at least one VHF coast station with DSC; A2 is, excluding A1, within coverage of at least one MF coast station with DSC. Both are defined by coast station coverage, not by distance offshore.
✗
Question 42. When peak and deep tanks are used as ballast tanks, what does SOLAS II-1 require of the ballast system?
Your Answer: (Not answered)
Correct Answer: B (It must be capable of safely filling and emptying ballast tanks under all operating conditions)
💡 SOLAS II-1 requires the ballast system to fill and empty tanks safely under all operating conditions so that draught and stability can be controlled. It is not confined to port use.
✗
Question 43. An echo sounder shall be fitted on:
Your Answer: (Not answered)
Correct Answer: D (passenger ships on international voyages and cargo ships of 500 GT and above)
💡 SOLAS V/19: passenger ships on international voyages and cargo ships of 500 GT and above shall be fitted with an echo sounder.
✗
Question 44. What reporting is required if equipment fails within a VTS area?
Your Answer: (Not answered)
Correct Answer: A (Report the failure and the ship's movements to the VTS at once so traffic can be managed)
💡 A failure within a VTS area should be reported to the VTS promptly, enabling the traffic centre to warn and manage surrounding vessels. Concealing or delaying the report increases the risk of collision.
✗
Question 45. What does SOLAS and the related requirements say about adjusting the magnetic compass?
Your Answer: (Not answered)
Correct Answer: D (It must be properly adjusted, with deviation table and adjustment records kept)
💡 SOLAS requires the magnetic compass to be adjusted with a deviation table and records of adjustment kept,so that the crew can convert compass readings to true headings. An unadjusted compass introduces errors in position fixing and steering.
✗
Question 46. What readiness of survival craft is required while the ship is in port?
Your Answer: (Not answered)
Correct Answer: C (Kept serviceable and ready; security measures may be applied but must be capable of rapid removal)
💡 While in port survival craft should remain serviceable and ready. Measures against theft may be taken, but they must be capable of being removed quickly to restore use. Locking them up completely or dismantling them would leave persons without the appliances in an emergency.
✗
Question 47. During a PSC inspection the lifeboat engine is started and fails several times in a row. The finding is?
Your Answer: (Not answered)
Correct Answer: B (The lifeboat cannot be used reliably, a serious deficiency that may lead to detention)
💡 A lifeboat engine should start reliably at any time, being essential for manoeuvring and clearing the casualty after abandonment. Repeated failure shows the lifeboat cannot be reliably put into use, a deficiency seriously affecting life-saving capability that may normally lead to detention.
✗
Question 48. What launching methods are acceptable for survival craft?
Your Answer: (Not answered)
Correct Answer: C (Davit, free-fall or others appropriate to the type, all ensuring safety)
💡 Methods appropriate to the type, such as davit or free-fall, are acceptable.
✗
Question 49. What is the role of the responsible person in the enclosed space entry permit system?
Your Answer: (Not answered)
Correct Answer: D (The master or a designated person reviews the test results and issues the permit, specifying the conditions of entry and the standby arrangements)
💡 SOLAS and the IMO resolutions require the master or a designated person to review the gas test results, confirm ventilation and standby arrangements and then issue the entry permit specifying the conditions. Self-assessment or issue by an unauthorised person does not comply.
✗
Question 50. Between completing a renewal survey and the issue of a new certificate, what measure may allow the ship to complete her voyage?
Your Answer: (Not answered)
Correct Answer: A (An extension of the existing certificate in specified circumstances, enabling the ship to reach the port of survey or complete the current voyage)
💡 SOLAS permits a limited extension of a certificate in specified circumstances so the ship may complete the voyage or reach the port of survey. The extension must be within the rules and recorded; the old certificate may not be used indefinitely.
✗
Question 51. Partially enclosed and fully enclosed lifeboats must have a capacity of at least:
Your Answer: (Not answered)
Correct Answer: D (All persons on board)
💡 SOLAS III/27: such lifeboats shall have a capacity for all persons on board and shall not be overloaded.
✗
Question 52. What manning of key positions is required?
Your Answer: (Not answered)
Correct Answer: D (The master and key positions must be manned in accordance with the minimum safe manning requirements, with substitutes arranged)
💡 A ship should carry the master and personnel for key positions such as chief officer, chief engineer and watchkeeping officers and engineers in accordance with the minimum safe manning document, with substitutes arranged for key positions. Reducing manning without authority or falling below the minimum leaves the ship non-compliant and affects emergency capability.
✗
Question 53. What is required for cleaning the galley range hood and exhaust duct?
Your Answer: (Not answered)
Correct Answer: B (Periodic cleaning of grease deposits, preventing accumulated oil from being ignited by heat)
💡 Grease accumulating in a galley hood and exhaust duct is readily ignited by high temperature or flame, so thorough periodic cleaning is required, with the nozzles of the fixed extinguishing system checked for grease blockage. This is a common cause of galley fires.
✗
Question 54. What do SOLAS and the IMSBC Code address regarding trimming of solid bulk cargo?
Your Answer: (Not answered)
Correct Answer: B (Cargo should be trimmed to reduce the risk of shifting and heeling, with special trimming required for certain cargoes)
💡 SOLAS and the IMSBC Code require trimming according to the nature of the cargo, distributing it evenly and reducing shifting and heeling during the voyage. Certain cargoes such as those liable to liquefy have specific trimming requirements, and failure to trim can lead to cargo shift and capsize.
✗
Question 55. Where must the valves of the bilge system be operable under SOLAS?
Your Answer: (Not answered)
Correct Answer: C (From a readily accessible position in the machinery space, and by remote operation when required)
💡 SOLAS requires bilge system valves to be arranged for operation from a readily accessible position and to be capable of remote operation where necessary, avoiding the need for personnel to enter a space that may be flooding or on fire.
✗
Question 56. Three crew members were replaced during the voyage. What should be done with the muster list?
Your Answer: (Not answered)
Correct Answer: B (It must be amended without delay and re-posted so that new crew know their duties)
💡 SOLAS III/37 requires the muster list to be kept up to date as the crew changes and re-posted, so that every person on board can find his duty and muster station. An oral briefing or a log entry alone is not sufficient.
✗
Question 57. A PSCO checked the permanent markings on the hull. Where must the IMO number be marked under SOLAS?
Your Answer: (Not answered)
Correct Answer: A (Permanently marked on the hull, such as on the stern or side, and internally as required)
💡 SOLAS XI-1/3 requires the IMO ship identification number to be permanently marked on the hull, normally on the stern and sides, and also internally as required, so that the ship can be identified and traced.
✗
Question 58. What checking of the firefighting equipment list against the ship is required?
Your Answer: (Not answered)
Correct Answer: D (Periodically verify the list against what is actually on board, replacing anything missing and updating records)
💡 The ISM Code and SOLAS require periodic verification of the firefighting equipment list against what is actually on board, including extinguishers, firefighter's outfits, hoses and fittings, with anything missing, damaged or expired made good and the records updated, preventing a shortfall from being discovered only at an inspection.
✗
Question 59. The main propulsion machinery shall be capable of continuing to operate under which condition?
Your Answer: (Not answered)
Correct Answer: B (when any essential auxiliary fails)
💡 SOLAS II-1/26 requires the main propulsion to remain operative when any essential auxiliary fails, so the ship retains manoeuvrability.
✗
Question 60. What structural condition should be confirmed before loading a bulk carrier?
Your Answer: (Not answered)
Correct Answer: A (The condition of hatch covers and coamings, deformation or corrosion of the internal structure and leakage of the double bottom and piping)
💡 Before loading a bulk carrier the condition of the hatch covers and coamings should be confirmed sound, the internal structure and stiffening free of serious deformation or corrosion and the double bottom and ballast piping free of leakage, with the bilges draining properly. These bear directly on the safety of loading and the structural integrity of the voyage.
✗
Question 61. What is the purpose of an inert gas system?
Your Answer: (Not answered)
Correct Answer: D (Reducing oxygen content in cargo tanks to prevent explosion)
💡 It reduces the oxygen content so that flammable vapour cannot ignite.
✗
Question 62. What routine maintenance does the fire main require?
Your Answer: (Not answered)
Correct Answer: A (Periodic checks for corrosion and leakage, freedom of valve operation and prevention of water standing and freezing in the pipe)
💡 The fire main should be checked periodically for corrosion and leakage of the pipe wall and for freedom of valve operation, with standing water prevented from freezing in cold weather and periodic pressure testing, ensuring the system works reliably when needed.
✗
Question 63. How often shall the Company carry out internal audits of the SMS?
Your Answer: (Not answered)
Correct Answer: A (At least once a year)
💡 At least once a year.
✗
Question 64. What abilities must the crew demonstrate during a SIRE inspection?
Your Answer: (Not answered)
Correct Answer: C (Familiarity with the operation of equipment in their charge, their emergency duties and the relevant procedures, able to demonstrate in practice)
💡 A SIRE inspection focuses on the crew's practical command of equipment. Each member should be familiar with the equipment in his charge, the emergency procedures and the system requirements and be able to demonstrate, such as preparing a lifeboat for launching or donning a firefighter's outfit. Reciting answers will not suffice.
✗
Question 65. What are the common risks in launching and recovering survival craft?
Your Answer: (Not answered)
Correct Answer: A (Inadvertent operation of the release gear dropping the boat and injuring persons, and persons being crushed between the falls and the boat)
💡 The principal risks in launching and recovering a lifeboat include the release gear operating inadvertently and dropping the boat, persons being crushed between the falls and the boat and the boat striking the ship's side. Procedures should be strictly followed, coordination maintained and positions chosen with care.
✗
Question 66. What should be done when a rescue coordination centre requests assistance?
Your Answer: (Not answered)
Correct Answer: D (Assess the ship's capability and situation, reply promptly and assist within the ship's capability)
💡 On receiving a request from a rescue coordination centre, the master should assess the ship's position, capability and own safety, reply promptly whether assistance can be given and cooperate to the extent possible, while ensuring the safety of his own ship.
✗
Question 67. Which aspects must the ship's electrical system be protected against under SOLAS?
Your Answer: (Not answered)
Correct Answer: D (Short circuit, overload and earth fault, preventing electrical fire and equipment damage)
💡 SOLAS requires protection against short circuit, overload and earth fault to prevent electrical fire, equipment damage and electric shock. A single type of protection is not enough.
✗
Question 68. What does SOLAS II-2 require regarding combustible materials in accommodation spaces?
Your Answer: (Not answered)
Correct Answer: B (Surface materials and furnishings must be restricted in combustibility and comply with prescribed flame spread requirements)
💡 SOLAS II-2 limits the combustibility of bulkheads, ceilings, deck coverings and furniture in accommodation spaces, reducing fire load and the rate of spread.
✗
Question 69. What type of seal is required for cable penetrations of a fire division?
Your Answer: (Not answered)
Correct Answer: D (An approved penetration seal whose fire rating is not less than the division penetrated)
💡 SOLAS requires cable penetration seals to be approved with a fire rating not less than that of the division penetrated, for example an A-60 rated seal where an A-60 division is crossed. Ordinary packing or expanding foam does not meet the fire and smoke requirements.
✗
Question 70. What do SOLAS and the ISM Code require in the execution of the planned maintenance programme?
Your Answer: (Not answered)
Correct Answer: B (Carry out the programme and record completion, with reasons given and re-scheduling for items not completed)
💡 ISM Code 10 requires the planned maintenance programme to be carried out with completion and any problems found recorded. Items not completed should have the reason stated, the risk assessed and the work re-scheduled, keeping equipment in good order at all times.
✗
Question 71. Which of the following is NOT required navigation equipment under SOLAS V/19?
Your Answer: (Not answered)
Correct Answer: A (facsimile machine)
💡 SOLAS V/19: a facsimile machine is not among the navigation equipment required by SOLAS V/19.
✗
Question 72. How shall portable extinguishers be positioned?
Your Answer: (Not answered)
Correct Answer: A (Readily accessible within the space without obstructing escape)
💡 They shall be readily accessible without impeding escape.
✗
Question 73. A Passenger Ship Safety Certificate shall be issued for a period not exceeding:
Your Answer: (Not answered)
Correct Answer: D (12 months)
💡 SOLAS I/12: a Passenger Ship Safety Certificate shall be issued for a period not exceeding 12 months.
✗
Question 74. Which statement about immersion suits is correct?
Your Answer: (Not answered)
Correct Answer: C (immersion suits reduce body heat loss in cold water)
💡 SOLAS III/32 requires immersion suits for rescue boat crew to reduce body heat loss in cold water.
✗
Question 75. From what tonnage shall the main steering gear have two independent power units?
Your Answer: (Not answered)
Correct Answer: D (10000 GT)
💡 From 10000 GT and above.
✗
Question 76. What is the main purpose of a ship reporting system?
Your Answer: (Not answered)
Correct Answer: B (Providing information for search and rescue and navigational safety)
💡 To provide information for SAR and navigational safety.
✗
Question 77. What principle applies to the officer of the watch in using navigational aids?
Your Answer: (Not answered)
Correct Answer: B (They should be used early and correctly, with information cross-checked rather than relying on a single aid)
💡 Radar, AIS and ECDIS should be used early and correctly, with information cross-checked between sources, rather than forming a collision avoidance judgement from a single aid or from experience alone.
✗
Question 78. Into how many classes does the IMDG Code divide packaged dangerous goods?
Your Answer: (Not answered)
Correct Answer: D (Nine)
💡 The IMDG Code divides packaged dangerous goods into nine classes by hazard type, for example Class 1 explosives, Class 2 gases and Class 3 flammable liquids. The number is fixed at nine.
✗
Question 79. What does the ISM Code provide regarding the master's responsibility and authority?
Your Answer: (Not answered)
Correct Answer: B (The master has overriding authority in matters of safety and pollution prevention, which the company must state in writing)
💡 ISM Code 5 gives the master overriding authority in matters of safety and pollution prevention, and requires the company to document this in writing. It is a cornerstone of the SMS.
✗
Question 80. What is the maximum extension the Administration may grant to an expired certificate?
Your Answer: (Not answered)
Correct Answer: B (5 months)
💡 An extension of not more than 5 months may be granted.
✗
Question 81. What is the safety significance of the documentation and declaration system for dangerous goods?
Your Answer: (Not answered)
Correct Answer: A (giving ship, port and administration the nature, quantity and hazards of the goods so stowage, segregation and the emergency side can be prepared)
💡 Nobody opens every package on board; what the goods are, how they are packed, how much there is, and what the emergency and first-aid measures are all come from the shipper's document and the container packing certificate. Stowage and segregation are laid out from that paper, keeping incompatible goods apart and the means of detection and access free, and the emergency response is planned from the same sheet. When something goes wrong the fire party and the salvage decision work from the declaration, and a false one buys the wrong extinguishing agent and the wrong segregation, which is what turns one incident into two. The paper therefore has to be correct before loading, not made up afterwards; it settles liability too, but its first use is safety.
✗
Question 82. What does SOLAS VI/1 require regarding cargo information before loading ordinary cargo?
Your Answer: (Not answered)
Correct Answer: B (The shipper must provide the necessary information about the cargo before loading, so the master can judge its suitability for safe carriage)
💡 SOLAS VI/1 requires the shipper to give the master the necessary information about the cargo before loading, enabling him to judge suitability for safe carriage and the precautions needed. Experience alone or later submission does not comply.
✗
Question 83. Fire is burning in a cargo hold that cannot be entered and whose seat cannot be reached directly. What is the more suitable treatment?
Your Answer: (Not answered)
Correct Answer: D (ventilation and openings of that hold closed, boundary cooling arranged, the fixed system discharged to its design concentration and the space left sealed)
💡 Where the seat cannot be reached the method is to shut off air and keep the agent in the space: ventilation, fire dampers and openings closed, the boundaries and adjacent spaces cooled, the space proved empty, the fixed gas or foam system discharged once at its design concentration, and then left sealed while concentration and bulkhead temperatures are watched. Floodwater on some cargoes worsens the reaction or adds weight and free surface; opening a hatch invites backdraft and injures the party with smoke; injection through a boundary rarely reaches a working concentration.
✗
Question 84. A rate-of-turn indicator shall be fitted on ships of:
Your Answer: (Not answered)
Correct Answer: D (100 000 GT and above)
💡 SOLAS V/19: a rate-of-turn indicator shall be fitted on ships of 100 000 GT and above.
✗
Question 85. What do SOLAS and STCW address regarding training in wearing lifejackets?
Your Answer: (Not answered)
Correct Answer: D (Every crew member must know how to don a lifejacket correctly and practise it in drills)
💡 SOLAS and STCW require every crew member to know how to don a lifejacket correctly, including in darkness, and to practise it in abandonment drills. Reading the instructions does not ensure prompt and correct donning in an emergency.
✗
Question 86. What does SOLAS require regarding safety devices on boilers, pressure vessels and air receivers?
Your Answer: (Not answered)
Correct Answer: D (Safety valves or protective devices must be fitted to prevent damage or explosion from overpressure)
💡 SOLAS II-1 requires boilers, pressure vessels and air receivers to be fitted with safety valves or protective devices that relieve or operate reliably on overpressure, preventing damage or explosion.
✗
Question 87. The Polar Water Operational Manual (PWOM) is intended to:
Your Answer: (Not answered)
Correct Answer: A (provide the ship's operational limitations and procedures for operating in polar waters)
💡 SOLAS XIV/2: the Polar Water Operational Manual provides the ship's operational limitations and procedures for operating in polar waters.
✗
Question 88. What is required regarding VHF channel 16 watchkeeping?
Your Answer: (Not answered)
Correct Answer: A (Continuous watch while under way)
💡 A continuous watch on VHF channel 16 shall be kept while under way.
✗
Question 89. What is the usual maximum validity of a Cargo Ship Safety Equipment Certificate?
Your Answer: (Not answered)
Correct Answer: D (Five years, with annual and periodical surveys)
💡 Under SOLAS I/12 the Cargo Ship Safety Equipment Certificate has a usual validity of not more than five years, with annual and periodical surveys within it. It remains valid only if the surveys are carried out and endorsed, the safety equipment provision and performance being the focus of the survey.
✗
Question 90. In addition to ventilation, what shall be fitted in paint lockers and flammable liquid stores?
Your Answer: (Not answered)
Correct Answer: D (A fixed fire-extinguishing system)
💡 SOLAS II-2/10.6.3: paint lockers and flammable liquid stores shall have a fixed fire-extinguishing arrangement.
✗
Question 91. When a total blackout occurs, what should the emergency source of power be able to do?
Your Answer: (Not answered)
Correct Answer: A (Start or come on automatically within the required time and supply essential loads such as emergency lighting, steering gear, communications and alarms)
💡 On a total blackout the emergency source of power should start or come on automatically within the required time and supply emergency lighting, emergency steering, radio equipment, alarms and necessary services, so that basic safety capability is restored within a short time. The crew should be familiar with starting and changing over to the emergency source.
✗
Question 92. What does the shipboard oil pollution emergency plan have the crew exercise in?
Your Answer: (Not answered)
Correct Answer: A (the alarm and the report when oil is seen, getting the gear out, working the containment and recovery, and who is to be told and what is said to them)
💡 The plan has to set out each step as the ship would take it: who sees it and when, how the source and position of the spill are judged, the order of raising the alarm and telling the bridge, the muster and the split of duties, what valves and pumps are worked on deck, where the boom and the absorbents live and who handles them, how the spread is held and the oil gathered, and then the report to the company, to the coastal State and to the port, its form and its timing, contact with the salvors and with other ships, the writing up and the look back afterwards. It is the exercise that puts these in the crew's hands: once a man has carried the gear and sent a practice report he knows what his own ship, at her speed and with her arrangement, can actually do. Exercises go best alongside the other drills and at the intervals the plan names, and what they show comes back into the plan and the training. A signature with no exercise, or another drill's record standing in for it, will not hold when the inspection asks or when the oil is on the water.
✗
Question 93. What is the core requirement of SOLAS regarding the number and arrangement of bulkheads in a passenger ship?
Your Answer: (Not answered)
Correct Answer: A (The number and position of main bulkheads are determined by the subdivision calculation so that residual stability is adequate after damage)
💡 SOLAS requires the number and position of main bulkheads in a passenger ship to be determined by the subdivision calculation, taking permeability and assumed extents of damage into account, so that the prescribed residual stability and floating position are met. Adding bulkheads at random is not the intent.
✗
Question 94. On encountering a danger to navigation such as an uncharted shoal, what does SOLAS V require of the master?
Your Answer: (Not answered)
Correct Answer: B (To communicate the information immediately to ships in the vicinity and to the competent authority)
💡 SOLAS V/31 requires the master to communicate such dangers immediately to ships nearby and to the competent authority so that a navigational warning can be issued. A log entry alone is insufficient.
✗
Question 95. What information must the master have before departure?
Your Answer: (Not answered)
Correct Answer: B (Approved stability information including damage stability)
💡 Approved stability information, including damage stability, shall be available to the master.
✗
Question 96. A pressure test found insufficient pressure when two jets were played simultaneously. What does SOLAS require?
Your Answer: (Not answered)
Correct Answer: A (Fire pumps must maintain the prescribed pressure and jets when the required number of hydrants are in simultaneous use)
💡 SOLAS II-2 requires the fire pumps to maintain the prescribed pressure and reach of the jets with the required number of hydrants in simultaneous use. Insufficient pressure impairs firefighting and is a deficiency.
✗
Question 97. What is the purpose of the towing and mooring equipment information required by SOLAS II-1/3-9?
Your Answer: (Not answered)
Correct Answer: B (To enable the crew to know the safe working load and limitations of the equipment and prevent injury during mooring)
💡 SOLAS II-1/3-9 requires information on the arrangement, number and safe working load of towing and mooring equipment to be kept on board for safe operation and maintenance.
✗
Question 98. What does SOLAS require regarding automatic controls and safety devices for main machinery and boilers?
Your Answer: (Not answered)
Correct Answer: B (Safety devices must be fitted to give warning or take action automatically when parameters become abnormal, preventing damage)
💡 SOLAS II-1 requires safety devices for propulsion machinery and boilers that warn or act automatically on abnormal conditions such as low lubricating oil pressure or high cooling water temperature, preventing damage.
✗
Question 99. What are the approval and use requirements for the Cargo Securing Manual?
Your Answer: (Not answered)
Correct Answer: C (It should be approved by the Administration and carried on board, the crew securing cargo and inspecting the securing equipment as it requires)
💡 Under SOLAS V/5 and related requirements the relevant ships should carry a Cargo Securing Manual approved by the Administration, containing the list, strength, arrangement and use of the securing devices, the crew securing cargo as it requires and inspecting and maintaining the equipment at the required intervals, recording defects and repairs.
✗
Question 100. What does 'Company' mean in SOLAS?
Your Answer: (Not answered)
Correct Answer: A (The shipowner or an organization which has assumed responsibility for operation)
💡 It means the owner or any organization which has assumed responsibility for the ship's operation.