Question 1. How many means of escape, widely separated, shall be provided on each deck in accommodation spaces?
Your Answer: (Not answered)
Correct Answer: B (Two)
💡 SOLAS II-2/13: at least two widely separated means of escape shall be provided on each deck.
✗
Question 2. Why should the length and diameter of fire hoses meet the requirements?
Your Answer: (Not answered)
Correct Answer: B (To ensure the hose reaches the protected space, is easy to handle and does not affect discharge pressure)
💡 A fire hose should be of appropriate length and diameter: too long increases friction loss and reduces pressure, too short cannot reach the protected space. Every hydrant's hose should reach any position in the protected space requiring it and be suitable for operation by two persons.
✗
Question 3. What does SOLAS address regarding electrical equipment in a paint locker?
Your Answer: (Not answered)
Correct Answer: C (Explosion-protected equipment or no electrical equipment within the space)
💡 SOLAS requires explosion-protected equipment in a paint locker, or no electrical equipment inside it, such as lighting fitted outside, preventing an electrical spark from igniting paint vapour.
✗
Question 4. What are the key points in using a portable extinguisher?
Your Answer: (Not answered)
Correct Answer: D (Pull the pin, aim the nozzle at the base of the fire and sweep while pressing the lever)
💡 Using a portable extinguisher involves pulling the pin, holding the nozzle and aiming at the base of the fire, that is the burning surface, then sweeping while pressing the lever. Aiming at the top of the flames is ineffective, and the position should allow a line of retreat.
✗
Question 5. Which of the following defines sea area A2?
Your Answer: (Not answered)
Correct Answer: D (The area, excluding sea area A1, within the coverage of at least one MF coast station with DSC alerting)
💡 A1 is within coverage of at least one VHF coast station with DSC; A2 is, excluding A1, within coverage of at least one MF coast station with DSC. Both are defined by coast station coverage, not by distance offshore.
✗
Question 6. Ships of 3 000 GT and above shall be fitted with:
Your Answer: (Not answered)
Correct Answer: C (two radars, at least one of which shall be 9 GHz)
💡 SOLAS V/19: ships of 3 000 GT and above shall be fitted with two radars, at least one of which shall be 9 GHz.
✗
Question 7. Which systems shall be used to receive navigational warnings?
Your Answer: (Not answered)
Correct Answer: C (Maritime safety information systems such as NAVTEX and SafetyNET)
💡 Systems such as NAVTEX and SafetyNET.
✗
Question 8. If unable to assist, the master receiving a distress alert shall:
Your Answer: (Not answered)
Correct Answer: D (Endeavour to relay the alert to units able to assist)
💡 Endeavour to relay the alert to units able to render assistance.
✗
Question 9. For passenger ships of less than 4 000 GT, the number of independently driven fire pumps required is:
Your Answer: (Not answered)
Correct Answer: C (not less than 2)
💡 SOLAS II-2/10 requires at least two independently driven fire pumps for passenger ships of less than 4 000 GT.
✗
Question 10. With regard to traffic separation schemes, ships shall:
Your Answer: (Not answered)
Correct Answer: D (navigate in the appropriate traffic lane in accordance with the scheme)
💡 SOLAS V/10 requires ships to navigate in the appropriate lane of a traffic separation scheme.
✗
Question 11. What is the purpose of the boat hook among the lifeboat equipment?
Your Answer: (Not answered)
Correct Answer: A (To pull or push the boat when coming alongside, recovering floating objects or landing)
💡 The boat hook is used to pull or push the boat when coming alongside, recovering floating objects or landing, a common handling tool whose absence reduces the boat's handling and rescue capability.
✗
Question 12. An inflatable liferaft shall:
Your Answer: (Not answered)
Correct Answer: B (inflate automatically when launched and also be capable of manual inflation)
💡 SOLAS III/36 (LSA Code) requires an inflatable liferaft to inflate automatically when launched, with manual inflation also provided.
✗
Question 13. What accuracy requirement applies to electronic position fixing systems?
Your Answer: (Not answered)
Correct Answer: A (They must provide the accuracy needed for safe navigation and give an indication when accuracy degrades)
💡 SOLAS requires electronic position fixing systems to provide the accuracy needed for safe navigation and to warn the user when accuracy degrades, such as a GPS integrity alarm, so the officer can switch to other means.
✗
Question 14. Means of escape from machinery spaces shall be:
Your Answer: (Not answered)
Correct Answer: A (clearly marked to indicate the escape direction, with emergency lighting where necessary)
💡 SOLAS II-2/13 requires means of escape to be clearly marked and provided with emergency lighting.
✗
Question 15. Dangerous goods shall be stowed:
Your Answer: (Not answered)
Correct Answer: A (in accordance with the IMDG Code, with segregation to prevent dangerous reactions)
💡 SOLAS VII/3 requires stowage and segregation of dangerous goods in accordance with the IMDG Code.
✗
Question 16. What cooperation with an external audit is required?
Your Answer: (Not answered)
Correct Answer: A (Provide documentation, records and the actual condition truthfully, arrange personnel to assist and explain the operation honestly, without concealing or falsifying)
💡 An external audit requires the system documentation, records and the actual condition of the ship to be provided truthfully, personnel arranged to assist and the operation explained honestly. Concealing problems, making up records at short notice or obstructing the audit is a serious breach and may lead to suspension or withdrawal of certificates.
✗
Question 17. The berth-to-berth principle of voyage planning means that the plan covers:
Your Answer: (Not answered)
Correct Answer: D (the entire passage from berth at the port of departure to berth at the port of destination)
💡 SOLAS V/34 requires a berth-to-berth plan covering all stages of the passage.
✗
Question 18. When must the first drill after leaving port be held?
Your Answer: (Not answered)
Correct Answer: D (Within 24 hours of leaving port, including abandon ship and fire drills)
💡 SOLAS III/19 requires the first drill, including abandon ship and fire drills and, on passenger ships, the participation of passengers, to be held within 24 hours of the ship leaving port, so that newly joined personnel and the whole crew have their emergency duties clear from the start of the voyage.
✗
Question 19. What does an inspector look at when he checks the safety system on board?
Your Answer: (Not answered)
Correct Answer: B (the certificates being valid and the documents in place, then the records set against the ship as she is)
💡 It begins with the certificates: the document of compliance and the pages listing the ship types it covers against this ship, the safety management certificate or its interim issue standing in date and the conditions of its issue having been met. Then whether the documents are actually on board at their current issue, and whether the procedures and instructions match this ship's equipment and cargo. Then the records: what internal audit and management review concluded and what moved after them, training and familiarisation done, the maintenance plan kept or deferred and how the deferral was handled, drills held with their content and what they showed. The three steps are compared - what the system says, what the record shows, what the deck presents - and where the paper is complete but the ship does not answer it, the finding is that the system does not work, not that a page is missing; hence certificates alone, or the signature closing a last year's finding alone, prove nothing.
✗
Question 20. How does SOLAS I/8 treat passenger ship certification differently from cargo ships?
Your Answer: (Not answered)
Correct Answer: C (The passenger ship safety certificate is valid for not more than 12 months)
💡 SOLAS I/8 limits the passenger ship safety certificate to 12 months, whereas cargo ship certificates are generally valid for not more than five years. The periods differ.
✗
Question 21. What do SOLAS and the IBC Code address regarding the operation of the inert gas system?
Your Answer: (Not answered)
Correct Answer: D (It must remain in operation with tank pressure and oxygen content monitored during cargo, ballast and tank cleaning operations)
💡 SOLAS and the IBC Code require the inert gas system to remain in operation during cargo handling, ballasting and tank washing, with the oxygen content and pressure of each tank monitored continuously. If limits are exceeded, operations must stop to avoid the risk of explosion.
✗
Question 22. Ventilation must be shut down when a machinery space fire occurs. What does SOLAS II-2/12 require for closing ventilation openings of machinery spaces?
Your Answer: (Not answered)
Correct Answer: D (They shall be capable of being closed rapidly from outside the space)
💡 SOLAS II-2/12 requires ventilation openings of machinery spaces to be capable of being closed rapidly from outside the space, so ventilation can be stopped without entering the fire area.
✗
Question 23. What does SOLAS address regarding drainage of ro-ro spaces?
Your Answer: (Not answered)
Correct Answer: A (Effective drainage removing firefighting water and leaked oil promptly)
💡 SOLAS requires ro-ro spaces to have effective drainage and storage arrangements able to remove firefighting water and leaked oil promptly, preventing free surface from affecting stability and reducing the risk of oil spreading the fire.
✗
Question 24. What applies when security level 3 is set?
Your Answer: (Not answered)
Correct Answer: C (Further specific protective measures until the incident is resolved)
💡 Further specific protective measures until the incident is resolved.
✗
Question 25. When proceeding along a narrow channel, a vessel should keep?
Your Answer: (Not answered)
Correct Answer: A (As near to the outer limit of the channel on her starboard side as is safe and practicable)
💡 Under the collision regulations a vessel proceeding along the course of a narrow channel or fairway should keep as near to the outer limit of the channel or fairway which lies on her starboard side as is safe and practicable. Overtaking in a narrow channel requires the agreement of the vessel being overtaken and must be done with caution.
✗
Question 26. The navigation lights are found not to meet the required position, colour or arc of visibility. The finding is?
Your Answer: (Not answered)
Correct Answer: B (Non-compliant navigation lights affect the ability of other ships to judge the situation, a deficiency to be corrected)
💡 The position, colour and arc of visibility of the navigation lights, such as masthead, sidelights and stern light, must meet the requirements so that other ships can judge the heading and movement of the vessel from the correct bearing and distance. Non-compliance may lead to misjudgement and increased risk of collision. It is a deficiency to be corrected.
✗
Question 27. When peak and deep tanks are used as ballast tanks, what does SOLAS II-1 require of the ballast system?
Your Answer: (Not answered)
Correct Answer: B (It must be capable of safely filling and emptying ballast tanks under all operating conditions)
💡 SOLAS II-1 requires the ballast system to fill and empty tanks safely under all operating conditions so that draught and stability can be controlled. It is not confined to port use.
✗
Question 28. A paint locker shall be located behind:
Your Answer: (Not answered)
Correct Answer: B (A class divisions, with independent ventilation and extinguishing arrangements)
💡 SOLAS II-2/9 requires paint lockers to be bounded by A class divisions with independent ventilation and extinguishing.
✗
Question 29. During anchoring in an anchorage, what is the basic watchkeeping requirement?
Your Answer: (Not answered)
Correct Answer: A (A continuous watch should be kept, monitoring the position and dragging risk, weather and surrounding traffic and keeping engines and steering available)
💡 During anchoring a continuous watch should be kept, monitoring the position, anchor chain loading and the risk of dragging, changes in tide, wind and current and surrounding traffic, with the engines, steering and communications available at all times. If dragging occurs the master should be informed promptly and measures taken.
✗
Question 30. Which of the following is expressly required on a dangerous goods document?
Your Answer: (Not answered)
Correct Answer: D (The UN number and packing group)
💡 SOLAS VII/4 requires the proper shipping name, class, UN number and packing group.
✗
Question 31. An escape route in the engine room is found permanently blocked by stores. The finding is?
Your Answer: (Not answered)
Correct Answer: C (Escape routes must be kept clear; blockage seriously affects emergency evacuation, a serious deficiency)
💡 A machinery space should have two escape routes as widely separated as practicable, always available. A blocked escape route endangers the evacuation of engine room personnel in a fire or other emergency. It is a serious deficiency affecting personnel safety and the obstruction should be removed at once.
✗
Question 32. What shall be done if radio equipment fails?
Your Answer: (Not answered)
Correct Answer: D (Repair it as soon as practicable and report as required)
💡 It shall be repaired as soon as practicable and reported as required.
✗
Question 33. What is the principle of assessing stability from the rolling period at sea?
Your Answer: (Not answered)
Correct Answer: D (The rolling period corresponds to the initial metacentric height: a shorter period means excessive stability and a longer one may mean insufficient stability)
💡 The rolling period varies inversely with the square root of the initial metacentric height. A clearly shorter period indicates increased stability from cargo settling or flooding, while a markedly longer period may indicate reduced stability from cargo shifting upwards or flooding. It is a useful aid to judging changes in stability at sea.
✗
Question 34. The voyage plan shall include:
Your Answer: (Not answered)
Correct Answer: A (a berth-to-berth plan giving due consideration to navigational hazards including safe speed)
💡 SOLAS V/34: the voyage plan covers the whole passage from berth to berth, giving due consideration to navigational hazards and safe speed.
✗
Question 35. How often must the radio reserve source of energy (batteries) be tested?
Your Answer: (Not answered)
Correct Answer: C (Weekly)
💡 SOLAS IV/13 and the associated performance standards require the reserve batteries to be checked and tested weekly to confirm capacity and condition of connections.
✗
Question 36. What is required for the identification of valves in the bilge system?
Your Answer: (Not answered)
Correct Answer: B (Clear identification of function and direction of operation to prevent misoperation)
💡 SOLAS and good practice require valves in the bilge, ballast and fire systems to be clearly and durably identified as to function and direction of operation, so that in an emergency, particularly in poor visibility or under pressure, the crew does not open or close the wrong valve.
✗
Question 37. During a PSC inspection the lifeboat engine is started and fails several times in a row. The finding is?
Your Answer: (Not answered)
Correct Answer: B (The lifeboat cannot be used reliably, a serious deficiency that may lead to detention)
💡 A lifeboat engine should start reliably at any time, being essential for manoeuvring and clearing the casualty after abandonment. Repeated failure shows the lifeboat cannot be reliably put into use, a deficiency seriously affecting life-saving capability that may normally lead to detention.
✗
Question 38. What should be done about items not covered by life-saving appliance inspections?
Your Answer: (Not answered)
Correct Answer: B (Explain the reason and give them priority in subsequent inspections; they must not be left unchecked for long)
💡 Life-saving appliances left uninspected for a long period require the reason to be established, such as an omission or a change of personnel, and the inspection to be scheduled as a priority, with the records reflecting the actual condition. Long neglect leaves their condition unknown and they may be unusable in an emergency.
✗
Question 39. What does SOLAS address regarding zoning of fire detection systems?
Your Answer: (Not answered)
Correct Answer: C (The system must identify the section in which the alarm originated, enabling the fire to be located quickly)
💡 SOLAS requires fixed fire detection systems to be arranged in sections so that the alarm indicates the section or space in which it originated, enabling the watchkeeper to confirm the actual location and act quickly.
✗
Question 40. A VHF radio installation shall maintain a continuous watch on:
Your Answer: (Not answered)
Correct Answer: A (channel 16)
💡 SOLAS IV/7: a VHF installation shall maintain a continuous watch on channel 16 and, where required, on channel 70.
✗
Question 41. The securing of cargo units such as containers shall be carried out in accordance with:
Your Answer: (Not answered)
Correct Answer: A (the approved Cargo Securing Manual)
💡 SOLAS VI/5 requires securing of cargo units in accordance with the approved Cargo Securing Manual.
✗
Question 42. Which statement about cooperation with a marine casualty investigation is correct?
Your Answer: (Not answered)
Correct Answer: C (Provide information truthfully, preserve the scene and evidence and cooperate, without falsifying or concealing)
💡 In a marine casualty investigation the ship should provide information truthfully, preserve the scene and evidence such as VDR data, the official log book, bell and engine movement records and pollution samples, and cooperate. Falsifying, concealing or destroying evidence is a serious violation with legal consequences.
✗
Question 43. A rate-of-turn indicator shall be fitted on ships of:
Your Answer: (Not answered)
Correct Answer: D (100 000 GT and above)
💡 SOLAS V/19: a rate-of-turn indicator shall be fitted on ships of 100 000 GT and above.
✗
Question 44. What is the most important preparation by the master for a PSC or SIRE inspection?
Your Answer: (Not answered)
Correct Answer: D (Ensuring the crew is familiar with the equipment and that records and the actual condition are genuine and complete)
💡 Preparation should focus on the true condition: operable equipment, genuine and complete records and a crew familiar with their duties. Filling in records at short notice or coaching answers will not survive an in-depth inspection and may amount to falsification.
✗
Question 45. If the Inmarsat equipment fails while a ship is in sea area A3, what alternative does SOLAS permit?
Your Answer: (Not answered)
Correct Answer: A (Using MF/HF equipment to meet the distress and safety communication requirements)
💡 Where the primary satellite equipment fails, the ship must use MF/HF to maintain distress and safety communication in sea area A3. Reliance on another ship or on repair is not acceptable.
✗
Question 46. What does the ISM Code require regarding training of personnel on board?
Your Answer: (Not answered)
Correct Answer: C (Crew must be trained and have the knowledge and skills needed for their duties, with records kept)
💡 ISM Code 6 requires the company to establish training procedures ensuring that personnel are trained and have the knowledge and skills needed for their duties, with records kept. Training must be completed before taking up duties, not afterwards.
✗
Question 47. What is the maximum length of a fire hose for use on the open deck?
Your Answer: (Not answered)
Correct Answer: B (20 m)
💡 On the open deck and in accommodation spaces the hose shall not exceed 20 m.
✗
Question 48. Which MF frequency is used for DSC distress alerting?
Your Answer: (Not answered)
Correct Answer: A (2187.5 kHz)
💡 The MF DSC distress frequency is 2187.5 kHz. 2182 kHz is the MF radiotelephony distress frequency and 2174.5 kHz is used for NBDP distress traffic.
✗
Question 49. What factors must be considered in preparing a solid bulk cargo loading plan?
Your Answer: (Not answered)
Correct Answer: B (Hull strength and stability limits, the weight per hold and the loading sequence, and the properties of the cargo)
💡 The IMSBC Code and SOLAS require the loading plan to take account of hull strength and stability limits, the maximum weight per hold and restrictions on adjacent holds, the sequence of loading and discharging and the properties of the cargo, such as density and moisture content, with the approved sequence followed.
✗
Question 50. What is the purpose of a compass corrector on board?
Your Answer: (Not answered)
Correct Answer: C (Eliminating residual deviation of the magnetic compass)
💡 A compass corrector compensates for residual deviation caused by the ship's magnetic field.
✗
Question 51. The quantity of extinguishing medium stored for a fixed gas fire-extinguishing system shall be sufficient for:
Your Answer: (Not answered)
Correct Answer: B (the volume of the largest protected space)
💡 SOLAS II-2/10 requires the stored quantity of medium to be sufficient for the largest protected space.
✗
Question 52. What type of electrical equipment shall be used in spaces where flammable gases may occur?
Your Answer: (Not answered)
Correct Answer: B (Explosion-proof or approved types)
💡 Explosion-proof or otherwise approved types shall be used.
✗
Question 53. What is the purpose of the automatic closing and hold-back release arrangements of fire doors?
Your Answer: (Not answered)
Correct Answer: D (To enable the doors to be held open for passage in normal service and to close automatically on a fire alarm to maintain the fire division)
💡 Under SOLAS II-2/9 fire doors required to be self-closing should be fitted with automatic closing arrangements and, where necessary, hold-back release arrangements that release the door on detection of a fire. The door may be held open in normal service for passage and ventilation and closes automatically on a fire alarm to maintain the fire division. The arrangements should be tested regularly.
✗
Question 54. What manning of key positions is required?
Your Answer: (Not answered)
Correct Answer: D (The master and key positions must be manned in accordance with the minimum safe manning requirements, with substitutes arranged)
💡 A ship should carry the master and personnel for key positions such as chief officer, chief engineer and watchkeeping officers and engineers in accordance with the minimum safe manning document, with substitutes arranged for key positions. Reducing manning without authority or falling below the minimum leaves the ship non-compliant and affects emergency capability.
✗
Question 55. What must the enclosed space entry testing record contain under SOLAS?
Your Answer: (Not answered)
Correct Answer: D (The date, location, parameters tested and results, and the issue of the permit)
💡 SOLAS and the IMO resolutions require records of enclosed space entry testing and permits, including the date, the space, the parameters tested — oxygen, toxic and flammable gases — the results and the permit issued, for traceability and inspection.
✗
Question 56. What do SOLAS and the related rules emphasise for position fixing in ice or polar waters?
Your Answer: (Not answered)
Correct Answer: A (Cross-check by several means, since compass and position fixing equipment may be affected by magnetic variation and signal conditions in polar regions)
💡 Magnetic variation is large in polar regions and satellite signals may be affected by ionospheric conditions. SOLAS and good seamanship require the position and heading to be cross-checked by several means, avoiding the risk from a single equipment error.
✗
Question 57. The ship shall carry for dangerous goods:
Your Answer: (Not answered)
Correct Answer: A (a list or manifest giving the name, class and location of the goods)
💡 SOLAS VII/5 requires a special list or manifest giving the name, class and location of the dangerous goods.
✗
Question 58. What shall the Ship Security Plan contain?
Your Answer: (Not answered)
Correct Answer: B (Security organisation, duties, measures and training)
💡 Security organisation, duties, protective measures and training.
✗
Question 59. What communication is required during liquid bulk cargo operations?
Your Answer: (Not answered)
Correct Answer: A (Clear communication between ship and shore with an agreed emergency stop, confirmed before the operation begins)
💡 SOLAS and industry guidance require clear communication to be established with the terminal before liquid cargo operations, by VHF or dedicated means, with an agreed emergency stop signal, keeping communication open throughout so that operations can be stopped at once if anything abnormal occurs.
✗
Question 60. What does SOLAS address regarding stability when carrying timber deck cargo?
Your Answer: (Not answered)
Correct Answer: B (The increase in weight from water absorbed by the timber and ice accretion must be included, with the prescribed stability criteria applied)
💡 SOLAS and the Load Line Convention prescribe stability requirements for ships carrying timber deck cargo, requiring account to be taken of the weight gained from water absorbed, ice accretion and increased windage, assessed against the prescribed criteria, failing which capsize may occur.
✗
Question 61. What identification is required for fire main isolation valves?
Your Answer: (Not answered)
Correct Answer: A (Clear marking of their position and direction of operation, enabling prompt and correct action in a fire)
💡 SOLAS requires fire main isolation valves to be clearly marked as to position and direction of operation, so that in an emergency the crew can find them quickly and correctly isolate the section affected. Missing or wrong marking delays firefighting.
✗
Question 62. What does SOLAS address regarding surface materials on bulkheads in accommodation spaces?
Your Answer: (Not answered)
Correct Answer: A (They must restrict flame spread and meet the prescribed requirements for non-combustibility and low flame spread)
💡 SOLAS II-2 prescribes requirements for non-combustibility and low flame spread for the surfaces of bulkheads, ceilings and linings, preventing rapid spread of flame over surfaces. The materials must be approved.
✗
Question 63. When must the Polar Water Operational Manual be updated?
Your Answer: (Not answered)
Correct Answer: A (On major changes to the ship or its equipment and on updates to the relevant requirements of the Polar Code)
💡 The Polar Code requires the PWOM to be revised on major changes to the ship, its equipment or its operations, and when the relevant requirements are updated, keeping it consistent with the actual situation. Operating from an out-of-date manual creates risk.
✗
Question 64. What does SOLAS address regarding life-saving appliances when trading in cold climates?
Your Answer: (Not answered)
Correct Answer: C (The effect of low temperature on equipment performance and on survival must be considered, with insulating and warming provisions)
💡 SOLAS requires ships trading in cold climates to take account of the effect of low temperature on life-saving appliances, such as reduced battery capacity, difficulty in starting engines and changed equipment performance, and on survival, such as the risk of hypothermia, providing immersion suits, thermal protective aids and corresponding emergency supplies.
✗
Question 65. A valve on the fire main has seized because it has not been operated for a long time. What is the finding?
Your Answer: (Not answered)
Correct Answer: A (A deficiency; valves must remain operable, and a seized valve prevents water reaching the required area)
💡 A fire main valve left unoperated seizes, so that in a fire it cannot be opened or changed over and water cannot reach the space concerned. Valves should be operated and lubricated periodically; a seized valve is a deficiency affecting safety.
✗
Question 66. What checking of the firefighting equipment list against the ship is required?
Your Answer: (Not answered)
Correct Answer: D (Periodically verify the list against what is actually on board, replacing anything missing and updating records)
💡 The ISM Code and SOLAS require periodic verification of the firefighting equipment list against what is actually on board, including extinguishers, firefighter's outfits, hoses and fittings, with anything missing, damaged or expired made good and the records updated, preventing a shortfall from being discovered only at an inspection.
✗
Question 67. An extinguisher's gauge needle is in the red zone. What should be done?
Your Answer: (Not answered)
Correct Answer: B (Establish the cause and recharge or replace it; an under-pressured extinguisher cannot discharge effectively)
💡 A needle in the red zone means internal pressure is too low, perhaps through leakage or use, so the extinguisher may discharge weakly or not at all. It must be recharged or replaced at once; recharging by the crew is not permitted.
✗
Question 68. What do SOLAS and the related standards require for the pressure containers of a fixed CO2 system?
Your Answer: (Not answered)
Correct Answer: B (Containers must be tested with capacity, charge and test date marked, and checked periodically)
💡 SOLAS and the pressure vessel standards require CO2 cylinders to be tested and clearly marked with charge and test date, and to be checked periodically for weight and pressure, since slow leakage leaves less agent than required.
✗
Question 69. What must be satisfied before dangerous goods packages are loaded on board?
Your Answer: (Not answered)
Correct Answer: C (Packages must be of a tested and certified type, in good condition, and correctly marked and labelled)
💡 SOLAS VII and the IMDG Code require packages of a tested type in good condition, correctly marked with the proper shipping name, UN number and hazard labels. All elements are required.
✗
Question 70. What communication is required for key shipboard operations?
Your Answer: (Not answered)
Correct Answer: D (Operations involving several parties must have a designated person in charge, maintained communication and confirmation of key steps)
💡 The ISM Code requires key operations involving several persons or departments, such as cargo work, ballasting, bunkering and hot work, to have a designated person in charge, a communication arrangement including a briefing before starting and confirmation of the key steps, preventing accidents or pollution from a failure of communication.
✗
Question 71. What language does SOLAS require for life-saving appliance markings?
Your Answer: (Not answered)
Correct Answer: C (The working language of the ship or English, with operating illustrations)
💡 SOLAS requires markings and instructions on life-saving appliances to be in the working language of the ship or in English, with illustrations, so that seafarers of different nationalities can understand them.
✗
Question 72. Which fixed system is normally provided for oil fires in machinery spaces?
Your Answer: (Not answered)
Correct Answer: A (A fixed high expansion foam, low pressure CO2 or equivalent system)
💡 SOLAS requires a fixed extinguishing system in category A machinery spaces, normally fixed high expansion foam, low pressure CO2 or an equivalent system. Portable extinguishers are not a substitute.
✗
Question 73. What securing is required for vehicles carried as ro-ro cargo?
Your Answer: (Not answered)
Correct Answer: A (Secure using the lashings or chains specified in the securing manual, confirming brake and gear status)
💡 SOLAS and the CSS Code require ro-ro cargo to be secured with the lashing straps, chains or dedicated devices specified in the securing manual, with the vehicle confirmed braked and in a suitable gear and its fuel and battery condition acceptable, preventing movement and collision during the voyage.
✗
Question 74. Where shall the emergency generator and its fuel supply be located?
Your Answer: (Not answered)
Correct Answer: B (In a position not readily affected by main engine failure or fire)
💡 It must be sited away from the main engine and fire risk, with an independent fuel supply.
✗
Question 75. Galleys within accommodation spaces shall generally be bounded by:
Your Answer: (Not answered)
Correct Answer: D (A class or B class divisions)
💡 SOLAS II-2/9 requires galleys and other high-fire-risk spaces to be bounded by A or B class divisions.
✗
Question 76. What records are required for ballast water operations?
Your Answer: (Not answered)
Correct Answer: A (Record the time, tanks, quantity and purpose, enabling stability to be checked and the ballast water management requirements to be met)
💡 Ballast water operations should be recorded with the time, tanks and quantity, enabling the ship's stability and draught condition to be verified, meeting the record requirements of the ballast water management convention and allowing the operations to be traced if something abnormal occurs. Missing records hamper investigation and compliance checks.
✗
Question 77. What is the purpose of isolation valves on the fire main required by SOLAS?
Your Answer: (Not answered)
Correct Answer: B (To isolate a damaged section so the rest of the main can continue to supply water)
💡 SOLAS requires isolation valves on the fire main so that if a section, for example in the machinery space, is damaged, it can be isolated while the remainder still supplies the hydrants, preserving at least part of the firefighting capability.
✗
Question 78. The double-side-skin requirement for new bulk carriers does not apply to every bulk carrier. What triggers it?
Your Answer: (Not answered)
Correct Answer: B (new bulk carriers of 150 metres in length and upwards, of single skin construction, intended to carry solid bulk cargo of a density of 1000 kg per cubic metre or greater)
💡 The line is drawn by length and cargo density: new bulk carriers of 150 metres in length and upwards, of single skin construction and intended for solid bulk cargo of a density of 1000 kg per cubic metre or greater, must have double side spaces, so that a breach in the side leaves reserve buoyancy and slows flooding. Carriers of lighter grain and ships under that length fall outside the regulation while still meeting other stability and structural requirements.
✗
Question 79. A shipment of dangerous goods is offered without a proper shipping name. What should the master do?
Your Answer: (Not answered)
Correct Answer: D (Require the proper shipping name, UN number and other information, refusing to load if it is incomplete)
💡 SOLAS VII and the IMDG Code require dangerous goods to be declared under the proper shipping name with the UN number, class and packing group. An incomplete declaration or a general description such as chemicals would leave the crew unable to identify the hazards. The master should require full information, or refuse to load.
✗
Question 80. What do SOLAS and good practice address regarding the inspection of the propulsion shafting?
Your Answer: (Not answered)
Correct Answer: A (Periodic inspection of the tail shaft, intermediate shaft and bearings for wear, sealing and alignment)
💡 SOLAS and the classification societies require periodic inspection of the propulsion shafting for stern tube sealing, bearing wear and alignment, detecting abnormalities that could cause oil leakage, vibration or shaft failure with loss of propulsion.
✗
Question 81. Which statement about the use of weather routeing is correct?
Your Answer: (Not answered)
Correct Answer: D (The route should be chosen taking account of weather forecasts and the ship's condition, avoiding severe weather and monitoring the passage plan)
💡 Weather routeing should combine professional weather forecasts with the ship's condition, such as stability, cargo and draught, to choose a relatively safe route avoiding typhoons, heavy seas and severe weather, monitoring and adjusting the plan during the voyage. It is an aid, the final navigational decision being the master's responsibility.
✗
Question 82. The purpose of a NAVTEX receiver is to:
Your Answer: (Not answered)
Correct Answer: D (automatically receive and print maritime safety information such as navigational and weather warnings)
💡 SOLAS IV/7: a NAVTEX receiver automatically receives and prints maritime safety information such as navigational and weather warnings.
✗
Question 83. A PSCO checked the chart updating of ECDIS. What does SOLAS require?
Your Answer: (Not answered)
Correct Answer: D (Electronic charts must be kept up to date and consistent with the ENCs in use)
💡 SOLAS requires the electronic charts used in ECDIS to be kept corrected to the latest state and consistent with the ENCs in use. Late updating means missing recent navigational warnings and increases the risk of grounding, a common deficiency.
✗
Question 84. Radio antennas shall be so installed that they can operate:
Your Answer: (Not answered)
Correct Answer: A (under all weather conditions with adequate protection)
💡 SOLAS IV/13 requires radio antennas to operate under all weather conditions with adequate protection.
✗
Question 85. What is required for stowage and securing of containers?
Your Answer: (Not answered)
Correct Answer: B (Load according to the approved securing plan and stowage plan, securing tier by tier with attention to weight distribution and the order of lashing)
💡 SOLAS and the CSS Code require containers to be loaded in accordance with the approved securing plan and stowage plan, lashed tier by tier with attention to weight distribution, heavier boxes below and avoiding uneven loading, and to the order of lashing, with weights and conditions verified, preventing stack collapse or loss overboard.
✗
Question 86. What does SOLAS address regarding the number of breathing apparatus?
Your Answer: (Not answered)
Correct Answer: B (Sufficient spare cylinders must be provided alongside the outfits, allowing extended use or a change while inside)
💡 SOLAS requires sufficient spare cylinders in addition to those with the firefighter's outfits, particularly on tankers, enabling rescuers to extend their working time inside or to supply a person being rescued. One cylinder per outfit would not meet the actual need.
✗
Question 87. Partially enclosed and fully enclosed lifeboats must have a capacity of at least:
Your Answer: (Not answered)
Correct Answer: D (All persons on board)
💡 SOLAS III/27: such lifeboats shall have a capacity for all persons on board and shall not be overloaded.
✗
Question 88. What loading limitation must be observed when a bulk carrier loads high density cargo?
Your Answer: (Not answered)
Correct Answer: D (Limits on the maximum weight in each hold and on differences between adjacent holds, preventing excessive local stresses)
💡 Concentrated high density cargo overstresses the tank top and double bottom. SOLAS and the IMSBC Code require limits on the maximum weight per hold and on differences between adjacent holds to be observed. Limiting deadweight alone does not protect the structure.
✗
Question 89. The fire main pressure gauge shows an abnormally low pressure. What is the concern?
Your Answer: (Not answered)
Correct Answer: C (It may indicate reduced pump performance, leakage or a valve not properly opened and the cause should be established)
💡 Abnormally low pressure in the fire main may result from reduced fire pump performance, leakage in the piping or valves, a valve not correctly opened or a problem on the suction side. It would mean insufficient pressure at the jets in a fire, so the cause should be established and dealt with at once, as this is a deficiency that may affect firefighting capability.
✗
Question 90. The garbage record book is found to disagree with the actual garbage categories and quantities and some discharge records are missing. The finding is?
Your Answer: (Not answered)
Correct Answer: B (False records make garbage management untraceable, a pollution prevention record deficiency)
💡 The garbage record book should truthfully record the category, quantity, means of disposal and time and place, being proof of compliance in garbage management. False or missing records make management untraceable. It is a pollution prevention record deficiency to be corrected and may lead to detention or penalty in serious cases.
✗
Question 91. For a cargo ship with a double bottom, the minimum height of the inner bottom above the top of the keel at midships shall be:
Your Answer: (Not answered)
Correct Answer: D (B/20 or 2 m, whichever is less)
💡 SOLAS II-1/6: the double bottom height shall be not less than B/20 and in no case less than 760 mm; in machinery spaces it may be reduced to B/20 or 2 m, whichever is less.
✗
Question 92. Which of the following is NOT among the statutory certificates normally obtained by a cargo ship after the relevant surveys?
Your Answer: (Not answered)
Correct Answer: B (The International Ship Security Certificate, which is issued under the ISPS Code and Chapter XI-2)
💡 SOLAS I/7 lists the Cargo Ship Safety Construction Certificate, Safety Equipment Certificate and Safety Radio Certificate. The ISSC is issued under Chapter XI-2 and the ISPS Code and is not one of the three listed in I/7.
✗
Question 93. What does SOLAS address regarding ventilation of paint and flammable liquid lockers?
Your Answer: (Not answered)
Correct Answer: C (Independent mechanical ventilation capable of effectively removing flammable vapour)
💡 SOLAS requires paint and flammable liquid lockers to have independent mechanical ventilation effectively removing flammable vapour, preventing accumulation and ignition. Sharing ventilation with accommodation would carry toxic vapour into the living spaces.
✗
Question 94. What safety requirements apply to steam systems?
Your Answer: (Not answered)
Correct Answer: A (Insulation and marking of piping and valves, with safety valves and drains, preventing burns and overpressure)
💡 SOLAS and good practice require steam piping to be insulated and marked for temperature and steam valves and fittings to have safety valves and drains, preventing burns, overpressure and water hammer damage. Steam systems are hazardous and must be operated strictly under the procedure.
✗
Question 95. The steering gear suddenly loses power while running. What alarm does SOLAS II-1/29 require?
Your Answer: (Not answered)
Correct Answer: D (An audible and visual alarm on the bridge on failure of the steering gear power unit)
💡 SOLAS II-1/29 requires an audible and visual alarm on the bridge when a steering gear power unit fails, so that the officer can immediately take emergency steering action.
✗
Question 96. What is the usual validity of the Cargo Ship Safety Equipment Certificate?
Your Answer: (Not answered)
Correct Answer: B (Not more than 5 years)
💡 Not more than 5 years, subject to annual and intermediate surveys.
✗
Question 97. A door in an escape route is found locked. What should be done?
Your Answer: (Not answered)
Correct Answer: C (Unlock it at once; doors in escape routes must be openable from inside without a key)
💡 A locked door in an escape route prevents evacuation in an emergency. SOLAS requires such doors to be openable from inside without a key. Security concerns should be met by other means such as an alarm, not by obstructing escape.
✗
Question 98. How does a non-conformity differ from an accident under the system?
Your Answer: (Not answered)
Correct Answer: D (a non-conformity being a state in which a requirement is not met, an accident an event that has caused injury, loss or pollution, and both, with near misses, to be reported and looked into)
💡 The non-conformity says a requirement has not been met: an entry missing from the record book, a drill or a course not done as planned, a survey overdue, the procedure on paper and another way on board, an observation from the last audit left unclosed. None of these has yet harmed anyone and all of them call for correction. The accident is named by what it did - injury, loss or pollution has in fact happened. Both are to be reported, looked into for cause and corrected, and the inquiry is meant to end at the management system rather than at the statement that a man handled it badly, which is also why the hazardous occurrence is listed by itself: the close run that did no harm is precisely the accident that has not yet happened. Downgrading whatever did no damage to a non-conformity, or holding that a departure in how work is done is not one either, takes the edge off the statistics and leaves the review with nothing to decide on.
✗
Question 99. How often must each crew member participate in abandon ship and fire drills under SOLAS?
Your Answer: (Not answered)
Correct Answer: D (At least once a month for each of abandon ship and fire drills)
💡 SOLAS III/19 requires each crew member to take part in an abandon ship drill and a fire drill at least once a month. If a drill is not held in a month it must be held within 24 hours afterwards, with the matter recorded in the log.
✗
Question 100. What is the main characteristic of a "bulk carrier" as defined in SOLAS XII/1?
Your Answer: (Not answered)
Correct Answer: D (A ship generally having a single deck, top side tanks and hopper side tanks, intended primarily to carry dry cargo in bulk)
💡 SOLAS XII/1 defines a bulk carrier as a ship generally with a single deck, top side tanks and hopper side tanks, intended primarily to carry dry cargo in bulk. Not every ship carrying bulk cargo falls within the definition.