Question 69. Class, statutory and system surveys: how are they arranged without wearing the ship out?
Your Answer:
(Not answered)
Correct Answer:
D (plan them together, combine what can be combined - less time off work, nothing missed)
💡 The three cover a great deal of the same ground: one compartment, one set of thickness measurements, one lot of safety appliances, one engine test may be a class item and a statutory item at once. Bringing them into one window - one entry, one trial, both signatures - saves off-hire and cost and keeps the records from contradicting each other, since two wastage figures for the same plate, one for the society and one for the flag, is exactly what cannot be explained after an accident. The condition is planning ahead: the company and the ship list every item falling due in the plan year, agree the order and what may be combined with the survey authorities, and have documents, tests and people ready in time. Combining is no reason to stretch one item's expiry, and separate visits are no reason to drop the shared work.