Question 1. What does ISM Chapter 1 (General) mainly provide?
Your Answer: (Not answered)
Correct Answer: A (definitions, objectives, scope and certification link)
💡 Chapter 1 sets purpose, SMS definition, ship scope and the DOC/SMC certification link.
✗
Question 2. What determines the towing speed?
Your Answer: (Not answered)
Correct Answer: B (agreed by both from towline strength, sea state and the towed ship's condition)
💡 Speed is agreed from line and gear strength, sea state and tow stability with a safety margin.
✗
Question 3. A company has just been formed or a ship newly taken over. How are certificates issued first?
Your Answer: (Not answered)
Correct Answer: C (an interim document of compliance for up to twelve months, on which an interim safety management certificate for up to six months can be issued)
💡 The transition is covered by two interim certificates: a company not yet initially verified may take an interim document of compliance for up to twelve months, and on that the ship may be issued an interim safety management certificate for up to six months, normally on delivery of a new ship, on a change of flag or when a company first takes over a ship. With them the trading starts while the system is built. Neither is a short version of the real thing: the verification has to be completed before expiry to earn the full-term certificate, and to let them lapse is to trade without certificates. Who issues them, on what conditions and against what evidence is set out in the code, and the ship's certificate has one name only.
✗
Question 4. How long should crew change documents and records be kept?
Your Answer: (Not answered)
Correct Answer: C (kept for the period set by company and law for inspection and disputes)
💡 Crew change records are evidence for inspection and disputes; keep them for the required period and retrievable.
✗
Question 5. What should the pre-operation meeting between ship and shore cover?
Your Answer: (Not answered)
Correct Answer: C (the plan, stop conditions, communications and emergency roles)
💡 The meeting fixes plan, stop criteria, communications and emergency roles so both share one understanding.
✗
Question 6. During bunkering, the barge figures differ markedly from the ship's; what applies?
Your Answer: (Not answered)
Correct Answer: A (suspend, recheck jointly and note a reservation on the document)
💡 Suspend and recheck, note the reservation and if needed refuse or sample for testing, never sign by default.
✗
Question 7. What is the risk when the master signs external documents?
Your Answer: (Not answered)
Correct Answer: D (he may assume personal legal obligations and liability)
💡 When signing bills, receipts or statements, verify truth and consequences; improper signing carries personal legal risk.
✗
Question 8. When should a Declaration of Security (DoS) be signed?
Your Answer: (Not answered)
Correct Answer: A (when ship/port requirements differ, entering high-threat ports, or on request)
💡 A DoS clarifies the security responsibility interface when levels differ or risk is high.
✗
Question 9. The interface between the SMS and the Ship Security Plan (SSP)?
Your Answer: (Not answered)
Correct Answer: C (security events reported, drilled and logged like safety)
💡 Security levels, events and drills are logged and reported through the SMS like safety items.
✗
Question 10. What makes the hand-over of the navigational watch complete?
Your Answer: (Not answered)
Correct Answer: C (the relieving officer being on the bridge and having himself grasped the position, the traffic and the orders)
💡 It begins with the relieving officer being on the bridge and fit to take it: if the master or the officer handing over doubts his fitness the watch is not passed and the master is told, and until it is properly accepted the officer on watch does not leave. What passes is not only what the ship is doing but what she is standing in - the position and how it was got, the course and the speed, the draughts and the ballast, weather and sea, the traffic about her and what has already been done about it, the state of the aids and the communications with any known defect, the errors of the compasses, the track to be kept and the cautions for this watch, the master's and the engineer's orders, and any work running. This is said where the relieving man can see the instruments and the chart, not through a cabin door. If he is not satisfied he asks before he takes it, and if need be the other keeps the watch a little longer; handing a watch to somebody who has not got the picture starts the risk counting again from that minute.
✗
Question 11. Finding badly corroded lifeboat falls, you should?
Your Answer: (Not answered)
Correct Answer: D (stop using that boat, arrange renewal and report the company)
💡 Corroded falls compromise strength; take the boat out of use, arrange renewal and track closure with the company.
✗
Question 12. How are improvement results locked in?
Your Answer: (Not answered)
Correct Answer: B (revise SMS documents, add to training and checklists and keep monitoring)
💡 Write into procedures, train and checklists and keep monitoring, or gains fade with crew turnover and time.
✗
Question 13. How should AIS be handled when transiting a high risk area?
Your Answer: (Not answered)
Correct Answer: C (decide visibility per company risk assessment and naval guidance)
💡 Decide AIS on the company risk assessment and naval advice; blind switching off forfeits friendly identification.
✗
Question 14. The SMS lesson from enclosed-space poisoning deaths is?
Your Answer: (Not answered)
Correct Answer: A (missing permit, testing or stand-by is fatal)
💡 Enclosed-space tragedies repeat because permit systems are hollow.
✗
Question 15. The Company training system should cover?
Your Answer: (Not answered)
Correct Answer: A (induction, transfer, new equipment, emergency and refresher)
💡 Training spans the whole career; new gear and emergencies need specifics.
✗
Question 16. What is NOT covered by document control?
Your Answer: (Not answered)
Correct Answer: C (restricting verbal communication among crew)
💡 Document control governs documents, not normal working communication; it covers versions, revision and distribution.
✗
Question 17. If verification finds falsified energy data, the consequence is?
Your Answer: (Not answered)
Correct Answer: C (a major system non-conformity with possible penalties and certificate consequences)
💡 Falsified data undermines compliance: a major non-conformity with penalties, certificate impact and reputational damage.
✗
Question 18. If the Company or charterer demands an unsafe act, the master should?
Your Answer: (Not answered)
Correct Answer: D (refuse and follow safe judgement, reporting to the DPA if needed)
💡 The master's safety judgement overrides commercial orders; refusal is authorised.
✗
Question 19. When regulations or Company procedures change, the SMS documents should?
Your Answer: (Not answered)
Correct Answer: A (be reviewed and revised promptly, ships notified, version record updated)
💡 Change is closed-loop: review, revise, distribute, train, obsolete the old version.
✗
Question 20. Forced to anchor in dense fog; what applies?
Your Answer: (Not answered)
Correct Answer: B (sound fog signals, keep anchor watch and radar watch and inform VTS)
💡 At anchor in fog sound the signals, keep radar and visual watch and inform VTS to prevent collision.
✗
Question 21. What does a "questioning attitude" in communication mean?
Your Answer: (Not answered)
Correct Answer: D (stay sceptical of anomalies, verify instead of blind compliance)
💡 A questioning attitude invites crew to verify anomalies and leaders to welcome questions as a safety barrier.
✗
Question 22. Discovering the chart lacks recent danger notices while at sea; you should?
Your Answer: (Not answered)
Correct Answer: D (check the latest notices, mark the danger and amend the route to avoid it)
💡 Uncorrected danger data invalidates the route; check current notices, mark the chart and divert if needed.
✗
Question 23. What does a hazardous situation mean in the system?
Your Answer: (Not answered)
Correct Answer: A (both the event that has done damage and the one that has not but could have)
💡 The definition covers both ends: an event that has caused damage to the ship, to persons or to the environment, and an event that created a hazard or could have caused such consequences. The second end carries no loss yet shows where the system is open, and it is reported, analysed and acted on in the same way. Reading a hazardous situation as only the one where nothing happened, or only the one where something did, loses half of it; equating it with the riskier routine operations confuses the job with the event. The system asks for this information through the reporting channel because it is a chance to improve earlier than a casualty would have given it.
✗
Question 24. Finding unauthorised persons on board while in port, you should?
Your Answer: (Not answered)
Correct Answer: D (detain and identify, report to master and shore, act per the plan)
💡 Control their movement, identify them, report to master, company and port security, then hand over with records.
✗
Question 25. The inspection focus for fire divisions (Class A/B) is?
Your Answer: (Not answered)
Correct Answer: B (fire integrity, self-closing devices and sealing of penetrations)
💡 Verify divisions are intact, doors self-close and penetrations are fire-stopped; breaches void the fire zone.
✗
Question 26. After the general alarm sounds, crew should?
Your Answer: (Not answered)
Correct Answer: D (muster at assigned stations per the muster list and await orders)
💡 On the alarm all muster with lifejackets per the list, be counted and await orders instead of improvising.
✗
Question 27. When a surveyor lists outstanding items, you should?
Your Answer: (Not answered)
Correct Answer: C (agree deadlines and owners, complete them and request confirmation before expiry)
💡 Log owners and deadlines, complete and request confirmation; overdue items can affect the certificate's validity.
✗
Question 28. During bunkering a leak is found in the hose; what applies?
Your Answer: (Not answered)
Correct Answer: B (stop work, close valves and contain the leak)
💡 Stop pumping, close valves and contain; resume only with a sound hose to prevent a larger spill.
✗
Question 29. ENC data updating should be?
Your Answer: (Not answered)
Correct Answer: C (update regularly via the official service and verify all applied)
💡 Apply official ENC updates routinely and verify completeness; outdated data must not be relied on for navigation.
✗
Question 30. The first management priority for survival at sea in a boat or raft?
Your Answer: (Not answered)
Correct Answer: B (ration water and food, shade from sun and wind, maintain morale)
💡 Ration water strictly, provide shade, keep warm and dry, set watches and routines, and sustain morale.
✗
Question 31. Why compare the gyro and magnetic compasses?
Your Answer: (Not answered)
Correct Answer: D (detect gyro error or failure early, preventing wrong heading information)
💡 Regular comparison reveals gyro drift or failure and checks magnetic deviation, keeping heading data trustworthy.
✗
Question 32. Audit finds crew unfamiliar with muster stations and no records exist. The most likely root cause is?
Your Answer: (Not answered)
Correct Answer: A (monthly drills and familiarization not effectively implemented)
💡 Unfamiliarity without records means drills and familiarization skipped or were formal—a training-system failure.
✗
Question 33. How should the master handle the survey report afterwards?
Your Answer: (Not answered)
Correct Answer: B (file it, transfer findings into the system list and send it to the company)
💡 The report feeds the SMS: file it, log findings for tracking and send it to the company for resources and verification.
✗
Question 34. The key protection for hot work environments on board is?
Your Answer: (Not answered)
Correct Answer: C (hydration, cooling, job rotation and monitoring condition)
💡 Provide water and electrolytes, shorten shifts, improve ventilation and watch for heat exhaustion signs.
✗
Question 35. The company orders on-time arrival but a severe typhoon is forecast ahead. What should the master do?
Your Answer: (Not answered)
Correct Answer: C (divert or heave to by safety judgement, reporting the rationale)
💡 The master's safety authority is final: take avoiding action and report with reasons; the company cannot compel risk.
✗
Question 36. "External documents" aboard (conventions, rules, circulars) should be?
Your Answer: (Not answered)
Correct Answer: B (identified, kept current and on a controlled list, avoiding outdated versions)
💡 External documents must be controlled and current; outdated ones mislead operations.
✗
Question 37. What should NOT appear in emergency drill records?
Your Answer: (Not answered)
Correct Answer: D (fabricated results or uniformly perfect times unlike reality)
💡 Records must be truthful with flaws and variations; fabrication hides problems and is easily detected in audit.
✗
Question 38. The ISM Code was adopted by IMO Assembly resolution A.741(18) and later made mandatory through SOLAS chapter IX. State the year of that resolution and the date by which it became fully mandatory for cargo ships of 500 gross tonnage and upwards on international voyages.
Your Answer: (Not answered)
Correct Answer: A (adopted in 1993; fully mandatory for cargo ships by 1 July 1998)
💡 Resolution A.741(18) was adopted by the 18th Assembly on 4 November 1993; the "(18)" is the assembly session, not the year 1994. SOLAS chapter IX entered into force on 1 July 1998, with phase-in for other cargo ships of 500 GT and upwards completing by 1 July 2002.
✗
Question 39. How does the ISM Code relate to pollution prevention?
Your Answer: (Not answered)
Correct Answer: A (pollution prevention is one of its objectives, embedded in operations and emergencies)
💡 ISM lists pollution prevention as an objective and integrates it into operations and emergency preparedness (e.g. SOPEP).
✗
Question 40. Main types of cover in a ship's insurance programme are?
Your Answer: (Not answered)
Correct Answer: A (hull, P&I liability, war risk and charterers' covers)
💡 Typical programmes include hull and machinery, P&I, war and strikes plus charter-required additions.
✗
Question 41. When port reception facilities are inadequate, what applies?
Your Answer: (Not answered)
Correct Answer: A (report the inadequacy and keep evidence; never discharge as a result)
💡 Report to port or flag with evidence and store properly; inadequate facilities never justify illegal discharge.
✗
Question 42. What is the value of the master walking around the ship?
Your Answer: (Not answered)
Correct Answer: B (find hazards, learn the real situation and build communication with crew)
💡 Walking around reveals issues reports miss and encourages crew to speak up, an effective leadership method.
✗
Question 43. The SMS response when a ship is arrested is?
Your Answer: (Not answered)
Correct Answer: D (notify company and club at once, cooperate and protect those aboard)
💡 Report at once so the club arranges security and lawyers while shipboard order, manning and watches continue.
✗
Question 44. Before a safety management system can be established and maintained, what must the company first produce?
Your Answer: (Not answered)
Correct Answer: C (the safety and environmental protection policy)
💡 The policy is the leading document of the system: signed at the highest level, stating safety and environmental objectives and giving the framework from which responsibilities, procedures and instructions are derived. Trading plans, pay scales and cargo codes sit below it and cannot stand in its place.
✗
Question 45. The purpose of a critical equipment list is?
Your Answer: (Not answered)
Correct Answer: D (identify priorities so resources prevent failures that cause casualties)
💡 Critical items are those whose failure endangers safety or the environment; prioritise care, spares and monitoring.
✗
Question 46. The key to man-overboard response is?
Your Answer: (Not answered)
Correct Answer: C (early detect, early alarm, never lose sight, early rescue coordination)
💡 MOB's golden window is short; sight and early alarm decide survival.
✗
Question 47. The normal validity of DOC and SMC is?
Your Answer: (Not answered)
Correct Answer: A (both not exceeding 5 years)
💡 Both DOC and SMC are valid for not more than 5 years, maintained by intermediate and renewal audits.
✗
Question 48. What makes the shipboard oil pollution emergency plan acceptable?
Your Answer: (Not answered)
Correct Answer: B (approved by the administration, always at hand on board, containing the reporting procedure and the steps to be taken, and exercised as planned)
💡 The plan is not a shore document: it is approved by the administration, must come to hand at once on board, and its content covers at least the procedure for reporting as circumstances require (to whom, what, and when to follow up), the first measures to control and reduce a discharge on board, the action and contact list needed to work with the coastal State, and the arrangement for training and drills. It has to fit this ship - her cargo, her tank arrangement, her piping - since a generic text will not match the valves and tank names when it matters. Readiness and drilling are one thing: each post named in the plan must have been exercised, each number proved to answer a call recently, and an out-of-date issue does not count at an inspection. The duty bites by tonnage: oil tankers of 150 gross tons and above and other ships of 400 gross tons and above.
✗
Question 49. The correct follow-up when equipment defects surface during a drill is?
Your Answer: (Not answered)
Correct Answer: D (record, repair request, add to PMS and verify serviceability)
💡 Drill findings must be logged, repaired, tracked in PMS and verified serviceable.
✗
Question 50. The significance of ergonomics on board is?
Your Answer: (Not answered)
Correct Answer: A (reduce musculoskeletal injury and operating error from poor design)
💡 Good layout, reach and lighting cut fatigue and error, serving both injury prevention and safety.
✗
Question 51. What is the standard for judging document effectiveness?
Your Answer: (Not answered)
Correct Answer: A (whether crews can follow it and achieve the intended result)
💡 Effectiveness means crews can follow it and get the intended result: workable, verifiable and effective.
✗
Question 52. On an observation found in audit, the proper action is?
Your Answer: (Not answered)
Correct Answer: D (record and monitor to prevent escalation)
💡 Observations are early warnings; monitoring prevents escalation.
✗
Question 53. By object, SMS audits may include?
Your Answer: (Not answered)
Correct Answer: A (system, procedure and activity (on-site ops) audits)
💡 Three layers—system, procedure, activity—cover write-do-record.
✗
Question 54. The master finds a crew member drinking while on duty; he should?
Your Answer: (Not answered)
Correct Answer: A (relieve him at once, act per discipline and record and report)
💡 Drinking on duty is grave: relieve him, apply the alcohol policy, record it and assess fitness to continue.
✗
Question 55. The role of emergency lighting and backup power is?
Your Answer: (Not answered)
Correct Answer: A (maintain lighting and comms or steering in key spaces when main power fails)
💡 After blackout they keep escape routes, muster stations, bridge and comms working—basic for regaining control.
✗
Question 56. How do condition monitoring and planned maintenance relate?
Your Answer: (Not answered)
Correct Answer: A (condition monitoring refines intervals; they complement rather than replace each other)
💡 Planned maintenance sets intervals and monitoring adjusts them from actual condition; together they raise reliability and cut waste.
✗
Question 57. What does ISM Chapter 9 (Reports and Analysis of Non-conformities, Accidents) stipulate?
Your Answer: (Not answered)
Correct Answer: C (SMS ensures reporting, investigation, analysis and corrective improvement)
💡 Chapter 9 requires reporting and analysis of NCs, accidents and hazardous occurrences for improvement.
✗
Question 58. How are certificates handled when a ship reflags?
Your Answer: (Not answered)
Correct Answer: A (reissued by the new flag Administration or its authorised body)
💡 New flag issues fresh certificates after survey; old ones lapse and SMS documents and markings must be updated.
✗
Question 59. The strongest expression of shore-side safety commitment is?
Your Answer: (Not answered)
Correct Answer: A (prioritize safety over cost when they conflict and deliver resources)
💡 Commitment shows when safety beats schedule and cost, backed by real resources rather than slogans.
✗
Question 60. The ship becomes fouled by fishing nets at sea; what applies?
Your Answer: (Not answered)
Correct Answer: B (stop to assess, report and take measures to clear it, avoiding blind manoeuvring)
💡 Blind manoeuvring worsens fouling and damages shafting; stop, assess, report and clear it safely.
✗
Question 61. The correct way to correct a logbook error is?
Your Answer: (Not answered)
Correct Answer: A (strike through with initials and note, keeping original legible, no overwrite)
💡 Overwriting suggests tampering; proper correction keeps the trace.
✗
Question 62. Cargo handling under the SMS requires?
Your Answer: (Not answered)
Correct Answer: C (an approved cargo plan and watch arrangement with a clear chain of command)
💡 Cargo ops need plan, watch and command chain to prevent loss and casualties.
✗
Question 63. Valuing near misses matters because?
Your Answer: (Not answered)
Correct Answer: C (they are unrealised accidents, exposing SMS gaps early)
💡 Near misses are free warnings; reporting prevents accidents before they happen.
✗
Question 64. Which ships must carry the oil pollution emergency plan?
Your Answer: (Not answered)
Correct Answer: A (oil tankers of 150 gross tonnage and upwards, other ships of 400 gross tonnage and upwards)
💡 Under Annex I an oil tanker of 150 gross tonnage and upwards and any other ship of 400 gross tonnage and upwards must have the plan on board, controlled as part of the safety management system - the copy that matters is the one that can be picked up at once, not the one held ashore. Its reporting procedures, contacts, equipment and the standing of who does what have to agree with the ship as she is, and are drilled, with what the drill exposes going back into the document. It must also join up with the pollution cover and the reporting demands of the coastal state, or in a real spill it is only read aloud.
✗
Question 65. How do the internal audit and the management review differ?
Your Answer: (Not answered)
Correct Answer: D (the internal audit checks whether the system is being followed; the top level judges, at the review, whether the system still works)
💡 The internal audit is carried out by the company's own people, or on its behalf, against ships and shore departments on a plan, and answers whether what the system requires is being done and done effectively; findings are raised as non-conformities and followed to correction. The management review is held by the company's top management, takes in audit results, casualties and near-misses, complaints, target performance and the measures from the last review, and outputs decisions on improvement, resources and revisions to policy and targets. The certifier's visit is an external verification for the documents and is not an internal audit; a review that only re-reads the paperwork, with no owner and no date, skips both exercises.
✗
Question 66. The master's safety attitude affects the crew by?
Your Answer: (Not answered)
Correct Answer: A (leading by example; the master sets the safety-culture tone)
💡 The master sets the safety-culture tone; conduct shapes compliance.
✗
Question 67. When a seafarer must be repatriated as medically unfit, the master should?
Your Answer: (Not answered)
Correct Answer: A (obtain medical advice, report the company and arrange treatment and repatriation)
💡 Medical unfitness needs medical advice; report, arrange treatment and repatriation and keep medical and cost records.
✗
Question 68. To enable effective crew performance onboard, the Company must provide?
Your Answer: (Not answered)
Correct Answer: C (adequate shore resources (info, spares, experts, training))
💡 Rules 4/6: the Company provides shore resources via the DPA to support crew performance.
✗
Question 69. The terminal pushes for faster discharge making moorings too tight; you should?
Your Answer: (Not answered)
Correct Answer: B (adjust line tension and tell the terminal, pausing the speed-up if needed)
💡 Changed rates alter position and tension; adjust, inform the terminal and pause if lines become over-strained.
✗
Question 70. Which is NOT a main hazard of heavy weather?
Your Answer: (Not answered)
Correct Answer: C (following seas giving fully reliable steering)
💡 Heavy seas threaten deck, cargo, engine and structure; in following seas steering may degrade, demanding care.
✗
Question 71. On a suspected infectious case aboard, the SMS should?
Your Answer: (Not answered)
Correct Answer: A (isolate, protect, report port health authority, follow guidance)
💡 Infection control needs isolation and reporting to stop spread in enclosed spaces.
✗
Question 72. ISM Chapter 12 requires the Company to conduct periodic?
Your Answer: (Not answered)
Correct Answer: A (internal audits verifying the SMS is effectively implemented afloat and ashore)
💡 Chapter 12 requires an internal audit mechanism to periodically check SMS operation.
✗
Question 73. A common technique in root cause analysis is?
Your Answer: (Not answered)
Correct Answer: A (repeatedly asking why until a manageable cause is reached)
💡 Techniques like the five whys drill down to causes the organisation controls and can change, not surface or personal blame.
✗
Question 74. After finding an SMS non-conformity, the Company shall?
Your Answer: (Not answered)
Correct Answer: B (investigate, root-cause analyse, correct and verify effectiveness)
💡 Rule 9: address NCs by investigation, root-cause analysis, corrective/preventive action and verified closure.
✗
Question 75. The towline parts while towing - what is done first?
Your Answer: (Not answered)
Correct Answer: B (alert both vessels, hold their positions, then weigh reconnection against anchoring or another way of keeping position)
💡 When the towline parts, the two ships stop constraining each other at once: the tug swings and the tow drifts on wind and current, which becomes a dangerous situation within minutes if a shoal, a bridge pier or traffic is near. The first step is therefore to warn both vessels, plus nearby shipping and the shore station where needed, hold position and use the tug's own engines and rudder to control the relationship between the two ships. Only then comes the judgement on reconnection - spare line, coming round to lead a new towline, or an alternative such as anchoring or a temporary line. Reporting to the company is required but sits behind holding position.
✗
Question 76. What is the basic rule for discharging oily mixtures in a special area?
Your Answer: (Not answered)
Correct Answer: D (prohibited in principle, with a narrow exception for treated low concentrations while underway)
💡 Special areas are far stricter: discharge is prohibited except under narrow conditions while underway and must be logged.
✗
Question 77. What distinguishes a special operation from a critical one?
Your Answer: (Not answered)
Correct Answer: A (an error shows no consequence at the moment; the harm accumulates out of sight)
💡 Both kinds have to be written up; they differ in when the consequence arrives. In a critical operation - anchoring and mooring, port entry and departure, bunkering, cargo lashing, enclosed-space entry - a mistake does its damage at once. In a special operation - structure and corrosion maintenance, spare gear and repairs, training and familiarisation, periodic testing of equipment - the ship keeps running and the cargo keeps flowing, and the fault shows up months later as a crack, wastage or a failure on demand. Because the result is not immediate, this is the work most likely to be squeezed, deferred and back-dated, which is exactly why the system asks for a plan, an owner, records and verification by the master and the shore, not repair after the fact.
✗
Question 78. What should the SMS do before statutory certificates expire?
Your Answer: (Not answered)
Correct Answer: A (maintain an expiry register and schedule surveys early to avoid gaps)
💡 The SMS keeps an expiry register and books surveys early so certificates never lapse.
✗
Question 79. "Human element" in an SMS investigation typically includes?
Your Answer: (Not answered)
Correct Answer: B (fatigue, inadequate training, ambiguous procedures, communication failure, poor supervision, etc.)
💡 The human element spans individual condition, competence, procedure design and organisational oversight.
✗
Question 80. How should non-conformities of ship and equipment be handled?
Your Answer: (Not answered)
Correct Answer: C (report, find root cause, correct and verify effectiveness before closure)
💡 Equipment non-conformities also follow report, root cause, correction and verified closure; repair alone does not stop recurrence.
✗
Question 81. In a major emergency, who leads external coordination (SAR, agent, authority)?
Your Answer: (Not answered)
Correct Answer: C (DPA/Company crisis team leads, master executes and reports)
💡 External coordination needs shore resources; master executes and feeds back.
✗
Question 82. A crew member finds a defect that does not immediately affect navigation. He should?
Your Answer: (Not answered)
Correct Answer: D (report it under the SMS and enter the corrective process, assessing if deferred repair is acceptable)
💡 Any defect must be reported and risk-assessed; controlled deferred repair is allowed with approval and monitoring.
✗
Question 83. The master's absolute safety power also means?
Your Answer: (Not answered)
Correct Answer: B (ultimate responsibility for safety/pollution, power matched by accountability)
💡 Power and accountability are matched; the master decides and owns the outcome.
✗
Question 84. During bunkering the supplier figures differ markedly from the ship's; you should?
Your Answer: (Not answered)
Correct Answer: C (pause and reconcile, retain samples and report to the company)
💡 Reconcile on the spot, seal joint samples, note reservations on documents and inform the company.
✗
Question 85. What share of casualty root causes does the human element account for?
Your Answer: (Not answered)
Correct Answer: B (the majority - in over about 80 per cent of casualties human error or a management weakness is present)
💡 The figure shifts with the statistic quoted, but the finding is stable: in most marine casualties one finds a failure of communication, fatigue, a wrong judgement, or a gap in the management system, with pure mechanical breakdown accounting for a small part. The value of the saying is not in memorising a percentage but in where the investigation is then aimed - if responsibility lands on the one man on watch, is punished and the file closed, the next watch on the same passage does the same thing. Hence the system treats the human element, training, fatigue management and reporting culture as separate subjects.
✗
Question 86. The voyage plan should be kept on board and?
Your Answer: (Not answered)
Correct Answer: C (accessible, familiar, amended with master sign-off)
💡 Keep it accessible, ensure familiarity, and amend with master's confirmation.
✗
Question 87. A supercargo embarked should follow which rule?
Your Answer: (Not answered)
Correct Answer: A (obey the master and ship's safety rules without interfering in navigation)
💡 Supercargo follow ship rules and safety briefings and must not interfere with navigation or cargo safety decisions.
✗
Question 88. The most important content of a post-drill debrief is?
Your Answer: (Not answered)
Correct Answer: C (review timeline, expose gaps and assign fixes with deadlines)
💡 A debrief reviews response, pinpoints gaps, assigns owners and deadlines to close the loop.
✗
Question 89. What is the value of trend analysis of technical condition?
Your Answer: (Not answered)
Correct Answer: D (detect deterioration early and arrange preventive action)
💡 Trend analysis spots drift and deterioration before failure, turning maintenance from reactive to proactive.
✗
Question 90. Which of these is NOT a shore-side safety department's job?
Your Answer: (Not answered)
Correct Answer: C (decide the avoidance and the handling for the master from the office)
💡 The shore side supports, resources and supervises: manning, training, spares, documents and money reaching the ship, audits organised and corrections followed, emergency back-up and outside liaison when something happens. Conning the ship and the judgement on the spot are the master's - the rules and the system both state his absolute authority to override. Deciding an avoidance from an office knows nothing of the local picture and tangles the liability afterwards. What the shore may properly do is set limits and raise flags, as in a weather routing discussion, not give the helm orders.
✗
Question 91. The principle when maintenance conflicts with the voyage schedule is?
Your Answer: (Not answered)
Correct Answer: B (safety-related maintenance takes priority; adjust schedule or call if needed)
💡 Safety and pollution maintenance cannot be dropped for schedule; if it conflicts, the company adjusts the voyage.
✗
Question 92. When ship and port security levels differ, the ship should?
Your Answer: (Not answered)
Correct Answer: B (apply the higher level and sign a DoS to clarify duties)
💡 Apply the stricter level and clarify via DoS—the interface rule.
✗
Question 93. What is a reasonable frequency for oil spill drills?
Your Answer: (Not answered)
Correct Answer: D (carried out periodically within the maximum interval set by the system)
💡 The system fixes a maximum interval and must comply so crews know duties and equipment before an incident.
✗
Question 94. The significance of auditor independence is?
Your Answer: (Not answered)
Correct Answer: B (avoid self-audit and ensure objective judgement)
💡 Auditors must not audit their own work; use external or cross-department staff to keep findings honest.
✗
Question 95. The purpose of a citadel when transiting high risk areas?
Your Answer: (Not answered)
Correct Answer: C (a place for crew to retreat with comms while awaiting outside rescue)
💡 The citadel is concealed and hardened with water and comms, letting crew shelter and call for outside help.
✗
Question 96. What is required for meetings and handovers in a common language?
Your Answer: (Not answered)
Correct Answer: D (use the common language for key content and allow confirmation questions)
💡 Key content must use the common language with questions encouraged; dialects and side-talk lock information away.
✗
Question 97. On merger or taking over ships, the SMS should?
Your Answer: (Not answered)
Correct Answer: C (assess gaps, integrate and re-verify applicability, not just apply)
💡 Post-merger SMS gaps need assessment and integration, avoiding fragmentation.
✗
Question 98. In an SMS audit, the most accurate definition of a "non-conformity" is?
Your Answer: (Not answered)
Correct Answer: A (objective evidence that a requirement is not fulfilled)
💡 A non-conformity requires objective evidence that a specified requirement has not been met; a mere subjective impression does not qualify.
✗
Question 99. The basic principle in communicating with families is?
Your Answer: (Not answered)
Correct Answer: D (timely, empathetic and truthful updates with support, avoiding an information vacuum)
💡 Update families promptly and honestly with dedicated support; silence breeds speculation and reputational damage.
✗
Question 100. A relief not familiar with the procedure taking over a critical op is a?
Your Answer: (Not answered)
Correct Answer: C (operational-control defect risking misuse)