Exam Home Website
中文 English
0
/100
FAIL
Correct: 0/100 Total Questions: 100 Time Spent: 60min0sec
Passing: 80
Retake History
Answer Review
✗
Question 1. A sign of Company SMS maturity is?
Your Answer: (Not answered)
Correct Answer: C (moving from passive compliance to proactive risk management)
💡 Mature systems treat safety as a strength, not a burden.
✗
Question 2. A management company operates a 420 GT dry-cargo ship, flagged of convenience and trading continuously on international voyages. Which statement about the scope of the ISM Code is correct?
Your Answer: (Not answered)
Correct Answer: B (Does not apply — for cargo ships the ISM threshold is 500 gross tonnage and upwards, and this ship is below it)
💡 On the cargo-ship side the threshold is 500 gross tonnage and upwards (plus passenger ships and mobile offshore drilling units). The 400 GT figure belongs to other instruments and is a frequent source of confusion; the measure is gross tonnage, not deadweight.
✗
Question 3. The basis for judging substantial corrosion in a gauging report is?
Your Answer: (Not answered)
Correct Answer: A (wastage percentage against original thickness beyond the allowed limit)
💡 It is the percentage loss against original thickness versus allowable limits; excessive items must be renewed.
✗
Question 4. The correct handling of an accidental SSAS activation is?
Your Answer: (Not answered)
Correct Answer: B (inform the alerted party to cancel and notify the company and authorities)
💡 Clarify the false alert to the recipient immediately, notify the company and log it to avoid a needless response.
✗
Question 5. The basic concept of general average is?
Your Answer: (Not answered)
Correct Answer: B (extraordinary sacrifice or expense for common safety shared by beneficiaries)
💡 Deliberate sacrifice such as jettison for common safety is shared across ship, cargo and freight interests.
✗
Question 6. Why is a cargo pump room kept under continuous mechanical ventilation with a level alarm on its bilge well?
Your Answer: (Not answered)
Correct Answer: D (ventilation keeping gas below a dangerous concentration, the level alarm catching a leaking seal or water ingress)
💡 A pump room is an enclosed space in which shaft seals, flanges and gauge lines will leak a little, so gas accumulates unless air is changed, which is why ventilation runs through cargo operations at the required number of changes. The level alarm on the bilge well is there to speak up early when a seal leaks or oil or water finds its way in, giving the watch a chance to act before the room floods and more flammable liquid gathers. To read either as cooling for the pumps, as room to work in, or as a matter of discharge rate puts their purpose elsewhere. Entry remains subject to the enclosed space procedure, testing the atmosphere and the permit.
✗
Question 7. When the master has safety concerns about voyage instructions, he should?
Your Answer: (Not answered)
Correct Answer: D (raise the concern for company review while retaining final authority)
💡 The master raises concerns; the company assesses or amends. The master's final safety authority stands.
✗
Question 8. Physical measures to prevent small-boat boarding include?
Your Answer: (Not answered)
Correct Answer: C (razor fencing, water hoses, ballast trim and deck lighting)
💡 Barriers plus active deterrent raise boarding difficulty—BMP core.
✗
Question 9. What does the inspection window mean?
Your Answer: (Not answered)
Correct Answer: A (the interval between periodic inspections, shorter for higher risk ships)
💡 It is the period for periodic inspection; high-risk ships have shorter windows and are flagged if overdue.
✗
Question 10. Consequences when crew are unfamiliar with emergency stations in PSC?
Your Answer: (Not answered)
Correct Answer: C (signals failed training/drills, possible detention and NC)
💡 Unfamiliar crew reveal failed training/drills; PSC may detain and raise an SMS non-conformity.
✗
Question 11. The interval for top management's review of the SMS is?
Your Answer: (Not answered)
Correct Answer: C (at least every 12 months)
💡 Rule 12.6: top management must review the SMS at intervals not exceeding 12 months.
✗
Question 12. What is the value of medical drills on board?
Your Answer: (Not answered)
Correct Answer: D (familiarising crews with procedures, equipment locations and roles to shorten response)
💡 Drills familiarise crews with stretcher handling, equipment and roles, markedly cutting response time in real events.
✗
Question 13. Whether a crew member may work independently is ultimately judged by?
Your Answer: (Not answered)
Correct Answer: C (SMS-assessed competence and familiarisation, not the certificate alone)
💡 A certificate is a threshold; independent duty needs assessed competence.
✗
Question 14. After a spill near-miss, the SMS's fundamental action is?
Your Answer: (Not answered)
Correct Answer: A (root-cause analysis and improve procedures/training to prevent recurrence)
💡 A near miss is an improvement chance; closed-loop fix lowers recurrence.
✗
Question 15. Quality control of contracted maintenance should be?
Your Answer: (Not answered)
Correct Answer: D (set standards, supervise the work and accept on completion)
💡 Outsourcing does not transfer duty: specify standards, supervise key steps and accept strictly.
✗
Question 16. The value of sharing lessons learned is?
Your Answer: (Not answered)
Correct Answer: D (prevent recurrence of similar incidents across the fleet)
💡 Sharing structured lessons lets ships that never had the event benefit—cheap prevention of recurrence.
✗
Question 17. How to cope with interference from background lights?
Your Answer: (Not answered)
Correct Answer: D (adjust lookout position and radar gain, identify shore lights against the chart)
💡 Avoid glare, tune radar, and identify shore lights on the chart so they are not mistaken for ship's lights.
✗
Question 18. ISM Chapter 7 "shipboard operations" requires the Company to establish?
Your Answer: (Not answered)
Correct Answer: A (safe procedures and guidance (with checklists) for all operations)
💡 Chapter 7 turns safety into executable procedures and guidance—core to implementation.
✗
Question 19. The concept of residual risk is?
Your Answer: (Not answered)
Correct Answer: D (the risk that remains after controls are applied)
💡 Residual risk remains after controls; judge acceptability and brief those exposed so nobody assumes zero risk.
✗
Question 20. Company communication with crew about an incident should?
Your Answer: (Not answered)
Correct Answer: B (transparent, timely with follow-up actions to maintain trust)
💡 Brief the crew transparently on developments and safeguards to prevent rumours and preserve trust.
✗
Question 21. If a court or investigator requests the ship's logs, what applies?
Your Answer: (Not answered)
Correct Answer: C (provide originals or certified copies under legal process with a receipt)
💡 Follow legal process, provide originals or certified copies with a receipt; deletion or alteration is a fresh offence.
✗
Question 22. The precondition for using shore power is?
Your Answer: (Not answered)
Correct Answer: B (compatible interface, adequate capacity and a proper changeover procedure)
💡 Confirm voltage, frequency, interface and capacity, then connect and disconnect by procedure for a safe changeover.
✗
Question 23. Fire precautions for battery and charging rooms include?
Your Answer: (Not answered)
Correct Answer: A (well ventilated, no smoking, prevent hydrogen accumulation)
💡 Charging releases hydrogen, so ventilate mechanically, use explosion-proof fittings and avoid sparking tools.
✗
Question 24. In a river a strong cross-current sets the ship towards a bridge pier; you should?
Your Answer: (Not answered)
Correct Answer: B (correct with engines and rudder early, anchor if needed and notify VTS)
💡 Counter with rudder and engine early, anchor if necessary and alert VTS and the bridge watch to avoid impact.
✗
Question 25. The particular risk of timber deck cargo is?
Your Answer: (Not answered)
Correct Answer: A (absorbing water and sliding, harming stability and visibility)
💡 Wet timber adds weight high up, slides in seas and threatens stability and visibility; stow and lash per rules.
✗
Question 26. When should an oil tanker emergency shutdown be triggered?
Your Answer: (Not answered)
Correct Answer: D (leak, fire, overpressure or lost communications)
💡 Trigger ESD on leaks, fire, overpressure or lost communications—safety over schedule.
✗
Question 27. The interface duty of the Port Facility Security Officer (PFSO) is?
Your Answer: (Not answered)
Correct Answer: D (coordinate with ship SSO, sign declarations and advise levels)
💡 PFSO coordinates access control, segregation and level information with the ship, signing DoS when required.
✗
Question 28. With multiple false radar echoes confusing the picture, what should you do?
Your Answer: (Not answered)
Correct Answer: C (adjust gain and clutter, change range and increase visual lookout)
💡 Improve the picture via gain, clutter and range changes, add lookouts and call the master if needed.
✗
Question 29. The ISM Code was adopted by IMO Assembly resolution A.741(18) and later made mandatory through SOLAS chapter IX. State the year of that resolution and the date by which it became fully mandatory for cargo ships of 500 gross tonnage and upwards on international voyages.
Your Answer: (Not answered)
Correct Answer: A (adopted in 1993; fully mandatory for cargo ships by 1 July 1998)
💡 Resolution A.741(18) was adopted by the 18th Assembly on 4 November 1993; the "(18)" is the assembly session, not the year 1994. SOLAS chapter IX entered into force on 1 July 1998, with phase-in for other cargo ships of 500 GT and upwards completing by 1 July 2002.
✗
Question 30. Preparation before an annual survey should include?
Your Answer: (Not answered)
Correct Answer: C (organise records, pre-check key items and arrange support staff)
💡 Prepare certificates and records, self-check firefighting, lifesaving and openings, gather reports and assign escorts.
✗
Question 31. What is the purpose of the requisition and approval process?
Your Answer: (Not answered)
Correct Answer: C (control cost, prevent waste and ensure necessary supply)
💡 Requisition and approval secure supply while controlling cost and stock, avoiding waste and costly urgent airfreight.
✗
Question 32. Emergency contact lists within SOPEP/SSP should be?
Your Answer: (Not answered)
Correct Answer: C (kept current, reachable 24 hours with primary and backup channels)
💡 Verify regularly, ensure round-the-clock reachability and list authorities, company, agents, club and SAR contacts.
✗
Question 33. What is the value of pilot reports and incident records?
Your Answer: (Not answered)
Correct Answer: B (objective basis for analysis, apportionment and improvement)
💡 Pilot records reconstruct operations objectively and support analysis and improvement; keep them and feed them into the system.
✗
Question 34. Backup requirements for electronic SMS documents are?
Your Answer: (Not answered)
Correct Answer: C (back up periodically, available offline and restore-tested)
💡 Back up regularly with offline access and test restoration, or failure still leaves documents unusable.
✗
Question 35. How many functional requirements (elements) does ISM Section 1 set out for the SMS?
Your Answer: (Not answered)
Correct Answer: C (13)
💡 ISM Section 1.2 lists 13 functional requirements covering policy, responsibility, resources, operations, emergencies, non-conformity, audits and certificates.
✗
Question 36. What is the key requirement of fuel consumption reporting schemes?
Your Answer: (Not answered)
Correct Answer: B (data that is true, complete, verifiable and submitted on time)
💡 Carbon data is compliance data: measure reliably, keep evidence, and never estimate or back-fill.
✗
Question 37. Detention for a major SMS non-conformity affects the Company by?
Your Answer: (Not answered)
Correct Answer: A (harms reputation, insurance, charter; triggers DOC review)
💡 SMS detention signals serious failure, hitting business and certificates.
✗
Question 38. The Company may delegate tasks, but it cannot delegate?
Your Answer: (Not answered)
Correct Answer: A (its ultimate responsibility for safety and pollution prevention)
💡 Duties may be delegated, but ultimate accountability stays with the Company.
✗
Question 39. The "ship-shore interface" documents should clarify?
Your Answer: (Not answered)
Correct Answer: D (the division of duties in emergency response and major-event reporting)
💡 The ship-shore interface (emergency contact, decision chain) must be documented to avoid confusion.
✗
Question 40. The purpose of a technical bulletin is?
Your Answer: (Not answered)
Correct Answer: D (inform the fleet of equipment failures, fixes and operational cautions)
💡 Bulletins spread one ship's failure and fix to sister ships quickly, preventing repeats across the fleet.
✗
Question 41. What must be confirmed before unberthing?
Your Answer: (Not answered)
Correct Answer: B (all lines clear, area clear and plan agreed with pilot and tugs)
💡 Verify lines are clear, side is clear, steering responsive and signals agreed to avoid fouling and contact.
✗
Question 42. What is the correct handling of electrical equipment after damp ingress?
Your Answer: (Not answered)
Correct Answer: C (isolate, dry it out and confirm insulation before use)
💡 Dry and megger-test before returning to service; energising damp equipment causes short circuits or breakdown.
✗
Question 43. On multinational crews, the key to unambiguous orders is?
Your Answer: (Not answered)
Correct Answer: B (a defined common working language with read-back confirmation)
💡 A common language plus read-back prevents mis-hearing—basic BRM/SMS.
✗
Question 44. A new crew member still unaware of alarms/duties after a week is a?
Your Answer: (Not answered)
Correct Answer: A (familiarisation non-conformity, breaching ISM Chapter 6)
💡 Chapter 6 requires competence and familiarisation; ignorance hurts safety directly.
✗
Question 45. What is a reasonable frequency for oil spill drills?
Your Answer: (Not answered)
Correct Answer: D (carried out periodically within the maximum interval set by the system)
💡 The system fixes a maximum interval and must comply so crews know duties and equipment before an incident.
✗
Question 46. Before loading a heavy lift you should?
Your Answer: (Not answered)
Correct Answer: D (check stability and strength, confirm lifting capacity and plan)
💡 Assess hull strength, gear SWL, resulting GM/draught and approve a written plan first.
✗
Question 47. In heavy weather the master should prioritise?
Your Answer: (Not answered)
Correct Answer: B (crew safety and hull integrity before schedule or cargo damage)
💡 The order is people and ship first, then cargo and schedule; reversing it multiplies risk.
✗
Question 48. What is the standard for judging document effectiveness?
Your Answer: (Not answered)
Correct Answer: A (whether crews can follow it and achieve the intended result)
💡 Effectiveness means crews can follow it and get the intended result: workable, verifiable and effective.
✗
Question 49. In a narrow channel another ship signals for you to go first. What does the master do?
Your Answer: (Not answered)
Correct Answer: B (judge it under the rules - his signal does not shift the duty that is yours)
💡 Another ship's sound signal, light or radio message states an intention or gives agreement; it does not make the judgement the rules ask of you. Inside a narrow channel the obligations to keep to the starboard side, not to impede passage and to obtain agreement before overtaking still stand on their own terms. Whether taking precedence is safe depends on your draught against the available water, engine and rudder response, the distance at which you would meet and the visibility; if going first means emerging off a bend or into a crowd, refuse and say why, briefly and in language that can be repeated back. A pilot on board shifts nothing - his advice neither alters the rules' demands on the ship nor takes the master's final authority.
✗
Question 50. At anchor at night another vessel with no anchor lights is closing; you should?
Your Answer: (Not answered)
Correct Answer: B (strengthen lookout, alert by light or VHF and prepare engines to avoid)
💡 A closing vessel showing no lights is a danger; alert by light or VHF, look out harder and ready engines.
✗
Question 51. What does ISM Chapter 2 (Safety and Environmental Protection Policy) require?
Your Answer: (Not answered)
Correct Answer: B (the company states a written policy implemented ashore and afloat)
💡 Chapter 2 demands a written commitment implemented at all levels ashore and aboard.
✗
Question 52. To prevent unauthorised boarding, the ship should implement?
Your Answer: (Not answered)
Correct Answer: C (identity check, escort, register and surveillance of boarders)
💡 Boarding control is the first line: verify, register, escort, surveil.
✗
Question 53. An abnormal rise in spare consumption usually indicates?
Your Answer: (Not answered)
Correct Answer: A (an unresolved root fault or poor maintenance)
💡 Abnormal use points to root faults or weak maintenance; do root cause analysis instead of just restocking.
✗
Question 54. What should the pilot information exchange cover?
Your Answer: (Not answered)
Correct Answer: A (manoeuvring characteristics, equipment state, draught and berthing plan)
💡 Exchange covers handling, equipment, draught and the berthing plan so pilot and bridge share one picture.
✗
Question 55. In PSC, if emergency equipment is found failed or drills never held, the ship may be?
Your Answer: (Not answered)
Correct Answer: A (issued non-conformities or detained)
💡 Failed preparedness is a major ISM non-conformity; PSC may detain until corrected.
✗
Question 56. How the Company ensures crew competence is?
Your Answer: (Not answered)
Correct Answer: D (check certificates, assess ability, train and periodically confirm)
💡 Certificates are a threshold; assessment and training sustain competence.
✗
Question 57. If the Company or charterer demands an unsafe act, the master should?
Your Answer: (Not answered)
Correct Answer: D (refuse and follow safe judgement, reporting to the DPA if needed)
💡 The master's safety judgement overrides commercial orders; refusal is authorised.
✗
Question 58. Cargo shifts during the voyage; the first measure is?
Your Answer: (Not answered)
Correct Answer: B (alter course and speed to reduce rolling, secure the cargo and assess stability)
💡 Reduce rolling and assess stability first, then secure or ballast; opening hatches or holding speed worsens it.
✗
Question 59. Sailing Directions are mainly used for?
Your Answer: (Not answered)
Correct Answer: B (give textual descriptions of conditions, port rules and navigational advice)
💡 They detail geography, hydrography, weather, port rules and anchorages for planning and pilotage decisions.
✗
Question 60. What does the system require for stowage and securing of stores?
Your Answer: (Not answered)
Correct Answer: A (sorted and secured stowage preventing movement or falling, with access kept clear)
💡 Sort and secure stores and keep passages and escape routes clear to prevent injury or blocked escape.
✗
Question 61. The cycle of continuous improvement in the SMS is?
Your Answer: (Not answered)
Correct Answer: A (plan, do, check, act (PDCA) cycling repeatedly)
💡 The SMS follows PDCA: plan targets, implement with records, check via audit, then improve continuously.
✗
Question 62. The basic requirements for report content are?
Your Answer: (Not answered)
Correct Answer: B (truthful, complete, timely, verifiable and recorded)
💡 Reports must be factual, complete, timely and logged; false or late reporting aggravates consequences.
✗
Question 63. Key points in designing a ship self-check list are?
Your Answer: (Not answered)
Correct Answer: A (items specific and judgeable, covering high-risk areas and easy to run)
💡 Target this ship's high-risk items with clear criteria that are quick to apply, avoiding vague ticks everyone passes.
✗
Question 64. What is required for energy isolation before maintenance?
Your Answer: (Not answered)
Correct Answer: B (isolate, tag and lock out and verify zero energy before work)
💡 Apply lock-out tag-out and verify zero energy to prevent inadvertent energising or starting and personal injury.
✗
Question 65. Beset by pack ice, the correct response is?
Your Answer: (Not answered)
Correct Answer: A (keep engines and steering usable, report and await change or request icebreaker assistance)
💡 Keep engines and steering ready, report, watch the ice and request icebreaker help rather than ramming.
✗
Question 66. A fuel oil mist leak is found in the engine room; what applies?
Your Answer: (Not answered)
Correct Answer: D (slow down and stop, remove ignition sources and find the leak)
💡 A fuel mist easily forms an explosive mixture; stop the equipment, remove ignition and locate and stop the leak.
✗
Question 67. High crew turnover affects the SMS by?
Your Answer: (Not answered)
Correct Answer: D (raising unfamiliarity risk, needing stronger handover and training)
💡 Turnover fluctuates familiarity; the SMS counters with handover and training.
✗
Question 68. "Human element" in an SMS investigation typically includes?
Your Answer: (Not answered)
Correct Answer: B (fatigue, inadequate training, ambiguous procedures, communication failure, poor supervision, etc.)
💡 The human element spans individual condition, competence, procedure design and organisational oversight.
✗
Question 69. What is the main system risk of extended service beyond contract?
Your Answer: (Not answered)
Correct Answer: D (cumulative fatigue causing human error and compliance disputes)
💡 Extended service increases fatigue and stress, breaching labour rules and raising accident risk; control it by planning.
✗
Question 70. How do segregated ballast tanks differ from clean ballast tanks?
Your Answer: (Not answered)
Correct Answer: B (segregated ballast is permanently a ballast tank, clean ballast is cargo tank carrying clean water and may go back to cargo)
💡 A segregated ballast tank is structure and piping given over to ballast for good, kept out of the oil cargo system, so its water leaves the ship without an oil content to watch. A clean ballast tank is a cargo tank washed out and filled with clean water, able to carry cargo again, which is precisely why it has to be protected from oil while it holds ballast and why its discharge is still bound by the under-way and oil content conditions, with the monitoring and interface detection gear in use and the operation written into the oil record book. To call the segregated tank convertible and the clean one closed to cargo is to reverse them; to look for the difference in the area sailed or in an unconditional right to discharge misses the scheme of the Annex altogether.
✗
Question 71. The master finds enclosed-space work without a permit; he should?
Your Answer: (Not answered)
Correct Answer: A (stop work at once and require a permit and satisfactory tests before entry)
💡 Unpermitted entry is potentially fatal; withdraw the team and require permit, ventilation and testing first.
✗
Question 72. At sea the charted depth differs from the echo sounder reading; what applies?
Your Answer: (Not answered)
Correct Answer: A (increase caution, slow down, report and divert to safe water if needed)
💡 Differences may come from old survey data or position error; slow, report, divert if needed and amend the data.
✗
Question 73. The correct closed-loop handling of a non-conformity is?
Your Answer: (Not answered)
Correct Answer: A (identify, report, root-cause analysis, corrective action, verify effectiveness, record)
💡 Closed-loop control requires each step to be traceable and recorded; verification prevents fake fixes.
✗
Question 74. After enclosed-space work is finished, one should?
Your Answer: (Not answered)
Correct Answer: D (account for persons/gear, close permit, ventilate, confirm safe)
💡 Account for all, close the permit, keep ventilation and log completion.
✗
Question 75. The key to man-overboard response is?
Your Answer: (Not answered)
Correct Answer: C (early detect, early alarm, never lose sight, early rescue coordination)
💡 MOB's golden window is short; sight and early alarm decide survival.
✗
Question 76. For an avoidable collision, common SMS root causes are?
Your Answer: (Not answered)
Correct Answer: C (look-out lapse, hesitant avoidance, comms misunderstanding, fatigue)
💡 Collisions are mostly human-procedure-supervision failures, not pure tech.
✗
Question 77. The key to oily bilge water management is?
Your Answer: (Not answered)
Correct Answer: B (minimise generation, collect and treat through equipment with honest records)
💡 Minimise generation by good upkeep, treat to standard and log each operation in the Oil Record Book.
✗
Question 78. During cargo operations on a tanker, who is answerable on the spot?
Your Answer: (Not answered)
Correct Answer: D (the master carries the overall responsibility, the chief officer runs cargo operations, the chief engineer the machinery)
💡 The system states the responsibility plainly: the master carries overall responsibility for safety and pollution prevention on board, the chief officer normally commands cargo work (cargo control, valves and pressures, liaison with the shore), and the chief engineer answers for pumps, lines and power on the machinery side. The cargo control room operator works to the chief officer's arrangements; the bridge watchkeeper is responsible for navigation and lookout, not for directing cargo operations alongside, and the shore authority is bounded by the hose and the connection flange. Who gives orders on the spot, who can stop the operation and who is told when something goes wrong has to be written down and repeated at the pre-transfer conference.
✗
Question 79. Interim DOC / interim SMC may be used for?
Your Answer: (Not answered)
Correct Answer: A (short transition such as newbuilding takeover or reflagging, time-limited)
💡 Interim certificates bridge newbuilding takeover, new company or reflagging for limited periods.
✗
Question 80. The priority order for distress, urgency and safety traffic is?
Your Answer: (Not answered)
Correct Answer: D (distress first, then urgency, then safety)
💡 Distress traffic has absolute priority; urgency next, then safety, with routine traffic lowest.
✗
Question 81. Navigation lights fail and cannot be repaired; you should?
Your Answer: (Not answered)
Correct Answer: C (show emergency substitute lighting, inform traffic and VTS and log it)
💡 Use backup or temporary lighting, strengthen the lookout, inform traffic and VTS, log it and repair promptly.
✗
Question 82. A crew member is found missing while at sea; the first action is?
Your Answer: (Not answered)
Correct Answer: B (turn back to search, sound the alarm and alert VTS and nearby ships)
💡 Alter course to search, sound the alarm, alert VTS and nearby ships and mark the position with lifebuoys.
✗
Question 83. Detention for SMS documents not matching practice indicates the SMS is?
Your Answer: (Not answered)
Correct Answer: A (a paper SMS not genuinely implemented)
💡 Say-do gaps are classic SMS failure—a major non-conformity needing real implementation, not paper.
✗
Question 84. When port strike or force majeure prevents berthing, the master should?
Your Answer: (Not answered)
Correct Answer: A (agree with company to wait or shift berth keeping ship safe and costs controlled)
💡 Report company and agent, decide to wait or divert per charter terms, controlling cost while keeping ship and cargo safe.
✗
Question 85. The gangway watch leaves his post while in port; you should?
Your Answer: (Not answered)
Correct Answer: A (correct at once, replace him, restate duties and log it)
💡 Gangway watch is a safety and security control; leaving post is serious—correct, replace and reinforce duties.
✗
Question 86. When shall new or transferred personnel complete familiarization with their duties?
Your Answer: (Not answered)
Correct Answer: D (before assuming the duties)
💡 Rule 6.5: personnel must be familiarized before taking over duties, not learning critical safety duties on the job.
✗
Question 87. How should document approval and issue work?
Your Answer: (Not answered)
Correct Answer: B (drafted, reviewed and approved at three levels, then issued under control with distribution recorded)
💡 Draft, review and approve, then issue under control with distribution recorded so old editions are withdrawn.
✗
Question 88. Why is garbage sorted on board?
Your Answer: (Not answered)
Correct Answer: D (to enable lawful handling and shore reception and cut illegal discharge risk)
💡 Sorting is the prerequisite for lawful handling, letting each category follow its rule and cutting mis-discharge risk.
✗
Question 89. What is the basic concept of general average?
Your Answer: (Not answered)
Correct Answer: D (extraordinary sacrifice or expenditure for common safety, shared by all interests)
💡 General average covers deliberate sacrifice for common safety, apportioned among ship, cargo and freight interests.
✗
Question 90. Who normally decides on medical evacuation?
Your Answer: (Not answered)
Correct Answer: A (decided by the master on medical advice, coordinated with the company)
💡 The master decides on medical advice plus conditions and position, coordinating evacuation with the company.
✗
Question 91. Using every audit finding merely to "blame crew" leads to?
Your Answer: (Not answered)
Correct Answer: A (under-reporting and a distorted SMS, losing improvement chances)
💡 A blame culture suppresses reporting and distorts the SMS; a just culture reveals real problems.
✗
Question 92. What does the system require on contracts and wage payment?
Your Answer: (Not answered)
Correct Answer: A (sign lawfully, pay in full and on time and keep signed receipts)
💡 Contracts and wages are inspection priorities: sign properly, pay on time and keep receipts.
✗
Question 93. When the security level is lowered, a ship should?
Your Answer: (Not answered)
Correct Answer: B (confirm, stand down measures to normal and record the change)
💡 Verify the source first, then stand down extra controls per the SSP and log the level change and timing.
✗
Question 94. After a change of flag, how should statutory certificates be handled?
Your Answer: (Not answered)
Correct Answer: B (re-issue under the new flag with interim certificates during transition)
💡 A new flag means a new Administration: re-issue certificates, use interim ones meanwhile and update SMS documents.
✗
Question 95. What is the purpose of maintenance required by the system?
Your Answer: (Not answered)
Correct Answer: A (keep the ship seaworthy and compliant and prevent failures)
💡 Maintenance prevents failure and keeps the ship seaworthy and compliant, with intervals, owners and records.
✗
Question 96. The core role of the ISM "Designated Person" (DPA) is?
Your Answer: (Not answered)
Correct Answer: A (the ship-shore link ensuring the ship gets needed support and resources)
💡 The DPA bridges Company and ship, empowered to mobilise resources.
✗
Question 97. How are key operations defined in the system?
Your Answer: (Not answered)
Correct Answer: A (operations whose error would cause major danger, requiring procedures and instructions)
💡 Key operations are defined by consequence and need procedures, instructions and permits or checks.
✗
Question 98. The most common fixed fire-extinguishing system in the engine room is?
Your Answer: (Not answered)
Correct Answer: B (carbon dioxide or equivalent total flooding gas system)
💡 Machinery spaces use CO2 total flooding; ensure evacuation and closure before discharge to prevent asphyxiation.
✗
Question 99. Before closing a corrective action, one must?
Your Answer: (Not answered)
Correct Answer: A (verify it removed the root cause without new risk)
💡 Verification prevents fake fixes; confirm effect, not paper.
✗
Question 100. If SMS records (drills, maintenance, training) are backfilled or forged, the consequence is?
Your Answer: (Not answered)
Correct Answer: A (SMS integrity collapses; PSC/audit may flag major non-conformity or detention)
💡 Forgery is worse than absence—it destroys SMS credibility.