Question 1. Logs show an officer's continuous watch exceeded rest rules; PSC may?
Your Answer: (Not answered)
Correct Answer: A (raise a fatigue-management non-conformity affecting watch safety)
💡 Inadequate rest impairs the watch; a shared STCW/SMS check item.
✗
Question 2. Significant matters handled by the DPA should be?
Your Answer: (Not answered)
Correct Answer: A (recorded and traceable as evidence of SMS operation and improvement)
💡 Recording significant matters supports closure, accountability and review.
✗
Question 3. The problem with electronic or proxy signing on board is?
Your Answer: (Not answered)
Correct Answer: C (it destroys evidence of who actually performed and confirmed)
💡 Proxy or template signatures void records as evidence and indicate a systemic documentation integrity issue.
✗
Question 4. The core STCW requirement for navigational watch is?
Your Answer: (Not answered)
Correct Answer: A (maintain a proper look-out and safe speed with continuous monitoring)
💡 Proper look-out and safe speed are fundamental; monitoring must be continuous.
✗
Question 5. What should crew training on garbage focus on?
Your Answer: (Not answered)
Correct Answer: D (sorting rules, prohibited items and recording requirements)
💡 Training must make clear what is banned, how to sort and how to record, preventing inadvertent breaches and fines.
✗
Question 6. Internal and external audit: who does each, and for what?
Your Answer: (Not answered)
Correct Answer: C (the company runs its own audit to see whether the system is actually used; the administration or its recognised body handles the certification)
💡 The internal audit is the company's own instrument, set at planned intervals to test whether the safety-management activities answer the documents and whether they reach the deck and the engine room, with non-conformities chased to their cause and the correction verified. The auditor need not come from outside but must not audit his own work, and that independence is a matter of how the audit is arranged. The external audit is the one behind the certificates: initial, intermediate and renewal verification, carried out by the administration or a recognised organisation, looking at papers and at how the ship actually works, the finding deciding whether the document issues or holds. Both go below and both ask the crew; the difference is in purpose, one for the company's improvement, one for the evidence of conformity. To write the split as office ashore versus equipment on board is to invent a division that does not exist.
✗
Question 7. What does the passage plan have to take on before ice?
Your Answer: (Not answered)
Correct Answer: A (arrangements for handling and lookout in ice, protection against freezing, clearing ice from deck, and a plan of refuge)
💡 What the plan takes on for ice: how far the ship's ice class and structure let her go into the ice, where the ice report and the forecast come from, the limits on speed and steering (a ship cannot be handled in ice as in open water), how lookout and the uncertainty of position are managed, protection against freezing of cooling water lines and deck piping, non-slip and ice clearing on deck, what fire and life-saving gear does at low temperature, the behaviour of fuel and lubricating oil in cold, the way out if heavy ice is met and where to take refuge, and the contact with icebreaker or escort. None of this is recovered by improvising on the spot, and every line needs both a man who can do it and the gear to do it with.
✗
Question 8. Who should be reported to when fuel quality is disputed after bunkering?
Your Answer: (Not answered)
Correct Answer: D (company, supplier and P&I club, retaining samples and documents)
💡 Report to company, supplier and club while preserving samples, bunker notes and measurements as evidence.
✗
Question 9. Which of these is an operational energy efficiency measure?
Your Answer: (Not answered)
Correct Answer: A (setting the speed and the track for each voyage, and keeping the hull clean and the trim right)
💡 Operational means what is saved by how the ship is used rather than by what she is built of: easing the service speed and the margin kept in it, routing for the weather so as to lose less to head sea and current, keeping hull and propeller clean and the fouling interval held, ballasting for the draught and trim that offer least resistance, cutting idle running of deck machinery and boilers, and matching the plant to the speed. Technical measures are the other sort - the retrofit of a saving device, the changed propeller or boss cap, the waste heat put to use - and fuel measures answer not what is burned. The plan kept on board asks for this kind of action to be written so it can be checked and its result reported, so neither a new installation nor a new flag belongs at the operational level.
✗
Question 10. A ship's own security threat assessment should rely on?
Your Answer: (Not answered)
Correct Answer: D (official advisories, route intel and Company guidance, kept current)
💡 Threat assessment uses authoritative info, not guesswork; keep current.
✗
Question 11. The role of operations scheduling within the SMS should be?
Your Answer: (Not answered)
Correct Answer: C (optimise the schedule within safety constraints and consult the master)
💡 Scheduling works within legal and SMS limits and consults the master; commerce never overrides safety.
✗
Question 12. Steering response degrades while navigating in ice; you should?
Your Answer: (Not answered)
Correct Answer: A (reduce speed and consider leaving the ice, checking rudder and propeller damage)
💡 Poor response suggests ice damage or blockage; slow down, withdraw if possible and inspect for damage.
✗
Question 13. SMS monitoring of crew certificate validity should?
Your Answer: (Not answered)
Correct Answer: B (maintain a register, warn on expiry, ensure valid certificates on watch)
💡 Keep a certificate register with expiry alerts; invalid certificates are serious non-compliance.
✗
Question 14. A crew member falls seriously ill with no shore medical advice available; you should?
Your Answer: (Not answered)
Correct Answer: A (treat per medical guide, call for help and divert to nearest port as appropriate)
💡 Treat per the guide, request assistance and weigh diverting to the nearest port against the remaining voyage.
✗
Question 15. After a blackout on the main switchboard, the first priority is?
Your Answer: (Not answered)
Correct Answer: D (restore emergency power, steering and comms then find the cause)
💡 Restore emergency power, steering and communications first, then load gradually and trace the cause.
✗
Question 16. What is the rule for discharging plastics?
Your Answer: (Not answered)
Correct Answer: A (prohibited from discharge into the sea anywhere)
💡 All plastics including synthetic ropes and packaging are banned from the sea; collect and land them ashore, as penalties are severe.
✗
Question 17. What prevents heat stress and heat stroke at work?
Your Answer: (Not answered)
Correct Answer: D (sensible work scheduling, water and salt replacement and rotation)
💡 Avoid peak heat, replace water and salt and rotate; treat and report dizziness or vomiting immediately.
✗
Question 18. How should the loading plan approval process work?
Your Answer: (Not answered)
Correct Answer: B (prepared and checked on board, with company or shore review where required before execution)
💡 The plan is prepared and checked on board, with shore review for complex or high-risk cargo to secure stability and strength.
✗
Question 19. The company orders on-time arrival but a severe typhoon is forecast ahead. What should the master do?
Your Answer: (Not answered)
Correct Answer: C (divert or heave to by safety judgement, reporting the rationale)
💡 The master's safety authority is final: take avoiding action and report with reasons; the company cannot compel risk.
✗
Question 20. What does the inspection window mean?
Your Answer: (Not answered)
Correct Answer: A (the interval between periodic inspections, shorter for higher risk ships)
💡 It is the period for periodic inspection; high-risk ships have shorter windows and are flagged if overdue.
✗
Question 21. Smoke is found in an accommodation corridor at sea; you should?
Your Answer: (Not answered)
Correct Answer: C (raise the alarm, locate the fire and respond per muster duties with firefighting and evacuation)
💡 Trigger the fire alarm, tell the bridge and act per muster list, locating and fighting the fire and limiting spread.
✗
Question 22. What is VHF channel 16 used for?
Your Answer: (Not answered)
Correct Answer: A (distress, safety and calling watch channel)
💡 Channel 16 is the international distress and calling channel; keep watch and shift to a working channel.
✗
Question 23. When participating in maritime SAR, the ship should?
Your Answer: (Not answered)
Correct Answer: D (obey the on-scene coordinator (OSC) and act per procedure)
💡 SAR needs unified coordination; obey the OSC to avoid chaos.
✗
Question 24. To judge whether the SMS operates, an auditor mainly relies on?
Your Answer: (Not answered)
Correct Answer: D (objective evidence (records, observation, interviews), not just the manual)
💡 "Write what you do, do what you write, record what you do": audit seeks operational evidence.
✗
Question 25. Requirements for Emergency Escape Breathing Devices (EEBD) are?
Your Answer: (Not answered)
Correct Answer: C (positioned to requirement, inspected and crews trained to don and escape)
💡 Place as required, keep serviceable and train quick donning for escape through smoke, not for firefighting entry.
✗
Question 26. Why is a cargo pump room kept under continuous mechanical ventilation with a level alarm on its bilge well?
Your Answer: (Not answered)
Correct Answer: D (ventilation keeping gas below a dangerous concentration, the level alarm catching a leaking seal or water ingress)
💡 A pump room is an enclosed space in which shaft seals, flanges and gauge lines will leak a little, so gas accumulates unless air is changed, which is why ventilation runs through cargo operations at the required number of changes. The level alarm on the bilge well is there to speak up early when a seal leaks or oil or water finds its way in, giving the watch a chance to act before the room floods and more flammable liquid gathers. To read either as cooling for the pumps, as room to work in, or as a matter of discharge rate puts their purpose elsewhere. Entry remains subject to the enclosed space procedure, testing the atmosphere and the permit.
✗
Question 27. What is the priority when an accident causes injury?
Your Answer: (Not answered)
Correct Answer: C (save life first while reporting and preserving the scene and evidence)
💡 Life first: rescue while reporting and preserving scene and evidence, then deal with cargo and schedule.
✗
Question 28. The correct attitude toward company instructions is?
Your Answer: (Not answered)
Correct Answer: A (carry out while keeping independent judgement, raising and reporting safety concerns)
💡 Follow orders but keep professional judgement bounded by safety; raise risks at once and keep correspondence.
✗
Question 29. The purpose of the International Certificate of Vaccination is?
Your Answer: (Not answered)
Correct Answer: C (proves required vaccination for immigration checks)
💡 It records vaccinations such as yellow fever, supporting health inspection at ports across borders.
✗
Question 30. SMS control of external persons (repairers, surveyors) on board should?
Your Answer: (Not answered)
Correct Answer: B (brief risks, require compliance, supervise and register)
💡 External workers must be briefed, made to comply, supervised and logged on board.
✗
Question 31. Mandatory reports to the Administration typically include?
Your Answer: (Not answered)
Correct Answer: D (collision, grounding, fire, spill, serious injury/death)
💡 Reportable events include collision, grounding, fire, spill, death/serious injury per rules and timelines.
✗
Question 32. The functions of a double bottom include?
Your Answer: (Not answered)
Correct Answer: A (second line of defence, ballast and fuel tanks plus longitudinal strength)
💡 It gives a second barrier against bottom damage, tanks for ballast/fuel and adds longitudinal strength.
✗
Question 33. How is the team's shared situational awareness raised?
Your Answer: (Not answered)
Correct Answer: D (report position, situation and intention at set intervals, cross-check, keep the picture open to the team)
💡 Awareness is not each man making his own estimate; it is one picture shared by the group: in handover and on watch, position, course and speed, traffic, weather and sea, the mode in force and the next intention are spoken out, and the officer, the helmsman, the pilot and the lookout are asked to repeat or question it, with any divergence corrected there and then. Saying "I am not sure" is safer than pretending to understand. Telling the helmsman and the engine room the plan in advance removes misreading. Keeping to one's own post, talking as little as possible and hoarding the picture with the master put the whole judgement on one man - and it is a recurring line in collisions and groundings that somebody saw the anomaly and never said it into the shared picture.
✗
Question 34. When must familiarization training be completed for new or transferred crew?
Your Answer: (Not answered)
Correct Answer: B (before sailing/assignment for key safety, equipment needs certification)
💡 New crew must be familiar with safety/alarm duties before sailing; critical equipment needs certified training.
✗
Question 35. What does ISM Chapter 3 (Company Responsibilities and Authority) clarify?
Your Answer: (Not answered)
Correct Answer: A (company duties and the option to designate shore personnel for safety and resources)
💡 Chapter 3 defines company duties and permits designated shore personnel with top-level access.
✗
Question 36. What does the system require of maintenance records?
Your Answer: (Not answered)
Correct Answer: C (true, timely, traceable and matched to the planned maintenance system)
💡 Records must be true, timely and linked to planned maintenance, building history for assessment and survey.
✗
Question 37. How does port State control relate to the flag State's own performance?
Your Answer: (Not answered)
Correct Answer: A (coastal State control makes good the flag's shortfalls, and a flag of poor record puts its ships in the way of more visits)
💡 Jurisdiction and responsibility stay with the flag: its certificates, or those of the organisation acting for it, are what the ship trades on, and rectification and re-inspection are normally reported to it as well. Control by the coastal State verifies and reinforces that record, requiring defects to be cleared by a date, detaining the ship in serious cases or asking the flag to act; the recent record of a flag and of a company feeds the risk profile of the ship, and a high profile both invites the visit and makes it longer. To treat the coastal State as replacing the flag is to merge two obligations running side by side; to treat them as unrelated explains nothing about why one deficiency changes the odds of the next boarding. What the ship should fear is the same defect surfacing twice in the two systems.
✗
Question 38. When the fifteen ppm alarm of the filtering equipment operates, what happens?
Your Answer: (Not answered)
Correct Answer: B (discharge stops automatically and may resume only after the cause is found)
💡 On alarm the overboard discharge stops automatically and may resume only once the cause is dealt with.
✗
Question 39. An SOPEP drill should cover?
Your Answer: (Not answered)
Correct Answer: B (reporting procedures, containment deployment, recovery and shore contact)
💡 It exercises reporting, boom deployment, recovery gear and team roles with timings recorded.
✗
Question 40. The added value of night or unannounced drills is?
Your Answer: (Not answered)
Correct Answer: C (test real response speed and resource availability)
💡 Night or surprise drills approximate reality and expose real gaps in access, lighting and readiness.
✗
Question 41. A proper critical-operation procedure should contain?
Your Answer: (Not answered)
Correct Answer: A (responsible person, timing, steps, risks and preventive measures)
💡 Procedures must state who, when, how, risks and precautions for correct execution.
✗
Question 42. Which is NOT a basis for continual improvement?
Your Answer: (Not answered)
Correct Answer: A (a competitor's commercial quotation)
💡 Improvement is driven by safety performance such as lessons, audits and trends, not by commercial quotations.
✗
Question 43. The use of fault tree analysis is?
Your Answer: (Not answered)
Correct Answer: C (work back from the top event to combinations of causes)
💡 It traces from the failure back through cause combinations, exposing weak points and common causes to fix.
✗
Question 44. The basis for setting intervals in a planned maintenance system is?
Your Answer: (Not answered)
Correct Answer: C (maker's advice, statutory requirements and operating experience combined)
💡 Intervals combine maker's data, statutory surveys and actual duty such as load, environment and failure history.
✗
Question 45. Sparks fly from the terminal conveyor during loading; you should?
Your Answer: (Not answered)
Correct Answer: C (suspend work at once and tell the terminal to find the source)
💡 Sparks are a serious ignition source; stop, notify the terminal and resume only when safe.
✗
Question 46. For urgent evacuation ashore, the SMS should?
Your Answer: (Not answered)
Correct Answer: C (contact RCC/agent for helicopter or port, prepare medical handover)
💡 Fast evacuation buys golden time; handover ensures continuity.
✗
Question 47. Backup requirements for electronic SMS documents are?
Your Answer: (Not answered)
Correct Answer: C (back up periodically, available offline and restore-tested)
💡 Back up regularly with offline access and test restoration, or failure still leaves documents unusable.
✗
Question 48. After each drill or real event, the SMS should?
Your Answer: (Not answered)
Correct Answer: B (debrief and revise plans/shortfalls, closing the loop)
💡 Debriefing turns experience into SMS improvement—the key step.
✗
Question 49. What does the shore do with the ship's monthly return?
Your Answer: (Not answered)
Correct Answer: C (it lets the shore see how the system is running on this ship, what defects and near misses there have been, so that trends can be read and resources put where they are needed)
💡 The monthly return is how the shore sees the ship: how far the system is being worked, the state of non-conformities and their correction, the reports of casualties and near misses, breakdowns and maintenance run overdue, drills and training done, crew turning over and who has just come aboard, the difficulties the ship raises and the revisions she proposes asking for. From it the shore reads a comparison (against like ships, against last quarter), puts resources and support where they are wanted, and pushes what needs a document or a spending decision up into management review. It stands in for no deck or engine log, and it should not be assembled when an inspection is due - a report assembled then only shows nobody reads it in ordinary months.
✗
Question 50. How to handle a failed competency assessment?
Your Answer: (Not answered)
Correct Answer: C (arrange retraining and reassessment, reassigning if necessary)
💡 Retrain and reassess; if still unfit, reassign or escalate so nobody unqualified holds a critical role.
✗
Question 51. Quality control of contracted maintenance should be?
Your Answer: (Not answered)
Correct Answer: D (set standards, supervise the work and accept on completion)
💡 Outsourcing does not transfer duty: specify standards, supervise key steps and accept strictly.
✗
Question 52. Enclosed-space rescue equipment should be?
Your Answer: (Not answered)
Correct Answer: C (ready on site, crew trained, drilled regularly)
💡 SCBA, lifelines, comms and stretchers must be ready, trained and drilled for rapid rescue.
✗
Question 53. A foreign certificate is accepted by another party's ship only if?
Your Answer: (Not answered)
Correct Answer: B (the issuing state is recognised by IMO and the certificate meets STCW)
💡 The certificate must come from an IMO-recognised party and meet the Convention.
✗
Question 54. The relationship between the ISM annual audit and the intermediate audit?
Your Answer: (Not answered)
Correct Answer: B (annual maintains DOC, intermediate maintains the five-year SMC)
💡 The company DOC is audited annually; the ship SMC needs one intermediate audit in five years.
✗
Question 55. What is the key to preparing claim documents?
Your Answer: (Not answered)
Correct Answer: C (complete, true, chronologically consistent and mutually corroborating)
💡 Claim papers must be true, complete and consistent in time, corroborating each other; gaps or contradictions weaken the claim.
✗
Question 56. Which is a hidden cost in operations?
Your Answer: (Not answered)
Correct Answer: D (rework and time lost through incidents)
💡 Off-hire, repairs and reputation loss from incidents far exceed direct costs and should be targeted by the system.
✗
Question 57. Why recheck tide and under-keel clearance for a port call?
Your Answer: (Not answered)
Correct Answer: A (prevent touching bottom on entry, berthing or departure, especially loaded and in shallow ports)
💡 Compute clearance at the worst moment with tide and draught plus a margin to avoid touching in channels or berths.
✗
Question 58. A Quanzhou owner operates two 8,000 DWT coasters on domestic voyages. Three views circulate among the crew: (1) ISM is an international instrument, so domestic voyages need no SMS; (2) whether it applies is for the flag Administration to settle under domestic rules; (3) an ISO 9001 certificate is equivalent compliance. Which view(s) hold(s)?
Your Answer: (Not answered)
Correct Answer: D (The second and the third)
💡 Applicability to domestic voyages rests with the flag Administration, which in China is handled by the domestic safety-management rules; view (1) wrongly turns "not directly mandatory" into "not needed at all". ISO 9001 certifies a quality system, not the statutory elements of an SMS, so it cannot substitute (view 3 fails). View (2) alone stands.
✗
Question 59. What is the correct handling of electrical equipment after damp ingress?
Your Answer: (Not answered)
Correct Answer: C (isolate, dry it out and confirm insulation before use)
💡 Dry and megger-test before returning to service; energising damp equipment causes short circuits or breakdown.
✗
Question 60. The company orders maintenance budget cuts; the master should?
Your Answer: (Not answered)
Correct Answer: A (state in writing which items cannot be cut and report to the DPA)
💡 Critical maintenance and spares are non-negotiable; state the safety consequences in writing to the DPA.
✗
Question 61. What are the consequences of illegal garbage discharge?
Your Answer: (Not answered)
Correct Answer: C (heavy fines, possible criminal liability and damage to company reputation)
💡 Penalties are tightening, especially for plastics; beyond fines, individuals may be liable and reputation suffers.
✗
Question 62. Ship technical files (drawings, certificates, TM, repairs) should be?
Your Answer: (Not answered)
Correct Answer: B (systematically archived and traceable, supporting maintenance and transfer)
💡 Complete technical files underpin maintenance and transactions.
✗
Question 63. When using low sulphur fuel in an emission control area, what should be done?
Your Answer: (Not answered)
Correct Answer: A (change over in good time and keep bunker notes and changeover records)
💡 Changeover takes time and volume planning; do it early and keep bunker notes, logs and samples for inspection.
✗
Question 64. If the charterer orders a port outside insurance or war-risk cover, what applies?
Your Answer: (Not answered)
Correct Answer: B (confirm additional cover with owners first, otherwise the master may decline)
💡 High-risk ports need war-risk cover arranged by owners; otherwise cover and liability have dangerous gaps.
✗
Question 65. The terminal pushes for faster discharge making moorings too tight; you should?
Your Answer: (Not answered)
Correct Answer: B (adjust line tension and tell the terminal, pausing the speed-up if needed)
💡 Changed rates alter position and tension; adjust, inform the terminal and pause if lines become over-strained.
✗
Question 66. How should the SMS interface with MLC?
Your Answer: (Not answered)
Correct Answer: C (incorporate MLC into SMS procedures and checks)
💡 The SMS should embed manning, hours, pay, accommodation, complaints and medical checks into its procedures.
✗
Question 67. When the Master's safety/pollution decision conflicts with existing SMS procedures?
Your Answer: (Not answered)
Correct Answer: C (the Master's decision is overriding and may depart from procedures)
💡 Rule 5.2: for safety/pollution, the Master's necessary decision is overriding and may depart from procedures.
✗
Question 68. Are electronic signatures / records accepted in the SMS?
Your Answer: (Not answered)
Correct Answer: A (acceptable if authentic, tamper-proof, traceable and legally recognized)
💡 E-records are accepted when authenticated and auditable; some statutory records still require paper.
✗
Question 69. The harm of retaliation against reporters is?
Your Answer: (Not answered)
Correct Answer: B (destroys reporting culture, driving hazards underground until accidents occur)
💡 Retaliation teaches silence; systemic hazards stay hidden until they surface as casualties at far greater cost.
✗
Question 70. Before sailing, the SMS requires?
Your Answer: (Not answered)
Correct Answer: B (voyage planning and risk assessment (weather, route, shoals, confined waters, manning))
💡 Voyage planning front-loads risk management and is a PSC focus.
✗
Question 71. Responsibilities for supporting surveys should be defined down to?
Your Answer: (Not answered)
Correct Answer: A (specific positions and persons including preparation, escort and follow-up)
💡 Assign duties by post and person for preparation, escort, findings and follow-up to avoid confusion on the day.
✗
Question 72. Underway in high-risk waters, deck security watch should?
Your Answer: (Not answered)
Correct Answer: C (24h multi-point patrol and look-out to spot fast skiffs early)
💡 Early detection is key; dense watch defeats blind spots and skiff raids.
✗
Question 73. The purpose of a note of protest is to?
Your Answer: (Not answered)
Correct Answer: D (preserve legal rights regarding risks met and possible damage)
💡 Filed after weather or events likely to cause damage, it records facts and preserves defence rights with evidence.
✗
Question 74. Protection when working with chemicals such as cleaners and paints is?
Your Answer: (Not answered)
Correct Answer: D (gloves, goggles, respiratory protection and ventilation)
💡 Follow instructions with gloves, goggles and respiratory protection, ventilate and avoid skin contact and inhalation.
✗
Question 75. What is the core objective of the Ballast Water Management Convention?
Your Answer: (Not answered)
Correct Answer: B (prevent transfer of harmful aquatic organisms and pathogens)
💡 It blocks invasive species through exchange and treatment before discharge, protecting local ecosystems.
✗
Question 76. With sudden main engine failure in a narrow channel, the master's first action is?
Your Answer: (Not answered)
Correct Answer: A (show NUC signals, alert VTS and traffic, control speed and heading)
💡 Show NUC signals, alert VTS and nearby ships, then manage position with remaining speed, anchors and tugs.
✗
Question 77. The basis for deciding which spares to carry on board is?
Your Answer: (Not answered)
Correct Answer: B (consequence of failure, difficulty of supply and repair time)
💡 Decide by whether failure strands or endangers the ship, supply difficulty and repair time, not price.
✗
Question 78. What finally shows whether a measure works?
Your Answer: (Not answered)
Correct Answer: B (whether the same risk actually falls and can be verified)
💡 Effectiveness is measured by real risk reduction verified by indicators and observation, not by whether it is documented.
✗
Question 79. A crew member is found missing while at sea; the first action is?
Your Answer: (Not answered)
Correct Answer: B (turn back to search, sound the alarm and alert VTS and nearby ships)
💡 Alter course to search, sound the alarm, alert VTS and nearby ships and mark the position with lifebuoys.
✗
Question 80. What commonly causes loss of control over stores and provisions cost?
Your Answer: (Not answered)
Correct Answer: B (unplanned requisitions, waste and expiry losses)
💡 Poor planning and stock control cause duplicate buying, expiry and waste; control it through registers and planning.
✗
Question 81. What is the purpose of cross-checking on board?
Your Answer: (Not answered)
Correct Answer: B (reducing single-person error through independent second checks)
💡 Cross-checking catches errors before they have consequences, a proven defence on the bridge and in the engine room.
✗
Question 82. On an engine room bilge alarm, the crew should?
Your Answer: (Not answered)
Correct Answer: B (find the leak, start emergency pumping and report, preparing damage control if needed)
💡 Find the source, start emergency pumping, report and prepare plugging and closing to protect buoyancy.
✗
Question 83. Before entering port the pilot ladder is found damaged; what applies?
Your Answer: (Not answered)
Correct Answer: B (replace or repair it and report; it must not be used while defective)
💡 A defective pilot ladder risks injury, complaints and detention; replace or repair, report and confirm it is serviceable.
✗
Question 84. For a ship to lawfully hold an SMC, its Company must hold?
Your Answer: (Not answered)
Correct Answer: B (a valid DOC covering that ship type and flag)
💡 The SMC depends on a valid DOC covering the ship type and flag; otherwise the SMC is invalid.
✗
Question 85. How is salvage reward determined?
Your Answer: (Not answered)
Correct Answer: A (by agreement or award based on success, danger and effort)
💡 Salvage reward encourages saving life and property, based on success, danger, effort and environment; no cure no pay applies.
✗
Question 86. When the same non-conformity recurs across fleet vessels, the company should primarily?
Your Answer: (Not answered)
Correct Answer: B (fleet root-cause analysis and revise procedures)
💡 Recurring non-conformities signal systemic causes; conduct fleet-wide root cause analysis and revise procedures.
✗
Question 87. Who has the authority to order abandonment?
Your Answer: (Not answered)
Correct Answer: A (the master, judging the degree of danger)
💡 Abandonment is extreme: the master decides from danger and crew safety, reporting the company where possible.
✗
Question 88. What applies to extra port services such as overtime or launch hire?
Your Answer: (Not answered)
Correct Answer: B (confirm necessity and rates beforehand and settle against documents afterwards)
💡 Confirm need and rates first and settle against documents, avoiding surprise high charges afterwards.
✗
Question 89. Receiving no SMS updates from the company for a long time, the master should?
Your Answer: (Not answered)
Correct Answer: A (ask the DPA and verify document version validity)
💡 The master should confirm current versions with the DPA to avoid using obsolete documents, keeping a record.
✗
Question 90. How should safety incentive work in the SMS?
Your Answer: (Not answered)
Correct Answer: A (tie safety performance to recognition and to resources, rather than to penalties alone)
💡 Incentive must point at the behaviour wanted: recognition, backed by resources (training time, spares, manning, working conditions), follows the number and quality of reports, drill performance, prompt correction of defects and improvement suggestions, while penalties stay reserved for deliberate breach and concealment. A penalty-only scheme, or a bonus paid on a clean accident figure, pushes near-misses back under the surface - fewer reports do not mean fewer incidents. Just culture, which separates honest error from reasonable risk from recklessness, is the foundation of the approach.
✗
Question 91. After new equipment is fitted, the SMS should?
Your Answer: (Not answered)
Correct Answer: B (update procedures and training, revise drawings and add it to the PMS)
💡 Update instructions, drawings and the PMS and train the crew, or a management gap appears immediately.
✗
Question 92. With tugs assisting berthing, the master should?
Your Answer: (Not answered)
Correct Answer: D (define tug positions and orders, unify communications and keep control of the situation)
💡 Tugs assist only; the master gives clear orders, keeps communications and retains overall control.
✗
Question 93. On a major casualty/security event, the Company should activate?
Your Answer: (Not answered)
Correct Answer: D (a crisis team for unified external coordination and decisions)
💡 Crisis management centralises command, preventing conflicting orders.
✗
Question 94. Alternatives when ship-shore communication is lost are?
Your Answer: (Not answered)
Correct Answer: D (use backup satellite, MF/HF or relay through another ship or coast station)
💡 Fall back to backup satellite or MF/HF, or relay via other ships and coast stations so contact is never lost.
✗
Question 95. The principle for mooring line layout at a berth is?
Your Answer: (Not answered)
Correct Answer: C (breast and spring lines share load, accounting for tide, wind and current)
💡 Arrange springs and breasts for the expected tide and weather so loads share evenly and no line overloads.
✗
Question 96. Common shortcomings simulated in abandon-ship drills are?
Your Answer: (Not answered)
Correct Answer: C (mustering too slow, lifejackets worn wrongly and head count unclear)
💡 Time the drill and check lifejacket fitting, equipment and head count, logging gaps and tracking fixes.
✗
Question 97. On hull breach flooding, the first action is?
Your Answer: (Not answered)
Correct Answer: B (close watertight doors/hatches, locate and rate inflow, report to master)
💡 Damage control first secures integrity and reports rate to the master.
✗
Question 98. Why re-check cargo securing during the voyage?
Your Answer: (Not answered)
Correct Answer: C (lashings slacken with motion; re-tightening prevents cargo shift)
💡 Lashings slacken under motion, so re-tension them especially after heavy weather to prevent bulk cargo shift.
✗
Question 99. Waiting for a berth causes high emissions; a reasonable response is?
Your Answer: (Not answered)
Correct Answer: B (coordinate arrival time with agent and terminal to cut waiting)
💡 Just-in-time arrival cuts waiting emissions and should be part of voyage planning and ship-shore communication.
✗
Question 100. The focus of a technical superintendent's visit is?
Your Answer: (Not answered)
Correct Answer: A (check equipment condition, maintenance and defect closure and support the ship)
💡 Superintendents review critical equipment, maintenance quality, spares and defect closure while supporting the ship.