Question 1. Finding unauthorised persons on board while in port, you should?
Your Answer: (Not answered)
Correct Answer: D (detain and identify, report to master and shore, act per the plan)
💡 Control their movement, identify them, report to master, company and port security, then hand over with records.
✗
Question 2. How often is an abandon-ship drill required on a cargo ship?
Your Answer: (Not answered)
Correct Answer: D (at least monthly)
💡 SOLAS requires monthly abandon-ship and fire drills on cargo ships, weekly on passenger ships.
✗
Question 3. Rolling increases on the fringe of a typhoon; you should?
Your Answer: (Not answered)
Correct Answer: A (adjust course and speed to avoid resonance and secure cargo)
💡 Alter course and speed away from resonance, secure cargo and gear, keep weather reception and reporting.
✗
Question 4. After a small fire is extinguished, the master should?
Your Answer: (Not answered)
Correct Answer: A (find the cause, check for re-ignition and report the company, preserving evidence)
💡 Check for re-ignition and smouldering, find the cause, report and preserve evidence rather than simply standing down.
✗
Question 5. The limitation of last-minute drills and tidying before an inspection is?
Your Answer: (Not answered)
Correct Answer: C (inspectors spot reality through records, interviews and wear patterns)
💡 Appearance cannot hide history: conflicting dates, unanswerable crew and wear reveal the truth. Manage routinely.
✗
Question 6. On sudden critical-equipment failure, the SMS response is?
Your Answer: (Not answered)
Correct Answer: B (report, assess risk, limit damage, repair per procedure and record)
💡 Failure follows report-assess-limit-repair-record to prevent escalation.
✗
Question 7. How does the Company verify the DPA truly performs?
Your Answer: (Not answered)
Correct Answer: A (via internal audit, ship feedback and review of contact records)
💡 Performance needs evidence: contact logs, ship feedback, audit findings.
✗
Question 8. A relieving master finds many open non-conformities; he should?
Your Answer: (Not answered)
Correct Answer: A (verify status, reprioritise and report to the company agreeing closure plans)
💡 On taking over, inventory open items, confirm severity and deadlines with the company and agree closure plans.
✗
Question 9. The primary duty of the accompanying officer is?
Your Answer: (Not answered)
Correct Answer: B (note inspector's questions, relay promptly and coordinate answers)
💡 Record every query and finding, relay to master/company and coordinate evidence without making commitments.
✗
Question 10. The role of security records in an audit is?
Your Answer: (Not answered)
Correct Answer: A (prove measures were carried out as required and are traceable)
💡 Records of patrols, level changes, drills and events are the evidence that security is actually implemented.
✗
Question 11. Who manages the register of seafarers' documents and certificates?
Your Answer: (Not answered)
Correct Answer: B (a designated crew member checks validity periodically under the master's oversight)
💡 Assign an owner to maintain and check expiry dates so certificates do not lapse unnoticed.
✗
Question 12. PSC SMS inspection often includes?
Your Answer: (Not answered)
Correct Answer: D (certificates, drill records, familiarisation, equipment, ship-shore link)
💡 SMS checks blend documents, records, equipment and people.
✗
Question 13. The sign of a closed maintenance work order is?
Your Answer: (Not answered)
Correct Answer: C (repair done, tested satisfactory and signed off by the responsible person)
💡 Record symptoms, cause, action, parts and test result with sign-off; no test means not complete.
✗
Question 14. The ship's relationship with the Rescue Coordination Centre (RCC) is?
Your Answer: (Not answered)
Correct Answer: C (obey RCC/on-scene coordinator's unified command and tasking)
💡 Unified coordination avoids chaos—the SAR principle.
✗
Question 15. What is the inert gas system on a crude-oil tanker really there against?
Your Answer: (Not answered)
Correct Answer: A (it holds the oxygen content below 8 per cent and the tank under positive pressure, so the gas cannot be ignited)
💡 Of the three things a fire needs, inert gas takes away the oxygen: with the tank atmosphere held below 8% oxygen and under positive pressure, the hydrocarbon present can never reach a flammable range - and the positive pressure is what keeps outside air from being sucked back in, which is exactly what happens on a tank falling below atmospheric pressure while discharging. So oxygen and pressure are monitored continuously; a rising oxygen content, a falling pressure or loss of the deck water seal gives alarm and the related operation stops. A fault in the generator or flue-gas plant, or in the inertial and pressure/vacuum valves, is a major defect to be handled under the system, not smothered by pushing more gas through. Inert gas is not air for men to breathe: gas-freeing, oxygen testing and an entry permit come first.
✗
Question 16. Monsoon and currents affect a voyage mainly through?
Your Answer: (Not answered)
Correct Answer: D (affecting speed, fuel burn and deviation of the actual track)
💡 Monsoons and currents reduce speed, push the ship off track and raise fuel use; allow margins in planning.
✗
Question 17. The key power ISM Chapter 5 gives the master is?
Your Answer: (Not answered)
Correct Answer: D (absolute authority and responsibility for safe operation and pollution prevention)
💡 The master has final say on safety and pollution prevention; none may override.
✗
Question 18. On prolonged anchorage waiting for orders, what should the master guard against?
Your Answer: (Not answered)
Correct Answer: A (dragging, watch fatigue and security risk while keeping equipment and crew ready)
💡 Long stays bring dragging and complacency; keep a proper anchor watch, equipment ready and security rounds, managing fatigue.
✗
Question 19. What is the purpose of trials or verification after repair?
Your Answer: (Not answered)
Correct Answer: B (confirm repair results and restored function)
💡 Verify restored function by trials after repair; do not resume normal service without confirmation.
✗
Question 20. Key points for the garbage record book are?
Your Answer: (Not answered)
Correct Answer: D (record by category the time, position and quantity discharged or delivered)
💡 Log each discharge or delivery by category with time, position and quantity, plus reception receipts per Annex V.
✗
Question 21. Long stay at a tropical port calls for precautions against?
Your Answer: (Not answered)
Correct Answer: A (cargo self-heating, hold condensation and insect-borne disease)
💡 Watch hold temperature and sweat, ventilate and inspect, and control insects and disease to protect the crew.
✗
Question 22. The risk of relying heavily on satellite communications is?
Your Answer: (Not answered)
Correct Answer: B (loss of ship-shore contact and emergency comms if interrupted or degraded)
💡 Over-reliance without HF or alternate routes strands the ship when links fail or service is denied; keep redundancy.
✗
Question 23. The most important content of a post-drill debrief is?
Your Answer: (Not answered)
Correct Answer: C (review timeline, expose gaps and assign fixes with deadlines)
💡 A debrief reviews response, pinpoints gaps, assigns owners and deadlines to close the loop.
✗
Question 24. Use of a turning basin should be?
Your Answer: (Not answered)
Correct Answer: A (confirm dimensions and clearance, control speed, use tugs as planned)
💡 Check diameter and under-keel clearance, manage speed and coordinate tugs before turning in confined water.
✗
Question 25. What is the most lethal risk during mooring operations?
Your Answer: (Not answered)
Correct Answer: C (the snap-back zone of a parting line)
💡 A parting line recoils at extreme speed; the snap-back zone must be marked and kept clear.
✗
Question 26. Availability assurance for GMDSS equipment normally requires?
Your Answer: (Not answered)
Correct Answer: A (shore maintenance, at-sea electronic maintenance or duplication of equipment)
💡 Availability is assured by shore maintenance agreements, onboard electronic maintenance or duplicated equipment.
✗
Question 27. With the ship disabled and towing requested, the master should first?
Your Answer: (Not answered)
Correct Answer: C (report the company and clarify contract type, cost and safety responsibility with the salvor)
💡 Clarify whether it is towage or salvage, with cost and liability, before agreeing, to avoid later disputes.
✗
Question 28. The closed-loop relationship between training and the SMS is?
Your Answer: (Not answered)
Correct Answer: D (the SMS identifies needs, training closes gaps and results feed back improvements)
💡 System gaps become training needs and training results feed back as verification, closing the improvement loop.
✗
Question 29. The danger of fabricating records ahead of inspection is?
Your Answer: (Not answered)
Correct Answer: C (inconsistencies are easily exposed, escalating to integrity issues or detention)
💡 Last-minute records show conflicting dates or matching handwriting; if challenged this escalates to integrity failures.
✗
Question 30. ISM Chapter 10 requires defect reporting to?
Your Answer: (Not answered)
Correct Answer: B (detect and report promptly with appropriate action and records)
💡 Defects are found and reported, temporary or permanent action taken, and records kept for traceability.
✗
Question 31. When must familiarization training be completed for new or transferred crew?
Your Answer: (Not answered)
Correct Answer: B (before sailing/assignment for key safety, equipment needs certification)
💡 New crew must be familiar with safety/alarm duties before sailing; critical equipment needs certified training.
✗
Question 32. Which is NOT a main factor in ship fuel consumption?
Your Answer: (Not answered)
Correct Answer: A (hull paint colour)
💡 Consumption depends on speed, draught, trim, fouling, propeller condition, weather and plant efficiency.
✗
Question 33. When the master has safety concerns about voyage instructions, he should?
Your Answer: (Not answered)
Correct Answer: D (raise the concern for company review while retaining final authority)
💡 The master raises concerns; the company assesses or amends. The master's final safety authority stands.
✗
Question 34. What is the purpose of segmenting ship networks?
Your Answer: (Not answered)
Correct Answer: D (limit the spread of failure or attack and protect critical navigation and control systems)
💡 Segmentation separates office, guest and control networks so an attack cannot reach navigation and control.
✗
Question 35. Typical bridge communication failure scenarios are?
Your Answer: (Not answered)
Correct Answer: C (ambiguous orders, no read-back, hierarchy suppressing dissent)
💡 Communication gaps let errors stand; BRM stresses read-back and speak-up.
✗
Question 36. Safety management of potable water on board includes?
Your Answer: (Not answered)
Correct Answer: A (periodic residual chlorine and microbiological testing plus tank cleaning)
💡 Test microbes and chlorine residual, clean and disinfect tanks with records to prevent waterborne outbreaks.
✗
Question 37. A common cause of position offset on ECDIS is?
Your Answer: (Not answered)
Correct Answer: B (chart datum mismatch or missing antenna offset reference)
💡 Usually datum mismatch between chart and GNSS or an unconfigured antenna offset; verify both routinely.
✗
Question 38. What is the risk of issuing a clean bill of lading against a letter of indemnity?
Your Answer: (Not answered)
Correct Answer: C (the owner may face cargo claims and the indemnity may not be enforceable)
💡 A clean bill against an indemnity shifts risk to the owner; if the indemnifier cannot pay, the owner bears the loss.
✗
Question 39. Audit finds crew unfamiliar with muster stations and no records exist. The most likely root cause is?
Your Answer: (Not answered)
Correct Answer: A (monthly drills and familiarization not effectively implemented)
💡 Unfamiliarity without records means drills and familiarization skipped or were formal—a training-system failure.
✗
Question 40. When the same deficiency recurs at consecutive inspections, PSC will consider?
Your Answer: (Not answered)
Correct Answer: B (the company's corrective action failed, warranting escalation and higher risk rating)
💡 Recurrence means failed root-cause fixes; PSC raises risk rating and may question the company itself.
✗
Question 41. What is the best way for crew to take part in improving the system?
Your Answer: (Not answered)
Correct Answer: D (reporting near misses and hazards and suggesting improvements)
💡 Frontline crew know the risks best; reporting near misses and suggesting improvements is the most valuable input.
✗
Question 42. The SOPEP should be periodically?
Your Answer: (Not answered)
Correct Answer: D (drilled for reporting and initial response, with equipment checks)
💡 Drills familiarise the crew with reporting and gear, ensuring real-spill effectiveness.
✗
Question 43. Class, statutory and system surveys: how are they arranged without wearing the ship out?
Your Answer: (Not answered)
Correct Answer: D (plan them together, combine what can be combined - less time off work, nothing missed)
💡 The three cover a great deal of the same ground: one compartment, one set of thickness measurements, one lot of safety appliances, one engine test may be a class item and a statutory item at once. Bringing them into one window - one entry, one trial, both signatures - saves off-hire and cost and keeps the records from contradicting each other, since two wastage figures for the same plate, one for the society and one for the flag, is exactly what cannot be explained after an accident. The condition is planning ahead: the company and the ship list every item falling due in the plan year, agree the order and what may be combined with the survey authorities, and have documents, tests and people ready in time. Combining is no reason to stretch one item's expiry, and separate visits are no reason to drop the shared work.
✗
Question 44. The role of a Recognized Organization (RO) is?
Your Answer: (Not answered)
Correct Answer: B (authorised by flag to survey and certify; the company cooperates with its audits)
💡 ROs survey and certify on the flag's behalf including ISM/ISPS audits; companies cooperate and act on findings.
✗
Question 45. The "four not let go" principle in incident reporting means?
Your Answer: (Not answered)
Correct Answer: D (no closure until cause clear, liable handled, fix done, crew trained)
💡 It demands clear cause, accountable handling, implemented fixes and trained personnel before closure.
✗
Question 46. Under ISM, a "critical operation" means?
Your Answer: (Not answered)
Correct Answer: C (an operation whose error would immediately endanger safety or cause pollution)
💡 Rule 7: critical operations are those whose error would immediately threaten safety or cause pollution.
✗
Question 47. When a seafarer must be repatriated as medically unfit, the master should?
Your Answer: (Not answered)
Correct Answer: A (obtain medical advice, report the company and arrange treatment and repatriation)
💡 Medical unfitness needs medical advice; report, arrange treatment and repatriation and keep medical and cost records.
✗
Question 48. The purpose of a technical bulletin is?
Your Answer: (Not answered)
Correct Answer: D (inform the fleet of equipment failures, fixes and operational cautions)
💡 Bulletins spread one ship's failure and fix to sister ships quickly, preventing repeats across the fleet.
✗
Question 49. On an engine room bilge alarm, the crew should?
Your Answer: (Not answered)
Correct Answer: B (find the leak, start emergency pumping and report, preparing damage control if needed)
💡 Find the source, start emergency pumping, report and prepare plugging and closing to protect buoyancy.
✗
Question 50. Through which channel should a request for maritime assistance be made?
Your Answer: (Not answered)
Correct Answer: B (via coast station, regional RCC or the distress calling channel)
💡 Use official channels such as coast stations, the RCC or channel 16 to enter the formal SAR system quickly.
✗
Question 51. How should watchkeeping be maintained while in port?
Your Answer: (Not answered)
Correct Answer: B (keep sufficient crew aboard with regular rounds meeting manning and response needs)
💡 Keep enough qualified crew aboard for rounds, manning minimums and emergency response, especially during cargo or bunkering.
✗
Question 52. After major repairs, the SMS requires?
Your Answer: (Not answered)
Correct Answer: D (accept per standard, keep certificates/records, verify safe state restored)
💡 Acceptance closes the repair loop; operating unverified risks hidden defects.
✗
Question 53. SMS use of idle time (at anchor, waiting tide) for maintenance should?
Your Answer: (Not answered)
Correct Answer: B (schedule non-urgent upkeep with risk assessment and permits)
💡 Use idle windows for low-risk maintenance under permits, keeping readiness to sail.
✗
Question 54. An effective safety/environment policy usually includes?
Your Answer: (Not answered)
Correct Answer: C (commitment to safety, health, pollution prevention and compliance with resources)
💡 The policy must commit to people, ship, environment, compliance with resources.
✗
Question 55. The value of equipment history files is?
Your Answer: (Not answered)
Correct Answer: B (support trend analysis, life assessment and renewal decisions)
💡 Histories reveal repeat failures and degradation rates, guiding strategy and renewal decisions.
✗
Question 56. Alternatives when ship-shore communication is lost are?
Your Answer: (Not answered)
Correct Answer: D (use backup satellite, MF/HF or relay through another ship or coast station)
💡 Fall back to backup satellite or MF/HF, or relay via other ships and coast stations so contact is never lost.
✗
Question 57. When crew medical care requires agent assistance, the ship should?
Your Answer: (Not answered)
Correct Answer: C (advise symptoms and needs early with documents and insurance details)
💡 Brief the agent on condition and specialty needed, and ready passports, seaman's book and insurance details.
✗
Question 58. A relief not familiar with the procedure taking over a critical op is a?
Your Answer: (Not answered)
Correct Answer: C (operational-control defect risking misuse)
💡 Unfamiliar operation is uncontrolled; the SMS must ensure handover and familiarisation.
✗
Question 59. In an emergency the master cannot carry the decision alone. What supports him?
Your Answer: (Not answered)
Correct Answer: B (delegation settled beforehand, rehearsed plans, shore support, and a just culture)
💡 In an emergency the master works under incomplete information, crowded communications and time pressure, and the quality of his judgement falls as the load rises. The system lightens it in advance: plans standardise the steps and the conditions that start them, delegation lets the officer of the watch, a tug or the shore act first within stated limits, the shore emergency centre supplies data, communications and outside co-ordination, and just culture keeps the ship willing to say the situation is worse than the master assumed. Loading everything onto the master afterwards teaches concealment for the next event, and pulling extra people onto the bridge to debate crowds the con.
✗
Question 60. On finding a suspicious person boarding or in a restricted area, the ship should?
Your Answer: (Not answered)
Correct Answer: A (per SSP intercept, question, alarm and report to CSO/authority)
💡 Handling suspects is the first security response—follow SSP, report up.
✗
Question 61. The core role of the Ship Security Plan (SSP) is?
Your Answer: (Not answered)
Correct Answer: C (specify the concrete security measures and duties at each level)
💡 The SSP is the security playbook—confidential, controlled, executed per level.
✗
Question 62. Chronic fatigue from scheduling requires the SMS to?
Your Answer: (Not answered)
Correct Answer: B (adjust manning and watches to ensure rest compliance)
💡 Fatigue breeds accidents; the SMS must fix scheduling and manning.
✗
Question 63. What measures prevent disease spread during crew changes?
Your Answer: (Not answered)
Correct Answer: C (health declaration, temperature checks and isolation as needed under port rules)
💡 Crew change is a high-risk path for disease; follow company and port rules on declaration, testing and isolation.
✗
Question 64. What decides whether a casualty is landed?
Your Answer: (Not answered)
Correct Answer: C (how far the case has gone, what the ship can do for it, and what is available ashore, weighed together)
💡 Both ends have to be looked at: what the case itself is - consciousness, breathing, whether bleeding can be held, whether it may worsen on the way; what the ship can do - how many hands, whether anyone is trained in first aid, whether the medicines and equipment and the ability to keep watching will cover it; and then what exists ashore, how far it is, and whether weather and sea allow a helicopter or a transfer alongside. Set those three against each other and the case for altering course makes itself, and the decision once made must be carried out at once, since the consequences of some injuries are counted in hours and cannot be undone. Leaving it to owner and charterer to talk over, or waiting because the port is due, hands the judgement to somebody else.
✗
Question 65. How are certificates handled when a ship reflags?
Your Answer: (Not answered)
Correct Answer: A (reissued by the new flag Administration or its authorised body)
💡 New flag issues fresh certificates after survey; old ones lapse and SMS documents and markings must be updated.
✗
Question 66. What does sediment management in ballast tanks involve?
Your Answer: (Not answered)
Correct Answer: B (periodic removal and disposal per procedure to avoid spread on discharge)
💡 Sediment concentrates organisms; remove it on plan and dispose per procedure, never discharge or dump it.
✗
Question 67. The pilot ladder is insecurely rigged before arrival; you should?
Your Answer: (Not answered)
Correct Answer: A (re-secure it properly and confirm safety before allowing boarding)
💡 Secure the ladder properly and confirm it reaches the water before allowing boarding; never let a pilot risk it.
✗
Question 68. What does the system require of shore staff?
Your Answer: (Not answered)
Correct Answer: C (have the competence to support ship safety and pollution prevention)
💡 Shore staff must be competent and resource the ship; ship and shore together make the system work.
✗
Question 69. A pre-arrival briefing should include?
Your Answer: (Not answered)
Correct Answer: C (plan, duties, risk points and abort criteria)
💡 Cover the plan, roles, known risks such as tide and traffic, and the conditions for aborting or diverting.
✗
Question 70. The emission-reduction benefit of shore power (cold ironing) is?
Your Answer: (Not answered)
Correct Answer: C (shut auxiliary engines in port cutting local air emissions)
💡 Shore power lets auxiliaries and boilers shut down in port, cutting SOx, NOx and particulate emissions.
✗
Question 71. The purpose of parallel indexing is?
Your Answer: (Not answered)
Correct Answer: A (continuously detect deviation from the planned track early)
💡 Comparing radar returns to fixed reference lines reveals any off-track drift continuously.
✗
Question 72. A common problem with decision-making under stress is?
Your Answer: (Not answered)
Correct Answer: C (cognitive tunnelling ignoring better options)
💡 Stress narrows attention to salient cues and skips verification; team cross-checks counter this.
✗
Question 73. How do condition monitoring and planned maintenance relate?
Your Answer: (Not answered)
Correct Answer: A (condition monitoring refines intervals; they complement rather than replace each other)
💡 Planned maintenance sets intervals and monitoring adjusts them from actual condition; together they raise reliability and cut waste.
✗
Question 74. An anchor watch should primarily monitor?
Your Answer: (Not answered)
Correct Answer: B (dragging, cable strain, position changes and nearby traffic)
💡 Watch position for dragging, cable direction/strain and approaching traffic while yawing.
✗
Question 75. The purpose of crew training records is?
Your Answer: (Not answered)
Correct Answer: C (evidence competence and compliance, supporting promotion, assignment and inspection)
💡 Records show courses, assessments and certificates, proving compliance and guiding assignments and audit checks.
✗
Question 76. Crew bring unauthorised persons aboard in port; the master should?
Your Answer: (Not answered)
Correct Answer: D (refuse and require them to leave, investigate and act under security procedures)
💡 Unauthorised persons breach security and create risk; refuse, remove them, investigate and report.
✗
Question 77. What is NOT covered by document control?
Your Answer: (Not answered)
Correct Answer: C (restricting verbal communication among crew)
💡 Document control governs documents, not normal working communication; it covers versions, revision and distribution.
✗
Question 78. When the review is closed, what should it leave behind?
Your Answer: (Not answered)
Correct Answer: C (decisions on improving the system, the resources and targets they imply, with named owners and dates)
💡 A management review outputs things that get executed: a judgement on the effectiveness of the system, the specific decisions to improve it, the resources and budget implied, revisions to policy and targets, a named owner and date for each measure, and a check on whether last round's measures were carried out. These pass into a follow-up list and are compared item by item next time. Minutes, attendance sheets and compliments are records, not outputs; a review comment with no owner and no date reappears untouched in next year's report.
✗
Question 79. If an equipment defect is found unrecorded at handover, what applies?
Your Answer: (Not answered)
Correct Answer: B (require it to be recorded and reported and entered into the defect list)
💡 Defects must be recorded and reported in writing; verbal handover breaks the tracking chain.
✗
Question 80. When a newbuilding joins the Company SMS, it should?
Your Answer: (Not answered)
Correct Answer: D (complete familiarisation, procedure-equipment alignment and audit approval)
💡 Newbuilds must merge into the SMS and be approved, not run outside it.
✗
Question 81. How should safety incentive work in the SMS?
Your Answer: (Not answered)
Correct Answer: A (tie safety performance to recognition and to resources, rather than to penalties alone)
💡 Incentive must point at the behaviour wanted: recognition, backed by resources (training time, spares, manning, working conditions), follows the number and quality of reports, drill performance, prompt correction of defects and improvement suggestions, while penalties stay reserved for deliberate breach and concealment. A penalty-only scheme, or a bonus paid on a clean accident figure, pushes near-misses back under the surface - fewer reports do not mean fewer incidents. Just culture, which separates honest error from reasonable risk from recklessness, is the foundation of the approach.
✗
Question 82. Conditions for maintaining management system certification validity include?
Your Answer: (Not answered)
Correct Answer: B (pass surveillance audits, keep the system operating and correct non-conformities)
💡 Certificates require periodic surveillance and renewal with the system running and findings closed or risk suspension.
✗
Question 83. Items to settle with the agent before departure usually include?
Your Answer: (Not answered)
Correct Answer: A (confirm disbursements, hand over documents and clear outstanding items)
💡 Before sailing confirm disbursements, complete bills of lading and manifests, and clear pending stores, repairs and crew matters.
✗
Question 84. The main means of internal emergency communication on board are?
Your Answer: (Not answered)
Correct Answer: D (general alarm, public address and portable radios combined)
💡 Emergency comms combine the general alarm, PA and handheld radios so orders get through amid noise and power loss.
✗
Question 85. How may sludge from the machinery spaces be disposed of?
Your Answer: (Not answered)
Correct Answer: B (to a reception facility, or through an approved arrangement on board and then to a reception facility)
💡 Sludge is what the separators and the settling leave behind, not a thin oil the sea can be asked to absorb: the rule forbids putting sludge from machinery spaces or residues from cargo oil tanks into the sea unless it goes to a reception facility, or passes through a fixed or approved arrangement on board that lets it be delivered to one. Hence the ship carries a sludge tank of adequate capacity, arranged to be emptied and cleaned; an approved incinerator may burn sludge within its own limits and where the rule allows, with what was burnt, when and where, entered in the record book. Crushing sludge to send it with bilge water through the separator, or diluting it under 15 ppm, does not work - that figure is the condition for bilge water and lends itself to nothing else. A receipt is taken and kept for every delivery ashore, and each entry has to square with what the tank could hold, since the auditor reads the tank soundings against the book.
✗
Question 86. Which ships are normally made subject to an expanded inspection under port State control?
Your Answer: (Not answered)
Correct Answer: C (ships of higher risk type and age and those with a detention or a weight of deficiency history, checked over more items and deeper)
💡 The expanded inspection is chosen rather than merely prolonged. Ships of certain types, passenger, tank and bulk carriers among them, older tonnage, a ship that has been detained or has a weight of deficiencies behind her, and any listed for closer monitoring in the information system, are asked for fuller documentation and are inspected over more of the ship, down to drill records, maintenance, permits and what the crew can actually do with the equipment. The thresholds and the list of areas belong to the procedure in force and differ in detail between the memoranda. A ship whose paper trail and drills are in order before arrival usually spends less of that time alongside.
✗
Question 87. How should a hull structural repair plan be handled?
Your Answer: (Not answered)
Correct Answer: A (approved by the company with class and carried out by a qualified yard)
💡 Structural repair affects class and strength; approve the plan with class and use a qualified yard with survey.
✗
Question 88. A mooring line parts during cargo work; you should?
Your Answer: (Not answered)
Correct Answer: C (stop the relevant work, run additional lines and check personnel and equipment)
💡 Announce and stop, clear the snap-back zone, run extra lines, equalise loads and check mooring gear for damage.
✗
Question 89. How should document approval and issue work?
Your Answer: (Not answered)
Correct Answer: B (drafted, reviewed and approved at three levels, then issued under control with distribution recorded)
💡 Draft, review and approve, then issue under control with distribution recorded so old editions are withdrawn.
✗
Question 90. During a lifeboat launching drill the boat engine will not start; what applies?
Your Answer: (Not answered)
Correct Answer: D (stop the drill, tag it out of service and report for repair, then re-drill once fixed)
💡 Defects found in drills must stop the exercise and be repaired, then re-drilled; that is the point of drills.
✗
Question 91. A warning of cargo self-heating is received at sea; what applies?
Your Answer: (Not answered)
Correct Answer: C (ventilate or seal and inert as appropriate, monitor temperature closely and report)
💡 Respond by ventilating or sealing and inerting as the cargo requires, monitor temperature, report and divert if needed.
✗
Question 92. How should the effect of energy efficiency measures be assessed?
Your Answer: (Not answered)
Correct Answer: C (comparable data on the same basis under comparable conditions)
💡 Remove differences in load, weather and speed and compare like with like, or conclusions mislead decisions.
✗
Question 93. A crew member is weak in English. What does the master do?
Your Answer: (Not answered)
Correct Answer: A (judge him against the safety demands of the post, then train or reassign where he falls short)
💡 Language bears directly on safe performance: distress traffic, collision-avoidance co-ordination, fire and dewatering orders, dangerous-goods marks and equipment plates all depend on reading and hearing. The master assesses the seafarer against the safety tasks of his post, arranges targeted training with supported use on the job, moves him to a post of lower language demand and lower risk, or reports the gap to the company so that the company decides on manning. The standard is not relaxed because the voyage is tight, and complete certificates prove qualification for discharge, not that orders can be heard and given on board.
✗
Question 94. The master's role in team conflict is?
Your Answer: (Not answered)
Correct Answer: B (intervene early, establish facts and restore cooperation)
💡 Unresolved conflict erodes teamwork and lookout quality; step in early, hear both sides and repair relations.
✗
Question 95. How should onboard objectives be set?
Your Answer: (Not answered)
Correct Answer: D (specific, measurable, with an owner and a deadline)
💡 Objectives need to be specific, measurable, owned and timed so progress and results can be checked, not vague slogans.
✗
Question 96. How do the dangerous goods list and the stowage plan relate?
Your Answer: (Not answered)
Correct Answer: A (the list and plan must agree, showing class, position and quantity)
💡 The plan must match the list with positions and classes so emergencies can be located and handled quickly.
✗
Question 97. The value of sharing lessons learned is?
Your Answer: (Not answered)
Correct Answer: D (prevent recurrence of similar incidents across the fleet)
💡 Sharing structured lessons lets ships that never had the event benefit—cheap prevention of recurrence.
✗
Question 98. Which ships must carry the oil pollution emergency plan?
Your Answer: (Not answered)
Correct Answer: A (oil tankers of 150 gross tonnage and upwards, other ships of 400 gross tonnage and upwards)
💡 Under Annex I an oil tanker of 150 gross tonnage and upwards and any other ship of 400 gross tonnage and upwards must have the plan on board, controlled as part of the safety management system - the copy that matters is the one that can be picked up at once, not the one held ashore. Its reporting procedures, contacts, equipment and the standing of who does what have to agree with the ship as she is, and are drilled, with what the drill exposes going back into the document. It must also join up with the pollution cover and the reporting demands of the coastal state, or in a real spill it is only read aloud.
✗
Question 99. If the fire pump cannot deliver or the lifeboat engine won't start, PSC will?
Your Answer: (Not answered)
Correct Answer: D (raise a major non-conformity and may detain, safety equipment failed)
💡 Fire/life-saving gear failure is a major non-conformity with high detention risk.
✗
Question 100. When is an occasional survey normally requested?
Your Answer: (Not answered)
Correct Answer: B (after casualty, conversion, change of name or flag or related certificate changes)
💡 Request after damage, conversion, change of name, owner or flag, or when certificate details need amending.