Question 1. In a crossing situation, what principle governs the stand-on vessel's action?
Your Answer: (Not answered)
Correct Answer: C (keep course and speed at first; but once it is clear the give-way vessel is not acting as the rules require, take avoiding action alone)
💡 Where one of two vessels is to keep out of the way the other keeps course and speed - not a bar on moving but a predictable target offered to the other. The keeping has a condition: as soon as the stand-on vessel finds the give-way vessel plainly not acting as the rules require, she should act alone in the way best to avoid collision, and a turn to starboard generally serves better than one to port, which would put her across his bow. When collision cannot be avoided by the give-way vessel's action alone, she may depart from the rules. Easing ahead across his bow, doing his keeping-out-of-the-way for him, or stopping on the spot all throw away the predictability.
✗
Question 2. What must the navigational safety measures for polar waters include?
Your Answer: (Not answered)
Correct Answer: D (A voyage plan taking account of ice conditions, visibility and the ship's capabilities, with action to be taken if they are exceeded)
💡 The Polar Code requires the voyage plan for polar waters to consider ice conditions, visibility, the ship's ice class capability and the experience of the crew, and to state the action to be taken if conditions exceed the ship's capabilities, such as altering course or stopping.
✗
Question 3. On a passenger ship, each space shall be provided with at least how many means of escape?
Your Answer: (Not answered)
Correct Answer: D (2)
💡 SOLAS II-2/13 requires at least two widely separated means of escape from each space on a passenger ship.
✗
Question 4. What is the usual maximum validity of a Passenger Ship Safety Certificate?
Your Answer: (Not answered)
Correct Answer: D (Twelve months)
💡 Under SOLAS I/12 a Passenger Ship Safety Certificate has a usual validity of not more than twelve months, unlike the certificates of a cargo ship, with the relevant surveys completed within the period. Because a passenger ship carries many people, its surveys and certificate management are more frequent.
✗
Question 5. What should be noted about the combined operation of watertight doors and the bilge system?
Your Answer: (Not answered)
Correct Answer: B (The interaction of door closure with bilge pumping should be considered, avoiding a change in heel or stability from pumping or flooding)
💡 Bilge pumping and ballast operations change the distribution of weight and the heel of the ship. They should be considered together with the open or closed state of the watertight doors, preventing pumping or flooding from increasing the list, altering stability or cross-connecting compartments, particularly when the ship is already damaged.
✗
Question 6. A cargo ship has lifeboats on one side and liferafts on the other. What is the basic requirement of SOLAS?
Your Answer: (Not answered)
Correct Answer: A (The survival craft capacity on each side must accommodate all persons on board)
💡 SOLAS requires that, whether lifeboats or liferafts are used, the capacity on each side accommodates all persons on board, so everyone can escape if one side is unavailable.
✗
Question 7. How should the hands-on ability of the crew be assessed?
Your Answer: (Not answered)
Correct Answer: D (Assessed through practical drills on critical equipment, with training strengthened where it is weak)
💡 The ISM Code and STCW require the practical ability of the crew on critical equipment to be assessed through drills, such as donning breathing apparatus, using extinguishers and hoses, preparing to launch a lifeboat, emergency steering and damage control operations, with training strengthened where skill is lacking, so that the ability is genuinely usable.
✗
Question 8. What does SOLAS V require when a ship enters a deep-water route?
Your Answer: (Not answered)
Correct Answer: A (To report to the appropriate authority as required and comply with the conditions of use)
💡 SOLAS V requires ships using deep-water routes to report as prescribed and comply with conditions such as under-keel clearance, so as to reduce the risk of grounding.
✗
Question 9. What is the difference between security drills and exercises?
Your Answer: (Not answered)
Correct Answer: B (Drills test individual security measures with the crew, while exercises are larger scale tests involving several parties)
💡 Under the ISPS Code, drills focus on the crew practising individual security measures, normally every three months, whereas exercises test the overall effectiveness of the plan and may involve the company, port facilities and other ships.
✗
Question 10. What information shall the shipper provide to the master before loading solid bulk cargoes?
Your Answer: (Not answered)
Correct Answer: A (Physical and chemical properties including moisture content)
💡 SOLAS XII/6: the shipper shall provide properties such as density, moisture content and flow moisture point.
✗
Question 11. Which system, directly related to fire protection, is required in accommodation and service spaces?
Your Answer: (Not answered)
Correct Answer: B (Fixed fire detection and alarm system)
💡 SOLAS II-2/12 requires fixed fire detection and alarm systems in accommodation and service spaces.
✗
Question 12. A lifebuoy (liferaft) hydrostatic release unit is found beyond its specified service or renewal date. The finding is?
Your Answer: (Not answered)
Correct Answer: B (The overdue release unit prevents the liferaft from releasing automatically as required, a deficiency to be corrected)
💡 A hydrostatic release unit must be within its specified service life; beyond it reliability cannot be assured. If the ship sinks, a failed unit means the liferaft cannot float free automatically, directly endangering survival after abandonment. Any unit found overdue is recorded as a deficiency and must be replaced.
✗
Question 13. A cargo ship has completed one fire drill this month. When at the latest should the next one be held?
Your Answer: (Not answered)
Correct Answer: B (Within the next month, since a cargo ship holds at least one a month)
💡 Under SOLAS III/19 each crew member of a cargo ship should take part in at least one fire drill and one abandon-ship drill each month, while passenger ships hold them weekly. The interval for a cargo ship is therefore one month, and missing it is an emergency preparedness deficiency.
✗
Question 14. What checking of fire pump suction strainers is required?
Your Answer: (Not answered)
Correct Answer: D (Check them for blockage and damage and clean them periodically)
💡 If the strainer at the fire pump suction, in the sea chest, is blocked by marine growth, mud or debris, the pump will draw insufficient water and the pressure will fall. It should be checked and cleaned periodically. A damaged strainer allows debris into the pump and piping and causes damage. Both require prompt attention.
✗
Question 15. A PSCO checked the permanent markings on the hull. Where must the IMO number be marked under SOLAS?
Your Answer: (Not answered)
Correct Answer: A (Permanently marked on the hull, such as on the stern or side, and internally as required)
💡 SOLAS XI-1/3 requires the IMO ship identification number to be permanently marked on the hull, normally on the stern and sides, and also internally as required, so that the ship can be identified and traced.
✗
Question 16. What is required when life-saving appliances are changed on board?
Your Answer: (Not answered)
Correct Answer: B (Replace with approved equipment of equal or better performance and update the records and certificate attachments)
💡 Life-saving appliances should be replaced with approved equipment of the same or better performance, with the equipment records and certificate attachments such as the record of equipment for the cargo ship safety equipment certificate updated and the classification society informed for verification where necessary.
✗
Question 17. What is required for the identification of valves in the bilge system?
Your Answer: (Not answered)
Correct Answer: B (Clear identification of function and direction of operation to prevent misoperation)
💡 SOLAS and good practice require valves in the bilge, ballast and fire systems to be clearly and durably identified as to function and direction of operation, so that in an emergency, particularly in poor visibility or under pressure, the crew does not open or close the wrong valve.
✗
Question 18. The voyage plan shall include:
Your Answer: (Not answered)
Correct Answer: A (a berth-to-berth plan giving due consideration to navigational hazards including safe speed)
💡 SOLAS V/34: the voyage plan covers the whole passage from berth to berth, giving due consideration to navigational hazards and safe speed.
✗
Question 19. What duration shall the lifejacket light battery provide?
Your Answer: (Not answered)
Correct Answer: B (8 hours of continuous operation)
💡 At least 8 hours of continuous operation.
✗
Question 20. What action principle do SOLAS and COLREG emphasise once a risk of collision exists?
Your Answer: (Not answered)
Correct Answer: A (Take early and substantial action so as to be readily apparent to the other vessel and avoid a close-quarters situation)
💡 COLREG requires action to be positive, made in ample time and large enough to be readily apparent. Waiting, hesitating or making a succession of small alterations creates confusion and leads to a close-quarters situation.
✗
Question 21. Sea area A1 means an area within the radiotelephone coverage of at least one:
Your Answer: (Not answered)
Correct Answer: A (VHF coast station with continuous alerting capability)
💡 SOLAS IV/2: Sea area A1 is the area within the radiotelephone coverage of at least one VHF coast station with continuous DSC alerting.
✗
Question 22. A cargo ship safety equipment certificate expires while the ship is still at sea on her return voyage. What may the Administration do?
Your Answer: (Not answered)
Correct Answer: A (Grant an extension of not more than three months so the ship may reach her port of survey)
💡 SOLAS I/14 permits an extension of up to three months for a certificate expiring during a voyage, so that the ship may reach the port where she is to be surveyed.
✗
Question 23. What do SOLAS and the IMDG Code require for marking and labelling of dangerous goods packages?
Your Answer: (Not answered)
Correct Answer: D (The proper shipping name, UN number and the relevant hazard class label)
💡 SOLAS VII and the IMDG Code require dangerous goods packages to show the proper shipping name, the UN number and the relevant hazard class label, including the marine pollutant mark, so that the crew can identify the hazard and act accordingly.
✗
Question 24. What familiarisation training is required for newly joined crew?
Your Answer: (Not answered)
Correct Answer: A (Completed before taking up duties, covering duties, the location and operation of equipment and emergency duties and procedures)
💡 The ISM Code and STCW require newly joined crew to complete familiarisation training before taking up their duties, covering their responsibilities on board, the location and operation of relevant equipment and emergency duties and procedures and safety and pollution prevention requirements, with records kept. Training after taking up duties is not acceptable.
✗
Question 25. What is the correct radiotelephony distress procedure?
Your Answer: (Not answered)
Correct Answer: A (Say MAYDAY three times, then give the ship's name, position and nature of distress and wait for an answer)
💡 The distress call comprises MAYDAY three times, followed by the name and call sign of the ship, her position, the nature of the distress and the assistance required, then waiting for an answer. Channel 70 must not be used for speech.
✗
Question 26. The berth-to-berth principle of voyage planning means that the plan covers:
Your Answer: (Not answered)
Correct Answer: D (the entire passage from berth at the port of departure to berth at the port of destination)
💡 SOLAS V/34 requires a berth-to-berth plan covering all stages of the passage.
✗
Question 27. How must a ship fulfil the duty to render assistance at sea under SOLAS V?
Your Answer: (Not answered)
Correct Answer: A (To proceed with all speed to render assistance where there is reasonable ground to believe another ship is in distress, and to inform the owner or agent)
💡 SOLAS requires the master to proceed with all speed to render assistance where there is reasonable ground to believe a ship is in distress, and to inform the owner or agent. Assistance is a legal duty.
✗
Question 28. What is the purpose of the transmitting heading device on board?
Your Answer: (Not answered)
Correct Answer: D (To distribute the heading signal from the gyro compass to radar, AIS and similar equipment)
💡 The transmitting heading device supplies the heading to radar, AIS, ECDIS and other equipment, ensuring consistent heading data and avoiding errors in control and display.
✗
Question 29. Which Code governs the stability of ships carrying grain in bulk?
Your Answer: (Not answered)
Correct Answer: C (The International Grain Code)
💡 The International Grain Code.
✗
Question 30. What is the requirement for the lifeline in a firefighter's outfit?
Your Answer: (Not answered)
Correct Answer: B (A fire-resisting lifeline of adequate length and strength for rescue use)
💡 SOLAS requires a fire-resisting lifeline of adequate length and strength for searching for and rescuing persons in smoke. An ordinary rope does not have the necessary fire resistance.
✗
Question 31. What is examined during a PSC inspection of a galley fixed extinguishing system?
Your Answer: (Not answered)
Correct Answer: C (Whether the system is operational, whether nozzles are clear and whether the release control is marked)
💡 A galley fixed extinguishing system should be checked for being operational, with pressure or weight correct, nozzles clear of grease and the release control clearly marked and operable. An appearance check alone would not reveal a failed system.
✗
Question 32. The carriage of liquefied gases in bulk shall follow:
Your Answer: (Not answered)
Correct Answer: B (the International Gas Carrier Code (IGC Code))
💡 SOLAS VII/11: the carriage of liquefied gases in bulk shall follow the IGC Code.
✗
Question 33. What must the cargo information provided by the shipper include under SOLAS and the IMSBC Code?
Your Answer: (Not answered)
Correct Answer: A (The cargo name, group, stowage factor, trimming requirements and chemical hazards where applicable)
💡 SOLAS VI/1 and the IMSBC Code require information including the proper shipping name, cargo group, stowage factor, trimming requirements, moisture content and chemical hazards to be provided before loading, enabling the master to judge suitability and take the necessary precautions.
✗
Question 34. What does COLREG require for crossing a traffic lane in a routeing scheme?
Your Answer: (Not answered)
Correct Answer: C (Cross as nearly as practicable at right angles to the lane and avoid impeding vessels following the lane)
💡 COLREG Rule 10 requires a vessel crossing a traffic lane to do so as nearly as practicable at right angles to the general direction of traffic flow and to avoid impeding vessels following the lane. Diagonal or contrary navigation disrupts the flow and increases the risk of collision.
✗
Question 35. What does SOLAS address regarding stopping machinery space ventilation fans?
Your Answer: (Not answered)
Correct Answer: D (Fans must be capable of remote stopping, with the control outside the space)
💡 SOLAS requires machinery space ventilation fans to be capable of being stopped remotely, with the control outside the space, working together with the closing of dampers to cut off the air supply quickly in a fire and prevent it from intensifying.
✗
Question 36. Isolating valves in the fire main shall be operable:
Your Answer: (Not answered)
Correct Answer: C (from a position outside the machinery space so as to isolate the main in case of fire)
💡 SOLAS II-2/10 requires isolating valves operable from outside the machinery space to isolate the fire main.
✗
Question 37. What communication is required when entering an enclosed space?
Your Answer: (Not answered)
Correct Answer: B (Continuous communication with the standby person, including periodic contact, with immediate withdrawal if it is lost)
💡 SOLAS and the IMO resolutions require the entrant to maintain continuous communication with the standby person at the entrance, normally by agreed periodic contact, and to withdraw at once if communication cannot be restored, preventing an incident from going unnoticed.
✗
Question 38. What reward mechanisms for crew suggestions may be used?
Your Answer: (Not answered)
Correct Answer: D (Rewards and recognition may encourage the crew to propose improvements, driving continual refinement)
💡 The ISM system encourages mechanisms of reward, recognition and inclusion in appraisal for crew who put forward effective improvements or detect significant hazards in time, giving them an incentive to take part in safety management and driving continual enhancement and genuine effectiveness of the system.
✗
Question 39. Besides the emergency duties of each crew member, what else must the muster list specify?
Your Answer: (Not answered)
Correct Answer: B (The muster stations)
💡 SOLAS III/37: the muster list shall specify duties and muster stations.
✗
Question 40. Which arrangement is required in vehicle spaces of ro-ro ships?
Your Answer: (Not answered)
Correct Answer: A (A fixed fire-extinguishing system and efficient drainage)
💡 A fixed system and effective drainage are required.
✗
Question 41. What is required regarding problems found at a renewal survey before a new certificate is issued?
Your Answer: (Not answered)
Correct Answer: D (All matters affecting issue must be resolved before issue, or accepted by the Administration with conditions recorded)
💡 SOLAS requires matters found at a renewal survey which affect the issue of the certificate to be resolved before issue, or accepted by the Administration with restrictions or additional requirements recorded after assessment. Issuing with the problem outstanding leaves the certificate inconsistent with the actual condition.
✗
Question 42. What items does the stability assessment after loading include?
Your Answer: (Not answered)
Correct Answer: D (Initial metacentric height, the righting lever curve, the maximum righting lever and the weather criterion)
💡 Intact stability assessment normally includes the initial metacentric height, the shape and range of the righting lever curve, the maximum righting lever and its angle and the weather criterion, the ratio of heeling to righting moment. Calculating the initial metacentric height alone does not ensure intact stability.
✗
Question 43. What may follow if a port State inspection finds a deficiency seriously affecting safety?
Your Answer: (Not answered)
Correct Answer: A (The ship may be detained until the deficiency is rectified and the flag State and recognised organisation notified)
💡 Under PSC procedures, where a deficiency seriously endangers the ship, persons or the environment, the port State may detain the ship until it is rectified, normally notifying the flag State and recognised organisation. A deadline or a record alone is not enough for a serious deficiency.
✗
Question 44. If the master finds a defect affecting safe navigation that cannot be repaired on board, the first action is to:
Your Answer: (Not answered)
Correct Answer: A (Report to the Company and arrange repair)
💡 The master should report to the Company so that repair can be arranged and the voyage adjusted.
✗
Question 45. Double bottom spaces may be used:
Your Answer: (Not answered)
Correct Answer: B (as ballast or fuel oil tanks, subject to restrictions on fuel oil tank location)
💡 SOLAS II-1/9 permits double bottom spaces to be used for ballast or fuel, subject to restrictions on fuel oil tanks.
✗
Question 46. A ship was detained by PSC and, after rectification, released following re-inspection by a recognised organisation. Under SOLAS, who issues the relevant certificate?
Your Answer: (Not answered)
Correct Answer: C (The Administration or a person duly authorised by it)
💡 The power to issue certificates rests with the Administration. A recognised organisation may act only within the scope of a formal authorisation given by that Administration.
✗
Question 47. What does the steering gear test before departure include under SOLAS and good seamanship?
Your Answer: (Not answered)
Correct Answer: C (Testing the main and auxiliary steering gear, checking the rudder angle indicator, and verifying bridge to steering gear compartment communication and the emergency steering procedure)
💡 Before departure the main and auxiliary steering gear should be tested, the rudder angle indicator checked, and communication with the steering gear compartment and the emergency steering procedure verified. Failure of any item may have serious consequences in a narrow channel or when berthing.
✗
Question 48. What is the focus of survey for ageing bulk carriers under SOLAS and the ESP?
Your Answer: (Not answered)
Correct Answer: C (The effect on hull strength of corrosion, fatigue cracking and structural deformation)
💡 The ESP and SOLAS require close-up examination of ageing bulk carriers for corrosion, fatigue cracking and deformation, with thickness measurement to assess remaining hull strength and decide on repair or reinforcement.
✗
Question 49. How should work where a single failure could have serious consequences be controlled?
Your Answer: (Not answered)
Correct Answer: C (Multiple barriers such as double checks, standby supervision and restrictions, preventing one mistake causing an accident)
💡 Work where a single failure or mistake could have serious consequences, such as releasing a lifeboat, entering an enclosed space, operating a critical valve or handling dangerous goods, should have multiple barriers: double checks, a standby person, a written permit, restrictions and emergency preparation, preventing one lapse from causing an accident.
✗
Question 50. What does SOLAS address regarding the arrangement of lubricating oil systems in machinery spaces?
Your Answer: (Not answered)
Correct Answer: C (Piping must be leak-tight and kept away from hot surfaces, with level monitoring of oil tanks)
💡 SOLAS requires lubricating oil piping to be leak-tight and clear of hot surfaces, with level monitoring of the oil tanks. Oil leaking onto a hot surface or a turbine is a common cause of machinery space fires.
✗
Question 51. What does SOLAS address regarding stability when carrying timber deck cargo?
Your Answer: (Not answered)
Correct Answer: B (The increase in weight from water absorbed by the timber and ice accretion must be included, with the prescribed stability criteria applied)
💡 SOLAS and the Load Line Convention prescribe stability requirements for ships carrying timber deck cargo, requiring account to be taken of the weight gained from water absorbed, ice accretion and increased windage, assessed against the prescribed criteria, failing which capsize may occur.
✗
Question 52. Besides the ship, where else shall life-saving appliances be provided?
Your Answer: (Not answered)
Correct Answer: A (One full set at the shore establishment)
💡 A full set shall also be kept at the shore establishment.
✗
Question 53. A PSCO tested ventilation closing devices and found some seized. What does SOLAS address?
Your Answer: (Not answered)
Correct Answer: A (Closing devices of machinery space ventilators must close rapidly to cut off ventilation and air supply)
💡 SOLAS II-2 requires machinery space ventilator closing devices to close rapidly and remain effective, cutting off the air supply in a fire. Seized devices or a lack of regular testing are common deficiencies.
✗
Question 54. What does the Polar Code address regarding emergency preparedness in polar waters?
Your Answer: (Not answered)
Correct Answer: A (Recognise the long distances and response times and strengthen self-help capability and emergency supplies)
💡 The Polar Code requires recognition that search and rescue resources in polar regions are limited, response times long and weather conditions severe, so the ship must strengthen her self-help capability, carry ample emergency supplies such as food, thermal protection and fuel and have suitable emergency procedures.
✗
Question 55. In which frequency band does a search and rescue radar transponder operate?
Your Answer: (Not answered)
Correct Answer: C (9 GHz (X band))
💡 A SART operates in the 9 GHz band; when interrogated by a 9 GHz radar it produces a series of response blips on the rescuing ship's display. 406 MHz is the EPIRB frequency.
✗
Question 56. What is the usual maximum interval before the battery of a 406 MHz satellite EPIRB must be replaced?
Your Answer: (Not answered)
Correct Answer: C (5 years)
💡 EPIRB batteries are typically replaced within five years.
✗
Question 57. What do the blind sector limitations of SOLAS V/22 principally concern?
Your Answer: (Not answered)
Correct Answer: A (The total arc and individual arcs of blind sectors ahead as seen from the conning position)
💡 SOLAS V/22 limits the number and total arc of blind sectors ahead from the conning position so that the look-out remains effective. It does not deal with radar shadows or window reflection.
✗
Question 58. What is the principal method of structural fire protection in accommodation and service spaces under SOLAS II-2?
Your Answer: (Not answered)
Correct Answer: B (Division into main vertical zones by class A and B divisions to limit fire spread)
💡 SOLAS II-2 protects accommodation and service spaces principally by fire-resisting divisions into main vertical zones with class A and B boundaries, rather than by extinguishing or detection equipment alone.
✗
Question 59. What is the function of the hydrostatic release unit of an inflatable liferaft?
Your Answer: (Not answered)
Correct Answer: D (To release the raft automatically and allow it to inflate when the ship sinks to a given depth)
💡 The hydrostatic release unit operates at a set depth, cutting the painter and freeing the raft so that it floats free and inflates automatically. It does not add buoyancy nor hold the raft to the ship.
✗
Question 60. A cargo declared as steel is in fact scrap liable to self-heat. What should the master do?
Your Answer: (Not answered)
Correct Answer: B (Require accurate cargo information from the shipper and take measures suited to the true nature; refuse to load if the information is false)
💡 SOLAS VI/1 and the IMSBC Code require the shipper to provide accurate cargo information. Where the nature of the cargo differs from the declaration, the master should require correction, including the group, self-heating properties and hazards, and refuse to load where accurate information cannot be obtained or the cargo is not suitable, avoiding danger from self-heating.
✗
Question 61. Bulk carriers of 150 m and above must be fitted with a loading instrument. What is its purpose?
Your Answer: (Not answered)
Correct Answer: A (To calculate hull stress and intact stability during loading and unloading)
💡 SOLAS XII/11 requires the loading instrument for calculating hull stresses and intact stability during cargo work, preventing structural damage from overloading or incorrect sequence. Water level detection is a separate requirement.
✗
Question 62. Which documents should the company ensure are kept on board?
Your Answer: (Not answered)
Correct Answer: B (The system documentation relevant to the ship's operation, including the manual, procedures and record forms, accessible to the crew)
💡 ISM Code 5 requires the documentation relevant to the operation of the ship, including the safety management manual, procedures, instructions and record forms, to be on board and accessible to the crew for reference and correct execution.
✗
Question 63. What does SOLAS address regarding the relationship between the rated capacity of survival craft and the persons on board?
Your Answer: (Not answered)
Correct Answer: C (The total rated capacity must meet the needs of all persons on board, with the prescribed margin)
💡 SOLAS requires the total rated capacity of the survival craft, under the rules for each side or the whole ship, to accommodate all persons on board with the prescribed margin. Insufficient capacity would leave some persons with nowhere to go on abandonment, a serious deficiency.
✗
Question 64. What equipment status must be handed over at a watch handover?
Your Answer: (Not answered)
Correct Answer: D (The condition of the main engine and steering gear, alarms, the status of navigational equipment and any problems found)
💡 A watch handover should cover the condition of the main engine and steering gear, any alarms or faults, the status of navigational equipment such as radar, ECDIS and AIS and any problems found, enabling the relieving officer to know the true state of the equipment and avoid a wrong appreciation.
✗
Question 65. What is the difference between the bulkhead deck and the freeboard deck under SOLAS II-1?
Your Answer: (Not answered)
Correct Answer: C (The bulkhead deck limits the extent of the main watertight bulkheads, while the freeboard deck is the datum for freeboard and load line)
💡 The bulkhead deck is the uppermost deck to which the main watertight bulkheads extend, whereas the freeboard deck is the datum for measuring freeboard and assigning load lines. Their roles in subdivision and load line calculations differ.
✗
Question 66. Fire hydrant couplings shall:
Your Answer: (Not answered)
Correct Answer: D (be compatible so that hydrants, hoses and nozzles on the same ship are interchangeable)
💡 SOLAS II-2/10: hydrant couplings, hoses and nozzles on the same ship shall be interchangeable.
✗
Question 67. Where must emergency lighting be provided, and what is it for?
Your Answer: (Not answered)
Correct Answer: C (escape routes and exits, muster and boarding stations and the places where work must go on, lighting that survives the failure)
💡 When the main supply has gone people evacuate through smoke and steam, and a route or an exit that is only painted is no use at all. Emergency lighting therefore covers the escape ways in the machinery and accommodation spaces, the exits, the muster and boarding stations, and the positions where work or watching must still go on, such as the steering gear, the fire pumps and the emergency source itself; spaces where passengers gather carry their own requirement. The lamps come on of themselves when the main supply fails and run from the emergency source for the period laid down, longer for passenger ships than for cargo. Luminous markers only assist, a hand lamp is not a substitute for fixed lighting, and neither takes the place of exit and stairway lit all the way out.
✗
Question 68. What capability must a bulk carrier have for loading sequence and strength verification under SOLAS?
Your Answer: (Not answered)
Correct Answer: A (The ability to verify hull stresses and stability at each stage of the approved loading sequence)
💡 SOLAS requires bulk carriers to work to an approved loading or unloading sequence and to verify hull stresses and stability at each stage using the loading instrument, preventing structural damage from concentrated local loading.
✗
Question 69. A Cargo Ship Safety Radio Certificate shall be issued for a period not exceeding:
Your Answer: (Not answered)
Correct Answer: C (5 years)
💡 SOLAS I/12 requires a Cargo Ship Safety Radio Certificate for a period not exceeding 5 years.
✗
Question 70. Emergency lighting shall come into operation automatically:
Your Answer: (Not answered)
Correct Answer: C (on failure of the normal lighting)
💡 SOLAS II-1/42-43 requires emergency lighting to come into operation automatically upon failure of the main source.
✗
Question 71. A PSC inspection found a lifeboat engine that would not start. What does SOLAS require of lifeboat engines?
Your Answer: (Not answered)
Correct Answer: A (They must start at the prescribed low temperature, with adequate fuel and regular testing including weekly running)
💡 SOLAS requires lifeboat engines to start at the prescribed low temperature, with fuel tanks kept filled, and to be run and tested regularly, including weekly running. No fuel or long neglect of testing are common deficiencies.
✗
Question 72. What protection is required when handling corrosive cargo on a chemical tanker?
Your Answer: (Not answered)
Correct Answer: C (Appropriate protective equipment such as acid-resistant gloves, face protection and protective clothing, with washing facilities available)
💡 SOLAS and the IBC Code require appropriate personal protective equipment for handling corrosive or toxic chemicals, such as resistant gloves, face and eye protection and protective clothing, with emergency washing facilities available for prompt treatment on contact. The ship should carry her own protective equipment.
✗
Question 73. What does SOLAS and good seamanship recommend for shiphandling in heavy weather?
Your Answer: (Not answered)
Correct Answer: A (Adopt a course and speed that reduce rolling and slamming, reducing speed or altering course as necessary)
💡 Measures in heavy weather include choosing a course so the hull meets the seas at a suitable angle, avoiding a beam sea and direct head seas, and adjusting speed to reduce slamming and pitching, preventing cargo shift and structural damage. Full speed intensifies the stresses.
✗
Question 74. What navigational measures should the officer of the watch take in restricted visibility?
Your Answer: (Not answered)
Correct Answer: D (Engines ready for immediate manoeuvre, enhanced look-out and radar observation, reducing speed as required and using sound signals)
💡 COLREG Rule 19 and good seamanship require engines ready for immediate manoeuvre, an enhanced look-out and radar observation, reduction of speed or stopping where necessary and the prescribed sound signals, so that other vessels are warned in due time.
✗
Question 75. What information must the damage control information contain under SOLAS?
Your Answer: (Not answered)
Correct Answer: D (Watertight boundaries of compartments, means of cross-flooding, methods of controlling heel and an index to the stability information)
💡 SOLAS II-1/23 requires the damage control information to give the watertight boundaries of compartments, the means of cross-flooding available, measures for controlling heel and an index to the stability information, enabling the master to consult it and act promptly in a damage situation.
✗
Question 76. Under SOLAS Chapter IX, which certificate shall the Company hold?
Your Answer: (Not answered)
Correct Answer: B (DOC)
💡 The Document of Compliance (DOC).
✗
Question 77. The intermediate verification of a Safety Management Certificate shall be carried out:
Your Answer: (Not answered)
Correct Answer: A (around the mid-point of the certificate's validity)
💡 SOLAS IX/4 (ISM) requires intermediate verification around the mid-point of the SMC validity.
✗
Question 78. What does SOLAS address regarding air pipes?
Your Answer: (Not answered)
Correct Answer: B (Air pipes must have effective closing appliances and adequate height to prevent water entering the tanks)
💡 SOLAS and the Load Line Convention prescribe the height and closing appliances of air pipes, so that water does not enter tanks when the deck is swept by seas or the ship lists, preventing loss of stability.
✗
Question 79. A vessel uses ECDIS as her primary means of navigation. Which back-up arrangement satisfies SOLAS chapter V when the superintendent checks it before departure?
Your Answer: (Not answered)
Correct Answer: C (an appropriate back-up arrangement on board, for example a full set of current official paper charts of the right scale, or a second ECDIS on an independent power supply)
💡 Regulation V/19 requires due allowance for ECDIS failure; accepted back-ups are a full set of current official paper charts, or a second ECDIS on independent power, or another type-approved arrangement. Data discs, USB sticks and printouts preserve data but are not an independently usable means of navigation.
✗
Question 80. What is the first action if dangerous goods catch fire on board?
Your Answer: (Not answered)
Correct Answer: D (Raise the alarm, establish the nature of the cargo from the EmS Guide and select the appropriate extinguishing medium, with protection of personnel)
💡 A dangerous goods fire requires the alarm to be raised at once and the nature of the cargo established from the EmS Guide, with the extinguishing medium selected accordingly, since some cargoes react with water or liberate toxic gas and water is prohibited. Personnel must be protected and evacuated, and blind use of water or a close approach avoided.
✗
Question 81. Why does SOLAS require firefighter's outfits to be stowed in more than one location?
Your Answer: (Not answered)
Correct Answer: A (To prevent a fire in one place from making all the outfits unavailable, so they are distributed)
💡 SOLAS requires firefighter's outfits to be stowed in two or more positions because, if they were all in one place, a fire there would make every outfit unavailable and firefighting and rescue could not proceed.
✗
Question 82. Where shall the emergency radio communication equipment be located for ready access?
Your Answer: (Not answered)
Correct Answer: B (Wherever it is readily accessible on the ship)
💡 SOLAS IV/9: the equipment shall be sited so that it is readily accessible at all times.
✗
Question 83. What is required for manholes and flush covers in the freeboard deck?
Your Answer: (Not answered)
Correct Answer: C (Kept closed and secured, preventing sea water entering spaces below when the deck is swept)
💡 SOLAS and the Load Line Convention require manholes and flush covers in the freeboard deck leading to spaces below to be kept closed and secured, with gaskets and fastenings, preventing sea water from entering when the deck is swept or the ship lists. A simple plate is not watertight.
✗
Question 84. A radar transponder (SART) shall operate in the frequency band:
Your Answer: (Not answered)
Correct Answer: D (9 GHz (X-band))
💡 SOLAS IV/7: a SART operates in the 9 GHz (X-band) band so that it can be displayed on a ship's radar.
✗
Question 85. What is required regarding the release of lifeboat gripes in an abandon ship drill?
Your Answer: (Not answered)
Correct Answer: B (Practise releasing the securing arrangements so the crew is familiar with the method and sequence)
💡 An abandon ship drill should include practical release of the lifeboat gripes, limiters and securing arrangements, so that the crew is familiar with the sequence, such as releasing the limiter before the securing, and with the tools. A briefing does not ensure correct operation in an emergency.
✗
Question 86. For SOLAS purposes, a passenger ship is one which carries more than how many passengers?
Your Answer: (Not answered)
Correct Answer: A (More than 12)
💡 SOLAS I/2: a passenger ship carries more than 12 passengers; children under one year are not counted.
✗
Question 87. What certificate is required for a ship operating in polar waters?
Your Answer: (Not answered)
Correct Answer: B (Polar Ship Certificate)
💡 The Polar Ship Certificate.
✗
Question 88. Pipes passing through the collision bulkhead shall be fitted with:
Your Answer: (Not answered)
Correct Answer: C (a valve operable from above the bulkhead deck, with the valve chest inside the forepeak)
💡 SOLAS II-1/12 requires pipes through the collision bulkhead to be fitted with a valve operable from above the bulkhead deck.
✗
Question 89. What is the requirement for the stowage of lifebuoys?
Your Answer: (Not answered)
Correct Answer: D (They must be readily available, normally distributed on both sides and near survival craft muster stations)
💡 SOLAS requires lifebuoys to be readily available, distributed on both sides and near muster stations. Central stowage delays the rescue of a person overboard.
✗
Question 90. What is the principle for dealing with a risk of dragging anchor while at anchor?
Your Answer: (Not answered)
Correct Answer: D (Bring engines to readiness immediately, inform the bridge and master, and if necessary weigh or adjust the cable, warning nearby vessels)
💡 On a risk of dragging, engines should be brought to readiness at once, the bridge and master informed, cable veered or the anchor weighed as necessary, and nearby vessels warned, with the position monitored. Waiting or hesitating often leads to grounding or collision.
✗
Question 91. A PSCO checked the gyro compass error. What does SOLAS and the related standards require of the gyro compass?
Your Answer: (Not answered)
Correct Answer: C (It must indicate true north steadily with the error within the prescribed limits while the ship is under way)
💡 SOLAS V/19 requires the gyro compass to indicate true north steadily within prescribed error limits while the ship is under way and rolling, with regular checks and records during the voyage.
✗
Question 92. In addition to intact stability, a passenger ship must also satisfy:
Your Answer: (Not answered)
Correct Answer: B (Damage stability)
💡 SOLAS II-1/7: passenger ships must comply with both intact and damage stability requirements.
✗
Question 93. What isolation is required between ballast and cargo hold piping?
Your Answer: (Not answered)
Correct Answer: D (The ballast system must not be connected to the cargo spaces, preventing contamination or cross-connection affecting stability)
💡 SOLAS and MARPOL require the piping between the ballast system and the cargo holds or cargo tanks to be effectively isolated, by isolating valves, blanks or separate piping, preventing ballast water and cargo from cross-connecting, which would contaminate the cargo, cause abnormal stability or lead to an illegal discharge.
✗
Question 94. What preparation does SOLAS and good seamanship require before heavy weather?
Your Answer: (Not answered)
Correct Answer: C (Check and secure deck and hold cargo, close watertight openings and adjust course and speed to reduce impact)
💡 Before heavy weather, cargo securing should be checked, watertight openings closed and course and speed adjusted to reduce hull stress, with the ship's condition monitored, limiting the risk of structural damage and cargo shift.
✗
Question 95. What length must a rescue boat have under SOLAS?
Your Answer: (Not answered)
Correct Answer: B (Not less than 3.8 m and not more than 8.5 m)
💡 SOLAS requires a rescue boat to be not less than 3.8 m and not more than 8.5 m in length, balancing carrying capability against the ability to be manoeuvred and recovered quickly. Too small gives insufficient capacity, too large hinders rapid handling.
✗
Question 96. What reporting is required for a security incident?
Your Answer: (Not answered)
Correct Answer: A (Report at once under the procedure to the company, the Administration and the relevant parties, recording the circumstances)
💡 A security incident such as unauthorised boarding, the introduction of weapons, theft or sabotage requires immediate reporting under the ship security plan to the company, the Administration where necessary and the port facility security officer, recording the course of the incident, the action taken and the result, with analysis and improvement to follow.
✗
Question 97. How should a deficiency concerning crew training found at a PSC inspection be rectified?
Your Answer: (Not answered)
Correct Answer: A (Organise targeted training and drills, assess the outcome and record it, revising the training plan if necessary)
💡 A training deficiency, such as unfamiliarity with equipment or unclear emergency duties, should be met by targeted training and practical drills, with the outcome assessed and records kept and the training plan and its execution analysed and revised, so that the problem is genuinely resolved.
✗
Question 98. An International Ship Security Certificate (ISSC) shall be issued for a period not exceeding:
Your Answer: (Not answered)
Correct Answer: C (5 years)
💡 SOLAS XI-2/3: an International Ship Security Certificate shall be issued for a period not exceeding 5 years.
✗
Question 99. What should be noted when using VHF for port communication?
Your Answer: (Not answered)
Correct Answer: A (Use the designated port channels, keep transmissions concise and end them promptly, maintaining a watch on channel 16)
💡 Port communication should use the designated channels, such as the berthing, pilot and VTS frequencies, with concise standard phraseology and transmissions ended promptly, while a watch is kept on channel 16 for distress and safety traffic. Channel 16 must not be occupied at length.
✗
Question 100. What is the required interval for enclosed space entry and rescue drills on a cargo ship?
Your Answer: (Not answered)
Correct Answer: D (At least once every two months)