Exam Home Website
中文 English
0
/100
FAIL
Correct: 0/100 Total Questions: 100 Time Spent: 60min0sec
Passing: 80
Retake History
Answer Review
✗
Question 1. What should be done when the residue tank capacity is insufficient?
Your Answer: (Not answered)
Correct Answer: C (arrange shore reception in advance and record it)
💡 Residues go to shore reception with a receipt; if capacity is short, report early. Any discharge at sea is illegal.
✗
Question 2. The main purpose of a fire patrol is to?
Your Answer: (Not answered)
Correct Answer: A (detect early signs, stop unsafe acts and verify fire systems)
💡 Patrols catch incipient signs and unsafe acts early and check escape routes—the cheapest prevention available.
✗
Question 3. Finding an unattended suspicious package on board, the first action is?
Your Answer: (Not answered)
Correct Answer: C (cordon off, forbid touching, activate security or emergency procedures)
💡 Never touch it; cordon off, evacuate the vicinity, inform master and shore and follow the emergency plan.
✗
Question 4. "External documents" aboard (conventions, rules, circulars) should be?
Your Answer: (Not answered)
Correct Answer: B (identified, kept current and on a controlled list, avoiding outdated versions)
💡 External documents must be controlled and current; outdated ones mislead operations.
✗
Question 5. The value of the List of Lights and Fog Signals is?
Your Answer: (Not answered)
Correct Answer: C (verify characteristics, period, sector and range for identification and screening)
💡 It lets you check colour, period, sectors and range to identify marks and detect screening by terrain.
✗
Question 6. The first choice for external emergency communication is?
Your Answer: (Not answered)
Correct Answer: D (use VHF, MF/HF or satellite distress calling as appropriate to the area)
💡 Use the appropriate distress path for the area and equipment—DSC VHF, MF/HF or satellite—and keep watch.
✗
Question 7. Under the ISM Code requirements on resources and personnel, the company must ensure before duty that seafarers are ____; in audits this is normally verified by ____.
Your Answer: (Not answered)
Correct Answer: A (being familiarised with the duties of their post and the SMS, with task-based training before duty; records sampled plus questioning and observation on board)
💡 The requirement is familiarisation and training before duty, not an invented hour quota or a signed undertaking. Auditors sample records and question and observe on board; a signature sheet proves nothing about understanding, and certificate validity or safe manning is a separate matter.
✗
Question 8. If documents differ from reality, for example in bill of lading quantities, the master should?
Your Answer: (Not answered)
Correct Answer: A (verify, refuse to sign false documents and report the company)
💡 Documents signed by the master carry legal effect; verify, refuse false content and report for instructions.
✗
Question 9. The usual three-tier structure of SMS documentation is?
Your Answer: (Not answered)
Correct Answer: C (manual, procedures, instructions/records three tiers)
💡 Tier 1 manual sets policy, tier 2 procedures set cross-functional flows, tier 3 instructions and records execute.
✗
Question 10. An SOPEP drill should cover?
Your Answer: (Not answered)
Correct Answer: B (reporting procedures, containment deployment, recovery and shore contact)
💡 It exercises reporting, boom deployment, recovery gear and team roles with timings recorded.
✗
Question 11. On what does the period for which system records are kept depend?
Your Answer: (Not answered)
Correct Answer: C (the conventions, the flag State and the company documents settling it, key records kept longer and not destroyed at will)
💡 The period is not the ship's to choose. Some records are fixed by the conventions themselves, the oil record book being kept for a stated time after the last entry, the garbage and ballast books having their own terms; the flag State sets what it wants for certificates, crew files and casualty material; and the company puts drills, the closing out of non-conformities and investigation papers into the class that must outlive the rest. Anything bound up with a casualty, a claim or an investigation is kept until that is done with, and destruction goes by the authority the documents name, with the fact of it recorded, not by a shortage of paper or the convenience of the person who clears the drawer. A list on board showing each record, its period, its keeper and where it lives belongs with the handover when the man changes.
✗
Question 12. The key to verification tracking of corrective actions is?
Your Answer: (Not answered)
Correct Answer: A (verify effectiveness, ineffective means not closed)
💡 Closure requires proven effectiveness—evidence and improved trend, not merely signed forms.
✗
Question 13. The Company may delegate tasks, but it cannot delegate?
Your Answer: (Not answered)
Correct Answer: A (its ultimate responsibility for safety and pollution prevention)
💡 Duties may be delegated, but ultimate accountability stays with the Company.
✗
Question 14. How to treat "inshore traffic zones" and "deep-water routes" in planning?
Your Answer: (Not answered)
Correct Answer: C (use per rules, avoid restricted zones, deep-draft uses deep-water route)
💡 Use designated deep-water routes for deep-draft vessels; avoid inshore zones unintentionally.
✗
Question 15. What is the correct principle for cost saving?
Your Answer: (Not answered)
Correct Answer: A (save without lowering safety and compliance standards)
💡 Cut costs above the safety and compliance floor; saving at safety's expense always costs more later.
✗
Question 16. What should structural maintenance records be?
Your Answer: (Not answered)
Correct Answer: C (complete and continuous, forming a traceable history for survey and decisions)
💡 Continuous records show corrosion and repair trends and support survey, budgeting and risk assessment.
✗
Question 17. A common cause of position offset on ECDIS is?
Your Answer: (Not answered)
Correct Answer: B (chart datum mismatch or missing antenna offset reference)
💡 Usually datum mismatch between chart and GNSS or an unconfigured antenna offset; verify both routinely.
✗
Question 18. Who normally decides on medical evacuation?
Your Answer: (Not answered)
Correct Answer: A (decided by the master on medical advice, coordinated with the company)
💡 The master decides on medical advice plus conditions and position, coordinating evacuation with the company.
✗
Question 19. The inspection focus for the emergency fire pump and fire main is?
Your Answer: (Not answered)
Correct Answer: B (reliable starting, adequate pressure, sound piping and hydrants)
💡 Start it to confirm pressure, check pipes, valves and hydrants, verify isolation valves and record the test.
✗
Question 20. What should be done if the ship is arrested?
Your Answer: (Not answered)
Correct Answer: C (notify the club and company at once, arrange security and follow legal procedures)
💡 Release comes through security arranged by the club and company; never leave or refuse service, which worsens matters.
✗
Question 21. If the Company DOC is suspended but the ship sails with an SMC, PSC should?
Your Answer: (Not answered)
Correct Answer: A (detain the ship, since the SMC's underpinning DOC is void)
💡 The SMC depends on a valid DOC; a void DOC voids the SMC.
✗
Question 22. What is the role of the accident investigation report in the system?
Your Answer: (Not answered)
Correct Answer: A (input to root cause analysis and corrective action driving improvement)
💡 Its value is improvement: convert it into root cause analysis and corrective action with effectiveness tracking, not blame.
✗
Question 23. How do outside investigations and the company's own stand related?
Your Answer: (Not answered)
Correct Answer: A (side by side and replacing neither: the internal search looks for root cause and amends the system, the external one settles liability and compliance)
💡 After a casualty several parties may be working at once: the flag or coastal State inquiry on liability and compliance, the association and the surveyor on loss and cover, charterers and cargo interests on where the damage came from, and the company on why the defence that should have held did not. The purposes differ, so do the methods and the papers, and none discharges another. The worth of the internal work is that it finds what to change in the documents, the training and the equipment, and it is not stopped because liability is awkward; nor is the internal report simply handed over - whether and in what form it goes is settled with legal advice and the association - while what the ship does is secure the evidence (records, alarms, instrument data, photographs, what people said) so the same paper is not altered until it proves nothing.
✗
Question 24. When shall new or transferred personnel complete familiarization with their duties?
Your Answer: (Not answered)
Correct Answer: D (before assuming the duties)
💡 Rule 6.5: personnel must be familiarized before taking over duties, not learning critical safety duties on the job.
✗
Question 25. Which factors must a safe speed take into account?
Your Answer: (Not answered)
Correct Answer: A (visibility, traffic density, manoeuvrability, draught and stopping distance)
💡 Safe speed weighs visibility, traffic, handling including stopping distance, draught, sea state and lights.
✗
Question 26. What risks does protection and indemnity cover mainly?
Your Answer: (Not answered)
Correct Answer: B (liability to third parties such as injury, pollution and cargo claims)
💡 P and I covers third party liabilities including injury, pollution, cargo claims and fines, complementing hull cover.
✗
Question 27. How is the team's shared situational awareness raised?
Your Answer: (Not answered)
Correct Answer: D (report position, situation and intention at set intervals, cross-check, keep the picture open to the team)
💡 Awareness is not each man making his own estimate; it is one picture shared by the group: in handover and on watch, position, course and speed, traffic, weather and sea, the mode in force and the next intention are spoken out, and the officer, the helmsman, the pilot and the lookout are asked to repeat or question it, with any divergence corrected there and then. Saying "I am not sure" is safer than pretending to understand. Telling the helmsman and the engine room the plan in advance removes misreading. Keeping to one's own post, talking as little as possible and hoarding the picture with the master put the whole judgement on one man - and it is a recurring line in collisions and groundings that somebody saw the anomaly and never said it into the shared picture.
✗
Question 28. What applies to a newbuild or newly taken-over ship?
Your Answer: (Not answered)
Correct Answer: C (adapt the system, familiarise crew and make necessary interim arrangements)
💡 New ships need document adaptation, familiarisation and interim arrangements so they operate within the system from day one.
✗
Question 29. The purpose of time contingency in a voyage plan is?
Your Answer: (Not answered)
Correct Answer: D (a buffer for weather, delays and breakdown uncertainties)
💡 Contingency absorbs weather, delays and breakdowns; cutting it transfers risk onto navigational safety.
✗
Question 30. Basic medical capability aboard must include?
Your Answer: (Not answered)
Correct Answer: B (first-aid kit, trained personnel, remote medical guidance contact)
💡 At-sea care is hard; onboard first aid plus remote guidance is the life chain.
✗
Question 31. How should watchkeeping be maintained while in port?
Your Answer: (Not answered)
Correct Answer: B (keep sufficient crew aboard with regular rounds meeting manning and response needs)
💡 Keep enough qualified crew aboard for rounds, manning minimums and emergency response, especially during cargo or bunkering.
✗
Question 32. Entering an ECA with insufficient low-sulphur fuel remaining; you should?
Your Answer: (Not answered)
Correct Answer: A (report the company and adjust the route or bunker to avoid non-compliance)
💡 Report early and divert or arrange compliant bunkers; never enter an ECA burning non-compliant fuel.
✗
Question 33. Smoke from self-heating cargo is found during discharge; you should?
Your Answer: (Not answered)
Correct Answer: D (stop work, seal and inert or apply water per plan and seek expert advice)
💡 Stop, seal and inert or fight carefully per the cargo emergency procedure, and seek expert advice ashore.
✗
Question 34. The DPA must guarantee?
Your Answer: (Not answered)
Correct Answer: D (the ship can reach him at any time, including off-hours)
💡 24/7 reachability is mandatory; otherwise the emergency link breaks.
✗
Question 35. What is the basic rule for discharging oily mixtures in a special area?
Your Answer: (Not answered)
Correct Answer: D (prohibited in principle, with a narrow exception for treated low concentrations while underway)
💡 Special areas are far stricter: discharge is prohibited except under narrow conditions while underway and must be logged.
✗
Question 36. The control when language barriers could cause misunderstanding is?
Your Answer: (Not answered)
Correct Answer: C (use a common working language with read-back and written confirmation)
💡 Use a common language, read-back and written confirmation for critical orders.
✗
Question 37. Requirements for periodic testing of the emergency generator are?
Your Answer: (Not answered)
Correct Answer: A (start and load test regularly and confirm automatic changeover)
💡 Start and load it periodically, verifying auto-start and changeover, and rehearse blackout scenarios.
✗
Question 38. Someone is seriously injured. What is the first step under the system?
Your Answer: (Not answered)
Correct Answer: B (first aid and an assessment of the vital signs, with medical advice sought at once)
💡 The person comes before the report. Bleeding, airway and breathing, shock and fracture are handled as the manual and the training say, while someone writes down what is seen, when, and what has been done; and the line to medical advice ashore is opened as the treatment goes on, the symptoms described plainly, since there is no second doctor at sea and the decisions on drugs and on evacuation rest on that link. Company, flag, coastal State and charterer must all be told, but none of that takes the first few minutes. After it, the accident report, the preservation of the scene and the investigation follow the system's own course, so that the same job injures someone once less next time. Photographs for evidence and the escalation of notifications are not the first step.
✗
Question 39. On merger or taking over ships, the SMS should?
Your Answer: (Not answered)
Correct Answer: C (assess gaps, integrate and re-verify applicability, not just apply)
💡 Post-merger SMS gaps need assessment and integration, avoiding fragmentation.
✗
Question 40. The ship risk profile used for PSC targeting mainly relies on?
Your Answer: (Not answered)
Correct Answer: C (ship type and age, past records, company performance and RO record)
💡 The profile combines type, age, deficiency and detention history, company and RO performance to target inspections.
✗
Question 41. At anchor at night a small boat loiters near the ship; you should?
Your Answer: (Not answered)
Correct Answer: C (increase lookout and lighting, log it and report master or shore as appropriate)
💡 A loitering craft at night may mean theft or security risk; light up, watch, log and report to master or shore.
✗
Question 42. What is VHF channel 16 used for?
Your Answer: (Not answered)
Correct Answer: A (distress, safety and calling watch channel)
💡 Channel 16 is the international distress and calling channel; keep watch and shift to a working channel.
✗
Question 43. What is required for storing paints and chemicals?
Your Answer: (Not answered)
Correct Answer: C (dedicated spaces, ventilated and fire safe, with protective and spill equipment)
💡 Flammable and harmful stores need dedicated ventilated fire-safe spaces with labels, PPE and spill kits.
✗
Question 44. On a spill, the SMS action chain is?
Your Answer: (Not answered)
Correct Answer: C (alarm, contain/recover per SOPEP, report to authority/Company)
💡 Spills need early report and control; SOPEP gear and reporting are timely.
✗
Question 45. The reporting chain for a security threat is?
Your Answer: (Not answered)
Correct Answer: A (watchkeeper, SSO, master, CSO and shore authorities)
💡 Escalate to SSO and master, who reports company and coastal authorities while applying SSP measures.
✗
Question 46. A case in which PSC may detain a ship under MLC is?
Your Answer: (Not answered)
Correct Answer: B (serious threat to safety/health, missing certificate or unpaid wages)
💡 Detention targets grave breaches: no certificate, unpaid wages or unsafe living conditions until rectified.
✗
Question 47. The key to onboard training (OJT) is?
Your Answer: (Not answered)
Correct Answer: A (coached by a competent person step by step with verified independent ability)
💡 OJT needs a competent coach, stepwise practice and confirmed independent ability before letting go.
✗
Question 48. What should the ship prioritise when preparing for survey?
Your Answer: (Not answered)
Correct Answer: D (self-check key items, sort certificates and records and rehearse equipment demonstrations)
💡 Preparation must be substantive: self-check, organise records and rehearse demonstrations to avoid exposing systemic gaps.
✗
Question 49. The purpose of the lifejacket light and whistle is?
Your Answer: (Not answered)
Correct Answer: C (aid night location and short-range signalling so rescuers find you)
💡 The water-activated light and whistle mark position by night and signal nearby, improving rescue chances.
✗
Question 50. Oil is seen near the ship in port and may have come from your vessel; you should?
Your Answer: (Not answered)
Correct Answer: C (check own lines and valves, report the port and activate the spill plan)
💡 Inspect lines and bilges, report port and company, start the plan, preserve evidence and never leave port.
✗
Question 51. Drill records show suspiciously regular intervals, indicating?
Your Answer: (Not answered)
Correct Answer: D (records may be fabricated rather than reflecting genuine drills)
💡 Real drills vary with voyage, weather and crew; uniform spacing often signals back-dated paperwork.
✗
Question 52. The relationship between ISPS security and the ISM SMS is?
Your Answer: (Not answered)
Correct Answer: C (security is integrated into the SMS (CSO often also the DPA), one Company system)
💡 In practice security is integrated with the SMS; CSO and DPA are often the same person.
✗
Question 53. The ship security alarm went off by mistake. What now?
Your Answer: (Not answered)
Correct Answer: D (report it promptly through the prescribed channel as a false activation)
💡 The alarm leaves the ship in silence - no lamp, no bell on board - so after a mistaken activation the crew often do not know it has gone off, and waiting for it to pass on its own spends the time that was available for clearing it up. Once transmitted it has already moved resources ashore and with the authority, which is why a false activation is reported at once through the channel laid down, with the procedure naming who reports, to whom and how much. Isolating the equipment, or writing the activation up as a drill, is a graver matter than the mistake itself. Afterwards look for the cause of the wrong pressing: where the switch sits, how clearly the procedure is written, whether the training was done.
✗
Question 54. Can the Master's final responsibility onboard for safety/pollution be delegated to the C/O or C/E?
Your Answer: (Not answered)
Correct Answer: D (No; the Master personally retains final responsibility)
💡 The Master's final responsibility is statutory and non-delegable; tasks may be assigned but the responsibility remains.
✗
Question 55. What prevents heat stress and heat stroke at work?
Your Answer: (Not answered)
Correct Answer: D (sensible work scheduling, water and salt replacement and rotation)
💡 Avoid peak heat, replace water and salt and rotate; treat and report dizziness or vomiting immediately.
✗
Question 56. What does alarm fatigue on the bridge mean?
Your Answer: (Not answered)
Correct Answer: A (excessive alarms cause dismissal or silencing, missing critical alerts)
💡 Constant low-value alarms desensitise crews; tune thresholds and priorities so critical alerts stand out.
✗
Question 57. When the master deems Company support insufficient, he should?
Your Answer: (Not answered)
Correct Answer: A (formally raise via the DPA, recording and escalating)
💡 The DPA channel is the master's formal path for resources and escalation.
✗
Question 58. Besides fuel switching, SOx control can use?
Your Answer: (Not answered)
Correct Answer: B (exhaust gas cleaning systems (scrubbers) achieving equivalent reduction)
💡 Annex VI permits scrubbers attaining equivalent SOx reduction, with washwater/residue controls and records.
✗
Question 59. How should an error in the Oil Record Book be corrected?
Your Answer: (Not answered)
Correct Answer: B (strike through leaving the original legible, sign and date)
💡 Corrections must leave the original readable, with signature and date; blacking out or removing pages looks like concealment.
✗
Question 60. For identified hazards, the next step is?
Your Answer: (Not answered)
Correct Answer: B (assess likelihood and consequence (risk matrix), decide acceptable or needing control)
💡 Risk assessment ranks by likelihood × severity, guiding where to invest controls.
✗
Question 61. Over-reliance on automation (e.g. autopilot) can?
Your Answer: (Not answered)
Correct Answer: D (erode vigilance and manual skill, slow response to anomalies)
💡 Automation reliance breeds monitoring laziness, slow in emergencies.
✗
Question 62. Which part of port disbursements is most easily reduced by management?
Your Answer: (Not answered)
Correct Answer: B (costs from waiting time and extra services)
💡 Fixed taxes and basic rates leave little room; cut waiting, overtime and duplicated services instead.
✗
Question 63. What verification follows a spare replacement?
Your Answer: (Not answered)
Correct Answer: C (run a trial and monitor parameters to confirm function)
💡 Trial run and monitor key parameters, confirm function and record it to avoid wrong fitting or hidden faults.
✗
Question 64. In a narrow channel a large ship overtakes from astern; what applies?
Your Answer: (Not answered)
Correct Answer: A (hold course and speed and communicate, slowing to give room if needed)
💡 Overtaking room is limited; confirm intentions, stay predictable and slow to cooperate if needed.
✗
Question 65. The relationship between interim and permanent measures is?
Your Answer: (Not answered)
Correct Answer: A (interim measures control risk first; permanent ones remove the cause and replace them)
💡 Control risk temporarily first such as speed limits or isolation, then apply permanent fixes and verify.
✗
Question 66. What does ISM Chapter 8 (Emergency Preparedness) require?
Your Answer: (Not answered)
Correct Answer: B (identify potential emergencies with drills and procedures)
💡 Chapter 8 asks the SMS to identify emergencies, plan responses and drill regularly.
✗
Question 67. Of the two certificates issued under the ISM Code, which goes to the company and which to the ship?
Your Answer: (Not answered)
Correct Answer: B (the document of compliance to the company, the safety management certificate to the ship run under the approved system)
💡 The document of compliance says the company's system for that class of ship meets the Code; the safety management certificate says the named ship is being run under the approved system, tied to the initial, intermediate, renewal and additional audits. A company certificate is no substitute on board, a ship's certificate says nothing about the company, and two ships cannot share one safety management certificate; both are produced on inspection and at port calls.
✗
Question 68. What makes onboard safety meetings effective?
Your Answer: (Not answered)
Correct Answer: C (focused topics, participation by all and follow-up on previous items)
💡 Effective meetings focus on real risk, involve all ranks and track previous decisions into a closed loop.
✗
Question 69. How are key operations identified?
Your Answer: (Not answered)
Correct Answer: B (by the consequence if it fails such as injury, pollution or damage)
💡 Judge by consequences: if failure could injure, pollute or cause major loss, manage it by procedure.
✗
Question 70. Shore technical support to the ship should show in?
Your Answer: (Not answered)
Correct Answer: A (timely advice, repair plans and spares, tracking defect closure)
💡 Shore technical backing keeps equipment reliable.
✗
Question 71. Finding an expired hydrostatic release unit on a liferaft at sea; you should?
Your Answer: (Not answered)
Correct Answer: B (report the company and arrange replacement at the next port, monitoring meanwhile)
💡 Expired units compromise release; report, arrange replacement in port and ensure manual release is possible meanwhile.
✗
Question 72. The correct sequence after an engine alarm sounds is?
Your Answer: (Not answered)
Correct Answer: A (acknowledge, find cause, act and record)
💡 Acknowledge and verify location, judge false or real, act accordingly and log times, actions and results.
✗
Question 73. Regarding Traffic Separation Schemes in voyage planning, one must especially?
Your Answer: (Not answered)
Correct Answer: D (follow direction, avoid crossing zone, use recommended route)
💡 Mark TSS entry/exit, avoid crossing separation zones, and watch junction traffic.
✗
Question 74. If an oil sheen is found and the ship is a suspect source, the first step is?
Your Answer: (Not answered)
Correct Answer: D (verify line-ups, valves and tank status and report to the master at once)
💡 Check for inadvertent discharge or leakage, report to the master and the coastal State, and preserve evidence.
✗
Question 75. Who should receive dangerous goods training?
Your Answer: (Not answered)
Correct Answer: A (the crew involved in handling, stowage and emergency response)
💡 Everyone involved in handling, stowage, monitoring and response needs training to be competent in their role.
✗
Question 76. Disposal of tanker tank-washing water should?
Your Answer: (Not answered)
Correct Answer: B (retain in slop tank, separate, discharge ashore or compliant)
💡 Wash water goes to slop tanks, is separated, and discharged ashore or per Annex I limits.
✗
Question 77. Before high-risk work (enclosed-space entry, hot work) one should conduct?
Your Answer: (Not answered)
Correct Answer: D (a Job Safety Analysis (JSA) and permit-to-work, with measures and watch)
💡 Permit-to-work plus JSA pins down hazards, controls, responsible persons and watch—a life-saving system.
✗
Question 78. What does the plastic discharge ban mean in garbage management?
Your Answer: (Not answered)
Correct Answer: A (no plastics of any kind may go into the sea; collect and deliver ashore)
💡 All plastics including ropes and packaging are banned from discharge; collect and land at reception facilities.
✗
Question 79. IMO intact stability requirements are usually verified via?
Your Answer: (Not answered)
Correct Answer: D (checking stability criteria for loading conditions in approved stability data)
💡 Approved stability data must show compliance of each loading condition with the criteria.
✗
Question 80. How does damage stability differ from intact stability?
Your Answer: (Not answered)
Correct Answer: C (damage stability considers residual stability and floating condition after flooding)
💡 Damage stability assesses residual stability and attitude after assumed flooding, the basis of subdivision and damage control.
✗
Question 81. The common reporting requirement for security incidents and safety accidents is?
Your Answer: (Not answered)
Correct Answer: B (both reported promptly, recorded and fed into SMS analysis)
💡 Both are reported, logged and analyzed for continuous improvement of the SMS.
✗
Question 82. When a surveyor lists outstanding items, you should?
Your Answer: (Not answered)
Correct Answer: C (agree deadlines and owners, complete them and request confirmation before expiry)
💡 Log owners and deadlines, complete and request confirmation; overdue items can affect the certificate's validity.
✗
Question 83. What is the basis for familiarisation training for joining crew?
Your Answer: (Not answered)
Correct Answer: B (system requirements for familiarisation and the duty list)
💡 Familiarisation follows system content and the duty list, covering emergency duties, equipment and procedures, with signatures.
✗
Question 84. The three ISPS security levels (MARSEC) from low to high are?
Your Answer: (Not answered)
Correct Answer: C (Level 1 (normal), Level 2 (heightened), Level 3 (exceptional))
💡 Level 1 is lowest, 3 highest; levels are declared by the flag/contracting government or master per threat.
✗
Question 85. The relationship between a casualty and a near miss in reporting is?
Your Answer: (Not answered)
Correct Answer: A (near misses are precursor warnings, report and analyze them)
💡 Near misses reveal the same latent weaknesses as casualties; reporting them prevents escalation.
✗
Question 86. Regarding the stevedoring programme arranged by the agent, the master should?
Your Answer: (Not answered)
Correct Answer: A (review effects on stability, strength and draught, requesting changes if needed)
💡 Loading sequence affects stress and stability, so review it and stop work that threatens safety, informing the company.
✗
Question 87. Periodic thickness measurement (TM) on tankers aims to?
Your Answer: (Not answered)
Correct Answer: A (assess hull/structure corrosion to judge safe continued operation)
💡 TM quantifies structural safety; excess loss requires repair or restriction.
✗
Question 88. The correct approach under laytime pressure is?
Your Answer: (Not answered)
Correct Answer: A (cooperate within safe limits without sacrificing safe operations for schedule)
💡 Never breach safety for schedule; log non-ship causes of delay to protect the vessel's position.
✗
Question 89. If a coastal State refuses a request for a place of refuge, the master should?
Your Answer: (Not answered)
Correct Answer: A (report company and flag State for coordination and take damage-limiting action in safe waters)
💡 A place of refuge needs consent; if refused, coordinate via company and flag while controlling the situation offshore.
✗
Question 90. Repeated unanswered calls to the DPA lead PSC to judge?
Your Answer: (Not answered)
Correct Answer: B (ship-shore emergency link broken, a major non-conformity)
💡 The DPA is the 24/7 ship-shore hub; silence breaks emergency support.
✗
Question 91. What is the right response to crew mental health problems?
Your Answer: (Not answered)
Correct Answer: D (attention, counselling, reducing stigma and reporting the company for professional support)
💡 Confinement and separation breed psychological problems; respond with care, communication and professional help, avoiding stigma.
✗
Question 92. Under ISPS, the CSO, SSO and PFSO respectively are?
Your Answer: (Not answered)
Correct Answer: B (the security responsible persons at Company, ship and port-facility levels)
💡 Each owns security at Company, ship and port; they coordinate across the interface.
✗
Question 93. The inspection focus for fire divisions (Class A/B) is?
Your Answer: (Not answered)
Correct Answer: B (fire integrity, self-closing devices and sealing of penetrations)
💡 Verify divisions are intact, doors self-close and penetrations are fire-stopped; breaches void the fire zone.
✗
Question 94. What is the first step required by the system after a cyber incident?
Your Answer: (Not answered)
Correct Answer: D (report, isolate and preserve evidence with logs under the plan)
💡 Report up the chain, isolate affected systems and preserve logs for tracing; never delete evidence.
✗
Question 95. The main risk of reducing manning levels is?
Your Answer: (Not answered)
Correct Answer: A (accumulated fatigue, weaker emergency response and more errors)
💡 Cutting crew raises fatigue and weakens response, with post-incident costs far exceeding savings and possible manning breaches.
✗
Question 96. The purpose of sampling in an SMS audit is?
Your Answer: (Not answered)
Correct Answer: D (infer overall performance from limited samples, controlling cost)
💡 Audits cannot cover everything; sample recent, higher-risk and problem areas to infer overall effectiveness.
✗
Question 97. The difference between correction and corrective action for an NC?
Your Answer: (Not answered)
Correct Answer: D (correction fixes the found problem, corrective action removes the cause)
💡 Correction removes the symptom; corrective action removes the cause and prevents recurrence.
✗
Question 98. What is the correct company attitude toward near misses?
Your Answer: (Not answered)
Correct Answer: B (collect, analyze, share and rectify)
💡 Near misses reveal latent weaknesses; encourage reporting and act on them to prevent accidents.
✗
Question 99. The value of a damage control / flooding drill is?
Your Answer: (Not answered)
Correct Answer: A (verify plugging gear, dewatering and watertight closure effectiveness)
💡 It tests plugging, pumping and watertight closure that decide whether flooding is contained.
✗
Question 100. What does the shore do with the ship's monthly return?
Your Answer: (Not answered)
Correct Answer: C (it lets the shore see how the system is running on this ship, what defects and near misses there have been, so that trends can be read and resources put where they are needed)
💡 The monthly return is how the shore sees the ship: how far the system is being worked, the state of non-conformities and their correction, the reports of casualties and near misses, breakdowns and maintenance run overdue, drills and training done, crew turning over and who has just come aboard, the difficulties the ship raises and the revisions she proposes asking for. From it the shore reads a comparison (against like ships, against last quarter), puts resources and support where they are wanted, and pushes what needs a document or a spending decision up into management review. It stands in for no deck or engine log, and it should not be assembled when an inspection is due - a report assembled then only shows nobody reads it in ordinary months.