Question 19. Cargo has shifted and the ship lists. What is the order of doing things?
Your Answer:
(Not answered)
Correct Answer:
B (the motion eased first by course and speed, the stability then worked out and the cargo or the ballast dealt with)
💡 The order is first to stop it getting worse, then to see what is left of the margin. When a list comes from a shift, the motion is what shifts more, so course and speed go over at once to bring the ship out of the head or beam sea, the openings are shut and the angle is watched to see if it still grows. Then the figures: the list, the free surfaces, the righting lever and what is left of dynamic stability in the sea there is now, from which follows restowing, whether part can be landed, or how ballast and free surfaces are worked. To force the list back by running water in before the sum is done invites the loss of what righting arm remains, the load centre having already moved. Abandoning is the last thing. What happened and what was done is logged and reported, and why the stow and the lashing let it come is looked into afterwards.