Question 1. What is the core risk addressed by SOLAS regarding cargo containment systems on gas carriers?
Your Answer: (Not answered)
Correct Answer: B (Cargo leakage, low temperature and accumulation of flammable or toxic gas)
💡 Gas cargoes are cryogenic, flammable or toxic. SOLAS and the IGC Code address leakage, low temperature embrittlement and the accumulation of gas in spaces, which could cause explosion or poisoning.
✗
Question 2. What is required on discovering a fuel oil leak?
Your Answer: (Not answered)
Correct Answer: A (Isolate the source immediately, such as with the quick closing valve, clean up the spill and remove sources of ignition, preventing a fire)
💡 A fuel oil leak requires the source to be closed at once, by the quick closing valve or an isolating valve, the spill cleaned up with absorbent material and sources of ignition and hot surfaces in the vicinity dealt with. Running with a leak very readily leads to a machinery space fire.
✗
Question 3. How is the rated capacity of survival craft determined under SOLAS?
Your Answer: (Not answered)
Correct Answer: A (From the volume and floor area required per person and the design capacity of the craft)
💡 SOLAS prescribes the method of determining the rated capacity of survival craft, based on the minimum volume and floor area per person and the buoyancy and strength of the craft. Carrying more than the rated capacity seriously affects buoyancy and stability.
✗
Question 4. What do SOLAS and the Load Line Convention address regarding the height of coamings at openings in the freeboard deck?
Your Answer: (Not answered)
Correct Answer: A (Coamings must reach the prescribed height to prevent sea water entering spaces below)
💡 SOLAS and the Load Line Convention require openings in the freeboard deck leading to spaces below to have coamings of the prescribed height with effective closing appliances, preventing water shipped on deck from entering and affecting stability.
✗
Question 5. What is the SOLAS concern regarding the protection of stairways in accommodation spaces?
Your Answer: (Not answered)
Correct Answer: A (They must be enclosed by class A or B divisions so they do not become paths for fire and smoke spread)
💡 SOLAS requires stairways in accommodation spaces to be enclosed in class A or B divisions according to their location, because vertical openings create a chimney effect that accelerates the spread of fire and smoke.
✗
Question 6. What shall the radio log essentially contain?
Your Answer: (Not answered)
Correct Answer: C (Records of distress, urgency and safety communications and equipment failures)
💡 Records of distress and safety communications and equipment failures.
✗
Question 7. A port State finding deficiencies affecting safety may:
Your Answer: (Not answered)
Correct Answer: C (require rectification and, if necessary, detain the ship)
💡 SOLAS I/19 allows the port State to require rectification and detain the ship if necessary.
✗
Question 8. What means should be used first for distress communication in sea area A4?
Your Answer: (Not answered)
Correct Answer: B (MF/HF equipment, DSC, radiotelephony and NBDP, trying several bands)
💡 Sea area A4 has no satellite or VHF coast station coverage, so distress communication should be attempted first on MF/HF equipment, including DSC alerting, radiotelephony distress calls and narrow-band direct printing telegraphy, trying several bands to establish contact with a coast station or another ship.
✗
Question 9. What does COLREG require regarding sound signals in areas of dense traffic?
Your Answer: (Not answered)
Correct Answer: A (Manoeuvring and warning signals must be given as prescribed, with light signals where appropriate)
💡 COLREG requires vessels in sight of one another to give the prescribed manoeuvring signals, such as one short blast for a starboard alteration, and to sound warning signals in narrow channels or at a bend. Sound signals are an important means of indicating intention and warning others.
✗
Question 10. What measures do SOLAS and the IMSBC Code require for solid bulk cargoes liable to self-heat or release harmful gas?
Your Answer: (Not answered)
Correct Answer: A (Obtain full cargo information before loading, increase ventilation and gas testing and restrict entry into the holds)
💡 The IMSBC Code requires precautions for cargoes liable to self-heat or release harmful gas: full cargo information, increased ventilation and gas testing, restricted entry into the holds and emergency preparation, preventing spontaneous combustion, poisoning or explosion.
✗
Question 11. What should a maintenance programme for radio equipment include?
Your Answer: (Not answered)
Correct Answer: B (Daily checks, periodic tests, spares provision and repair arrangements, either ashore or on board)
💡 SOLAS requires the availability of radio equipment to be ensured by daily checks, periodic tests, spare parts and either a shore-based maintenance agreement or at-sea maintenance capability, with the maintenance programme reflecting these arrangements and verified at survey.
✗
Question 12. What should the crew do after the abandon ship alarm is sounded?
Your Answer: (Not answered)
Correct Answer: A (Act in accordance with the duties in the muster list, taking the designated items to the muster station and awaiting orders)
💡 On the abandon ship alarm the crew acts under the muster list: taking the designated emergency items such as lifejackets, certificates and the log and reporting to the muster station, with the master or the officer in charge deciding whether to abandon and the order of boarding. No one acts independently.
✗
Question 13. What does SOLAS address regarding fire doors in an enclosed escape route?
Your Answer: (Not answered)
Correct Answer: C (Self-closing fire doors must be fitted, maintaining the fire integrity of the route)
💡 SOLAS requires self-closing fire doors in an enclosed escape route, allowing normal passage and closing automatically in a fire to preserve the fire integrity of the route. Ordinary or removed doors destroy that protection.
✗
Question 14. What does SOLAS address regarding gravity davits?
Your Answer: (Not answered)
Correct Answer: B (The craft must be launched by gravity without power and capable of being released from within the craft)
💡 SOLAS requires a gravity davit to launch the craft by gravity without power and to be capable of release from within the craft, so that abandonment can still be carried out if power is lost or personnel are dispersed.
✗
Question 15. A door in an escape route is found locked. What should be done?
Your Answer: (Not answered)
Correct Answer: C (Unlock it at once; doors in escape routes must be openable from inside without a key)
💡 A locked door in an escape route prevents evacuation in an emergency. SOLAS requires such doors to be openable from inside without a key. Security concerns should be met by other means such as an alarm, not by obstructing escape.
✗
Question 16. What is required regarding the stability information at a renewal survey?
Your Answer: (Not answered)
Correct Answer: D (Verify that it agrees with the actual condition of the ship and update it if the loading conditions have changed)
💡 SOLAS requires the approved stability information to be verified at survey as agreeing with the actual condition of the ship, structure, equipment and loading conditions. Where the ship is converted, the loading method changes or the weight distribution alters, the information should be updated and approved.
✗
Question 17. Below which value shall the inert gas system maintain the oxygen content in cargo tanks?
Your Answer: (Not answered)
Correct Answer: A (8% by volume)
💡 SOLAS requires the oxygen content to be maintained at not more than 8% by volume.
✗
Question 18. What must the ship security plan contain under the ISPS Code?
Your Answer: (Not answered)
Correct Answer: A (The security organisation and duties, restricted areas, training of personnel, drills and security incident procedures)
💡 ISPS Code Part A/9 requires the ship security plan to cover the security organisation and duties, restricted areas and their control, personnel training and drills, and procedures for security incidents, subject to Administration approval.
✗
Question 19. A major conversion was found to have been carried out during the validity of a certificate. What does SOLAS require?
Your Answer: (Not answered)
Correct Answer: A (Appropriate re-survey with updated documentation and re-issue of the certificate where necessary)
💡 SOLAS I/11 requires re-survey when significant alterations are made to the structure or equipment, with certificates and drawings updated as necessary. Failing to declare a conversion leaves the certificate inconsistent with the actual condition, a serious breach.
✗
Question 20. What should the boat handlers practise in an abandon ship drill?
Your Answer: (Not answered)
Correct Answer: D (Starting and operating the engine, using the rudder and bringing the boat alongside and to the rendezvous)
💡 An abandon ship drill should have the designated boat handlers practise handling the lifeboat: starting and running the engine, using the rudder, coming alongside another craft or the ship's side and closing the rendezvous as directed, so that the boat can be effectively handled after abandonment.
✗
Question 21. How must the expiry dates of medicines be managed?
Your Answer: (Not answered)
Correct Answer: B (Check expiry dates periodically and replace expired medicines, keeping records of the checks and updates)
💡 Medicines on board should be checked periodically for expiry, the integrity of packaging and storage conditions, with expired or deteriorated items replaced and records kept. Using an expired medicine may be ineffective or harmful, and it will be recorded as a deficiency at inspection.
✗
Question 22. What is the basic SOLAS II-1/42 requirement for the location of the emergency generator and its prime mover?
Your Answer: (Not answered)
Correct Answer: C (Outside category A machinery spaces, with an independent fuel supply)
💡 SOLAS II-1/42 requires the emergency source of power to be located outside category A machinery spaces so it remains available if that space is on fire, with a separate fuel supply.
✗
Question 23. What should be done about fire doors that do not close properly?
Your Answer: (Not answered)
Correct Answer: B (Adjust or replace the self-closing device and seals promptly so that they close reliably in a fire)
💡 A fire door that does not close properly, for example because the self-closing device has failed, the frame is distorted or the seal has perished, allows smoke and flame to pass. It should be adjusted or its parts replaced promptly to close reliably in a fire; securing it with rope is not permitted.
✗
Question 24. What communication is required when entering an enclosed space?
Your Answer: (Not answered)
Correct Answer: B (Continuous communication with the standby person, including periodic contact, with immediate withdrawal if it is lost)
💡 SOLAS and the IMO resolutions require the entrant to maintain continuous communication with the standby person at the entrance, normally by agreed periodic contact, and to withdraw at once if communication cannot be restored, preventing an incident from going unnoticed.
✗
Question 25. What is the principal consideration for the foam concentrate quantity of a tanker deck foam system?
Your Answer: (Not answered)
Correct Answer: C (It must sustain the required period of extinguishing operation and meet the prescribed minimum quantity)
💡 SOLAS requires the foam concentrate on a tanker to sustain continuous extinguishing for the prescribed duration and to meet a specified minimum, ensuring adequate firefighting capability.
✗
Question 26. A PSCO checked the permanent markings on the hull. Where must the IMO number be marked under SOLAS?
Your Answer: (Not answered)
Correct Answer: A (Permanently marked on the hull, such as on the stern or side, and internally as required)
💡 SOLAS XI-1/3 requires the IMO ship identification number to be permanently marked on the hull, normally on the stern and sides, and also internally as required, so that the ship can be identified and traced.
✗
Question 27. Who is responsible for acting on navigational warnings received during the voyage?
Your Answer: (Not answered)
Correct Answer: B (The master or the officer of the watch)
💡 The master shall ensure warnings received are acted upon and the voyage adjusted if necessary.
✗
Question 28. With regard to the IMO Ship Identification Number, it shall be:
Your Answer: (Not answered)
Correct Answer: B (permanent and marked on the hull)
💡 SOLAS XI-1/3: a ship shall have a permanent IMO Ship Identification Number marked on the hull and shown on certificates.
✗
Question 29. What records of drills and training are required?
Your Answer: (Not answered)
Correct Answer: B (Records of drills and training kept, including dates, content, participants and problems found)
💡 The ISM Code and SOLAS require records of drills and training to be kept, including dates, content, participants, problems found and the improvement action taken, as evidence of the effective operation of the system and a focus of attention at survey and PSC.
✗
Question 30. The muster list is found not updated after crew changes and some duties are vacant. The finding is?
Your Answer: (Not answered)
Correct Answer: A (The muster list must match the crew on board; failure to update is an emergency preparedness deficiency)
💡 The muster list should set out the duties and muster station of each crew member in an emergency and be updated promptly with crew changes so that everyone knows their duty. Failure to update leaves some posts vacant and causes confusion in an emergency. It is a deficiency to be corrected.
✗
Question 31. For a hydraulic steering gear, provision shall be made to detect abnormal conditions by means of:
Your Answer: (Not answered)
Correct Answer: C (a tank level gauge with a low-level alarm)
💡 SOLAS II-1/29 requires a tank level gauge with a low-level alarm to monitor hydraulic fluid leakage.
✗
Question 32. What does SOLAS and good seamanship recommend for shiphandling in heavy weather?
Your Answer: (Not answered)
Correct Answer: A (Adopt a course and speed that reduce rolling and slamming, reducing speed or altering course as necessary)
💡 Measures in heavy weather include choosing a course so the hull meets the seas at a suitable angle, avoiding a beam sea and direct head seas, and adjusting speed to reduce slamming and pitching, preventing cargo shift and structural damage. Full speed intensifies the stresses.
✗
Question 33. A crew member's actual rank does not match the certificate held, a junior certificate being used for a senior post. The finding is?
Your Answer: (Not answered)
Correct Answer: A (Serving with a mismatched certificate is an illegal manning arrangement, a serious deficiency to be corrected)
💡 A crew member's certificate of competency should match the rank held. Using a lower-grade certificate for a higher post is an illegal manning arrangement. It weakens the capability of the post and violates the safe manning requirements. It is a serious deficiency to be corrected, normally by changing personnel or supplying properly certificated crew.
✗
Question 34. What does SOLAS address regarding automatic and remote control of propulsion machinery?
Your Answer: (Not answered)
Correct Answer: B (The control system must have the necessary alarms, monitoring and protection, retaining basic manoeuvring capability if it fails)
💡 SOLAS requires the control system of the main propulsion machinery to have alarms and monitoring, such as fault and parameter deviation alarms, and to retain basic manoeuvring capability through local control or other means if the control system fails.
✗
Question 35. What does SOLAS require of an embarkation ladder?
Your Answer: (Not answered)
Correct Answer: A (It must extend from the deck to a point below the lightest waterline as prescribed, enabling persons to board the craft)
💡 SOLAS requires an embarkation ladder to extend from the stowage position or deck to a point below the lightest seagoing waterline, normally not less than 2 m, enabling persons to board the craft safely. Insufficient length forces people to jump.
✗
Question 36. Which of the following is supplied from the emergency source of power?
Your Answer: (Not answered)
Correct Answer: A (Emergency lighting, navigation lights, radio installation and steering gear related equipment, among others)
💡 SOLAS II-1/42 lists the emergency services, including emergency lighting, navigation lights, the GMDSS installation, steering gear and, where applicable, the emergency fire pump. Lighting is only one of them.
✗
Question 37. How must alarms be handled at sea?
Your Answer: (Not answered)
Correct Answer: D (Establish the cause and deal with it promptly; alarms must not be silenced or inhibited at will)
💡 Every alarm, whether fire, machinery or water ingress, requires the cause to be established and appropriate action taken. It must not be silenced or inhibited at will for the sake of quiet. Inhibiting alarms conceals real faults, so that a genuine problem goes unnoticed.
✗
Question 38. What is the basic requirement of a proper look-out during a navigational watch?
Your Answer: (Not answered)
Correct Answer: A (Maintain look-out by sight and hearing as well as by all available means, with the look-out not impeded by other duties)
💡 COLREG and SOLAS require a look-out at all times by sight, hearing and all available means, making a full appraisal of the situation and risk of collision. The look-out must not be given duties that interfere with the watch.
✗
Question 39. For power-operated sliding watertight doors, control shall be possible from:
Your Answer: (Not answered)
Correct Answer: C (both the navigation bridge and a position above the bulkhead deck)
💡 SOLAS II-1/10 requires power-operated sliding watertight doors to be operable from the navigation bridge and from a position above the bulkhead deck, as well as locally.
✗
Question 40. What does SOLAS require for change-over of power supplies for radio equipment?
Your Answer: (Not answered)
Correct Answer: A (Change-over between the main and reserve sources must be completed within the prescribed time, keeping communication unbroken)
💡 SOLAS requires radio equipment to be capable of rapid change-over between the main and reserve sources, so that distress and safety communication is not interrupted for a long period by the change. The change-over arrangement should be tested periodically for reliability.
✗
Question 41. What protection is required when taking shore power in port?
Your Answer: (Not answered)
Correct Answer: A (Confirm voltage, frequency and phase sequence match, with insulation checked and proper earthing, preventing damage and electric shock)
💡 Before taking shore power, the voltage, frequency and phase sequence should be confirmed to match, with the cable insulation checked, reliable earthing established and earth leakage protection fitted. Once connected, the phase sequence should be verified to prevent motors running backwards and the equipment confirmed to operate normally, preventing damage and electric shock.
✗
Question 42. What does SOLAS address regarding strainers on bilge suctions?
Your Answer: (Not answered)
Correct Answer: A (Strainers must be fitted and readily removable for cleaning, preventing blockage and loss of drainage capacity)
💡 SOLAS requires bilge suctions to be fitted with strainers readily removable for cleaning, preventing debris from blocking them and reducing drainage capacity. Welded-in strainers or ones never cleaned cause the drainage to fail, a common deficiency.
✗
Question 43. What is required for monitoring stability during loading and unloading?
Your Answer: (Not answered)
Correct Answer: C (Monitor stability and strength at each stage against the loading plan, preventing excessive hogging or sagging or insufficient initial stability)
💡 SOLAS requires stability and hull strength to be monitored at each stage against the loading plan, preventing excessive hogging or sagging and insufficient initial stability. Calculating only afterwards cannot prevent structural damage during cargo work.
✗
Question 44. What isolation is required between ballast and cargo hold piping?
Your Answer: (Not answered)
Correct Answer: D (The ballast system must not be connected to the cargo spaces, preventing contamination or cross-connection affecting stability)
💡 SOLAS and MARPOL require the piping between the ballast system and the cargo holds or cargo tanks to be effectively isolated, by isolating valves, blanks or separate piping, preventing ballast water and cargo from cross-connecting, which would contaminate the cargo, cause abnormal stability or lead to an illegal discharge.
✗
Question 45. How many SARTs must a ship normally carry under SOLAS?
Your Answer: (Not answered)
Correct Answer: B (Two, normally sited on either side of the bridge for rapid access)
💡 SOLAS IV/7 requires two SARTs on cargo ships of 300 GT and above, normally sited on either side of the bridge for rapid access. A single SART cannot serve rescuing vessels approaching from either side.
✗
Question 46. The packaging of dangerous goods shall:
Your Answer: (Not answered)
Correct Answer: C (comply with the packing requirements of the IMDG Code and be properly marked and labelled)
💡 SOLAS VII/3 requires packaging in accordance with the IMDG Code with proper marking and labelling.
✗
Question 47. Where shall emergency escape breathing devices be provided?
Your Answer: (Not answered)
Correct Answer: C (On means of escape that may be affected by smoke)
💡 EEBDs are provided on means of escape that may be affected by smoke.
✗
Question 48. During a PSC inspection the lifeboat engine is started and fails several times in a row. The finding is?
Your Answer: (Not answered)
Correct Answer: B (The lifeboat cannot be used reliably, a serious deficiency that may lead to detention)
💡 A lifeboat engine should start reliably at any time, being essential for manoeuvring and clearing the casualty after abandonment. Repeated failure shows the lifeboat cannot be reliably put into use, a deficiency seriously affecting life-saving capability that may normally lead to detention.
✗
Question 49. A fire drill must do more than muster and call names. What else has to happen?
Your Answer: (Not answered)
Correct Answer: D (mustering to the station bill and reporting, doors, dampers, outfits and communication examined, a fire simulated and water streamed)
💡 The drill has to be worked through for real: mustering to the station bill and reporting the numbers and the positions taken; fire doors and dampers closed and their closing confirmed; the firemen's outfits ready to be put on, the cylinders charged, the communication gear tested; a fire simulated, the way found and approached, the fire pump started and water streamed from a hydrant, so that pump, pipe, nozzle and people are proved together. A fire party drilling alone while the rest wait in their cabins, or a lecture in place of the exercise, tests nothing about the duties the station bill assigns and leaves a record no inspector can accept.
✗
Question 50. After a collision, besides assisting the persons on the other vessel, what should be done?
Your Answer: (Not answered)
Correct Answer: C (Check the damage and flooding of own ship, assess safety and report to those concerned, preserving evidence as needed)
💡 After a collision, while assisting the persons on the other vessel provided own ship is safe, the damage and flooding should be checked, stability and safety assessed, those concerned informed and evidence preserved as needed, such as VDR data, logs and photographs. Leaving the scene or failing to assist may constitute an offence.
✗
Question 51. What is the usual maximum validity of a Cargo Ship Safety Construction Certificate?
Your Answer: (Not answered)
Correct Answer: C (Five years, with annual and intermediate surveys)
💡 Under SOLAS I/12 the Cargo Ship Safety Construction Certificate has a usual validity of not more than five years, with annual and intermediate surveys within it. It remains valid only if the surveys are carried out and endorsed, otherwise it lapses.
✗
Question 52. What distinguishes A-0 from A-60 among class A divisions?
Your Answer: (Not answered)
Correct Answer: D (A-60 requires limitation of temperature rise for 60 minutes, while A-0 requires no such limitation but must still prevent smoke and flame)
💡 Class A divisions are graded A-60, A-30, A-15 and A-0 by the period for which temperature rise is limited. A-0 must still prevent the passage of smoke and flame and maintain structural integrity; only the temperature limitation is absent.
✗
Question 53. What communication backup is required in polar waters?
Your Answer: (Not answered)
Correct Answer: D (Backup means not depending on a single system, such as HF together with satellite, with consideration of reserve power)
💡 The Polar Code requires account to be taken of limited satellite coverage and possible loss of communication in polar regions, providing means not dependent on a single system, such as HF together with satellite equipment, reserve power and a spare antenna, and setting out the contingency arrangements if communication is lost.
✗
Question 54. For a ship with no emergency generator, for how long shall the GMDSS reserve source of energy supply?
Your Answer: (Not answered)
Correct Answer: C (6 hours)
💡 SOLAS IV/13: the reserve source shall be capable of supplying for 6 hours on ships without an emergency generator.
✗
Question 55. What valves and fittings does SOLAS require on fire pumps?
Your Answer: (Not answered)
Correct Answer: A (A relief valve and pressure gauge on each pump, preventing overpressure damage to the piping)
💡 SOLAS requires a relief valve and pressure gauge on each fire pump, preventing overpressure damage when the discharge valve is closed or the line is blocked, with the gauge enabling the watchkeeper to judge the water supply.
✗
Question 56. What is required for testing the emergency lighting system?
Your Answer: (Not answered)
Correct Answer: A (Periodic testing of automatic operation and duration, with records kept)
💡 SOLAS and good practice require periodic testing of the automatic operation of the emergency lighting and of its duration, for example by simulating failure of the main source, observing the lighting come on and timing it, verifying the prescribed period with records kept, preventing failure during an actual blackout.
✗
Question 57. What is required for the availability of the emergency source of power in flooding or fire?
Your Answer: (Not answered)
Correct Answer: D (It must be located where it is not directly affected by such casualties and be capable of independent supply)
💡 SOLAS requires the emergency source to be located outside category A machinery spaces, such as on the poop deck, with an independent fuel or power supply, so that it remains available when the machinery space is on fire or flooded.
✗
Question 58. What lighting must accompany embarkation and launching of survival craft?
Your Answer: (Not answered)
Correct Answer: B (Adequate lighting at the embarkation station and on the water, supplied from the emergency source)
💡 SOLAS requires the embarkation station, the stowage position of the craft and the water alongside to be lit from the emergency source, ensuring safe abandonment at night or in poor visibility.
✗
Question 59. What marking shall survival craft have for night detection?
Your Answer: (Not answered)
Correct Answer: D (Lighting or retro-reflective material to aid detection)
💡 Lighting or retro-reflective material to aid detection.
✗
Question 60. What certificate is required for a ship operating in polar waters?
Your Answer: (Not answered)
Correct Answer: B (Polar Ship Certificate)
💡 The Polar Ship Certificate.
✗
Question 61. What loading limitation must be observed when a bulk carrier loads high density cargo?
Your Answer: (Not answered)
Correct Answer: D (Limits on the maximum weight in each hold and on differences between adjacent holds, preventing excessive local stresses)
💡 Concentrated high density cargo overstresses the tank top and double bottom. SOLAS and the IMSBC Code require limits on the maximum weight per hold and on differences between adjacent holds to be observed. Limiting deadweight alone does not protect the structure.
✗
Question 62. What emergency supplies must be carried?
Your Answer: (Not answered)
Correct Answer: D (Portable emergency lighting, life-saving equipment, first aid supplies, emergency water and food and communication equipment, checked periodically)
💡 A ship should carry and check periodically the emergency supplies: portable emergency lighting, life-saving equipment, first aid medicines and equipment, emergency water and food, portable communication equipment including two-way VHF and damage control and firefighting equipment, ensuring they are available immediately in an emergency.
✗
Question 63. How must the effect of free surface be treated in stability calculations under SOLAS?
Your Answer: (Not answered)
Correct Answer: A (The adverse effect of free surfaces in slack tanks must be deducted)
💡 SOLAS requires the free surface correction of slack tanks to be included in stability calculations. Free surfaces reduce the initial metacentric height, and with several slack tanks the combined effect is significant; ignoring it leads to actual stability being less than calculated.
✗
Question 64. What does SOLAS permit when a certificate expires while the ship is at sea?
Your Answer: (Not answered)
Correct Answer: B (An extension of not more than three months in specified circumstances, so the ship may complete the voyage or reach the port of survey)
💡 SOLAS I/14 permits an extension of not more than three months in the specified circumstances, where a certificate expires during a voyage and the ship has not been surveyed in time, so that she may reach the port where she is to be surveyed. The extension must be within the rules and recorded.
✗
Question 65. What is required for stowage and securing of containers?
Your Answer: (Not answered)
Correct Answer: B (Load according to the approved securing plan and stowage plan, securing tier by tier with attention to weight distribution and the order of lashing)
💡 SOLAS and the CSS Code require containers to be loaded in accordance with the approved securing plan and stowage plan, lashed tier by tier with attention to weight distribution, heavier boxes below and avoiding uneven loading, and to the order of lashing, with weights and conditions verified, preventing stack collapse or loss overboard.
✗
Question 66. What period should the fuel supply for the emergency generator (emergency source) generally be provided for?
Your Answer: (Not answered)
Correct Answer: C (Not less than eighteen hours, corresponding to the supply time of the emergency source)
💡 Under SOLAS II-1/42 the emergency source, including the emergency generator, should supply the specified emergency load for at least eighteen hours for a cargo ship, so its fuel reserve should meet the corresponding running time with reliable fuel supply and storage. Passenger ships have higher requirements.
✗
Question 67. Which code governs the stability and heeling calculations for grain in bulk?
Your Answer: (Not answered)
Correct Answer: C (the grain code, with its stowage manual and the document of authorisation)
💡 Grain in bulk is dealt with on its own terms: the code gives the assumptions for the heeling caused by grain shifting, the stability criteria and what is required of a hold to be filled with grain, the ship carries a grain stowage manual and an authorisation to carry grain in bulk, and the calculation works out the heeling moment of each hold and checks the stability left after the shift. The solid bulk code answers mineral concentrates and coal, cargoes that may liquefy or react; packaged dangerous goods have their own code; the securing manual is about lashing and the forces in it. The mistake made by mixing the three is to treat grain as an ordinary bulk cargo and so leave out the heeling that comes from surface settlement and slope. Levelling and trimming before loading are done as required, and the booklets with the stability figures go to the master for signature.
✗
Question 68. What is required for escape routes in an emergency?
Your Answer: (Not answered)
Correct Answer: C (They must be usable in fire and smoke, with low level lighting, kept clear and doors openable from inside without a key)
💡 SOLAS requires escape routes to be designed and arranged to remain usable in a fire, with low level lighting enabling the direction to be seen in dense smoke, the route kept clear and doors openable from inside without a key, so that personnel can evacuate safely.
✗
Question 69. A PSCO asks you to confirm the ship's permanent identification number on the hull. What does SOLAS XI-1/3 require?
Your Answer: (Not answered)
Correct Answer: A (The IMO ship identification number)
💡 SOLAS XI-1/3 requires the IMO ship identification number to be permanently marked. Unlike the registry number, call sign or MMSI, it does not change with the ship's name or flag.
✗
Question 70. The Ship Security Plan shall be approved by:
Your Answer: (Not answered)
Correct Answer: A (the Administration or a recognised security organisation on its behalf)
💡 SOLAS XI-2/3: the Ship Security Plan shall be approved by the Administration or a recognised security organisation on its behalf.
✗
Question 71. What fire precautions apply during cargo operations on a tanker?
Your Answer: (Not answered)
Correct Answer: A (Control vapour emission, prohibit hot work and spark-producing operations and keep the inert gas and firefighting equipment available)
💡 During cargo operations on a tanker, vapour emission should be controlled, for example by recovery or discharge to a safe position, hot work and spark-producing operations such as hammering or the use of non-protected tools must be prohibited in the cargo area, and the inert gas system and firefighting equipment kept available.
✗
Question 72. The fire main pressure gauge shows an abnormally low pressure. What is the concern?
Your Answer: (Not answered)
Correct Answer: C (It may indicate reduced pump performance, leakage or a valve not properly opened and the cause should be established)
💡 Abnormally low pressure in the fire main may result from reduced fire pump performance, leakage in the piping or valves, a valve not correctly opened or a problem on the suction side. It would mean insufficient pressure at the jets in a fire, so the cause should be established and dealt with at once, as this is a deficiency that may affect firefighting capability.
✗
Question 73. What is required regarding damage control equipment?
Your Answer: (Not answered)
Correct Answer: C (Suitable equipment must be carried with the crew familiar with its use, such as leak stopping plates, shores, wedges and cement)
💡 SOLAS requires suitable damage control equipment to be carried and the crew to be familiar with its use through training and drills, such as a leak stopping plate and shores for a gap and a cement box for a larger breach, so that flooding can be limited at once.
✗
Question 74. Before issuing certificates, the Administration must be satisfied that the ship:
Your Answer: (Not answered)
Correct Answer: C (Complies in all respects with the applicable convention requirements)
💡 Certificates are issued only when the Administration is satisfied the ship complies.
✗
Question 75. What do SOLAS and good practice address regarding fire hose nozzles?
Your Answer: (Not answered)
Correct Answer: B (Spray nozzles suit oil fires and cooling, while solid jet nozzles suit distant solid fires)
💡 A spray nozzle cools and smothers with fine droplets, suiting oil fires and protective cooling, while a solid jet has greater range and impact, suiting solid fires. Choosing the wrong nozzle reduces effectiveness or spreads the fire.
✗
Question 76. Where shall manual fire alarm call points be located?
Your Answer: (Not answered)
Correct Answer: A (In corridors and near exits where persons can reach them)
💡 They are located in corridors and near exits for easy access.
✗
Question 77. What does the SOLAS II-2 requirement for the total capacity of fire pumps address?
Your Answer: (Not answered)
Correct Answer: B (The aggregate capacity must meet the prescribed figure and the remaining pumps must still suffice if one is out of action)
💡 SOLAS II-2 specifies the aggregate capacity and requires that, with any one pump out of action, the remaining pumps still deliver the required quantity and pressure, providing redundancy.
✗
Question 78. Ships engaged on international voyages shall be fitted with a gyro-compass. The number required is generally:
Your Answer: (Not answered)
Correct Answer: A (one (two may be required above 1 000 GT))
💡 SOLAS V/19: ships on international voyages shall be fitted with a gyro-compass; two may be required above 1 000 GT.
✗
Question 79. A PSC inspection found escape routes from accommodation to the embarkation station obstructed by stores. What does SOLAS require?
Your Answer: (Not answered)
Correct Answer: B (Escape routes must be kept clear and unobstructed; any obstruction is a deficiency)
💡 SOLAS II-2/13 requires means of escape to be kept clear and usable at all times. Any stowage or obstruction could cause casualties during an emergency evacuation and is a serious deficiency.
✗
Question 80. What checks are required after cargo operations on a tanker?
Your Answer: (Not answered)
Correct Answer: A (Confirm valves closed, lines depressurised and drained properly and the deck free of oil before standing down)
💡 After cargo operations on a tanker the procedure requires confirmation that the relevant valves are closed, the lines depressurised and drained, residual oil and drips dealt with, the deck clean and free of oil and the inert gas system normal, with a record made, before standing down, preventing danger from residual vapour.
✗
Question 81. What does COLREG require for crossing a traffic lane in a routeing scheme?
Your Answer: (Not answered)
Correct Answer: C (Cross as nearly as practicable at right angles to the lane and avoid impeding vessels following the lane)
💡 COLREG Rule 10 requires a vessel crossing a traffic lane to do so as nearly as practicable at right angles to the general direction of traffic flow and to avoid impeding vessels following the lane. Diagonal or contrary navigation disrupts the flow and increases the risk of collision.
✗
Question 82. How must cable penetrations of fire divisions be treated under SOLAS?
Your Answer: (Not answered)
Correct Answer: D (They must be sealed to maintain the original fire and smoke integrity of the division)
💡 SOLAS requires approved penetration seals where cables pass through class A or B divisions, maintaining fire and smoke integrity. Cotton waste or loose packing provides no fire resistance.
✗
Question 83. What performance must survival craft achieve in respect of wind and sea conditions under SOLAS?
Your Answer: (Not answered)
Correct Answer: A (They must float safely and retain their performance under the prescribed wind and sea conditions)
💡 SOLAS requires survival craft designed for the prescribed wind and sea conditions, able to float safely and maintain their essential performance in heavy weather. A declaration for calm water alone does not meet the needs after abandonment.
✗
Question 84. What arrangement does SOLAS require between the steering gear compartment and the navigation bridge?
Your Answer: (Not answered)
Correct Answer: C (Means of communication between the two, with provision for emergency stopping of the machinery from the steering gear compartment)
💡 SOLAS requires reliable communication between the steering gear compartment and the bridge, with provision for emergency action from the steering gear compartment, so that orders and feedback flow freely during emergency steering.
✗
Question 85. What is the usual maximum interval before the battery of a 406 MHz satellite EPIRB must be replaced?
Your Answer: (Not answered)
Correct Answer: C (5 years)
💡 EPIRB batteries are typically replaced within five years.
✗
Question 86. A pressure test found insufficient pressure when two jets were played simultaneously. What does SOLAS require?
Your Answer: (Not answered)
Correct Answer: A (Fire pumps must maintain the prescribed pressure and jets when the required number of hydrants are in simultaneous use)
💡 SOLAS II-2 requires the fire pumps to maintain the prescribed pressure and reach of the jets with the required number of hydrants in simultaneous use. Insufficient pressure impairs firefighting and is a deficiency.
✗
Question 87. What do SOLAS and the Load Line Convention address regarding the height of air pipe openings on deck?
Your Answer: (Not answered)
Correct Answer: A (The height must be as prescribed, preventing sea water entering the tanks when the deck is swept)
💡 SOLAS and the Load Line Convention require air pipe openings on the freeboard deck and superstructure deck to reach the prescribed height, so that sea water does not readily enter the tanks when the deck is swept or the ship lists, preventing loss of stability.
✗
Question 88. From what tonnage shall the main steering gear have two independent power units?
Your Answer: (Not answered)
Correct Answer: D (10000 GT)
💡 From 10000 GT and above.
✗
Question 89. What is the master's responsibility under SOLAS V?
Your Answer: (Not answered)
Correct Answer: A (Ultimate responsibility for the safety of the ship and persons, which may not be assumed by others)
💡 The master bears ultimate responsibility for the safety of the ship and those on board.
✗
Question 90. The purpose of ships' routeing systems is to:
Your Answer: (Not answered)
Correct Answer: B (promote safe navigation and reduce the risk of collision and grounding)
💡 SOLAS V/10 requires compliance with adopted routeing systems to promote safety of life at sea.
✗
Question 91. What does SOLAS require for the maintenance and testing of radio equipment?
Your Answer: (Not answered)
Correct Answer: A (Regular testing with records kept so that the equipment remains ready for use at all times)
💡 SOLAS IV/15 requires prescribed daily and periodic tests with records kept, keeping the equipment in a state of readiness. Waiting for the annual survey is not sufficient.
✗
Question 92. What do SOLAS and good practice address regarding the inspection of the propulsion shafting?
Your Answer: (Not answered)
Correct Answer: A (Periodic inspection of the tail shaft, intermediate shaft and bearings for wear, sealing and alignment)
💡 SOLAS and the classification societies require periodic inspection of the propulsion shafting for stern tube sealing, bearing wear and alignment, detecting abnormalities that could cause oil leakage, vibration or shaft failure with loss of propulsion.
✗
Question 93. What special safety is required for non-routine work?
Your Answer: (Not answered)
Correct Answer: B (Enhanced risk assessment, a specific plan and supervision for work done for the first time or rarely)
💡 Non-routine work such as a repair done for the first time, testing equipment not operated for a long time or an unusual cargo operation lacks experience and precedent, so the risk assessment should be enhanced, a specific plan and steps prepared and experienced personnel involved with on-site supervision, preventing accidents from unfamiliarity.
✗
Question 94. The function of flame arresters in a tanker cargo tank venting system is to:
Your Answer: (Not answered)
Correct Answer: C (prevent external flame from entering the cargo tanks)
💡 SOLAS II-2/4 requires flame arresters to prevent external flame from passing through vent pipes into cargo tanks.
✗
Question 95. What is the purpose of a bearing device in collision avoidance?
Your Answer: (Not answered)
Correct Answer: A (To take bearings of an approaching vessel and determine whether a risk of collision exists)
💡 A bearing device is used to take repeated bearings of an approaching vessel, an essential means of judging whether a risk of collision exists. It has nothing to do with speed or depth measurement.
✗
Question 96. A ship of 3200 GT. Under SOLAS V/19, is a second radar required?
Your Answer: (Not answered)
Correct Answer: A (Yes; ships of 3000 GT and above must carry a second radar)
💡 SOLAS V/19 requires ships of 3000 GT and above to be fitted with a second radar operating independently. At 3200 GT the ship is above the threshold.
✗
Question 97. Fuel oil used in machinery spaces shall generally have a flash point (closed cup) of not less than:
Your Answer: (Not answered)
Correct Answer: A (60 °C)
💡 SOLAS II-2/4 generally requires a flash point of not less than 60 °C, except emergency generators may use fuel with a flash point of not less than 43 °C.
✗
Question 98. The life-saving drill records are found identical to each other and inconsistent with the official log book. The finding is?
Your Answer: (Not answered)
Correct Answer: C (Drill records must reflect reality; false records are an SMS execution deficiency that may lead to detention and investigation)
💡 Life-saving and fire drills should genuinely be held and truthfully recorded with the time, content and participants in the official log book and similar records. Records that do not match reality, or are identical, suggest the drills may not have been genuinely held. This is a serious SMS execution and emergency preparedness deficiency that may lead to detention or even investigation.
✗
Question 99. What alternative measures are required if a fire detection system fails?
Your Answer: (Not answered)
Correct Answer: B (Repair promptly; pending repair, increase patrols of the affected spaces under the procedure and keep records)
💡 If a detection system fails it should be repaired promptly and, pending repair, patrols of the affected spaces increased under the procedure with records kept, preventing a fire from going unnoticed while the system is out of action.
✗
Question 100. A shipment of dangerous goods is offered without a proper shipping name. What should the master do?
Your Answer: (Not answered)
Correct Answer: D (Require the proper shipping name, UN number and other information, refusing to load if it is incomplete)
💡 SOLAS VII and the IMDG Code require dangerous goods to be declared under the proper shipping name with the UN number, class and packing group. An incomplete declaration or a general description such as chemicals would leave the crew unable to identify the hazards. The master should require full information, or refuse to load.