Exam Home Website
中文 English
0
/100
FAIL
Correct: 0/100 Total Questions: 100 Time Spent: 60min0sec
Passing: 80
Retake History
Answer Review
✗
Question 1. Upon receiving a detention decision, the master should first?
Your Answer: (Not answered)
Correct Answer: B (notify company and flag, organize rectification and request re-check)
💡 Report to company, flag and P&I; plan and complete repairs, then request re-inspection.
✗
Question 2. The value of the List of Lights and Fog Signals is?
Your Answer: (Not answered)
Correct Answer: C (verify characteristics, period, sector and range for identification and screening)
💡 It lets you check colour, period, sectors and range to identify marks and detect screening by terrain.
✗
Question 3. The principle for setting safe speed in restricted visibility is?
Your Answer: (Not answered)
Correct Answer: A (able to stop within the available distance and suited to the circumstances)
💡 In fog speed must let the ship stop within half the visibility or available range considering radar and traffic.
✗
Question 4. Who should be reported to when fuel quality is disputed after bunkering?
Your Answer: (Not answered)
Correct Answer: D (company, supplier and P&I club, retaining samples and documents)
💡 Report to company, supplier and club while preserving samples, bunker notes and measurements as evidence.
✗
Question 5. After a slight grounding, the first actions are?
Your Answer: (Not answered)
Correct Answer: C (stop, assess damage, sound tanks and report, planning refloating)
💡 Stop, check damage and flooding, sound tanks and depths, report and plan a safe refloating operation.
✗
Question 6. When crew change leaves a key post vacant, the master should?
Your Answer: (Not answered)
Correct Answer: A (report the company and adjust arrangements; do not sail with the deficiency)
💡 A vacant key post is a manning deficiency: report, get qualified relief and do not sail in that condition.
✗
Question 7. Berth operations' security/safety checks with terminals should?
Your Answer: (Not answered)
Correct Answer: B (ship-shore checklists and written handover clarify duties and emergency)
💡 Ship-shore checklists prevent responsibility vacuums—a hard rule.
✗
Question 8. What is the risk of issuing a clean bill of lading against a letter of indemnity?
Your Answer: (Not answered)
Correct Answer: C (the owner may face cargo claims and the indemnity may not be enforceable)
💡 A clean bill against an indemnity shifts risk to the owner; if the indemnifier cannot pay, the owner bears the loss.
✗
Question 9. Why is a ship-shore communications arrangement agreed before tanker operations begin?
Your Answer: (Not answered)
Correct Answer: A (both sides working to one set of calls and emergency stop signals so that a fault halts the pumps at once)
💡 The checklist completed before cargo work begins asks how the two sides will talk: which watches are kept, on which channel or by which signals, who may trigger an emergency stop and how the pumps are restarted, and who on each side is the person to reach. Arranged beforehand and tested, it lets either side halt the pumping the moment something is wrong, and the agreed way of confirming before starting again is what keeps a well-meant stop from turning into a rush. It is no substitute for the explosion-proof communication the hazardous area requires, and it is not written for an inspection or to divide liability afterwards; a channel or a watch changed without telling the other side empties the arrangement of meaning, and what was agreed belongs in the record.
✗
Question 10. The critical equipment list must be?
Your Answer: (Not answered)
Correct Answer: C (identify, mark intervals and update dynamically, covering safety/pollution)
💡 A dynamic list is the maintenance backbone; stale lists miss items.
✗
Question 11. The correct way to send a VHF distress call is?
Your Answer: (Not answered)
Correct Answer: A (use the distress format on channel 16 with name, position and situation)
💡 Call on channel 16 in the standard format with name, call sign, position, nature and assistance needed, then keep watch.
✗
Question 12. When should the SMC "intermediate audit" within its validity take place?
Your Answer: (Not answered)
Correct Answer: B (between the 2nd and 3rd anniversary, within ±3 months)
💡 The intermediate audit must fall in the 2nd–3rd anniversary window (±3 months); missing it can void the certificate.
✗
Question 13. For tanker loading/discharge, tank cleaning, gas-freeing, the SMS requires?
Your Answer: (Not answered)
Correct Answer: A (approved procedures and checklists with clear command and watch)
💡 Critical cargo ops need written procedures, checklists and assigned responsibility.
✗
Question 14. "Human element" in an SMS investigation typically includes?
Your Answer: (Not answered)
Correct Answer: B (fatigue, inadequate training, ambiguous procedures, communication failure, poor supervision, etc.)
💡 The human element spans individual condition, competence, procedure design and organisational oversight.
✗
Question 15. The basic qualification for an internal auditor is?
Your Answer: (Not answered)
Correct Answer: B (trained, knows ISM and the audited area, independent of the work)
💡 Auditors are trained in ISM and independent of the area they audit, ensuring objectivity.
✗
Question 16. Psychological support for crew after a major event should?
Your Answer: (Not answered)
Correct Answer: A (timely identify trauma, provide debrief and follow-up, in the SMS)
💡 Psychological trauma affects later duty; the SMS needs support mechanisms.
✗
Question 17. The master's proper attitude at the audit closing meeting is?
Your Answer: (Not answered)
Correct Answer: B (listen, clarify facts, acknowledge gaps and commit to corrective action)
💡 The closing meeting confirms facts, clarifies misunderstanding and accepts valid findings while offering extra evidence.
✗
Question 18. A ship's own security threat assessment should rely on?
Your Answer: (Not answered)
Correct Answer: D (official advisories, route intel and Company guidance, kept current)
💡 Threat assessment uses authoritative info, not guesswork; keep current.
✗
Question 19. The purpose of testing the main engine before port entry is?
Your Answer: (Not answered)
Correct Answer: A (confirm ahead and astern reliability for engine standby and emergency manoeuvring)
💡 Trial of ahead and astern confirms the plant responds so emergency manoeuvring is available.
✗
Question 20. The consequence of inaccurate vetting questionnaire answers is?
Your Answer: (Not answered)
Correct Answer: A (damages owner credibility and may show contradictions at later inspection)
💡 False answers conflict with later findings and certificates, severely harming the owner's commercial reputation.
✗
Question 21. The master finds the OOW deviated from the planned route without reporting; he should?
Your Answer: (Not answered)
Correct Answer: C (correct the course, find the cause and restate the reporting requirement)
💡 Deviation is a major risk event; correct it, find whether fatigue or judgement failed and restate reporting discipline.
✗
Question 22. Which factors must a safe speed take into account?
Your Answer: (Not answered)
Correct Answer: A (visibility, traffic density, manoeuvrability, draught and stopping distance)
💡 Safe speed weighs visibility, traffic, handling including stopping distance, draught, sea state and lights.
✗
Question 23. In fog a fog signal is heard near the beam and very close; you should?
Your Answer: (Not answered)
Correct Answer: D (slow or stop at once, act cautiously and avoid blind alteration)
💡 A close signal means a vessel is nearby; slow or stop first since blind turns may collide.
✗
Question 24. The purpose of a designated ship-shore contact system is?
Your Answer: (Not answered)
Correct Answer: B (define counterparts, means and time limits to avoid delay)
💡 Named contacts with channels and escalation paths ensure swift decisions in emergencies.
✗
Question 25. What risks does protection and indemnity cover mainly?
Your Answer: (Not answered)
Correct Answer: B (liability to third parties such as injury, pollution and cargo claims)
💡 P and I covers third party liabilities including injury, pollution, cargo claims and fines, complementing hull cover.
✗
Question 26. Who ends up answerable for day-to-day equipment maintenance on board?
Your Answer: (Not answered)
Correct Answer: C (the master answers for the whole, each department head working his part under the system)
💡 On board the work is done by departments: machinery to the chief engineer, deck, life-saving and fire appliances to the chief officer, electrical and automation by allocation, each keeping his own plan, execution and records. Responsibility is not spread away with the work - the master answers for the safe operation of the ship and for pollution prevention, and the system states his duty to implement and verify it and to provide what it needs; the shore side is answerable for spares, money, technical support and the windows in which work can be done, not for doing the work. Periodic survey by the society is external checking, not a substitute. Treating maintenance as one engineer's affair is where rusted deck gear and expired life-jackets usually come from.
✗
Question 27. On a major issue (casualty, major defect, security threat), the ship should first report to?
Your Answer: (Not answered)
Correct Answer: A (the Company/DPA, who coordinates resources and escalation)
💡 The DPA is the ship's escalation point, enabling upward info and downward support.
✗
Question 28. Two masters hand over at Xiamen. As to statutory documents, which item most needs checking item by item on the spot and is hardest to attribute afterwards?
Your Answer: (Not answered)
Correct Answer: A (that each certificate's title, number, validity and signature pages are complete, with outstanding deficiencies and pending actions entered in the handover record)
💡 An expired certificate or a missing signature page is laid at the serving master's door at the next PSC inspection; if the handover list is silent the incoming master inherits the blame, and the same holds for outstanding deficiencies. The other items are administrative and can be reissued by the company.
✗
Question 29. A crew member hides damage he caused and it is later found; how to handle?
Your Answer: (Not answered)
Correct Answer: A (handle per discipline and SMS while restating the value of honest reporting)
💡 Concealment is worse than the error; act per policy, stress honest reporting and check for a climate of fear.
✗
Question 30. What is the first insurance step after a collision?
Your Answer: (Not answered)
Correct Answer: D (notify insurers, preserve evidence and arrange joint surveys)
💡 Notify insurers, secure evidence and arrange joint survey to support apportionment and claims later.
✗
Question 31. Before entering an enclosed space, which core procedure is required?
Your Answer: (Not answered)
Correct Answer: B (permit, ventilation, gas test, standby and comms)
💡 Enclosed-space entry needs a permit, continuous ventilation, O2/LEL testing, a standby and communications.
✗
Question 32. PSC results and deficiencies are shared via?
Your Answer: (Not answered)
Correct Answer: C (MoU databases, affecting this and sister ships' targeting)
💡 Deficiencies enter networks, flagging sister ships for company-wide fix.
✗
Question 33. The correct positioning of energy efficiency management in the SMS is?
Your Answer: (Not answered)
Correct Answer: A (embed efficiency into SMS objectives, procedures and assessment)
💡 Companies should set efficiency targets with measures, owners, monitoring and review within the SMS.
✗
Question 34. Which ships must carry the oil pollution emergency plan?
Your Answer: (Not answered)
Correct Answer: A (oil tankers of 150 gross tonnage and upwards, other ships of 400 gross tonnage and upwards)
💡 Under Annex I an oil tanker of 150 gross tonnage and upwards and any other ship of 400 gross tonnage and upwards must have the plan on board, controlled as part of the safety management system - the copy that matters is the one that can be picked up at once, not the one held ashore. Its reporting procedures, contacts, equipment and the standing of who does what have to agree with the ship as she is, and are drilled, with what the drill exposes going back into the document. It must also join up with the pollution cover and the reporting demands of the coastal state, or in a real spill it is only read aloud.
✗
Question 35. Priority items to take when abandoning ship include?
Your Answer: (Not answered)
Correct Answer: A (logbook and essential certificates, EPIRB and drinking water)
💡 Take statutory documents, EPIRB, handheld radio, water and first aid; life takes precedence over property.
✗
Question 36. After the emergency, the external closing report should?
Your Answer: (Not answered)
Correct Answer: C (present facts, corrective measures and improvements showing accountability)
💡 Report facts, causes, actions taken and improvements honestly; glossing causes secondary reputational loss.
✗
Question 37. Cargo oil is spilling. What does the system ask for first?
Your Answer: (Not answered)
Correct Answer: C (stop the pumps, close the valves, stop up the deck scuppers, contain as planned and notify as required)
💡 While oil is still running the source is cut off first: pumps stopped, the relevant valves and manifold closed, the shore told to stop transferring, deck scuppers stopped up, and the oil on deck surrounded with absorbents, boom and plugging gear so it cannot reach the sea through the side drains. The ship then works to the shipboard oil pollution emergency plan - assignments, equipment counted, times and sequence of actions written down - and notifies the coastal state authority, the port and the company as required, rather than settling the account on arrival. Quantity spilled, cause and liability belong to the investigation and come after control; a spill that cannot be seen at night is all the more reason to stop the flow at once, since the drift is growing.
✗
Question 38. How are hull thickness gauging results used?
Your Answer: (Not answered)
Correct Answer: A (compared with original thickness to assess margin and decide repair or renewal)
💡 Compare with original and permissible limits to judge margin and plan repair, renewal or closer monitoring.
✗
Question 39. The IMO Assembly resolution that adopted the ISM Code is?
Your Answer: (Not answered)
Correct Answer: B (A.741(18))
💡 The ISM Code was adopted by IMO Assembly resolution A.741(18).
✗
Question 40. The key requirement for lifeboat emergency organisation is?
Your Answer: (Not answered)
Correct Answer: B (a designated boat coxswain and second-in-command with crew duties clear)
💡 Assign a coxswain and deputy with clear duties, boarding order and seating for an organised launch.
✗
Question 41. Accident-prone organisations tend to have?
Your Answer: (Not answered)
Correct Answer: B (blame culture, information blackout, hollow procedures)
💡 Blame and concealment suppress reporting, letting hazards accumulate.
✗
Question 42. Common forms of corrective action evidence are?
Your Answer: (Not answered)
Correct Answer: B (photographs, records, test reports, training attendance and recheck findings)
💡 Evidence must show actions done and effective: photos, updated records, tests, rechecks and training logs.
✗
Question 43. Facing a serious injury on board, how does the ship reach a doctor ashore?
Your Answer: (Not answered)
Correct Answer: B (reach the shore medical service through the prescribed radio or satellite channel and act on the doctor's advice)
💡 Asking the shore medical authority through the prescribed channel is the ordinary practice: put together a short history first - name, age, how the illness or injury came about, the signs, consciousness and breathing, medicine already given, any allergy - and on that the doctor advises on treatment on board, drugs, and whether evacuation is needed. What the ship must hold is the medicine inventory, the equipment, the case records and the crew health file, with the means of communication, radio or satellite, named in the system documentation and kept serviceable. Waiting for a port without doing anything may let the window close, and asking another ship for a doctor or sending for a helicopter is a separate arrangement, not the first step.
✗
Question 44. To enable effective crew performance onboard, the Company must provide?
Your Answer: (Not answered)
Correct Answer: C (adequate shore resources (info, spares, experts, training))
💡 Rules 4/6: the Company provides shore resources via the DPA to support crew performance.
✗
Question 45. A sound principle for setting KPI targets is?
Your Answer: (Not answered)
Correct Answer: D (specific, measurable, challenging yet achievable and linked to safety goals)
💡 Targets must be clear, realistic and accepted; unattainable ones breed falsification and harm safety.
✗
Question 46. The crew cannot say who the designated person is. Where is the failure?
Your Answer: (Not answered)
Correct Answer: A (the system never reached the crew - the name was not shown on board and not covered in familiarisation)
💡 The designated person's name and how to reach him are to be shown on board, and the familiarisation of a new arrival covers whom to report to and when he may come straight to shore - the route exists so that a safety concern can be raised past the master if it has to be. A blank answer says both ends have failed: the information was never put in front of the crew, the familiarisation never included it, and nobody has used it in ordinary working. The fix is the name posted on the bridge, in the engine control room and at the muster station, and this item written into the familiarisation list and done within the first week aboard. Laying it on the crew's memory or on how the auditor asked leaves the deficiency where it was.
✗
Question 47. The role of a Recognized Organization (RO) is?
Your Answer: (Not answered)
Correct Answer: B (authorised by flag to survey and certify; the company cooperates with its audits)
💡 ROs survey and certify on the flag's behalf including ISM/ISPS audits; companies cooperate and act on findings.
✗
Question 48. Finding the radar failed before entering a busy traffic separation scheme, the master should?
Your Answer: (Not answered)
Correct Answer: A (assess the risk and divert or wait for repair rather than enter with the defect)
💡 Radar failure in dense traffic is a major defect; divert or wait for repair rather than raise collision risk.
✗
Question 49. What is the basic concept of general average?
Your Answer: (Not answered)
Correct Answer: D (extraordinary sacrifice or expenditure for common safety, shared by all interests)
💡 General average covers deliberate sacrifice for common safety, apportioned among ship, cargo and freight interests.
✗
Question 50. If SMS records (drills, maintenance, training) are backfilled or forged, the consequence is?
Your Answer: (Not answered)
Correct Answer: A (SMS integrity collapses; PSC/audit may flag major non-conformity or detention)
💡 Forgery is worse than absence—it destroys SMS credibility.
✗
Question 51. Requirements for Emergency Escape Breathing Devices (EEBD) are?
Your Answer: (Not answered)
Correct Answer: C (positioned to requirement, inspected and crews trained to don and escape)
💡 Place as required, keep serviceable and train quick donning for escape through smoke, not for firefighting entry.
✗
Question 52. The ISM Code makes the company establish emergency-preparedness procedures. What are they to cover?
Your Answer: (Not answered)
Correct Answer: B (the foreseeable emergencies — collision, grounding, fire, casualty, oil spill, abandon ship)
💡 The emergency-preparedness section asks the company to identify: the emergencies that ship, area and cargo can meet, a plan for each with duties, communications and resources, drills to prove the plan works, and the drill findings fed back into revision. Substituting piracy for every case, letting a port State defect list stand in for identification, or trimming drills when they inconvenience, all leave the procedure on paper.
✗
Question 53. The correct relationship between cost control and safety is?
Your Answer: (Not answered)
Correct Answer: C (safety is the precondition; optimise cost within safety and compliance)
💡 Meet safety and legal requirements first, then cut cost within them; savings below the safety line cost more later.
✗
Question 54. The impact of incomplete technical documentation is?
Your Answer: (Not answered)
Correct Answer: C (maintenance and emergency response lack basis, causing errors and delay)
💡 Missing manuals, drawings and spares lists force guesswork in repairs and emergencies, raising error and downtime risk.
✗
Question 55. The role of maintenance records in the SMS and PSC?
Your Answer: (Not answered)
Correct Answer: C (prove good order and timely care, compliance evidence)
💡 Records prove airworthiness and timely care; PSC checks critical-equipment histories.
✗
Question 56. Which is NOT a fire precaution during bunkering or cargo work in port?
Your Answer: (Not answered)
Correct Answer: D (using high-power heaters in accommodation)
💡 Ban smoking and flames, keep equipment and shutdown ready and comms open; illegal heaters are themselves a hazard.
✗
Question 57. The key to verification tracking of corrective actions is?
Your Answer: (Not answered)
Correct Answer: A (verify effectiveness, ineffective means not closed)
💡 Closure requires proven effectiveness—evidence and improved trend, not merely signed forms.
✗
Question 58. The relationship between interim and permanent measures is?
Your Answer: (Not answered)
Correct Answer: A (interim measures control risk first; permanent ones remove the cause and replace them)
💡 Control risk temporarily first such as speed limits or isolation, then apply permanent fixes and verify.
✗
Question 59. What must be confirmed before unberthing?
Your Answer: (Not answered)
Correct Answer: B (all lines clear, area clear and plan agreed with pilot and tugs)
💡 Verify lines are clear, side is clear, steering responsive and signals agreed to avoid fouling and contact.
✗
Question 60. How are "critical equipment" defined within PMS?
Your Answer: (Not answered)
Correct Answer: D (those whose failure threatens safety/pollution or immobilizes the ship)
💡 Critical items (steering, fire pump, generators, nav) get priority care, spares and surveys.
✗
Question 61. What are the compliance requirements for incineration?
Your Answer: (Not answered)
Correct Answer: A (use approved equipment for permitted categories, never burning plastics)
💡 Use an approved incinerator for permitted categories only; plastics and oil residues are banned, and operations must be logged.
✗
Question 62. An anchor watch should primarily monitor?
Your Answer: (Not answered)
Correct Answer: B (dragging, cable strain, position changes and nearby traffic)
💡 Watch position for dragging, cable direction/strain and approaching traffic while yawing.
✗
Question 63. What must a system add for ships using alternative fuels?
Your Answer: (Not answered)
Correct Answer: D (procedures and training on fuel properties, leakage and toxicity risks)
💡 Methanol, ammonia and LNG differ greatly; add operating procedures, risk control and emergency training rather than reusing fuel oil practice.
✗
Question 64. The risk of sharing spares across a fleet is?
Your Answer: (Not answered)
Correct Answer: D (critical items borrowed leaving another ship stranded)
💡 Borrowing critical spares strands other ships; control by register and approval with prompt replenishment.
✗
Question 65. Onboard repairs with hot work, enclosed space etc. require the SMS to?
Your Answer: (Not answered)
Correct Answer: A (permits, stand-by and joint yard/ship safety supervision)
💡 Repair-period accidents spike; joint supervision is mandatory.
✗
Question 66. Asked to continue with insufficient crew, the master should?
Your Answer: (Not answered)
Correct Answer: C (refuse and report the company to meet the minimum safe manning)
💡 Below minimum manning is a serious breach and unseaworthy; refuse, report and sail only once properly manned.
✗
Question 67. The MLC requirement for onboard complaint procedures is?
Your Answer: (Not answered)
Correct Answer: A (shipboard procedures with escalation beyond master, recorded and answered)
💡 MLC requires fair, recorded procedures with escalation and confidentiality, answered within set times.
✗
Question 68. What does ISM Chapter 8 (Emergency Preparedness) require?
Your Answer: (Not answered)
Correct Answer: B (identify potential emergencies with drills and procedures)
💡 Chapter 8 asks the SMS to identify emergencies, plan responses and drill regularly.
✗
Question 69. Regarding fatigue and watchkeeping, the SMS should?
Your Answer: (Not answered)
Correct Answer: B (control hours, ensure rest, avoid fatigue-induced errors)
💡 Fatigue is a leading accident cause; the SMS must manage rest to protect lookout and operations.
✗
Question 70. How should dietary and religious customs of a multinational crew be handled?
Your Answer: (Not answered)
Correct Answer: D (respect and accommodate them as far as conditions allow)
💡 Respecting diet and religion lifts morale and cohesion; plan meals fairly within what is practical.
✗
Question 71. A sign of Company SMS maturity is?
Your Answer: (Not answered)
Correct Answer: C (moving from passive compliance to proactive risk management)
💡 Mature systems treat safety as a strength, not a burden.
✗
Question 72. The significance of complete documentation for cargo claims is?
Your Answer: (Not answered)
Correct Answer: B (reconstructs condition and handling, supporting defence against claims)
💡 Bill remarks, stowage plans and hold records reconstruct the voyage and help allocate liability for cargo damage.
✗
Question 73. Management of onboard first aid kits and medicines should?
Your Answer: (Not answered)
Correct Answer: D (kept by a responsible person, expiry checked and restocked, prescription drugs on medical advice)
💡 A designated officer checks expiry and stock with records; controlled drugs need dual custody and medical advice.
✗
Question 74. What cannot be replaced by remote visual inspection of the hull?
Your Answer: (Not answered)
Correct Answer: D (quantitative gauging and corrosion assessment)
💡 Visual checks find deformation and fouling, but wastage needs measured gauging to judge structural strength.
✗
Question 75. In fog at 15 knots a target 3 miles ahead bears steady on the compass. What should be done?
Your Answer: (Not answered)
Correct Answer: B (slow or stop engines, judge risk of collision and act)
💡 A steady bearing with closing range means risk of collision; slow or stop, sound signals and keep plotting.
✗
Question 76. What is the risk in electronic document management?
Your Answer: (Not answered)
Correct Answer: A (version confusion and unauthorised changes undermining control)
💡 Electronic files need permissions and version control against casual edits and old versions, with retrievable backups.
✗
Question 77. When SMS documents differ in language from what crew use, the Company should?
Your Answer: (Not answered)
Correct Answer: B (provide a version or effective translation the crew understand)
💡 Language barriers cause misoperation; an understandable language version is essential to SMS effectiveness.
✗
Question 78. The purpose of a pre-arrival checklist is?
Your Answer: (Not answered)
Correct Answer: A (systematically confirm equipment, documents and people are ready, preventing omissions)
💡 It covers engine and steering tests, windlass, mooring gear, pilot ladder, certificates and manning as checkable steps.
✗
Question 79. What is the priority when an accident causes injury?
Your Answer: (Not answered)
Correct Answer: C (save life first while reporting and preserving the scene and evidence)
💡 Life first: rescue while reporting and preserving scene and evidence, then deal with cargo and schedule.
✗
Question 80. An audit report should be distributed to?
Your Answer: (Not answered)
Correct Answer: D (relevant managers, the DPA and relevant top management)
💡 Send to the auditee's manager, the DPA and management who must decide, so actions get owners and resources.
✗
Question 81. Crisis management's "golden time" emphasizes?
Your Answer: (Not answered)
Correct Answer: D (rapid early assessment, control and rescue, prevent escalation)
💡 Early action controls outcome; prioritize stabilizing and saving lives before escalation.
✗
Question 82. A repeated non-conformity usually indicates?
Your Answer: (Not answered)
Correct Answer: C (earlier corrective action failed or missed the root cause)
💡 A repeat NC means the prior fix was superficial; restart RCA and strengthen verification.
✗
Question 83. The hazard of a steep authority gradient is?
Your Answer: (Not answered)
Correct Answer: D (juniors stay silent despite seeing anomalies, losing correction chances)
💡 When juniors fear challenge, early warnings go unspoken; leaders must invite questions openly.
✗
Question 84. How does confirmation bias appear on the bridge?
Your Answer: (Not answered)
Correct Answer: B (accept only evidence supporting the current belief, ignore contrary signs)
💡 Once convinced of an assessment, officers cherry-pick supporting signs and ignore contrary evidence.
✗
Question 85. After a PSC inspector raises an SMS deficiency, the ship should normally?
Your Answer: (Not answered)
Correct Answer: B (rectify within a reasonable prescribed period and obtain verification of closure)
💡 PSC deficiencies must be rectified within a set time and verified; failure may escalate to detention.
✗
Question 86. Which is NOT normally required among nautical publications on board?
Your Answer: (Not answered)
Correct Answer: A (the company's annual financial report)
💡 SOLAS requires charts, sailing directions, light lists, tide tables and radio signal lists; finance reports are unrelated.
✗
Question 87. A ship sailing with an expired or suspended SMC will be?
Your Answer: (Not answered)
Correct Answer: B (detained and the Company may be held accountable)
💡 Without a valid SMC the ship is non-compliant under ISM; detention is mandatory.
✗
Question 88. The role of a pilot in SMS improvement is?
Your Answer: (Not answered)
Correct Answer: C (validate on a small scale before rollout, lowering risk of fleet-wide change)
💡 Trial on one or two ships, correct and then roll out, avoiding unverified risk across the whole fleet.
✗
Question 89. Pollution prevention training should cover?
Your Answer: (Not answered)
Correct Answer: A (discharge rules, equipment operation, record requirements and emergency response)
💡 Cover rules, operation, records and emergency response so crews know, can operate and can respond.
✗
Question 90. At sea communications with the company are lost; what applies?
Your Answer: (Not answered)
Correct Answer: D (use backup means and log attempts, continuing safe operation under the plan)
💡 Use backups and log attempts under the plan, keeping navigation safe while trying to restore contact.
✗
Question 91. If cost-cutting causes severe crew shortage or equipment decay, it is?
Your Answer: (Not answered)
Correct Answer: D (failure to fulfil SMS duty, breaching the safety/environment policy)
💡 Commitments need resources; cutting safety for cost is a fundamental failure.
✗
Question 92. How does saving life relate to saving property?
Your Answer: (Not answered)
Correct Answer: C (life first, and reward for life does not depend on property being saved)
💡 Saving life is a legal duty with priority, and life salvage reward does not depend on property success.
✗
Question 93. When using water for firefighting one should note?
Your Answer: (Not answered)
Correct Answer: A (conductivity and free-surface effects; never jet water on oil fires)
💡 Water suits solid fires but not oil or live plant; accumulation harms stability, so manage and drain it.
✗
Question 94. What does the company's policy on alcohol and drugs normally say?
Your Answer: (Not answered)
Correct Answer: C (no alcohol before or on watch, illegal drugs forbidden outright, and anyone involved is taken off duty)
💡 The policy is written before the event, not after it: no alcohol before or on watch (many companies also bar it for a stated number of hours before relieving), illegal drugs forbidden without exception, prescribed and sedative medication to be declared. When something alcohol- or drug-related happens on board - an accident, an incident or a mere suspicion - the master can stand the person down, arrange testing and observation, and report to the company, which handles the case and keeps the record. Calling drugs a private matter leaves a possibly impaired person on the job, and leaving the policy to be written after an accident admits it was never in the system.
✗
Question 95. Logs show an officer's continuous watch exceeded rest rules; PSC may?
Your Answer: (Not answered)
Correct Answer: A (raise a fatigue-management non-conformity affecting watch safety)
💡 Inadequate rest impairs the watch; a shared STCW/SMS check item.
✗
Question 96. The first step for a new ship management Company to build an SMS is?
Your Answer: (Not answered)
Correct Answer: C (top management commitment and policy, defining responsibility structure)
💡 The SMS starts with leadership commitment and policy; templates can't replace it.
✗
Question 97. Before entering a tanker cargo space, besides oxygen, one must also?
Your Answer: (Not answered)
Correct Answer: D (test flammable/toxic gas, ventilate and stand-by; never alone)
💡 Residual hydrocarbon and toxins demand multi-gas testing plus stand-by.
✗
Question 98. After a major accident or major non-conformity involving the SMS, the Company should?
Your Answer: (Not answered)
Correct Answer: A (promptly conduct a dedicated review to find SMS defects and correct them)
💡 Major events trigger event-driven review to prevent recurrence.
✗
Question 99. What is required for the ship-shore access?
Your Answer: (Not answered)
Correct Answer: A (firm, non-slip, with handrails and a lifebuoy and adequate lighting at night)
💡 Access must be firm and non-slip with handrails, a lifebuoy nearby and lighting, plus a safety net where there is a drop.
✗
Question 100. A sudden strong wind strikes while alongside; the master should?
Your Answer: (Not answered)
Correct Answer: A (strengthen mooring, inform the terminal and stand by engines, requesting a shift if needed)
💡 Add lines, inform the terminal, stand by engines and assess whether to leave or shift, preventing parted lines and contact.