Question 1. What is the effect of an open communication climate on board?
Your Answer: (Not answered)
Correct Answer: D (hazards and errors surface early and are corrected)
💡 Openness makes crew report hazards and errors so problems are found before accidents, a hallmark of safety culture.
✗
Question 2. A corrective action plan should contain?
Your Answer: (Not answered)
Correct Answer: A (the action, responsible person, deadline and verification method)
💡 Include what, who, by when and how effectiveness will be verified so items can be tracked and closed.
✗
Question 3. A statutory item must be taken out of service for repair; what applies?
Your Answer: (Not answered)
Correct Answer: B (assess and report first, then apply equivalent alternative safety measures with approval)
💡 Taking key equipment out of service needs prior assessment, approval and documented equivalent arrangements.
✗
Question 4. The behaviour of a ship with too small a GM is?
Your Answer: (Not answered)
Correct Answer: C (long slow rolling with sluggish righting)
💡 Too small a GM gives weak righting, slow rolling and poor recovery—correct by ballasting or restowing.
✗
Question 5. What applies to hot work at a berth?
Your Answer: (Not answered)
Correct Answer: C (obtain terminal and ship permits, test gas and provide a fire watch)
💡 Hot work in port affects both sides; get both permits, test gas and post a fire watch.
✗
Question 6. What does the system require of maintenance records?
Your Answer: (Not answered)
Correct Answer: C (true, timely, traceable and matched to the planned maintenance system)
💡 Records must be true, timely and linked to planned maintenance, building history for assessment and survey.
✗
Question 7. Alarm signals for fire, abandon ship, man overboard shall be?
Your Answer: (Not answered)
Correct Answer: D (distinct, defined and known to all crew)
💡 Each emergency has a distinct signal known to all for rapid correct response.
✗
Question 8. The precondition for using shore power is?
Your Answer: (Not answered)
Correct Answer: B (compatible interface, adequate capacity and a proper changeover procedure)
💡 Confirm voltage, frequency, interface and capacity, then connect and disconnect by procedure for a safe changeover.
✗
Question 9. What is the risk when the master signs external documents?
Your Answer: (Not answered)
Correct Answer: D (he may assume personal legal obligations and liability)
💡 When signing bills, receipts or statements, verify truth and consequences; improper signing carries personal legal risk.
✗
Question 10. Backup requirements for electronic SMS documents are?
Your Answer: (Not answered)
Correct Answer: C (back up periodically, available offline and restore-tested)
💡 Back up regularly with offline access and test restoration, or failure still leaves documents unusable.
✗
Question 11. When the master or crew find a non-conformity, accident or hazardous situation, their first duty is?
Your Answer: (Not answered)
Correct Answer: A (promptly and truthfully report to the Company and record it in the designated SMS record)
💡 ISM Chapter 9 requires all non-conformities, accidents and hazardous situations to be reported to the Company and recorded.
✗
Question 12. Repeated accidents in one Company most likely indicate?
Your Answer: (Not answered)
Correct Answer: A (Company-level SMS failure (resources, supervision, culture), not lone crew)
💡 Isolated incidents may be chance; repeated ones signal top-level failure.
✗
Question 13. When carrying deck cargo, the key considerations are?
Your Answer: (Not answered)
Correct Answer: C (control weight/height within limits, keep visibility and stability, lash securely)
💡 Limit height/weight, protect visibility and stability, lash per manual and re-check during voyage.
✗
Question 14. How should document approval and issue work?
Your Answer: (Not answered)
Correct Answer: B (drafted, reviewed and approved at three levels, then issued under control with distribution recorded)
💡 Draft, review and approve, then issue under control with distribution recorded so old editions are withdrawn.
✗
Question 15. Crew suggestions for improvement should be?
Your Answer: (Not answered)
Correct Answer: A (encouraged, answered promptly and adopted with recognition)
💡 Front-line ideas are closest to reality; provide a channel, respond and recognise adoptions to build a loop.
✗
Question 16. Ship safety-performance data (deficiencies, near misses) should be?
Your Answer: (Not answered)
Correct Answer: B (aggregate, benchmark and feed back to ships for joint uplift)
💡 Feedback spreads good practice and supports weak ships.
✗
Question 17. Records of crew familiarisation and training should?
Your Answer: (Not answered)
Correct Answer: C (be genuine, tied to person and date, consistent with actual duties)
💡 Familiarisation records must be real and person-specific; forgery is a serious finding.
✗
Question 18. The fundamental purpose of a marine casualty investigation is?
Your Answer: (Not answered)
Correct Answer: C (find causes, learn lessons, prevent recurrence, not just blame)
💡 Investigation aims to learn and prevent, with accountability secondary, per IMO casualty rules.
✗
Question 19. A warning of cargo self-heating is received at sea; what applies?
Your Answer: (Not answered)
Correct Answer: C (ventilate or seal and inert as appropriate, monitor temperature closely and report)
💡 Respond by ventilating or sealing and inerting as the cargo requires, monitor temperature, report and divert if needed.
✗
Question 20. The core limit for engine-room bilge discharge is?
Your Answer: (Not answered)
Correct Answer: D (treated by a 15 ppm oil-content monitor, not in prohibited zones)
💡 Oily bilge needs a 15 ppm separator/monitor; zero discharge in prohibited zones.
✗
Question 21. Control of third-party personnel safety risks should be?
Your Answer: (Not answered)
Correct Answer: B (safety briefing before boarding, escorted throughout with proper PPE)
💡 Repairers, surveyors and tally staff briefed, equipped with PPE and accompanied in designated areas.
✗
Question 22. The core duty of the Designated Person Ashore (DPA) is?
Your Answer: (Not answered)
Correct Answer: C (ensure the ship-shore link and provide the Master adequate resources and shore support)
💡 The DPA ensures safe operation of each ship and provides the Master with adequate resources and shore support (Rule 4).
✗
Question 23. When contacting P&I or surveyors through the agent, the master should?
Your Answer: (Not answered)
Correct Answer: D (notify company and P&I directly in parallel to avoid distortion via one channel)
💡 Notify company and P&I in parallel for survey or claim matters and keep correspondence to avoid distortion.
✗
Question 24. What PSC most often checks in pollution prevention is?
Your Answer: (Not answered)
Correct Answer: D (true continuous records, serviceable equipment, current plans, drills done)
💡 Pollution compliance shows in records, equipment, plans and drills.
✗
Question 25. Aging ships in the SMS should receive?
Your Answer: (Not answered)
Correct Answer: A (more frequent maintenance, inspection and assessment as risk rises with age)
💡 Risk rises with age; the SMS must tighten control.
✗
Question 26. The purpose of a risk matrix is?
Your Answer: (Not answered)
Correct Answer: C (grade likelihood and consequence to set priorities and control effort)
💡 It grades likelihood and consequence so resources target the highest risks instead of spreading evenly.
✗
Question 27. The purpose of an intermediate audit is?
Your Answer: (Not answered)
Correct Answer: A (maintain validity, confirm continued effectiveness in the certificate period)
💡 The intermediate audit mid-term confirms continued SMS effectiveness to keep the certificate valid.
✗
Question 28. The terminal requests operation above agreed pressure to speed up work; the master should?
Your Answer: (Not answered)
Correct Answer: B (refuse, explain rated limits and coordinate with company and terminal)
💡 Exceeding rated pressure risks rupture and spill; refuse per the ship/shore agreement and escalate the schedule issue.
✗
Question 29. How is the NC closure deadline usually set?
Your Answer: (Not answered)
Correct Answer: A (minor NC within a set period (e.g. three months), major NC immediately)
💡 Minor NCs close within a set period; major NCs need immediate demonstrated correction.
✗
Question 30. The consequence of inaccurate vetting questionnaire answers is?
Your Answer: (Not answered)
Correct Answer: A (damages owner credibility and may show contradictions at later inspection)
💡 False answers conflict with later findings and certificates, severely harming the owner's commercial reputation.
✗
Question 31. The significance of the emergency fire pump is?
Your Answer: (Not answered)
Correct Answer: A (provide fire water when the main pumps fail)
💡 With independent power and sea suction outside the machinery space, it keeps fire water available after engine room fire or blackout.
✗
Question 32. A port state control officer comes on board. What does the master do?
Your Answer: (Not answered)
Correct Answer: C (cooperate, provide what is genuine, check the deficiencies on the spot and arrange the work)
💡 The master or his nominee stays with the officer throughout, hands over certificates, records and the state of the equipment as they are, and demonstrates what is asked for. Each deficiency on the report is checked against reality, anything unclear is questioned there and then, and the correction, its owner and its date go into the reply with a copy kept aboard; where follow-up or a return is required, it is arranged. What can be fixed while the officer is on board is fixed and reported as fixed, and what cannot is given a plan. The agent has no standing to speak for the ship, and agreeing first and writing the records later - or paper with no work behind it - only makes the next inspection harder and invites detention.
✗
Question 33. On what does the period for which system records are kept depend?
Your Answer: (Not answered)
Correct Answer: C (the conventions, the flag State and the company documents settling it, key records kept longer and not destroyed at will)
💡 The period is not the ship's to choose. Some records are fixed by the conventions themselves, the oil record book being kept for a stated time after the last entry, the garbage and ballast books having their own terms; the flag State sets what it wants for certificates, crew files and casualty material; and the company puts drills, the closing out of non-conformities and investigation papers into the class that must outlive the rest. Anything bound up with a casualty, a claim or an investigation is kept until that is done with, and destruction goes by the authority the documents name, with the fact of it recorded, not by a shortage of paper or the convenience of the person who clears the drawer. A list on board showing each record, its period, its keeper and where it lives belongs with the handover when the man changes.
✗
Question 34. Complete accurate SMS records help insurance claims by?
Your Answer: (Not answered)
Correct Answer: D (proving due diligence, reducing or clearing liability)
💡 Records prove due care—key to defence and claims.
✗
Question 35. What is a reasonable way to control fuel cost?
Your Answer: (Not answered)
Correct Answer: B (optimising speed, route and trim, hull cleaning and choosing bunkering ports)
💡 Control fuel safely through speed, routing, trim, hull condition and bunkering port selection, not just slow steaming.
✗
Question 36. Oil tankers of 150 GT and above must carry and correctly keep?
Your Answer: (Not answered)
Correct Answer: D (an Oil Record Book (Part I) for cargo/ballast/sludge operations)
💡 The Oil Record Book is statutory evidence; entries must be true and continuous.
✗
Question 37. Discovering a senior officer serving with a forged certificate, the master should?
Your Answer: (Not answered)
Correct Answer: C (suspend him immediately, report company and flag, start an investigation)
💡 Forged certification is serious illegality; stop his watch, report to company and flag and investigate fully.
✗
Question 38. The focus of controlling externally sourced documents is?
Your Answer: (Not answered)
Correct Answer: B (confirm source and edition, assess applicability and add to the list)
💡 Verify source and edition, judge applicability, list and brief before using external regulations or maker data.
✗
Question 39. The main security concern with ship-shore data synchronisation is?
Your Answer: (Not answered)
Correct Answer: A (expanded attack surface exposing navigational or commercial data)
💡 Connectivity raises cyber exposure; segregate critical systems, control access, back up and train crews.
✗
Question 40. After a sanctions list is updated, the ship should?
Your Answer: (Not answered)
Correct Answer: C (re-check the current voyage and counterparties against restrictions and report)
💡 Lists change; re-check at key points and report so the ship is not drawn into breaches unknowingly.
✗
Question 41. What extinguishing medium should be used for an electrical fire?
Your Answer: (Not answered)
Correct Answer: B (non-conductive agents such as carbon dioxide or dry powder)
💡 Use non-conductive agents and de-energise first; never use a conductive water jet on live equipment.
✗
Question 42. After third-party-related casualties/near misses, the SMS should?
Your Answer: (Not answered)
Correct Answer: B (re-review supplier/agent lists and refine interface procedures)
💡 Use incidents to refine selection and interface control, preventing recurrence.
✗
Question 43. How long must the Oil Record Book be kept on board?
Your Answer: (Not answered)
Correct Answer: A (at least three years after the last entry)
💡 Keep it on board at least three years after the final entry for port State verification.
✗
Question 44. The SMS consequence of falsifying records is?
Your Answer: (Not answered)
Correct Answer: A (destroys system integrity, escalating to major non-conformity and affecting certification)
💡 Falsification blinds the system and is treated as a major NC, risking certificate suspension and reputation.
✗
Question 45. When a man-overboard is not noticed immediately, afterwards you should?
Your Answer: (Not answered)
Correct Answer: A (act at once on MOB procedures, alert others and organise a search)
💡 Even if late, start MOB procedures, mark the position, alert VTS and nearby ships and search without delay.
✗
Question 46. The correct way to prepare for an external audit on board is?
Your Answer: (Not answered)
Correct Answer: C (keep evidence routinely, cooperate honestly with records)
💡 Routine evidence and honest cooperation; admit NCs with plans rather than fabricate.
✗
Question 47. Surveyors/technicians boarding for work require the SMS to?
Your Answer: (Not answered)
Correct Answer: D (register, safety brief, work permit and onboard supervision)
💡 Uncontrolled contractor work causes casualties; bring them into ship control.
✗
Question 48. What does alarm fatigue on the bridge mean?
Your Answer: (Not answered)
Correct Answer: A (excessive alarms cause dismissal or silencing, missing critical alerts)
💡 Constant low-value alarms desensitise crews; tune thresholds and priorities so critical alerts stand out.
✗
Question 49. When the master delays sailing for safety reasons, the company should?
Your Answer: (Not answered)
Correct Answer: C (support and verify the reasons, adjusting schedule and resources)
💡 Safety delays deserve support; investigate, re-plan and resource. Punishing safety calls destroys reporting culture.
✗
Question 50. Common causes of failed internal coordination are?
Your Answer: (Not answered)
Correct Answer: B (unclear duties, inconsistent terminology and no cross-checking)
💡 Failures come from unclear roles, mixed terminology and missing read-back; fix with muster lists, standard phrases and read-back.
✗
Question 51. The master's first duty after a casualty is?
Your Answer: (Not answered)
Correct Answer: D (save lives and stabilise, preserve evidence and report promptly)
💡 Rescue and stabilise first, then preserve evidence and report; blame and messaging come later.
✗
Question 52. When planning with ECDIS, what should also be retained?
Your Answer: (Not answered)
Correct Answer: C (paper chart or backup plus manual position check)
💡 Retain paper charts or backup and cross-check position manually against ECDIS failure.
✗
Question 53. In a narrow channel a large ship overtakes from astern; what applies?
Your Answer: (Not answered)
Correct Answer: A (hold course and speed and communicate, slowing to give room if needed)
💡 Overtaking room is limited; confirm intentions, stay predictable and slow to cooperate if needed.
✗
Question 54. How is the team's shared situational awareness raised?
Your Answer: (Not answered)
Correct Answer: D (report position, situation and intention at set intervals, cross-check, keep the picture open to the team)
💡 Awareness is not each man making his own estimate; it is one picture shared by the group: in handover and on watch, position, course and speed, traffic, weather and sea, the mode in force and the next intention are spoken out, and the officer, the helmsman, the pilot and the lookout are asked to repeat or question it, with any divergence corrected there and then. Saying "I am not sure" is safer than pretending to understand. Telling the helmsman and the engine room the plan in advance removes misreading. Keeping to one's own post, talking as little as possible and hoarding the picture with the master put the whole judgement on one man - and it is a recurring line in collisions and groundings that somebody saw the anomaly and never said it into the shared picture.
✗
Question 55. The role of "clear grounds" in PSC inspection is?
Your Answer: (Not answered)
Correct Answer: A (the trigger for conducting a more detailed inspection)
💡 Clear grounds such as evident disrepair or system failure justify expanding into a detailed inspection.
✗
Question 56. The concept of residual risk is?
Your Answer: (Not answered)
Correct Answer: D (the risk that remains after controls are applied)
💡 Residual risk remains after controls; judge acceptability and brief those exposed so nobody assumes zero risk.
✗
Question 57. What makes the shipboard oil pollution emergency plan acceptable?
Your Answer: (Not answered)
Correct Answer: B (approved by the administration, always at hand on board, containing the reporting procedure and the steps to be taken, and exercised as planned)
💡 The plan is not a shore document: it is approved by the administration, must come to hand at once on board, and its content covers at least the procedure for reporting as circumstances require (to whom, what, and when to follow up), the first measures to control and reduce a discharge on board, the action and contact list needed to work with the coastal State, and the arrangement for training and drills. It has to fit this ship - her cargo, her tank arrangement, her piping - since a generic text will not match the valves and tank names when it matters. Readiness and drilling are one thing: each post named in the plan must have been exercised, each number proved to answer a call recently, and an out-of-date issue does not count at an inspection. The duty bites by tonnage: oil tankers of 150 gross tons and above and other ships of 400 gross tons and above.
✗
Question 58. How does shore support show in technical management?
Your Answer: (Not answered)
Correct Answer: A (providing technical guidance, spares and coordination of repair resources)
💡 Shore support means guidance, resources and coordination to solve what the ship cannot handle alone.
✗
Question 59. What does Managing By Walking Around (MBWA) mean on board?
Your Answer: (Not answered)
Correct Answer: A (go to the site, observe, communicate and correct rather than read reports)
💡 MBWA means leaders observe, listen and correct on site, finding real issues reports miss.
✗
Question 60. Ship emergency response is usually graded by severity to?
Your Answer: (Not answered)
Correct Answer: C (graded levels (e.g. 3/2/1) mobilizing matching resources)
💡 Severity levels match command authority and resources to the incident scale.
✗
Question 61. Beyond certificate compliance, the ultimate aim of audits and reviews is?
Your Answer: (Not answered)
Correct Answer: B (continuous improvement of safety and pollution-prevention performance)
💡 The PDCA cycle underlies ISM; improvement, not mere compliance, is the goal.
✗
Question 62. The minimum frequency for executing the planned emergency drills under ISM is?
Your Answer: (Not answered)
Correct Answer: D (at least every 3 months)
💡 Rule 8.2: drills shall be conducted at least every 3 months per the planned schedule.
✗
Question 63. After an engine room fire is extinguished at sea, what follows?
Your Answer: (Not answered)
Correct Answer: A (stay alert for re-ignition, inspect damaged systems and report for investigation)
💡 Watch for re-ignition, inspect electrical and piping damage, report and preserve the scene for investigation.
✗
Question 64. The role of SMS records in an insurance claim is?
Your Answer: (Not answered)
Correct Answer: B (evidence of proper management and due diligence, key to the claim)
💡 Maintenance, drills, training and audit records prove due diligence and shape liability and settlement.
✗
Question 65. Awaiting berth at anchor for a prolonged period, crew requirements include?
Your Answer: (Not answered)
Correct Answer: D (keep adequate watches and emergency manpower with the SMS running normally)
💡 Keep sufficient crew aboard for watches, plant and emergency readiness; drills and maintenance continue at anchor.
✗
Question 66. The purpose of a draft survey is to?
Your Answer: (Not answered)
Correct Answer: B (compute loaded weight from draught corrected for density)
💡 It reads draughts, measures water density and corrects for trim to derive the loaded quantity.
✗
Question 67. Two masters hand over at Xiamen. As to statutory documents, which item most needs checking item by item on the spot and is hardest to attribute afterwards?
Your Answer: (Not answered)
Correct Answer: A (that each certificate's title, number, validity and signature pages are complete, with outstanding deficiencies and pending actions entered in the handover record)
💡 An expired certificate or a missing signature page is laid at the serving master's door at the next PSC inspection; if the handover list is silent the incoming master inherits the blame, and the same holds for outstanding deficiencies. The other items are administrative and can be reissued by the company.
✗
Question 68. When ECDIS and radar disagree on a target's position, you should?
Your Answer: (Not answered)
Correct Answer: A (treat it as an alert discrepancy, cross-check and resume manual fixing)
💡 The mismatch signals position or target error; check GNSS source, offset and radar alignment, then navigate manually.
✗
Question 69. When planning the annual internal audit, one should consider?
Your Answer: (Not answered)
Correct Answer: A (ship risk profile, past non-conformities, certificate cycle, major changes)
💡 Risk- and history-based planning makes audits targeted, not ceremonial.
✗
Question 70. What is the priority when an accident causes injury?
Your Answer: (Not answered)
Correct Answer: C (save life first while reporting and preserving the scene and evidence)
💡 Life first: rescue while reporting and preserving scene and evidence, then deal with cargo and schedule.
✗
Question 71. What is required for energy isolation before maintenance?
Your Answer: (Not answered)
Correct Answer: B (isolate, tag and lock out and verify zero energy before work)
💡 Apply lock-out tag-out and verify zero energy to prevent inadvertent energising or starting and personal injury.
✗
Question 72. Which is NOT a feature of a good safety culture?
Your Answer: (Not answered)
Correct Answer: D (concealing errors to protect the image)
💡 Good culture reports openly and learns; concealing errors lets problems accumulate until an accident occurs.
✗
Question 73. During cargo work shore personnel are found smoking in breach of rules; what applies?
Your Answer: (Not answered)
Correct Answer: A (stop it at once and inform the terminal representative, suspending work if needed)
💡 Smoking in the cargo area is a major ignition risk; stop it, inform the terminal and suspend work if it persists.
✗
Question 74. The purpose of time contingency in a voyage plan is?
Your Answer: (Not answered)
Correct Answer: D (a buffer for weather, delays and breakdown uncertainties)
💡 Contingency absorbs weather, delays and breakdowns; cutting it transfers risk onto navigational safety.
✗
Question 75. The SMS requirement for ballast water management (BWM) is?
Your Answer: (Not answered)
Correct Answer: B (exchange/treat per BWM Convention and log)
💡 Exchange or treat ballast per the BWM Convention and log it to stop species transfer.
✗
Question 76. When pirates have boarded and control accommodation, crew should?
Your Answer: (Not answered)
Correct Answer: B (prioritise life, comply and wait for a chance to alert or retreat)
💡 Prioritise life: do not resist, comply, and when safe trigger alarms or retreat; never provoke the attackers.
✗
Question 77. Are electronic signatures / records accepted in the SMS?
Your Answer: (Not answered)
Correct Answer: A (acceptable if authentic, tamper-proof, traceable and legally recognized)
💡 E-records are accepted when authenticated and auditable; some statutory records still require paper.
✗
Question 78. What is the company's management review of the safety management system required to achieve?
Your Answer: (Not answered)
Correct Answer: D (top management, at set intervals, judging the system suitable, adequate and effective and issuing the measures to improve it)
💡 The review belongs to top management and is to be done at set intervals, on the strength of the internal audits, the accidents and near misses, the tally of deficiencies and non-conformities, what the drills showed, what the ships and crews have said, and what the administration and port State officers have found. The question put is whether the system still suits the fleet and the trades the company now runs, whether its provisions reach far enough, and whether it is being worked as written; from that come decisions on resources, people and procedure, with actions, owners and dates that can be followed up and that reach the hands on board. A designated person amending the wording, last year's conclusions copied forward to see off a renewal audit, or the master's summary standing in for the shore side is not this level of work and will not carry the chain of improvement.
✗
Question 79. Who should be reported to when fuel quality is disputed after bunkering?
Your Answer: (Not answered)
Correct Answer: D (company, supplier and P&I club, retaining samples and documents)
💡 Report to company, supplier and club while preserving samples, bunker notes and measurements as evidence.
✗
Question 80. Finding the actual draught exceeds the load line certificate, you should?
Your Answer: (Not answered)
Correct Answer: D (stop loading and discharge to comply, reporting company and Administration)
💡 Overloading breaches load line and buoyancy: stop, lighten to comply and report; never sail in that condition.
✗
Question 81. The safe oxygen range for enclosed-space testing is generally?
Your Answer: (Not answered)
Correct Answer: D (about 19.5% to 23.5% by volume)
💡 Keep O2 around 19.5%–23.5%; too low risks asphyxia, too high raises fire risk.
✗
Question 82. Protection when working with chemicals such as cleaners and paints is?
Your Answer: (Not answered)
Correct Answer: D (gloves, goggles, respiratory protection and ventilation)
💡 Follow instructions with gloves, goggles and respiratory protection, ventilate and avoid skin contact and inhalation.
✗
Question 83. At sea the rudder angle indicator disagrees with the actual angle; what applies?
Your Answer: (Not answered)
Correct Answer: A (change to emergency steering, report and manage it as a system defect)
💡 A false rudder indicator undermines handling; change to emergency steering, report and manage as a defect until fixed.
✗
Question 84. The basis for allocating war-risk premium and excluded areas is?
Your Answer: (Not answered)
Correct Answer: D (charterparty clauses such as war risks provisions and club rules)
💡 Premium and excluded-area responsibility follow the charterparty; align changes in writing to avoid gaps and disputes.
✗
Question 85. During mooring operations the most common type of injury is?
Your Answer: (Not answered)
Correct Answer: A (rope recoil and snap-back, crushing and entanglement)
💡 Snap-back zones are most hazardous; keep clear of the rope line, signal clearly and wear protection.
✗
Question 86. Visibility drops sharply in a narrow channel; you should?
Your Answer: (Not answered)
Correct Answer: B (slow with engines ready, sound fog signals and anchor or leave the channel as appropriate)
💡 Slow and ready engines, sound signals, look out hard and inform VTS; anchor safely if continuing is unsafe.
✗
Question 87. Who establishes, implements and maintains the Safety Management System (SMS)?
Your Answer: (Not answered)
Correct Answer: D (the Company (applied to each ship it manages))
💡 The Company establishes and maintains the SMS and applies it to every ship it manages; the Master executes it onboard.
✗
Question 88. The ISM Code makes the company establish emergency-preparedness procedures. What are they to cover?
Your Answer: (Not answered)
Correct Answer: B (the foreseeable emergencies — collision, grounding, fire, casualty, oil spill, abandon ship)
💡 The emergency-preparedness section asks the company to identify: the emergencies that ship, area and cargo can meet, a plan for each with duties, communications and resources, drills to prove the plan works, and the drill findings fed back into revision. Substituting piracy for every case, letting a port State defect list stand in for identification, or trimming drills when they inconvenience, all leave the procedure on paper.
✗
Question 89. The role of a designated spokesperson in an emergency is?
Your Answer: (Not answered)
Correct Answer: A (unify external messaging so multiple people do not contradict each other)
💡 A single spokesperson prevents contradiction and speculation, releasing only verified information and protecting credibility.
✗
Question 90. Before insurance expires, the ship should?
Your Answer: (Not answered)
Correct Answer: B (confirm renewal evidence is issued and kept on board)
💡 Insurance certificates are required documents; confirm renewal before expiry and keep evidence on board to avoid detention.
✗
Question 91. When sailing near a high-threat port, security level rises 2 to 3; the ship should?
Your Answer: (Not answered)
Correct Answer: C (immediately apply SSP Level 3 measures, check restricted areas and comms)
💡 Level change must trigger specific SSP extras: patrols, boarding limits, comms.
✗
Question 92. The company wants a statement signed that does not match the ship. What is done?
Your Answer: (Not answered)
Correct Answer: A (refusing to sign, the reason and the evidence written down, the designated person told)
💡 The master's signature is where an irreplaceable judgment enters the papers: what he signs is read back at survey, at audit, in a claim and in a criminal inquiry as evidence, and it decides how far others trust the state of the gear and the space. To sign what is not so takes that false statement onto himself, and the people ashore who asked may not carry what follows. So he does not sign, and he writes why, with what he saw, the records and the reports behind it, and takes it to the designated person - that route exists in the system for exactly this, and the rules give the master the authority to decide on board and to call for what the shore must provide. Amending the words, another man signing, or signing first and noting later, does not make the paper true and only spreads the loss of footing further; if the shore answers by pressure or by finding another hand, that is itself a thing to report and to put on record.
✗
Question 93. A limitation of AIS information is?
Your Answer: (Not answered)
Correct Answer: A (depends on other ships' equipment and input; may be wrong, delayed or absent)
💡 AIS data can be wrong, delayed or missing; it is an aid only and never a substitute for a proper lookout.
✗
Question 94. During a shipboard emergency, the Master's role is?
Your Answer: (Not answered)
Correct Answer: D (overall commander, leading response per the emergency plan to protect life and ship)
💡 The Master commands emergencies, directing fire, abandon ship and pollution response per the SMS plan.
✗
Question 95. What is the right response to crew mental health problems?
Your Answer: (Not answered)
Correct Answer: D (attention, counselling, reducing stigma and reporting the company for professional support)
💡 Confinement and separation breed psychological problems; respond with care, communication and professional help, avoiding stigma.
✗
Question 96. At anchor at night a small boat loiters near the ship; you should?
Your Answer: (Not answered)
Correct Answer: C (increase lookout and lighting, log it and report master or shore as appropriate)
💡 A loitering craft at night may mean theft or security risk; light up, watch, log and report to master or shore.
✗
Question 97. Berthing at night with poor quay lighting and a strong cross-current, the master should?
Your Answer: (Not answered)
Correct Answer: B (postpone or request extra tugs and lighting after risk assessment)
💡 With poor light and cross-current do not force it; wait or add tugs rather than be driven by schedule.
✗
Question 98. During survey an isolating valve on the fire main cannot be closed; what applies?
Your Answer: (Not answered)
Correct Answer: A (report it for repair and verify the fix, applying equivalent fire measures meanwhile)
💡 Fire main defects risk detention; repair and verify, with approved equivalent arrangements until fixed.
✗
Question 99. For a ransomware attack triggered by an email attachment, the correct response is?
Your Answer: (Not answered)
Correct Answer: C (disconnect and isolate, report the company and activate the emergency plan)
💡 Isolate and report first, then restore from backups under the plan; paying does not guarantee recovery.
✗
Question 100. What are the legal consequences of tampering with ship monitoring systems?
Your Answer: (Not answered)
Correct Answer: B (unlawful, with fines, ship arrest and personal criminal liability)
💡 Tampering is a deceptive shipping practice: fines, arrest and criminal liability, an absolute red line.