Exam Home Website
中文 English
0
/100
FAIL
Correct: 0/100 Total Questions: 100 Time Spent: 60min0sec
Passing: 80
Retake History
Answer Review
✗
Question 1. What are the requirements for keeping a radio log?
Your Answer: (Not answered)
Correct Answer: C (Distress, urgency and safety communications and equipment tests must be recorded as required)
💡 SOLAS IV/17 requires a radio log recording distress and safety communications, equipment tests and significant events, for use at surveys and in casualty investigation.
✗
Question 2. As a minimum, the flash point of fuel oil (excluding diesel lubricating oil) shall be:
Your Answer: (Not answered)
Correct Answer: B (60°C)
💡 SOLAS II-2/4.2: fuel oil, other than diesel lubricating oil, shall have a flash point of at least 60°C.
✗
Question 3. When inerting the cargo tanks of a tanker, what is the usual upper limit for the oxygen content of the tank atmosphere?
Your Answer: (Not answered)
Correct Answer: A (Not more than five per cent by volume)
💡 Under SOLAS II-2/4 and the related requirements, when the cargo tanks of a tanker are inerted the oxygen content of the tank atmosphere should be held below five per cent by volume so that a flammable mixture cannot form. The inert gas system should maintain a positive tank pressure and monitor the oxygen content, and the operation should stop if the limit is exceeded.
✗
Question 4. Which of the following is NOT required navigation equipment under SOLAS V/19?
Your Answer: (Not answered)
Correct Answer: A (facsimile machine)
💡 SOLAS V/19: a facsimile machine is not among the navigation equipment required by SOLAS V/19.
✗
Question 5. How shall the number and capacity of lifeboats on a passenger ship be determined?
Your Answer: (Not answered)
Correct Answer: B (To accommodate the total number of persons on board)
💡 The total capacity shall accommodate all persons on board.
✗
Question 6. What does SOLAS address regarding automatic closing devices on air pipes?
Your Answer: (Not answered)
Correct Answer: C (Automatic closing devices must be fitted, closing and remaining effective under the impact of sea water)
💡 SOLAS and the Load Line Convention require air pipes to be fitted with automatic closing devices that close and remain effective under the impact of water shipped on deck, preventing sea water from entering the tanks. A manual device alone would fail unnoticed.
✗
Question 7. What is the legal status of annexes and attachments to statutory certificates under SOLAS?
Your Answer: (Not answered)
Correct Answer: D (They form part of the certificate, to be kept with it and produced for inspection)
💡 SOLAS requires annexes and attachments such as equipment records, exemption lists and survey records to form part of the certificate, kept with it and produced at port State inspection. Missing annexes make the certificate incomplete.
✗
Question 8. What is the purpose of a continuous fire shelter in the means of escape on a ship?
Your Answer: (Not answered)
Correct Answer: C (To provide a passage which remains usable in a fire, enabling persons to reach the embarkation stations safely)
💡 SOLAS requires a continuous fire shelter on certain ships — a passage enclosed and protected by class A divisions — so that it remains passable in a fire and persons can reach the embarkation stations safely.
✗
Question 9. What maintenance is required for steering gear hydraulic oil and filters?
Your Answer: (Not answered)
Correct Answer: B (Oil quality checked, filters and oil changed as the manufacturer requires, with maintenance recorded)
💡 The hydraulic steering gear should have its oil quality checked periodically, including water, contamination and viscosity changes, with filters and oil changed as the maker requires and the maintenance recorded. Deteriorated oil causes valves to stick and steering to fail, so this is preventive maintenance of essential equipment.
✗
Question 10. The voyage plan shall be monitored by:
Your Answer: (Not answered)
Correct Answer: A (the master overall, with the officer of the watch executing and monitoring it)
💡 SOLAS V/34 requires the master to be responsible and the OOW to execute and monitor the voyage plan.
✗
Question 11. Under SOLAS V/8, what follows from a breach of the regulations?
Your Answer: (Not answered)
Correct Answer: A (Responsibility follows and regard shall be had to navigational dangers)
💡 Responsibility follows and regard shall be had to navigational dangers.
✗
Question 12. What is the purpose of the water ingress detection system required on a bulk carrier?
Your Answer: (Not answered)
Correct Answer: B (To give an alarm when water enters the cargo holds and fore and aft spaces, enabling the crew to detect and deal with it promptly)
💡 Under SOLAS XII/12 a bulk carrier should have water ingress detection and alarm systems for the cargo holds and the forepeak and similar spaces, giving an alarm on the bridge promptly when water enters so that the crew can detect the ingress early and take pumping, leak-hunting and damage control measures, preventing the situation from worsening. The testing of the system should be kept effective.
✗
Question 13. When shall a fixed fire detection and alarm system operate?
Your Answer: (Not answered)
Correct Answer: C (On abnormal temperature rise or presence of smoke)
💡 It shall operate on abnormal temperature rise or presence of smoke.
✗
Question 14. What permit systems are required for critical operations?
Your Answer: (Not answered)
Correct Answer: B (A permit to work system for high risk activities such as hot work, enclosed space entry and work at height, with approval and precautions defined)
💡 The ISM Code and industry practice require a permit to work system for high risk activities such as hot work, enclosed space entry, work at height and electrical work, approved by the master or a designated person, with a risk assessment, gas testing, protective measures and standby arrangements completed beforehand and permit records kept.
✗
Question 15. An 80 m cargo ship is under plan approval. What does SOLAS II-1/10 require regarding the double bottom?
Your Answer: (Not answered)
Correct Answer: A (For ships of 76 m and above a double bottom shall be fitted as far as practicable between the collision and afterpeak bulkheads)
💡 SOLAS II-1/10 requires a double bottom, as far as practicable, between the collision bulkhead and the afterpeak bulkhead for cargo ships of 76 m and above. It does not require it throughout the whole ship.
✗
Question 16. Each ship shall carry how many lifejackets for every person on board?
Your Answer: (Not answered)
Correct Answer: D (one per person)
💡 SOLAS III/7 requires one lifejacket for every person on board, with additional child lifejackets as required.
✗
Question 17. After a ship is detained by PSC, what is the correct course of action?
Your Answer: (Not answered)
Correct Answer: D (Rectify the deficiencies before departure and apply for a re-inspection, fulfilling the duty to report to the flag State, the recognised organisation and the company)
💡 A detained ship should rectify the deficiencies before departure, or within the permitted period, apply for a port State re-inspection and be confirmed before leaving, and report to the flag State, recognised organisation and company as required with the rectification plan. Sailing without rectification aggravates the consequences and affects the future PSC record.
✗
Question 18. What is the most important preparation by the master for a PSC or SIRE inspection?
Your Answer: (Not answered)
Correct Answer: D (Ensuring the crew is familiar with the equipment and that records and the actual condition are genuine and complete)
💡 Preparation should focus on the true condition: operable equipment, genuine and complete records and a crew familiar with their duties. Filling in records at short notice or coaching answers will not survive an in-depth inspection and may amount to falsification.
✗
Question 19. Which statement about keeping a lookout is correct?
Your Answer: (Not answered)
Correct Answer: B (A proper lookout should be kept at all times by qualified persons using sight, hearing and all available means)
💡 Under SOLAS V/19 and the collision regulations every vessel should at all times maintain a proper lookout by sight and hearing as well as by all available means appropriate to the circumstances, so as to make a full appraisal of the situation and the risk of collision. Combining the lookout with the conning by one person is a common cause of accidents.
✗
Question 20. What is the general requirement of SOLAS Chapter II-1 for machinery and electrical installations?
Your Answer: (Not answered)
Correct Answer: C (They shall ensure the safety of the ship under normal and emergency conditions)
💡 They shall ensure the ship's safety under both normal and emergency conditions.
✗
Question 21. What preparation do SOLAS and BMP require before entering a high risk area?
Your Answer: (Not answered)
Correct Answer: C (Complete a security risk assessment, apply hardening and protective measures, conduct drills and report to the company, with reporting maintained)
💡 Before entering a high risk area a security risk assessment should be completed, protective and hardening measures applied in accordance with BMP, drills held, the company informed and reports made to the relevant bodies as required, so that the ship is prepared if threatened.
✗
Question 22. What is the purpose of the Emergency Escape Breathing Device (EEBD) carried on board?
Your Answer: (Not answered)
Correct Answer: B (For personnel to escape from a smoke-filled space in an emergency such as a fire; it is not for firefighting work)
💡 Under SOLAS II-2/10 a ship should carry Emergency Escape Breathing Devices in machinery spaces and similar locations for personnel to escape from a space in an emergency such as fire and smoke. The EEBD is not for firefighting work and cannot replace the self-contained breathing apparatus of the firefighter's outfit.
✗
Question 23. On which primary frequency does NAVTEX broadcast navigational and meteorological warnings?
Your Answer: (Not answered)
Correct Answer: B (518 kHz)
💡 NAVTEX broadcasts on 518 kHz, with 490 kHz as the backup frequency.
✗
Question 24. A lifeboat shall be provided with at least how many hand flares?
Your Answer: (Not answered)
Correct Answer: B (6)
💡 SOLAS III/34 requires at least six hand flares in a lifeboat.
✗
Question 25. A VHF radio installation shall maintain a continuous watch on:
Your Answer: (Not answered)
Correct Answer: A (channel 16)
💡 SOLAS IV/7: a VHF installation shall maintain a continuous watch on channel 16 and, where required, on channel 70.
✗
Question 26. Under SOLAS Chapter IX, which certificate shall the Company hold?
Your Answer: (Not answered)
Correct Answer: B (DOC)
💡 The Document of Compliance (DOC).
✗
Question 27. The carriage of liquefied gases in bulk shall follow:
Your Answer: (Not answered)
Correct Answer: B (the International Gas Carrier Code (IGC Code))
💡 SOLAS VII/11: the carriage of liquefied gases in bulk shall follow the IGC Code.
✗
Question 28. In what circumstances must an immersion suit be provided for every person on board?
Your Answer: (Not answered)
Correct Answer: D (When the ship operates in cold waters and the thermal protection provided by the survival craft is otherwise insufficient)
💡 SOLAS III/32 requires an immersion suit for every person on board when the ship operates in cold waters and the survival craft do not provide sufficient thermal protection. It is not a universal requirement in all trades.
✗
Question 29. A fixed detection system was tested with smoke. What action must follow detection under SOLAS?
Your Answer: (Not answered)
Correct Answer: B (An audible and visual alarm on the bridge or at the control station, indicating the space concerned)
💡 SOLAS requires detection to produce an audible and visual alarm on the bridge or at a continuously manned control station and to indicate the space involved. Automatic discharge is not necessarily required.
✗
Question 30. What does the Polar Code require regarding life-saving appliances in polar waters?
Your Answer: (Not answered)
Correct Answer: C (They must work at low temperature, with measures to extend survival time in the polar environment)
💡 The Polar Code requires life-saving appliances to function at low temperature and for measures to extend survival time, such as additional thermal protection, collective survival equipment and search aids.
✗
Question 31. Where shall manual fire alarm call points be located?
Your Answer: (Not answered)
Correct Answer: A (In corridors and near exits where persons can reach them)
💡 They are located in corridors and near exits for easy access.
✗
Question 32. What is the principle of zoning for a fixed fire detection and fire alarm system?
Your Answer: (Not answered)
Correct Answer: A (The system should detect by zone and indicate the affected zone so that the fire can be quickly located and action taken)
💡 Under SOLAS II-2/7 a fixed fire detection and fire alarm system should be arranged in sections so that the alarm indicates the section in which a fire or fault has occurred, enabling the crew quickly to locate the fire and take action. A fault in the detection system should be capable of being indicated, isolated and reset.
✗
Question 33. Class A and class B divisions: what separates them?
Your Answer: (Not answered)
Correct Answer: A (class A of steel or equivalent with non-combustible insulation, stopping flame and smoke; class B need only be non-combustible and for a shorter time)
💡 Three things decide the class: the material, the limit on temperature rise on the unexposed face, and the time the division stands up to the standard fire test. Class A asks for steel or equivalent material with non-combustible insulation behind, so that neither flame nor smoke passes, and for the longest test period; class B asks only that the material be non-combustible, with lower insulation and strength and a much shorter time holding flame. Either class may be a bulkhead or a deck, the name not fixing the use; which class a boundary needs depends on how dangerous the space is, whether the ship carries passengers or cargo, and what the rules require around machinery spaces, stairways and control stations. Cut a hole for a pipe and leave it unsealed and the division stops being what it was, which is the commonest thing an inspection finds.
✗
Question 34. A fire breaks out at the deep-fat fryer in the galley. What fixed protection does SOLAS II-2/10.6 require?
Your Answer: (Not answered)
Correct Answer: A (A fixed extinguishing system over the cooking range, supplemented by a fire blanket)
💡 SOLAS II-2/10.6 requires a fixed extinguishing system over the galley cooking range together with a fire blanket. Portable extinguishers do not satisfy the requirement for a fixed system.
✗
Question 35. A PSCO checked the escape arrangements from a category A machinery space. What does SOLAS require?
Your Answer: (Not answered)
Correct Answer: D (Two means of escape distant from each other, one of which may be an enclosed route)
💡 SOLAS II-2/13 requires two means of escape from a category A machinery space, remote from each other, normally two steel ladders one of which may be enclosed, so that one remains usable if the other is blocked by fire or smoke.
✗
Question 36. What risk does SOLAS II-1/3-6 on entry into enclosed spaces principally address?
Your Answer: (Not answered)
Correct Answer: C (Asphyxiation, poisoning or explosion from an oxygen-deficient, toxic or flammable atmosphere)
💡 SOLAS II-1/3-6 requires portable gas detectors and procedures for entry into enclosed spaces to guard against asphyxiation, poisoning and explosion, a frequent cause of fatal accidents on board.
✗
Question 37. What is the core risk addressed by SOLAS regarding cargo containment systems on gas carriers?
Your Answer: (Not answered)
Correct Answer: B (Cargo leakage, low temperature and accumulation of flammable or toxic gas)
💡 Gas cargoes are cryogenic, flammable or toxic. SOLAS and the IGC Code address leakage, low temperature embrittlement and the accumulation of gas in spaces, which could cause explosion or poisoning.
✗
Question 38. What checking of embarkation ladders is required?
Your Answer: (Not answered)
Correct Answer: D (Check the steps, ropes and securing arrangements for damage and deterioration and that it is stowed for ready use)
💡 An embarkation ladder should have its steps checked for splitting, its ropes for corrosion and wear, its securing and connecting arrangements for reliability and its stowage for being readily available and quick to rig. A failed ladder causes a person to fall while boarding, so it is critical life-saving equipment.
✗
Question 39. What does SOLAS require of an embarkation ladder?
Your Answer: (Not answered)
Correct Answer: A (It must extend from the deck to a point below the lightest waterline as prescribed, enabling persons to board the craft)
💡 SOLAS requires an embarkation ladder to extend from the stowage position or deck to a point below the lightest seagoing waterline, normally not less than 2 m, enabling persons to board the craft safely. Insufficient length forces people to jump.
✗
Question 40. What is the purpose of isolation valves on the fire main required by SOLAS?
Your Answer: (Not answered)
Correct Answer: B (To isolate a damaged section so the rest of the main can continue to supply water)
💡 SOLAS requires isolation valves on the fire main so that if a section, for example in the machinery space, is damaged, it can be isolated while the remainder still supplies the hydrants, preserving at least part of the firefighting capability.
✗
Question 41. Which statement about the purpose of spare navigation lights is correct?
Your Answer: (Not answered)
Correct Answer: A (They can be brought into use if a main navigation light fails, ensuring the required lights are continuously available)
💡 Under SOLAS V/19 and related requirements a ship may carry spare navigation lights, such as duplicate fittings or portable spare lights, to be brought into use if a main light fails, ensuring the required lights are continuously available. Their stowage and power supply should be kept ready for use.
✗
Question 42. If the master finds a defect affecting safe navigation that cannot be repaired on board, the first action is to:
Your Answer: (Not answered)
Correct Answer: A (Report to the Company and arrange repair)
💡 The master should report to the Company so that repair can be arranged and the voyage adjusted.
✗
Question 43. Which Convention governs the ship's handling of ballast water?
Your Answer: (Not answered)
Correct Answer: B (The Ballast Water Management Convention)
💡 Ballast water is to be managed under the Ballast Water Management Convention.
✗
Question 44. Which of the following is NOT part of an abandon ship drill under SOLAS III/19?
Your Answer: (Not answered)
Correct Answer: C (Checking crew wage and leave records)
💡 SOLAS III/19 lists summoning of persons, checking dress and lifejackets, briefing and operation of launching appliances and checking equipment readiness. Wage and leave records are not part of a drill.
✗
Question 45. A ship carrying dangerous goods is asked by PSCOs to produce documentation. What does SOLAS VII/4 require on board?
Your Answer: (Not answered)
Correct Answer: B (A dangerous goods manifest or stowage plan showing the location of each class of goods)
💡 SOLAS VII/4 requires a manifest or stowage plan listing the dangerous goods and their location on board so they can be found quickly in an emergency. An ordinary cargo manifest is not a substitute.
✗
Question 46. What does SOLAS address regarding drainage of ro-ro spaces?
Your Answer: (Not answered)
Correct Answer: A (Effective drainage removing firefighting water and leaked oil promptly)
💡 SOLAS requires ro-ro spaces to have effective drainage and storage arrangements able to remove firefighting water and leaked oil promptly, preventing free surface from affecting stability and reducing the risk of oil spreading the fire.
✗
Question 47. Which aspects must the ship's electrical system be protected against under SOLAS?
Your Answer: (Not answered)
Correct Answer: D (Short circuit, overload and earth fault, preventing electrical fire and equipment damage)
💡 SOLAS requires protection against short circuit, overload and earth fault to prevent electrical fire, equipment damage and electric shock. A single type of protection is not enough.
✗
Question 48. In SOLAS I/2 the expression "upright position" is used to define which condition of the ship?
Your Answer: (Not answered)
Correct Answer: B (The reference condition with no heel, used for measuring freeboard and similar particulars)
💡 SOLAS and the Load Line Convention take the upright (no heel) condition as the datum for measuring moulded depth, freeboard and similar particulars, irrespective of the loading condition.
✗
Question 49. A PSCO checked the operation of navigation lights. What additional requirement does SOLAS impose?
Your Answer: (Not answered)
Correct Answer: B (An indicator or failure alarm for navigation lights on the bridge)
💡 SOLAS requires an indicator or alarm on the bridge for navigation lights, so that the watchkeeper learns at once of a failure and can act, avoiding misinterpretation by other ships.
✗
Question 50. What does SOLAS address regarding the use of watertight doors in drills?
Your Answer: (Not answered)
Correct Answer: A (Closing and remote operation of watertight doors should be practised in drills so the crew is familiar with the procedure)
💡 SOLAS requires the closing and remote operation of watertight doors to be practised in drills, so that the crew is familiar with the procedure and the operating positions for closing doors in an emergency. A briefing alone does not ensure correct operation when it matters.
✗
Question 51. What factors must a voyage plan consider under SOLAS and good practice?
Your Answer: (Not answered)
Correct Answer: A (Prohibited and restricted areas, shoal water and draught limits, traffic density, weather and tides, and emergency shelter)
💡 A voyage plan should consider prohibited and exercise areas, shoal water and draught limitations, traffic density, weather and tidal conditions and emergency shelter anchorages and alternative routes, making the passage safe and practicable with contingency arrangements.
✗
Question 52. The recording device of an inert gas system may record:
Your Answer: (Not answered)
Correct Answer: B (oxygen content, gas pressure and time)
💡 SOLAS II-2/5 requires continuous recording of oxygen content, gas pressure and time.
✗
Question 53. What time limits apply to launching and recovering a rescue boat?
Your Answer: (Not answered)
Correct Answer: B (Launching and recovery, when loaded, each within 5 minutes)
💡 Launching and recovery when fully loaded shall each be within 5 minutes.
✗
Question 54. A new chief officer needs to familiarise himself with the damage control plan. Where does SOLAS II-1/23 require it to be permanently exhibited?
Your Answer: (Not answered)
Correct Answer: B (On the navigation bridge, in the cargo control room and at the damage control station)
💡 SOLAS II-1/23 requires the damage control plan to be permanently exhibited at the positions where it will be needed, including the navigation bridge, cargo control room and damage control station.
✗
Question 55. What is the relationship between a lifeboat's permitted complement and the overload test?
Your Answer: (Not answered)
Correct Answer: B (The boat should be used within its permitted complement, with an overload test carried out as required to verify strength and safety)
💡 A lifeboat's permitted complement is the specified safe carrying capacity and must not be exceeded in use. Under the relevant requirements a lifeboat may undergo an overload test, such as at one point one times the permitted complement or a specified load, to verify the strength and safety margin of the davits and the boat. Overloading endangers the safety of launching.
✗
Question 56. What do SOLAS and the related standards require for the pressure containers of a fixed CO2 system?
Your Answer: (Not answered)
Correct Answer: B (Containers must be tested with capacity, charge and test date marked, and checked periodically)
💡 SOLAS and the pressure vessel standards require CO2 cylinders to be tested and clearly marked with charge and test date, and to be checked periodically for weight and pressure, since slow leakage leaves less agent than required.
✗
Question 57. What does 'Administration' mean in SOLAS?
Your Answer: (Not answered)
Correct Answer: A (The Government of the State whose flag the ship is entitled to fly)
💡 It means the Government of the flag State.
✗
Question 58. A power-operated steering gear of a cargo ship is to be provided with two independent power units in order to:
Your Answer: (Not answered)
Correct Answer: A (ensure steering capability if one unit fails)
💡 SOLAS II-1/26 requires two or more identical power units so that steering capability is retained if one fails.
✗
Question 59. What is the basic requirement of SOLAS for protection against electric shock?
Your Answer: (Not answered)
Correct Answer: A (Live parts must be protected, and safety voltage or isolation used in hazardous locations)
💡 SOLAS requires exposed live parts to be protected and safety voltage or isolation and residual current protection to be used in damp or metal-enclosed locations, reducing the risk of electric shock.
✗
Question 60. On discovering equipment that may endanger safety, the master shall:
Your Answer: (Not answered)
Correct Answer: A (Take immediate precautions and, if necessary, report and seek assistance)
💡 Take immediate precautions and, if needed, report and seek assistance.
✗
Question 61. What preparation and actions does SOLAS require in an abandon ship drill?
Your Answer: (Not answered)
Correct Answer: C (Donning lifejackets, mustering and reporting, preparing and operating the launching gear on orders and starting the boat engine)
💡 SOLAS requires an abandon ship drill to include mustering and reporting, the correct donning of lifejackets, preparing and operating the launching appliances on orders and starting the boat engine, so that each crew member knows his task on abandonment.
✗
Question 62. When is a Declaration of Security concluded?
Your Answer: (Not answered)
Correct Answer: D (When security levels differ between ship and port facility, or the interface risk is high)
💡 ISPS Code A/5: a DoS is concluded when levels differ or the security risk at the interface is high.
✗
Question 63. On a passenger ship, each space shall be provided with at least how many means of escape?
Your Answer: (Not answered)
Correct Answer: D (2)
💡 SOLAS II-2/13 requires at least two widely separated means of escape from each space on a passenger ship.
✗
Question 64. Which of the following is the stowage requirement for liferafts on board?
Your Answer: (Not answered)
Correct Answer: D (They must be stowed so as to be readily available and to float free if the ship sinks)
💡 SOLAS III requires liferafts to be stowed ready for use and able to float free if the ship sinks, fitted with hydrostatic release units. Locking them in a store or placing them in a cargo hold is not permitted.
✗
Question 65. What does SOLAS require regarding a look-out when the ship is under way?
Your Answer: (Not answered)
Correct Answer: A (A look-out must be posted when conditions require it, to assist the officer in maintaining a proper look-out)
💡 SOLAS and COLREG require a look-out to be posted when conditions demand it, such as in restricted visibility, dense traffic or narrow channels. The look-out's sole duty is to keep watch and report, without other tasks such as steering.
✗
Question 66. What is required when checking the equipment of survival craft?
Your Answer: (Not answered)
Correct Answer: D (Check each item against the equipment list, replacing missing or expired items promptly)
💡 SOLAS requires each item to be checked against the equipment list for completeness and condition, such as whether pyrotechnics are expired, water has been renewed and medicines are within date, with missing or expired items replaced at once.
✗
Question 67. When proceeding along a narrow channel, a vessel should keep?
Your Answer: (Not answered)
Correct Answer: A (As near to the outer limit of the channel on her starboard side as is safe and practicable)
💡 Under the collision regulations a vessel proceeding along the course of a narrow channel or fairway should keep as near to the outer limit of the channel or fairway which lies on her starboard side as is safe and practicable. Overtaking in a narrow channel requires the agreement of the vessel being overtaken and must be done with caution.
✗
Question 68. During an alteration a machinery-space boundary bulkhead adjacent to a cargo hold is cut for cable penetrations and the original fire dampers are removed. Which statement about the requirements for that bulkhead is correct?
Your Answer: (Not answered)
Correct Answer: D (it must stay watertight as a limit face under II-1 and satisfy an A-60 division under II-2, penetrations being closed to equivalent fire and gas tightness)
💡 The point is that chapters II-1 and II-2 impose two separate duties: the bulkhead is a watertight limit face and, under the II-2 integrity table, an A-60 division against cargo spaces. Removing dampers and cutting penetrations weaken both, so any alteration must be approved and restored to equivalent performance.
✗
Question 69. The function of a hydrostatic release unit for a liferaft is to:
Your Answer: (Not answered)
Correct Answer: B (release the liferaft automatically when the ship sinks to a certain depth)
💡 SOLAS III/13 requires a hydrostatic release unit to release the liferaft automatically when the ship sinks.
✗
Question 70. What is required when fire and abandon ship drills are combined?
Your Answer: (Not answered)
Correct Answer: A (They may be combined where reasonable and practicable, provided the objectives of each are achieved without omitting essential elements)
💡 SOLAS permits drills of different kinds to be combined where reasonable and practicable, provided that the objectives of each, such as preparing and launching survival craft in an abandon ship drill and firefighting and rescue in a fire drill, are fully achieved. Essential elements must not be omitted because the drills are combined.
✗
Question 71. The inert gas system alarms shall operate on:
Your Answer: (Not answered)
Correct Answer: A (high oxygen content, abnormal gas pressure and abnormal water level conditions)
💡 SOLAS II-2/5 requires alarms for high oxygen content, abnormal pressure and abnormal water levels.
✗
Question 72. What medical first aid guidance must a ship carrying dangerous goods carry?
Your Answer: (Not answered)
Correct Answer: C (MFAG, the Medical First Aid Guide for use in accidents involving dangerous goods)
💡 SOLAS requires MFAG for the treatment of poisoning and chemical injury, while the EmS Guide addresses fire and spill response. The two serve different purposes and neither replaces the other.
✗
Question 73. What is required for testing the emergency lighting system?
Your Answer: (Not answered)
Correct Answer: A (Periodic testing of automatic operation and duration, with records kept)
💡 SOLAS and good practice require periodic testing of the automatic operation of the emergency lighting and of its duration, for example by simulating failure of the main source, observing the lighting come on and timing it, verifying the prescribed period with records kept, preventing failure during an actual blackout.
✗
Question 74. What is required in controlling trim during loading?
Your Answer: (Not answered)
Correct Answer: A (Maintain an appropriate stern trim or even keel, avoiding excessive trim affecting manoeuvrability, speed and structural stress)
💡 A moderate stern trim favours propeller efficiency and rudder response, but excessive trim by the stern or by the head reduces forward freeboard or lifts the propeller out, affecting manoeuvrability and speed and increasing structural stress. Trim should be controlled according to the stability and strength information.
✗
Question 75. Who approves the Ship Security Plan?
Your Answer: (Not answered)
Correct Answer: C (The Administration or its recognized security organization)
💡 ISPS Code Part A/9: the SSP must be approved by the Administration or its RSO.
✗
Question 76. What are the key points in testing fire pumps during a drill?
Your Answer: (Not answered)
Correct Answer: C (Start the pumps in practice and check output and pressure, testing the emergency fire pump as well)
💡 In a fire drill the fire pumps should actually be started and the output and pressure checked against the requirement, with the starting and water supply capability of the emergency fire pump tested as well, so that the crew is familiar with the operation and the equipment is verified.
✗
Question 77. The deck foam system of a tanker shall be capable of supplying foam over the protected deck area within:
Your Answer: (Not answered)
Correct Answer: A (30 minutes)
💡 SOLAS II-2/20: the deck foam system shall be capable of supplying foam over the protected deck area within 30 minutes.
✗
Question 78. What is required when life-saving appliances are changed on board?
Your Answer: (Not answered)
Correct Answer: B (Replace with approved equipment of equal or better performance and update the records and certificate attachments)
💡 Life-saving appliances should be replaced with approved equipment of the same or better performance, with the equipment records and certificate attachments such as the record of equipment for the cargo ship safety equipment certificate updated and the classification society informed for verification where necessary.
✗
Question 79. How many buoyant smoke signals shall each survival craft carry?
Your Answer: (Not answered)
Correct Answer: A (2)
💡 Two.
✗
Question 80. On what basis should a maintenance programme be prepared?
Your Answer: (Not answered)
Correct Answer: C (The manufacturer's instructions, classification society requirements and the ship's actual service experience, revised as necessary)
💡 The ISM Code requires the maintenance programme to be based on the manufacturer's instructions and the requirements of the classification society and regulations, together with the actual service history of the equipment, failure history and survey findings, and to be revised after modification or failure, so that it remains effective.
✗
Question 81. What is the principal safety hazard of a fixed CO2 system?
Your Answer: (Not answered)
Correct Answer: B (Asphyxiation of personnel)
💡 CO2 displaces oxygen, so personnel must be clear and alarms given before release.
✗
Question 82. After failure of the main steering gear, within what time must the auxiliary steering gear be brought into use?
Your Answer: (Not answered)
Correct Answer: D (7 seconds for a passenger ship and 45 seconds for a cargo ship, the changeover being proved in drills)
💡 The time is fixed by type of ship: on a passenger ship the auxiliary gear must be capable of being brought into use within 7 seconds after failure of the main gear, and within 45 seconds on a cargo ship; the arrangements must also be such that failure of one does not render the other inoperative, and the changeover is worked and logged at drills. Blurring the figures into one minute, or treating multiple power units as replacing the auxiliary gear, is found out in the exercise or in a real failure.
✗
Question 83. What electrical equipment is required in a pump room on a tanker?
Your Answer: (Not answered)
Correct Answer: B (Explosion-protected equipment, with the number of items and wiring minimised)
💡 A pump room is a high-risk space where hydrocarbon vapour can accumulate. SOLAS and the IBC Code require explosion-protected equipment with the number of items and wiring kept to a minimum, preventing electrical sparks from igniting vapour.
✗
Question 84. What safety information does a ship in sea area A3 receive through Inmarsat-C?
Your Answer: (Not answered)
Correct Answer: A (Navigational warnings, weather warnings and search and rescue messages broadcast by enhanced group call)
💡 In sea area A3 maritime safety information is received through the enhanced group call, SafetyNET, on Inmarsat-C, including navigational warnings, weather warnings and forecasts, search and rescue messages and other safety information broadcast by coast stations. It is an important source outside NAVTEX coverage.
✗
Question 85. What is the relationship between an extension and a short-term certificate?
Your Answer: (Not answered)
Correct Answer: B (An extension applies where a certificate expires during a voyage; a short-term certificate is issued to enable the ship to reach a port of survey or for another specific purpose)
💡 An extension under SOLAS is a remedy where a certificate expires during a voyage before survey can be carried out, while a short-term certificate is issued for a limited period to enable the ship to reach the port of survey or for another specific purpose. The situations differ and neither may replace the full certificate long term.
✗
Question 86. A survey is carried out two months early. What is the effect under SOLAS?
Your Answer: (Not answered)
Correct Answer: C (The next due date is still counted from the original anniversary, not postponed by the early survey)
💡 The SOLAS window allows flexibility in scheduling but does not change the due date, which is counted from the certificate anniversary. An early survey does not postpone the next one, preventing effective extension of the certificate by surveying early.
✗
Question 87. What size should the international shore connection fitted on ships of 500 GT and above be?
Your Answer: (Not answered)
Correct Answer: A (65 mm)
💡 The international shore connection is 65 mm in diameter.
✗
Question 88. In the periodic inspection of lifeboat davits, what does SOLAS require particular attention to?
Your Answer: (Not answered)
Correct Answer: B (Structural corrosion, sheave wear and the reliability of limit switches and release gear)
💡 Davit inspection concentrates on structural corrosion, wear of sheaves and falls, and the reliability of limit switches and on-load release gear, all of which determine whether the boat can be launched safely.
✗
Question 89. Which statement about the inspection and maintenance of davits is correct?
Your Answer: (Not answered)
Correct Answer: A (Their structure, sheaves, wire ropes and braking arrangements should be inspected regularly to ensure reliable launching with the boat at its permitted complement)
💡 Under SOLAS III/4 and related requirements davits and their launching appliances should be inspected regularly for structural integrity, the condition of the sheaves and wire ropes, the braking and limit arrangements and whether the boat can be launched reliably with its permitted complement. Inspection and maintenance records should be kept and defects rectified promptly.
✗
Question 90. What must be confirmed before releasing a fixed extinguishing system?
Your Answer: (Not answered)
Correct Answer: A (That all persons have left the space and been accounted for, that ventilation is closed and that the system is in working order)
💡 Before releasing a fixed extinguishing system such as CO2, it must be confirmed that all persons have left the space and been accounted for, that ventilation and openings are closed to prevent loss of gas and that the pressure or weight of the system is correct. Any omission could cause fatalities or failure of the system.
✗
Question 91. What shall be the relationship between the main and emergency sources of power?
Your Answer: (Not answered)
Correct Answer: A (They are independent and the emergency source takes over automatically)
💡 They shall be independent and the emergency source shall take over automatically.
✗
Question 92. What checking of rations in lifeboats is required?
Your Answer: (Not answered)
Correct Answer: B (Check the packaging is sound and the rations are within date, replacing them if not)
💡 Lifeboat rations should be checked for sound packaging, free of damage or damp, and for being within their expiry date, with any failing replaced at once. Expired or damp rations provide no nourishment after abandonment and may even cause illness. It is a common deficiency.
✗
Question 93. A 4200 GT cargo ship on international voyages has three pumps in the machinery space. Under SOLAS II-2/10.2, what is the minimum fire pump arrangement?
Your Answer: (Not answered)
Correct Answer: B (At least two independently driven fire pumps)
💡 SOLAS II-2/10.2 requires cargo ships of 1000 GT and above to have at least two independently driven fire pumps. At 4200 GT the ship is well above the threshold, so two is the minimum.
✗
Question 94. What is the risk if a crew member answers vaguely when asked about equipment operation?
Your Answer: (Not answered)
Correct Answer: D (It raises doubt about training and the effective operation of the system and may lead to a deeper inspection)
💡 A vague answer about equipment or emergency duties indicates that training and familiarisation may not be effective. The inspector will go deeper, including asking for practical demonstrations and checking records, and may find that the system is not effectively implemented.
✗
Question 95. A cargo ship meets the requirements on construction, equipment and radio alike. What may be applied for to reduce the number of certificates?
Your Answer: (Not answered)
Correct Answer: D (a cargo ship safety certificate, issued in place of the certificates for cargo ship safety construction, safety equipment and safety radio)
💡 Chapter I allows one cargo ship safety certificate to be issued in place of the three: safety construction, safety equipment and safety radio, on the same periods and surveys as those it replaces. A passenger ship certificate has no application to a cargo ship; an exemption meets a particular requirement on stated conditions and short voyages; and the safety management certificate belongs to the ISM Code and cannot be shown as proof of construction, equipment or radio.
✗
Question 96. What separation is required for the deck between accommodation spaces and a machinery space?
Your Answer: (Not answered)
Correct Answer: A (Normally A-60 class, protecting a high fire risk boundary)
💡 SOLAS requires A-60 class boundaries between category A machinery spaces and accommodation spaces. Because the fire risk in machinery spaces is high, the strongest protection is required to prevent spread to the accommodation.
✗
Question 97. Which VHF channel is used for distress and safety radiotelephony?
Your Answer: (Not answered)
Correct Answer: A (Channel 16 (156.8 MHz))
💡 VHF channel 16 (156.8 MHz) is for distress and safety radiotelephony. Channel 70 is reserved for DSC calling and must not be used for speech.
✗
Question 98. What is the servicing interval for inflatable liferafts?
Your Answer: (Not answered)
Correct Answer: A (Not exceeding 12 months, at an approved servicing station)
💡 Inflatable liferafts must be serviced at an approved station at intervals not exceeding 12 months, unless a longer interval is approved for specially designed rafts.
✗
Question 99. What is the function of a thermal protective aid?
Your Answer: (Not answered)
Correct Answer: D (To reduce loss of body heat in a survival craft and prevent hypothermia)
💡 A thermal protective aid is used to wrap a person and reduce loss of body heat in a survival craft, preventing hypothermia. It has no buoyancy and is not used to immobilise casualties.
✗
Question 100. The total capacity of the fire pumps on a cargo ship shall not be less than:
Your Answer: (Not answered)
Correct Answer: C (the required capacity of each pump)
💡 SOLAS II-2/10 requires the total capacity of fire pumps on a cargo ship to be not less than the required capacity of each pump.