Question 1. What is the basic concept of general average?
Your Answer: (Not answered)
Correct Answer: D (extraordinary sacrifice or expenditure for common safety, shared by all interests)
💡 General average covers deliberate sacrifice for common safety, apportioned among ship, cargo and freight interests.
✗
Question 2. In the planned maintenance system, which equipment is picked out for special attention?
Your Answer: (Not answered)
Correct Answer: C (equipment whose sudden failure would put safety, persons on board or the environment at risk)
💡 The weight sits on the critical equipment list. The test is neither price nor mere presence in the inventory but whether sudden failure would endanger the ship, the people on board or the environment, which brings in the steering gear and its hydraulics, fire pumps and fixed extinguishing systems, lifeboats and their release gear, the main engine and the auxiliaries serving it, and the navigation and communication gear. Company and ship keep the list together from the actual layout, the maker's instructions and the record of past failures, and each entry states who checks it, how often and what counts as satisfactory, the sheet being signed and filed when done. The surveyor will look for those records, but nobody else writes the list for the ship. Spreading the effort evenly over a few hundred items is how the handful that truly must not fail end up with no one watching them.
✗
Question 3. The SMS consequence of falsifying records is?
Your Answer: (Not answered)
Correct Answer: A (destroys system integrity, escalating to major non-conformity and affecting certification)
💡 Falsification blinds the system and is treated as a major NC, risking certificate suspension and reputation.
✗
Question 4. The locations most prone to fatigue cracking in hull structure are?
Your Answer: (Not answered)
Correct Answer: A (hatch corners and abrupt structural changes with high stress concentration)
💡 Cracks start at hatch corners, openings, bracket toes and abrupt changes—focus areas during structural surveys.
✗
Question 5. If statutory surveys (class, safety equipment) lapse, the direct consequence is?
Your Answer: (Not answered)
Correct Answer: A (certificates become invalid, risking detention by PSC)
💡 Statutory surveys sustain certificate validity; lapse invalidates them and invites detention.
✗
Question 6. Emergency procedures should specify communications to include?
Your Answer: (Not answered)
Correct Answer: B (internal alarms, external reporting contacts and channels)
💡 State alarm signals, mustering, reporting contacts such as company and coastal State, and the channels used.
✗
Question 7. Class requires defects found during survey to be rectified within a time limit; the SMS should?
Your Answer: (Not answered)
Correct Answer: A (record it as a non-conformity with corrective action, assign an owner and verify closure)
💡 External survey findings enter the non-conformity system with owner, deadline and verified closure.
✗
Question 8. "External documents" aboard (conventions, rules, circulars) should be?
Your Answer: (Not answered)
Correct Answer: B (identified, kept current and on a controlled list, avoiding outdated versions)
💡 External documents must be controlled and current; outdated ones mislead operations.
✗
Question 9. What is an exemption certificate for?
Your Answer: (Not answered)
Correct Answer: C (the Administration allowing one requirement not to apply to this ship under stated conditions, with the trading area and the period written on it)
💡 The Convention lets the Administration, on conditions it lays down, exempt a particular ship from a particular requirement, and the certificate is that decision put in writing: which requirement, on what conditions, in what waters, until when. It covers this ship and this exemption only - it is not a pass for the class, and it exempts nothing from being looked at: the other requirements and certificates stand, the paper is carried on board and it has to be in date. Papers of this kind appear with trading-area limits, with dimensions of the ship, and in transitional arrangements; substituting the owner's own explanation for the Administration's permission puts the authority in the wrong place.
✗
Question 10. Has an ordinary seaman the authority to stop the job?
Your Answer: (Not answered)
Correct Answer: A (anyone who sees something unsafe may stop the job, have it checked, and not be answerable for having stopped it)
💡 The point of the authority is that stopping is not held against the man who stopped: anyone who sees an unsafe condition may halt the work, have the hazard looked at, and go on once it is covered. If stopping brings a report to answer for and lost time charged to him, people learn to keep it to themselves, and the next accident is often this one swallowed. Whether it lives is seen in a few places: whether training covers it, whether anyone has actually used it at the pre-job talk, what the company asks first when a stop is reported - the facts, or the cost - and what the record shows. A record book with no stop in it is usually not evidence that nothing was unsafe, but that the route is closed.
✗
Question 11. The main use of an audit findings database is?
Your Answer: (Not answered)
Correct Answer: A (support trend analysis, benchmarking and management review input)
💡 A findings database enables cross-ship and period comparison, revealing recurring issues for review input.
✗
Question 12. Cargo shifts during the voyage; the first measure is?
Your Answer: (Not answered)
Correct Answer: B (alter course and speed to reduce rolling, secure the cargo and assess stability)
💡 Reduce rolling and assess stability first, then secure or ballast; opening hatches or holding speed worsens it.
✗
Question 13. The value of simulator training is?
Your Answer: (Not answered)
Correct Answer: B (practise decisions and actions for high-risk or rare scenarios safely)
💡 Simulators recreate casualties and extremes, letting crews practise judgement safely where drills cannot reach.
✗
Question 14. A fresh water tank is found contaminated; what applies?
Your Answer: (Not answered)
Correct Answer: D (stop using the tank, trace the contamination and disinfect to keep drinking water safe)
💡 Contaminated water threatens health; stop using the tank, trace and clean and disinfect, seeking shore support if needed.
✗
Question 15. Berth operations' security/safety checks with terminals should?
Your Answer: (Not answered)
Correct Answer: B (ship-shore checklists and written handover clarify duties and emergency)
💡 Ship-shore checklists prevent responsibility vacuums—a hard rule.
✗
Question 16. The role of operations scheduling within the SMS should be?
Your Answer: (Not answered)
Correct Answer: C (optimise the schedule within safety constraints and consult the master)
💡 Scheduling works within legal and SMS limits and consults the master; commerce never overrides safety.
✗
Question 17. Upon receiving a detention decision, the master should first?
Your Answer: (Not answered)
Correct Answer: B (notify company and flag, organize rectification and request re-check)
💡 Report to company, flag and P&I; plan and complete repairs, then request re-inspection.
✗
Question 18. When food poisoning occurs on board, the first step is?
Your Answer: (Not answered)
Correct Answer: A (stop serving suspect food, treat cases and report)
💡 Withdraw and seal suspect items, treat patients, keep samples, report and assist the investigation.
✗
Question 19. Under-keel clearance calculation should include?
Your Answer: (Not answered)
Correct Answer: D (draught, tide, chart datum, squat and a sea-state margin)
💡 Combine draught, tide correction, datum, squat and wave margin with adequate safety in depth-limited waters.
✗
Question 20. How should onboard medical records be managed?
Your Answer: (Not answered)
Correct Answer: B (record symptoms, treatment and drugs truthfully, keep confidential)
💡 Record complaints, findings, treatment and medication accurately, stored confidentially for continuity and inquiry.
✗
Question 21. The purpose of time contingency in a voyage plan is?
Your Answer: (Not answered)
Correct Answer: D (a buffer for weather, delays and breakdown uncertainties)
💡 Contingency absorbs weather, delays and breakdowns; cutting it transfers risk onto navigational safety.
✗
Question 22. When KPIs look good yet accidents still occur, it indicates?
Your Answer: (Not answered)
Correct Answer: D (the metrics miss real risk or data quality is poor)
💡 Divergence means wrong measures, poor definitions or false reporting; audit the data chain and relevance.
✗
Question 23. An oil drip from a deck line is found in port; what applies?
Your Answer: (Not answered)
Correct Answer: A (catch and contain it, close the relevant valves and report)
💡 Even a drip needs containment, valve closure and reporting to prevent pollution at sea and penalties.
✗
Question 24. How may sludge from the machinery spaces be disposed of?
Your Answer: (Not answered)
Correct Answer: B (to a reception facility, or through an approved arrangement on board and then to a reception facility)
💡 Sludge is what the separators and the settling leave behind, not a thin oil the sea can be asked to absorb: the rule forbids putting sludge from machinery spaces or residues from cargo oil tanks into the sea unless it goes to a reception facility, or passes through a fixed or approved arrangement on board that lets it be delivered to one. Hence the ship carries a sludge tank of adequate capacity, arranged to be emptied and cleaned; an approved incinerator may burn sludge within its own limits and where the rule allows, with what was burnt, when and where, entered in the record book. Crushing sludge to send it with bilge water through the separator, or diluting it under 15 ppm, does not work - that figure is the condition for bilge water and lends itself to nothing else. A receipt is taken and kept for every delivery ashore, and each entry has to square with what the tank could hold, since the auditor reads the tank soundings against the book.
✗
Question 25. Why is garbage sorted on board?
Your Answer: (Not answered)
Correct Answer: D (to enable lawful handling and shore reception and cut illegal discharge risk)
💡 Sorting is the prerequisite for lawful handling, letting each category follow its rule and cutting mis-discharge risk.
✗
Question 26. During bunkering the flow meter does not move; what applies?
Your Answer: (Not answered)
Correct Answer: B (suspend, check metering and the line before continuing)
💡 A failed meter makes quantity unverifiable; suspend and check metering and lines before resuming.
✗
Question 27. For identified hazards, the next step is?
Your Answer: (Not answered)
Correct Answer: B (assess likelihood and consequence (risk matrix), decide acceptable or needing control)
💡 Risk assessment ranks by likelihood × severity, guiding where to invest controls.
✗
Question 28. When anti-piracy measures (slow, reroute) conflict with schedule, the ship should?
Your Answer: (Not answered)
Correct Answer: C (safety first, sacrifice schedule if needed and inform parties)
💡 Safety overrides commerce; schedule loss is negotiable, lives are not.
✗
Question 29. What risks does protection and indemnity cover mainly?
Your Answer: (Not answered)
Correct Answer: B (liability to third parties such as injury, pollution and cargo claims)
💡 P and I covers third party liabilities including injury, pollution, cargo claims and fines, complementing hull cover.
✗
Question 30. A Voyage Data Recorder (VDR) in a casualty acts like?
Your Answer: (Not answered)
Correct Answer: A (an aircraft black box recording heading, comms, radar for review)
💡 VDR continuously logs steering, comms and radar; it is key objective evidence, must be preserved.
✗
Question 31. The difference between equipment and class certificates is?
Your Answer: (Not answered)
Correct Answer: C (equipment certificates address individual items; class certificate evidences classification status)
💡 Lifesaving, fire and navigation gear hold statutory certificates; class covers hull and machinery standards.
✗
Question 32. Mental health support on board should include?
Your Answer: (Not answered)
Correct Answer: B (communication channels, shore counselling and adequate leave)
💡 Offer confidential support, communications and leave, with attention after incidents or long isolated service.
✗
Question 33. What does ISM Chapter 2 (Safety and Environmental Protection Policy) require?
Your Answer: (Not answered)
Correct Answer: B (the company states a written policy implemented ashore and afloat)
💡 Chapter 2 demands a written commitment implemented at all levels ashore and aboard.
✗
Question 34. In recruiting crew the Company should?
Your Answer: (Not answered)
Correct Answer: A (verify credentials, certificate authenticity and safety record)
💡 Recruitment vetting blocks fake certificates and incompetence aboard.
✗
Question 35. When new rules/circulars appear, the SMS should?
Your Answer: (Not answered)
Correct Answer: A (assess impact, revise procedures and train to stay compliant)
💡 Rules evolve; the SMS must keep pace or fall behind compliance.
✗
Question 36. The value of analysing deficiency distribution is?
Your Answer: (Not answered)
Correct Answer: D (identify recurring systems and port patterns to target resources)
💡 Statistics by system, ship type, trade and port reveal weak points and risk hotspots guiding training and preparation.
✗
Question 37. Which is NOT normally included in immediate reporting of major events?
Your Answer: (Not answered)
Correct Answer: C (crew private vacation plans)
💡 Immediate reports cover casualties, incidents and pollution—not private vacation planning.
✗
Question 38. What is the key to preparing claim documents?
Your Answer: (Not answered)
Correct Answer: C (complete, true, chronologically consistent and mutually corroborating)
💡 Claim papers must be true, complete and consistent in time, corroborating each other; gaps or contradictions weaken the claim.
✗
Question 39. What happens if the main engine remote control fails?
Your Answer: (Not answered)
Correct Answer: C (change to local control keeping communications and steering)
💡 Switch to local control, strengthen bridge-engine communication, keep steering and propulsion and troubleshoot.
✗
Question 40. The relationship between innovation and compliance is?
Your Answer: (Not answered)
Correct Answer: C (innovate within legal and safety requirements)
💡 Confirm any new method neither breaches mandatory rules nor lowers safety, then pursue efficiency gains.
✗
Question 41. What is the risk when the master signs external documents?
Your Answer: (Not answered)
Correct Answer: D (he may assume personal legal obligations and liability)
💡 When signing bills, receipts or statements, verify truth and consequences; improper signing carries personal legal risk.
✗
Question 42. Over-reliance on automation (e.g. autopilot) can?
Your Answer: (Not answered)
Correct Answer: D (erode vigilance and manual skill, slow response to anomalies)
💡 Automation reliance breeds monitoring laziness, slow in emergencies.
✗
Question 43. By object, SMS audits may include?
Your Answer: (Not answered)
Correct Answer: A (system, procedure and activity (on-site ops) audits)
💡 Three layers—system, procedure, activity—cover write-do-record.
✗
Question 44. The "four must-nots" of SMS document control generally are?
Your Answer: (Not answered)
Correct Answer: A (no obsolete use, no unauthorized edits, no uncontrolled copies, no untrained rollout)
💡 Document control means only valid editions on board, controlled changes, tracked copies and trained rollout.
✗
Question 45. The consequence of trading with an expired certificate is?
Your Answer: (Not answered)
Correct Answer: B (illegal trading, detention, fines and insurance/port issues)
💡 Operating with expired certificates draws detention, fines and insurance consequences.
✗
Question 46. PSC results and deficiencies are shared via?
Your Answer: (Not answered)
Correct Answer: C (MoU databases, affecting this and sister ships' targeting)
💡 Deficiencies enter networks, flagging sister ships for company-wide fix.
✗
Question 47. What supports a claim for repair costs?
Your Answer: (Not answered)
Correct Answer: D (repair invoices, survey reports and proof of causal link to the incident)
💡 Claims need invoices, surveys and proof that the loss was caused by the insured event.
✗
Question 48. What is the basic rule for discharging oily mixtures in a special area?
Your Answer: (Not answered)
Correct Answer: D (prohibited in principle, with a narrow exception for treated low concentrations while underway)
💡 Special areas are far stricter: discharge is prohibited except under narrow conditions while underway and must be logged.
✗
Question 49. Complex equipment (IGS, purifier) should be provided with?
Your Answer: (Not answered)
Correct Answer: A (concise operating instructions and emergency stop steps)
💡 Instructions cut misuse; emergency steps protect safety.
✗
Question 50. During bunkering a crew member leaves his post; what applies?
Your Answer: (Not answered)
Correct Answer: A (cover the post at once, correct him and restate the watch requirement)
💡 Bunkering needs continuous dedicated watch; leaving the post means a spill goes unseen, so cover and correct it firmly.
✗
Question 51. What is the master's first key role in an emergency?
Your Answer: (Not answered)
Correct Answer: A (establish command and an information hub keeping the overall picture)
💡 In emergencies the master commands, holds the whole picture and assigns tasks; operating gear himself loses overall control.
✗
Question 52. Digital SMS (electronic manuals) must guard against?
Your Answer: (Not answered)
Correct Answer: B (version drift, offline failure and tampering via controlled distribution)
💡 Electronic manuals need controlled versions, offline access, tamper-proofing and backups.
✗
Question 53. Special attention when transiting locks or canals includes?
Your Answer: (Not answered)
Correct Answer: A (control speed, follow scheduling and signals and coordinate tugs and boats)
💡 Follow scheduling and signals, control speed and position, coordinate with tugs and watch bank effects and currents.
✗
Question 54. After initial audit, a new Company first obtains?
Your Answer: (Not answered)
Correct Answer: D (a temporary DOC (≤12 months), operate then face full audit)
💡 The temporary DOC gives time to build and run before the full DOC.
✗
Question 55. An anchor watch should primarily monitor?
Your Answer: (Not answered)
Correct Answer: B (dragging, cable strain, position changes and nearby traffic)
💡 Watch position for dragging, cable direction/strain and approaching traffic while yawing.
✗
Question 56. How are external documents (regulations, circulars) incorporated into the SMS?
Your Answer: (Not answered)
Correct Answer: D (identify applicability, update controlled list, brief and revise internal docs)
💡 Track new rules, assess applicability, update the list, brief staff and revise internal procedures.
✗
Question 57. What is the core content of the Shipboard Oil Pollution Emergency Plan?
Your Answer: (Not answered)
Correct Answer: B (reporting procedures, contact lists and onboard spill response measures)
💡 The SOPEP sets reporting lines, contacts and onboard containment measures for the first response.
✗
Question 58. The management principle for watertight openings at sea is?
Your Answer: (Not answered)
Correct Answer: A (open as needed with records, kept closed at sea)
💡 Keep watertight doors closed at sea; temporary opening for work is logged and closed immediately after.
✗
Question 59. Cargo shifts because of long-period swell; you should?
Your Answer: (Not answered)
Correct Answer: A (reduce speed, alter heading, re-lash and recompute stability)
💡 Alter course and speed to reduce motion, re-secure when safe, recompute stability and shelter if needed.
✗
Question 60. Advised by VTS that the ship is proceeding against traffic in a TSS, the master should?
Your Answer: (Not answered)
Correct Answer: B (correct course immediately per the rules and inform VTS and traffic)
💡 Wrong-direction traffic is grave and risks head-on collision; alter safely, inform VTS and traffic and report.
✗
Question 61. The fire control station is found blocked with stores; you should?
Your Answer: (Not answered)
Correct Answer: A (clear it at once and keep access and operating space free)
💡 The station must be instantly operable; clear and add it to routine rounds to prevent recurrence.
✗
Question 62. Personnel conducting internal audits should?
Your Answer: (Not answered)
Correct Answer: B (be independent of the activity audited and competent/trained)
💡 Auditor independence and competence are the basis of objective audits.
✗
Question 63. Drill records show suspiciously regular intervals, indicating?
Your Answer: (Not answered)
Correct Answer: D (records may be fabricated rather than reflecting genuine drills)
💡 Real drills vary with voyage, weather and crew; uniform spacing often signals back-dated paperwork.
✗
Question 64. When undermanning is found, the audit should trace it to?
Your Answer: (Not answered)
Correct Answer: A (company manning policy and resourcing, a shore management duty)
💡 Undermanning usually stems from company staffing and budget decisions, so findings should point ashore.
✗
Question 65. How does the master build a just culture?
Your Answer: (Not answered)
Correct Answer: B (no retaliation for reporting errors but accountability for deliberate violations)
💡 A just culture separates inadvertent error from recklessness, encouraging reporting while holding wilful breaches accountable.
✗
Question 66. Who is responsible for checking the pilot ladder and boarding arrangements?
Your Answer: (Not answered)
Correct Answer: A (the ship inspects and confirms safety, and the pilot may comment)
💡 The ship rigs and checks the ladder and confirms it is safe, correcting defects at once; this is a critical safety item.
✗
Question 67. Gauging shows shell plating beyond the allowable corrosion limit; the master should?
Your Answer: (Not answered)
Correct Answer: B (report company and class at once and follow instructions to reduce load or repair)
💡 Corrosion beyond limits affects hull strength; report and follow class instructions on load or repair, never conceal it.
✗
Question 68. What is required of garbage storage spaces?
Your Answer: (Not answered)
Correct Answer: D (weatherproof, odour and pest controlled and away from food and heat)
💡 Covered, weatherproof storage controlling odour and pests, separated from food and heat, keeping the ship hygienic.
✗
Question 69. Before berthing, the tug plan should specify?
Your Answer: (Not answered)
Correct Answer: B (number, power, made-fast positions and working signals)
💡 The plan fixes number, bollard pull, positions and signals, agreed by master, pilot and tugs.
✗
Question 70. What is the emphasis of the first response after a spill?
Your Answer: (Not answered)
Correct Answer: D (the source stopped or limited, the required report made, containment and recovery laid out)
💡 The ship's pollution emergency plan puts stopping the source first: work halted, the right valves shut, the leak bounded, transfer or discharge into another tank to take the load off, so that the quantity still going over the side is as small as may be. At the same time the report prescribed by the plan goes to the authority and to any coast that may be affected, in the form and with the items the plan lists, and the time, the position and the steps taken are written down; booms, absorbents and recovery gear then follow an assessment of the sea state and the sensitive shore. Dispersant is normally a decision for the authority under conditions of depth, sea state and environment, not the first thing a ship sprays on its own, and computing the loss or filling the incident form before acting simply spends the hours the oil has. Samples and records are kept for what follows.
✗
Question 71. The long-term strategy for managing incident-related public opinion is?
Your Answer: (Not answered)
Correct Answer: B (rebuild trust with safety performance and transparency)
💡 Long-term trust comes from real improvement and transparency, not from suppressing coverage.
✗
Question 72. A dragging vessel strikes your ship at anchor; afterwards you should?
Your Answer: (Not answered)
Correct Answer: D (check own damage, preserve evidence and report company and P&I)
💡 Survey damage, photograph, exchange details, notify company, club and VTS and log the whole event.
✗
Question 73. Key deck fire/explosion control during tanker port operations is?
Your Answer: (Not answered)
Correct Answer: A (no-smoking, anti-static, controlled hot work, explosion-proof equipment)
💡 Hydrocarbons accumulate on deck during transfer; ignition control and EX equipment are vital.
✗
Question 74. To keep the Document of Compliance and Safety Management Certificate valid, which verifications does the ISM Code recognise?
Your Answer: (Not answered)
Correct Answer: B (initial, annual, intermediate and renewal, with additional verification where needed)
💡 A five-year certificate is held together by a chain of verifications: initial to issue, annual to show the system still works, an intermediate for the Document of Compliance between the second and third anniversary dates, renewal at expiry, and additional verification after a major non-conformity, an accident or a substantial change.
✗
Question 75. What should the pilot information exchange cover?
Your Answer: (Not answered)
Correct Answer: A (manoeuvring characteristics, equipment state, draught and berthing plan)
💡 Exchange covers handling, equipment, draught and the berthing plan so pilot and bridge share one picture.
✗
Question 76. What makes the shipboard oil pollution emergency plan acceptable?
Your Answer: (Not answered)
Correct Answer: B (approved by the administration, always at hand on board, containing the reporting procedure and the steps to be taken, and exercised as planned)
💡 The plan is not a shore document: it is approved by the administration, must come to hand at once on board, and its content covers at least the procedure for reporting as circumstances require (to whom, what, and when to follow up), the first measures to control and reduce a discharge on board, the action and contact list needed to work with the coastal State, and the arrangement for training and drills. It has to fit this ship - her cargo, her tank arrangement, her piping - since a generic text will not match the valves and tank names when it matters. Readiness and drilling are one thing: each post named in the plan must have been exercised, each number proved to answer a call recently, and an out-of-date issue does not count at an inspection. The duty bites by tonnage: oil tankers of 150 gross tons and above and other ships of 400 gross tons and above.
✗
Question 77. The key requirement for lifeboat emergency organisation is?
Your Answer: (Not answered)
Correct Answer: B (a designated boat coxswain and second-in-command with crew duties clear)
💡 Assign a coxswain and deputy with clear duties, boarding order and seating for an organised launch.
✗
Question 78. Key points for the garbage record book are?
Your Answer: (Not answered)
Correct Answer: D (record by category the time, position and quantity discharged or delivered)
💡 Log each discharge or delivery by category with time, position and quantity, plus reception receipts per Annex V.
✗
Question 79. The towline parts while towing - what is done first?
Your Answer: (Not answered)
Correct Answer: B (alert both vessels, hold their positions, then weigh reconnection against anchoring or another way of keeping position)
💡 When the towline parts, the two ships stop constraining each other at once: the tug swings and the tow drifts on wind and current, which becomes a dangerous situation within minutes if a shoal, a bridge pier or traffic is near. The first step is therefore to warn both vessels, plus nearby shipping and the shore station where needed, hold position and use the tug's own engines and rudder to control the relationship between the two ships. Only then comes the judgement on reconnection - spare line, coming round to lead a new towline, or an alternative such as anchoring or a temporary line. Reporting to the company is required but sits behind holding position.
✗
Question 80. The basis for allocating war-risk premium and excluded areas is?
Your Answer: (Not answered)
Correct Answer: D (charterparty clauses such as war risks provisions and club rules)
💡 Premium and excluded-area responsibility follow the charterparty; align changes in writing to avoid gaps and disputes.
✗
Question 81. The core elements of a permit to work are?
Your Answer: (Not answered)
Correct Answer: B (scope, duration, test data, precautions and issuing and accepting persons)
💡 State scope and period, gas tests or isolation, precautions, issuer and executor, plus completion sign-off.
✗
Question 82. An example of a leading safety indicator is?
Your Answer: (Not answered)
Correct Answer: A (drill completion, near-miss reports and timely hazard close-out)
💡 Leading indicators measure prevention and warn early; lagging ones record outcomes already occurred.
✗
Question 83. The voyage plan should be kept on board and?
Your Answer: (Not answered)
Correct Answer: C (accessible, familiar, amended with master sign-off)
💡 Keep it accessible, ensure familiarity, and amend with master's confirmation.
✗
Question 84. At anchor in fog, what should be done?
Your Answer: (Not answered)
Correct Answer: D (sound the anchor fog signal, keep a good lookout and watch)
💡 Sound the prescribed fog signal, keep a proper lookout and watch for approaching traffic and dragging.
✗
Question 85. The Company should consolidate casualty lessons and best practice into?
Your Answer: (Not answered)
Correct Answer: C (a knowledge base disseminated fleet-wide to avoid repeating mistakes)
💡 Knowledge management turns individual lessons into organisational capability.
✗
Question 86. What principle governs releasing information after an accident?
Your Answer: (Not answered)
Correct Answer: B (a single company spokesperson with consistent messaging, no casual crew comments)
💡 Use one authorised voice; casual crew remarks are easily taken out of context and affect investigation and liability.
✗
Question 87. Emergency drills and exercises shall be?
Your Answer: (Not answered)
Correct Answer: C (recorded and filed for review)
💡 Rule 8.2: drills must be recorded (date, type, participation, evaluation) for audit.
✗
Question 88. Before entering a high risk area, hardening measures usually include?
Your Answer: (Not answered)
Correct Answer: C (razor wire, fire hoses, locked aft access and citadel preparation)
💡 Hardening means razor wire, water jets, locked stern, fewer handholds plus citadel and backup comms readiness.
✗
Question 89. Before high-risk work (enclosed-space entry, hot work) one should conduct?
Your Answer: (Not answered)
Correct Answer: D (a Job Safety Analysis (JSA) and permit-to-work, with measures and watch)
💡 Permit-to-work plus JSA pins down hazards, controls, responsible persons and watch—a life-saving system.
✗
Question 90. The value of sharing lessons learned is?
Your Answer: (Not answered)
Correct Answer: D (prevent recurrence of similar incidents across the fleet)
💡 Sharing structured lessons lets ships that never had the event benefit—cheap prevention of recurrence.
✗
Question 91. If off track is noticed during watch handover, one should?
Your Answer: (Not answered)
Correct Answer: B (verify position, inform the master and take corrective action)
💡 Confirm position, assess danger, inform the master and correct before the situation develops.
✗
Question 92. The purpose of testing the main engine before port entry is?
Your Answer: (Not answered)
Correct Answer: A (confirm ahead and astern reliability for engine standby and emergency manoeuvring)
💡 Trial of ahead and astern confirms the plant responds so emergency manoeuvring is available.
✗
Question 93. The purpose of emergency steering drills is?
Your Answer: (Not answered)
Correct Answer: B (ensure rapid changeover when main steering fails)
💡 Drills make the crew fluent in changeover and communications so steering is restored quickly.
✗
Question 94. Noticing the autopilot slowly drifting the ship off track, you should?
Your Answer: (Not answered)
Correct Answer: A (take manual control, correct and investigate the cause)
💡 Take manual control, correct, check settings and sensors and only resume automatic after cross-checking.
✗
Question 95. The consequence of bypassing pollution prevention equipment is?
Your Answer: (Not answered)
Correct Answer: A (serious illegality risking detention, fines and criminal liability)
💡 Bypassing and falsifying are treated as wilful violations with penalties far beyond ordinary deficiencies.
✗
Question 96. What is the most effective language strategy on a multinational ship?
Your Answer: (Not answered)
Correct Answer: A (establish a common working language and require standard phrases for key orders)
💡 Set a common working language, use standard marine phrases for key orders and read back to avoid misunderstanding.
✗
Question 97. To reduce human error, the SMS emphasises?
Your Answer: (Not answered)
Correct Answer: C (standard procedures, adequate rest, clear communication, just (non-punitive) reporting)
💡 Human-factor management is systemic, not individual; a just culture surfaces hazards.
✗
Question 98. What is hazard identification for in the safety system?
Your Answer: (Not answered)
Correct Answer: D (working out, task by task, what here could injure or damage)
💡 Identification asks what here can hurt a person, damage the ship or pollute the sea, and it looks at the sources and conditions of the work: height and shipside, oxygen deficiency and gas in a space, moving loads and lifting, heat and turning gear in the engine room, traffic and weather in the port, fatigue and how people talk to one another. It comes before the estimate of likelihood and consequence, so a line missing from the list is a line absent from the controls afterwards; the usual way of missing it is to build the list backwards from the accident statistics, which tell where harm has already been done, not where it will be done next. What comes out has to land as a check before the job, a condition on a permit, or a step in an instruction, and to be revised as the equipment, the cargo, the ports and the people change.
✗
Question 99. The strongest expression of shore-side safety commitment is?
Your Answer: (Not answered)
Correct Answer: A (prioritize safety over cost when they conflict and deliver resources)
💡 Commitment shows when safety beats schedule and cost, backed by real resources rather than slogans.
✗
Question 100. What is the effect of an open communication climate on board?
Your Answer: (Not answered)
Correct Answer: D (hazards and errors surface early and are corrected)
💡 Openness makes crew report hazards and errors so problems are found before accidents, a hallmark of safety culture.