Exam Home Website
中文 English
0
/100
FAIL
Correct: 0/100 Total Questions: 100 Time Spent: 60min0sec
Passing: 80
Retake History
Answer Review
✗
Question 1. Which statement about the master's authority in matters of safety and pollution prevention is correct?
Your Answer: (Not answered)
Correct Answer: D (The master has overriding authority in safety and pollution prevention, and the company should specify this absolute authority in the system)
💡 Under SOLAS V/34 and the ISM Code the master has overriding authority in matters of safety and pollution prevention and the company should specify this absolute authority in its safety management system, ensuring that the master can take safety decisions free from commercial pressure where necessary. In the master's absence a designated person acts.
✗
Question 2. What does the Polar Code address regarding equipment for low temperature in polar waters?
Your Answer: (Not answered)
Correct Answer: A (Materials and operating temperatures of essential equipment must suit the low temperatures, preventing brittle fracture and failure)
💡 The Polar Code requires essential equipment, materials and systems of a ship in polar waters to be designed for low temperatures, preventing failure through brittle fracture of steel, increased viscosity of hydraulic oil or reduced battery capacity.
✗
Question 3. What is required for the identification of valves in the bilge system?
Your Answer: (Not answered)
Correct Answer: B (Clear identification of function and direction of operation to prevent misoperation)
💡 SOLAS and good practice require valves in the bilge, ballast and fire systems to be clearly and durably identified as to function and direction of operation, so that in an emergency, particularly in poor visibility or under pressure, the crew does not open or close the wrong valve.
✗
Question 4. What should be done if an electronic aid such as GPS shows a jump in position?
Your Answer: (Not answered)
Correct Answer: D (Switch at once to other means such as radar or visual bearings for cross-checking, establish the cause and record and report the matter)
💡 If GPS shows a jump, drift or loss of signal, other means such as radar and visual bearings should be used at once to cross-check the position, the cause established, for example signal interference or equipment failure, and the matter recorded and reported, preventing grounding from an error in a single aid.
✗
Question 5. Segregation is required when dangerous goods are stowed on board. What is the fundamental purpose?
Your Answer: (Not answered)
Correct Answer: B (To prevent incompatible substances reacting dangerously on contact)
💡 Segregation under SOLAS VII/3 and the IMDG Code prevents incompatible substances from reacting if released, causing fire, explosion or toxic gas. It is not a tallying convenience.
✗
Question 6. What do SOLAS and good practice require when radar and other radio equipment interfere with one another?
Your Answer: (Not answered)
Correct Answer: D (Identify the source and take measures such as adjusting antenna positions or settings so that all equipment works normally)
💡 Interference between equipment, such as same frequency radar or VHF and other transmitters, affects target presentation and communication. The cause should be found and removed by adjusting antenna positions, using filters or changing settings. Simply switching off the affected equipment is not acceptable.
✗
Question 7. What measures prevent overflow during loading of liquid bulk cargo?
Your Answer: (Not answered)
Correct Answer: B (Monitor tank levels, use high level alarms and control the loading rate, slowing as tanks approach full)
💡 Liquid bulk operations require tank levels to be monitored, including level and high level alarms, the loading rate controlled and reduced as tanks approach full, with a person detailed to watch the vents and overflow, preventing spillage with its pollution and fire risks.
✗
Question 8. Each person in a lifeboat shall be provided with food of an energy value of not less than:
Your Answer: (Not answered)
Correct Answer: D (10 000 kJ)
💡 SOLAS III/34 requires food of not less than 10 000 kJ per person in a lifeboat.
✗
Question 9. Before entry into an enclosed space, what preparation must the master ensure?
Your Answer: (Not answered)
Correct Answer: C (Ventilation and testing with calibrated instruments, with satisfactory readings and an entry permit issued)
💡 SOLAS and the IMO resolutions require ventilation, testing of oxygen and toxic and flammable gases with calibrated instruments, and an entry permit issued by the responsible officer before anyone enters.
✗
Question 10. What marking shall life-saving appliances and their stowage positions have?
Your Answer: (Not answered)
Correct Answer: A (Clear markings for quick identification in an emergency)
💡 Markings shall identify the appliances and their stowage positions.
✗
Question 11. At what interval must a company carry out internal audits under the ISM Code?
Your Answer: (Not answered)
Correct Answer: B (At intervals specified by the company, normally not exceeding 12 months)
💡 ISM Code 12 requires planned internal audits at intervals normally not exceeding 12 months to verify the effectiveness of the elements of the system and drive improvement. Auditing only after accidents or at excessive intervals does not keep the system effective.
✗
Question 12. What special requirement applies to life-saving appliances on ships operating in polar waters?
Your Answer: (Not answered)
Correct Answer: A (They must function at low temperature, with measures to extend survival time taken into account)
💡 The Polar Code requires life-saving appliances to function at low temperatures and for measures to be taken to extend survival time, such as thermal protection and collective survival equipment. Ordinary water requirements alone do not suffice.
✗
Question 13. A PSCO checked the continuous synopsis record against the ship's history. What changes must the CSR record?
Your Answer: (Not answered)
Correct Answer: D (Significant events such as changes of name, flag, company, recognised organisation and class)
💡 SOLAS XI-1/5 requires the CSR to record the ship's history and significant changes, including changes of name, flag, company, recognised organisation and class, so the record is traceable. Incomplete or out-of-date entries are a deficiency.
✗
Question 14. Which of the following is not broadcast by AIS?
Your Answer: (Not answered)
Correct Answer: C (Contents of the cargo commercial contract)
💡 AIS broadcasts identity, position, course, speed, draught and destination — not commercial contract details.
✗
Question 15. What is the minimum number of radar transponders (SARTs) for a cargo ship of 500 gross tonnage and above?
Your Answer: (Not answered)
Correct Answer: D (Two, one on each side)
💡 Under SOLAS IV/7 a cargo ship of five hundred gross tonnage and above should carry at least two radar transponders, normally one on each side, so that one can be taken into the survival craft on either side during abandonment. The SART marks the distress position on the radar.
✗
Question 16. What must be provided in the steering gear compartment under SOLAS?
Your Answer: (Not answered)
Correct Answer: C (Arrangements to control the steering gear and to operate the machinery on emergency)
💡 SOLAS requires the steering gear compartment to have arrangements for controlling the steering gear and for operating the machinery on emergency, such as emergency stopping, making it an emergency control centre.
✗
Question 17. What is required in forming main vertical zones?
Your Answer: (Not answered)
Correct Answer: C (Dividing the ship into sections by class A divisions so that fire in one section is restricted from spreading to adjacent sections)
💡 SOLAS requires main vertical zones formed by class A divisions, dividing the ship into sections so that a fire is confined to the zone in which it starts. This is the core of structural fire protection.
✗
Question 18. What is required if a particular drill cannot be held in a month?
Your Answer: (Not answered)
Correct Answer: B (It should be held as soon as conditions permit, normally within 24 hours, with the reason for the delay recorded in the log)
💡 SOLAS requires a drill not held in a month because of navigational conditions to be held as soon as conditions permit, normally within the following 24 hours, with the reason for the delay recorded in the deck log. Missing drills over several months is a serious deficiency.
✗
Question 19. What rescue arrangement is required when entering an enclosed space?
Your Answer: (Not answered)
Correct Answer: B (A standby person at the entrance with rescue equipment and continuous communication)
💡 Entry into an enclosed space requires a standby person at the entrance, continuous communication and rescue equipment including breathing apparatus, so that immediate rescue is possible. Solo entry is a principal cause of multiple fatalities.
✗
Question 20. What training and experience does the Polar Code require for seafarers?
Your Answer: (Not answered)
Correct Answer: C (Masters and deck officers must have completed basic or advanced polar waters training appropriate to the ship's category)
💡 The Polar Code and STCW require masters and deck officers to hold basic or advanced polar waters training appropriate to the ship's category, together with the prescribed seagoing service.
✗
Question 21. What does SOLAS III require regarding monthly inspection records of survival craft?
Your Answer: (Not answered)
Correct Answer: A (Records must be kept and produced at statutory surveys)
💡 SOLAS III requires monthly inspections of survival craft and launching appliances to be recorded and kept on board for verification by the surveyor and PSC. Records held only ashore are not sufficient.
✗
Question 22. How is the meteorological service addressed in SOLAS V?
Your Answer: (Not answered)
Correct Answer: A (Contracting Governments undertake to provide meteorological information and warnings to ships)
💡 SOLAS V/5 requires Contracting Governments to provide meteorological information and warnings to ships, which masters use in planning the voyage.
✗
Question 23. What time window is permitted for an annual survey under SOLAS?
Your Answer: (Not answered)
Correct Answer: C (Within three months before or after the anniversary date, with the next due date counted from the anniversary)
💡 SOLAS provides for the annual survey to be carried out within a window of three months before or after the anniversary date, with the next due date counted from the anniversary. The interval must not be extended at will.
✗
Question 24. What is the legal status of annexes and attachments to statutory certificates under SOLAS?
Your Answer: (Not answered)
Correct Answer: D (They form part of the certificate, to be kept with it and produced for inspection)
💡 SOLAS requires annexes and attachments such as equipment records, exemption lists and survey records to form part of the certificate, kept with it and produced at port State inspection. Missing annexes make the certificate incomplete.
✗
Question 25. Enhanced Surveys shall be carried out in accordance with:
Your Answer: (Not answered)
Correct Answer: D (the harmonized system of survey and certification and the Enhanced Survey Programme guidelines)
💡 SOLAS XI-1/2: Enhanced Surveys are carried out under the harmonized system of survey and certification and the ESP guidelines.
✗
Question 26. Which code governs the stability and heeling calculations for grain in bulk?
Your Answer: (Not answered)
Correct Answer: C (the grain code, with its stowage manual and the document of authorisation)
💡 Grain in bulk is dealt with on its own terms: the code gives the assumptions for the heeling caused by grain shifting, the stability criteria and what is required of a hold to be filled with grain, the ship carries a grain stowage manual and an authorisation to carry grain in bulk, and the calculation works out the heeling moment of each hold and checks the stability left after the shift. The solid bulk code answers mineral concentrates and coal, cargoes that may liquefy or react; packaged dangerous goods have their own code; the securing manual is about lashing and the forces in it. The mistake made by mixing the three is to treat grain as an ordinary bulk cargo and so leave out the heeling that comes from surface settlement and slope. Levelling and trimming before loading are done as required, and the booklets with the stability figures go to the master for signature.
✗
Question 27. Besides the proper shipping name, what must appear on a dangerous goods document?
Your Answer: (Not answered)
Correct Answer: C (The UN number and the hazard class)
💡 Dangerous goods documents must show the proper shipping name, UN number, class and packing group.
✗
Question 28. What is the servicing interval for inflatable liferafts?
Your Answer: (Not answered)
Correct Answer: A (Not exceeding 12 months, at an approved servicing station)
💡 Inflatable liferafts must be serviced at an approved station at intervals not exceeding 12 months, unless a longer interval is approved for specially designed rafts.
✗
Question 29. Change-over between automatic pilot, manual steering and emergency steering shall be:
Your Answer: (Not answered)
Correct Answer: A (rapid and reliable, and hand steering shall be immediately available at all times)
💡 SOLAS V/19: change-over between automatic pilot, manual steering and emergency steering shall be rapid and reliable, and hand steering shall be immediately available at all times.
✗
Question 30. What do the blind sector limitations of SOLAS V/22 principally concern?
Your Answer: (Not answered)
Correct Answer: A (The total arc and individual arcs of blind sectors ahead as seen from the conning position)
💡 SOLAS V/22 limits the number and total arc of blind sectors ahead from the conning position so that the look-out remains effective. It does not deal with radar shadows or window reflection.
✗
Question 31. What is the purpose of the bilge system?
Your Answer: (Not answered)
Correct Answer: D (Draining water from any watertight compartment)
💡 The bilge system shall be capable of draining any watertight compartment.
✗
Question 32. What mainly determines the minimum range of a radar installation?
Your Answer: (Not answered)
Correct Answer: C (Pulse width and antenna height)
💡 Minimum range depends chiefly on pulse width and the height of the antenna.
✗
Question 33. What does SOLAS require regarding the authorisation of a recognised organisation by the Administration?
Your Answer: (Not answered)
Correct Answer: C (A written authorisation specifying its scope, together with the responsibilities and supervision of the organisation)
💡 SOLAS I/4 requires the authorisation to be in writing, specifying its scope, conditions and responsibilities, with supervision of the organisation. The Administration remains ultimately responsible for the Convention obligations.
✗
Question 34. What principle should the officer of the watch follow in using ECDIS in confined waters or a port approach?
Your Answer: (Not answered)
Correct Answer: B (Adjust the display scale appropriately and keep the chart updated, avoiding over-reliance on a single display for position)
💡 ECDIS should be used with the scale adjusted to the leg of the passage, charts kept updated and the position cross-checked. Switching off safety alarms or fixing one scale weakens the warning function and increases the risk of grounding.
✗
Question 35. On what basis is the extent of close-up survey determined?
Your Answer: (Not answered)
Correct Answer: A (Ship type, age, cargo characteristics and known high risk areas taken together)
💡 The ESP requires the extent of close-up survey to be determined by the ship type and age, the characteristics of the cargoes carried, such as the corrosive or abrasive effect of coal and ore, and the known high risk areas such as hatch coamings and hopper tanks, supported by a survey programme.
✗
Question 36. ECDIS shall be fitted on:
Your Answer: (Not answered)
Correct Answer: A (passenger ships and cargo ships of 3 000 GT and above)
💡 SOLAS V/19: passenger ships and cargo ships of 3 000 GT and above shall be fitted with ECDIS.
✗
Question 37. A fire breaks out at the deep-fat fryer in the galley. What fixed protection does SOLAS II-2/10.6 require?
Your Answer: (Not answered)
Correct Answer: A (A fixed extinguishing system over the cooking range, supplemented by a fire blanket)
💡 SOLAS II-2/10.6 requires a fixed extinguishing system over the galley cooking range together with a fire blanket. Portable extinguishers do not satisfy the requirement for a fixed system.
✗
Question 38. What does SOLAS V require when a ship enters a deep-water route?
Your Answer: (Not answered)
Correct Answer: A (To report to the appropriate authority as required and comply with the conditions of use)
💡 SOLAS V requires ships using deep-water routes to report as prescribed and comply with conditions such as under-keel clearance, so as to reduce the risk of grounding.
✗
Question 39. What operational requirement relates to ballast water and SOLAS?
Your Answer: (Not answered)
Correct Answer: B (Ballasting according to stability and strength requirements, preventing excessive hogging or sagging and insufficient stability)
💡 Ballast operations must follow stability and strength requirements so the ship keeps an appropriate draught, trim and stability. Excessive ballast or a poor sequence overstresses the hull, so the loading plan must be followed.
✗
Question 40. The number and arrangement of watertight bulkheads shall ensure that the ship retains sufficient stability:
Your Answer: (Not answered)
Correct Answer: B (after damage to any one compartment, meeting the damage stability requirements)
💡 SOLAS II-1/4 requires watertight bulkheads so that the ship satisfies the required damage stability assumptions.
✗
Question 41. What checking of the lifeboat engine fuel system is required?
Your Answer: (Not answered)
Correct Answer: C (Check the fuel quantity and condition and the piping for leakage, renewing the fuel periodically)
💡 A lifeboat engine should have its fuel tank checked for adequate quantity, the fuel checked for deterioration, since long storage can form gum that blocks the fuel system, and the piping checked for leakage, with the fuel renewed periodically and the filters inspected, ensuring the engine starts readily when needed.
✗
Question 42. A PSCO tested ventilation closing devices and found some seized. What does SOLAS address?
Your Answer: (Not answered)
Correct Answer: A (Closing devices of machinery space ventilators must close rapidly to cut off ventilation and air supply)
💡 SOLAS II-2 requires machinery space ventilator closing devices to close rapidly and remain effective, cutting off the air supply in a fire. Seized devices or a lack of regular testing are common deficiencies.
✗
Question 43. What rowing equipment shall a liferaft carry?
Your Answer: (Not answered)
Correct Answer: D (Oars suitable for rowing)
💡 Oars shall be provided so the raft can be moved short distances.
✗
Question 44. What is required for route monitoring when using electronic charts?
Your Answer: (Not answered)
Correct Answer: B (Continuously monitor the deviation from the planned route, act on and acknowledge safety alarms and correct as necessary)
💡 When ECDIS is in use the deviation from the planned route should be monitored continuously and safety alarms such as off-track and approaching danger acted on and acknowledged, with course corrections as necessary. Setting the route and then neglecting to monitor it is not acceptable.
✗
Question 45. What is the principle of assessing stability from the rolling period at sea?
Your Answer: (Not answered)
Correct Answer: D (The rolling period corresponds to the initial metacentric height: a shorter period means excessive stability and a longer one may mean insufficient stability)
💡 The rolling period varies inversely with the square root of the initial metacentric height. A clearly shorter period indicates increased stability from cargo settling or flooding, while a markedly longer period may indicate reduced stability from cargo shifting upwards or flooding. It is a useful aid to judging changes in stability at sea.
✗
Question 46. What is the total embarkation and launching time for survival craft on a passenger ship?
Your Answer: (Not answered)
Correct Answer: B (Not more than 30 minutes from the abandon ship signal)
💡 Within 30 minutes of the abandon ship signal.
✗
Question 47. How often must each crew member participate in abandon ship and fire drills under SOLAS?
Your Answer: (Not answered)
Correct Answer: D (At least once a month for each of abandon ship and fire drills)
💡 SOLAS III/19 requires each crew member to take part in an abandon ship drill and a fire drill at least once a month. If a drill is not held in a month it must be held within 24 hours afterwards, with the matter recorded in the log.
✗
Question 48. A magnetic compass deviation curve is found not updated within the required period. The finding is?
Your Answer: (Not answered)
Correct Answer: A (The magnetic compass must be swung and its deviation curve drawn periodically; being overdue makes the heading reference unreliable)
💡 The magnetic compass is one of the key heading references and should be swung and its deviation curve drawn at the required intervals, the deviation changing with the magnetic state of the ship. Being overdue means the indicated heading carries an unknown error. If relied on as the primary heading reference it may endanger navigational safety. It is a deficiency to be corrected.
✗
Question 49. What is required regarding problems found at a renewal survey before a new certificate is issued?
Your Answer: (Not answered)
Correct Answer: D (All matters affecting issue must be resolved before issue, or accepted by the Administration with conditions recorded)
💡 SOLAS requires matters found at a renewal survey which affect the issue of the certificate to be resolved before issue, or accepted by the Administration with restrictions or additional requirements recorded after assessment. Issuing with the problem outstanding leaves the certificate inconsistent with the actual condition.
✗
Question 50. What important items should be taken when abandoning ship?
Your Answer: (Not answered)
Correct Answer: C (The deck log, copies of certificates, the crew list, emergency radio equipment and essential supplies)
💡 Where possible the deck log, certificates or copies, the crew list, emergency radio equipment such as the EPIRB and portable VHF and essential food, water and medicines should be taken, as these are vital for subsequent search and rescue and for investigation.
✗
Question 51. What equipment status must be handed over at a watch handover?
Your Answer: (Not answered)
Correct Answer: D (The condition of the main engine and steering gear, alarms, the status of navigational equipment and any problems found)
💡 A watch handover should cover the condition of the main engine and steering gear, any alarms or faults, the status of navigational equipment such as radar, ECDIS and AIS and any problems found, enabling the relieving officer to know the true state of the equipment and avoid a wrong appreciation.
✗
Question 52. Steering trials are run at maximum service speed. Under SOLAS II-1/29, within what time must the main steering gear put the rudder over from 35 degrees on one side to 30 degrees on the other?
Your Answer: (Not answered)
Correct Answer: D (Not more than 28 seconds)
💡 SOLAS II-1/29 requires the main steering gear, at deepest seagoing draught and maximum service speed, to put the rudder over from 35 degrees to 30 degrees within 28 seconds. The 60-second limit applies to the auxiliary steering gear for 15 degrees to 15 degrees.
✗
Question 53. What reporting is required if equipment fails within a VTS area?
Your Answer: (Not answered)
Correct Answer: A (Report the failure and the ship's movements to the VTS at once so traffic can be managed)
💡 A failure within a VTS area should be reported to the VTS promptly, enabling the traffic centre to warn and manage surrounding vessels. Concealing or delaying the report increases the risk of collision.
✗
Question 54. What reporting is required for a security incident?
Your Answer: (Not answered)
Correct Answer: A (Report at once under the procedure to the company, the Administration and the relevant parties, recording the circumstances)
💡 A security incident such as unauthorised boarding, the introduction of weapons, theft or sabotage requires immediate reporting under the ship security plan to the company, the Administration where necessary and the port facility security officer, recording the course of the incident, the action taken and the result, with analysis and improvement to follow.
✗
Question 55. What capacity is required for the fuel tank of the emergency generator?
Your Answer: (Not answered)
Correct Answer: A (Sufficient to run the emergency generator at full load for the prescribed period, normally not less than 18 hours)
💡 SOLAS requires the fuel tank of the emergency generator to hold enough fuel to run it at full rated load for the prescribed period, normally not less than 18 hours on a cargo ship, corresponding to the emergency lighting period, with the fuel of an acceptable flashpoint and able to feed properly at low temperature.
✗
Question 56. To which new bulk carriers does the double side skin requirement apply?
Your Answer: (Not answered)
Correct Answer: C (a new single-side-skin bulk carrier of 150 m and up carrying solid bulk of a density of 1000 kg/m3 and above)
💡 The requirement addresses new single-side-skin bulk carriers of 150 m and over intended to carry solid bulk cargoes of a density of 1000 kg/m3 and above, the inner skin being supported by the double side when cargo is discharged and in the event of damage; it does not apply to every bulk carrier. Chapter XII carries other structural requirements taking 100 m as their threshold, the two lengths covering different things, and running them together is the commonest error; the numbering and scope of the provisions have been revised, so the text carried on board governs, and this item makes no reference to a particular sub-regulation. Both the length and the density must be met, so "any bulk carrier" and "the cargo decides" alike fail.
✗
Question 57. The sewage treatment plant is found not in operation and untreated sewage is being discharged directly. The finding is?
Your Answer: (Not answered)
Correct Answer: B (Discharging untreated sewage does not meet the rules, a pollution prevention deficiency)
💡 Discharge of sewage must meet the applicable rules, that is, be treated by an approved treatment plant and meet the discharge conditions, or be discharged as permitted beyond the specified distance. Direct discharge of untreated sewage with the plant not running does not meet pollution prevention requirements and is a deficiency to be corrected.
✗
Question 58. Before boarding the lifeboat in an abandon ship drill, crew shall first:
Your Answer: (Not answered)
Correct Answer: D (Don lifejackets and act per the muster list)
💡 The drill covers alarm, mustering, donning lifejackets and operating the launching appliances per the muster list.
✗
Question 59. A steering gear compartment shall be provided with communication facilities:
Your Answer: (Not answered)
Correct Answer: B (two-way communication between the navigation bridge and the steering gear compartment)
💡 SOLAS II-1/29 requires two-way communication between the navigation bridge and the steering gear compartment.
✗
Question 60. What is required for launching survival craft when the ship is listed?
Your Answer: (Not answered)
Correct Answer: B (Launching shall be safe up to the specified angle of list)
💡 Launching shall be safe up to the specified angle of list and trim.
✗
Question 61. A berth-to-berth passage plan is drawn up before sailing. Besides charts and nautical publications, what else must be gathered and marked?
Your Answer: (Not answered)
Correct Answer: B (wheeling points with times, the aids and radio services available, areas of danger and under-keel clearance, an alternative track and points for emergency anchorage)
💡 Chapter V sets out what the plan must rest on: the track and wheeling points with estimated times, the edition and corrections of the material used, the aids and radio services available, dangers and prohibited areas, depths and under-keel clearance, speed and the manoeuvring margin, an alternative track and points for emergency anchorage. Rates and statistics are commercial papers, and a private note cannot replace officially corrected publications.
✗
Question 62. Which of the following is NOT required navigation equipment under SOLAS V/19?
Your Answer: (Not answered)
Correct Answer: A (facsimile machine)
💡 SOLAS V/19: a facsimile machine is not among the navigation equipment required by SOLAS V/19.
✗
Question 63. What shall the Ship Security Plan contain?
Your Answer: (Not answered)
Correct Answer: B (Security organisation, duties, measures and training)
💡 Security organisation, duties, protective measures and training.
✗
Question 64. How many hand flares must each survival craft carry?
Your Answer: (Not answered)
Correct Answer: A (Six)
💡 SOLAS III requires six hand flares in each survival craft, in addition to the four rocket parachute flares required separately. The two numbers are different.
✗
Question 65. After failure of the main source of power, within what period must the emergency generator take over automatically?
Your Answer: (Not answered)
Correct Answer: A (Within 45 seconds)
💡 SOLAS II-1/41 requires the emergency generator to start automatically and connect to the emergency switchboard within 45 seconds. Fifteen seconds applies to the transitional reserve source of power (batteries).
✗
Question 66. The Ship Security Plan shall be approved by:
Your Answer: (Not answered)
Correct Answer: A (the Administration or a recognised security organisation on its behalf)
💡 SOLAS XI-2/3: the Ship Security Plan shall be approved by the Administration or a recognised security organisation on its behalf.
✗
Question 67. What does SOLAS require regarding the loading instrument on a bulk carrier?
Your Answer: (Not answered)
Correct Answer: D (Bulk carriers of 150 m and above must carry an approved loading instrument for calculating strength and stability during cargo work)
💡 SOLAS XII/11 requires bulk carriers of 150 m and above to be fitted with an approved loading instrument for calculating hull stresses and stability during cargo operations. Unapproved software does not satisfy the requirement.
✗
Question 68. What is required regarding the stability information at a renewal survey?
Your Answer: (Not answered)
Correct Answer: D (Verify that it agrees with the actual condition of the ship and update it if the loading conditions have changed)
💡 SOLAS requires the approved stability information to be verified at survey as agreeing with the actual condition of the ship, structure, equipment and loading conditions. Where the ship is converted, the loading method changes or the weight distribution alters, the information should be updated and approved.
✗
Question 69. What size should the international shore connection fitted on ships of 500 GT and above be?
Your Answer: (Not answered)
Correct Answer: A (65 mm)
💡 The international shore connection is 65 mm in diameter.
✗
Question 70. What does the steering gear test before departure include under SOLAS and good seamanship?
Your Answer: (Not answered)
Correct Answer: C (Testing the main and auxiliary steering gear, checking the rudder angle indicator, and verifying bridge to steering gear compartment communication and the emergency steering procedure)
💡 Before departure the main and auxiliary steering gear should be tested, the rudder angle indicator checked, and communication with the steering gear compartment and the emergency steering procedure verified. Failure of any item may have serious consequences in a narrow channel or when berthing.
✗
Question 71. Should satellite positioning fail, the vessel relies on which alternative means?
Your Answer: (Not answered)
Correct Answer: A (Compass bearings together with chart observation)
💡 Traditional observation with compasses and charts remains the fall-back means.
✗
Question 72. What time limits apply to launching and recovering a rescue boat?
Your Answer: (Not answered)
Correct Answer: B (Launching and recovery, when loaded, each within 5 minutes)
💡 Launching and recovery when fully loaded shall each be within 5 minutes.
✗
Question 73. What work do the liferaft painter and the weak link in its falls each do?
Your Answer: (Not answered)
Correct Answer: A (the painter tensioning as the raft leaves the cradle to start inflation, the weak link parting when a sinking ship's pull exceeds its strength so the raft frees itself)
💡 The painter is made fast to the ship and to the raft: as the raft leaves the cradle the painter strains and pulls the inflation valve, so the raft is inflated at the water; if the ship goes down, the load on the painter exceeds the weak link and the link parts, freeing the raft instead of dragging it under. The hydrostatic release unit is the other route, releasing the lashings at about 15 metres of depth. The three work together, and the loss of any one may leave the raft down with the ship or unpumped on the surface.
✗
Question 74. A PSC inspection found the container holding the fire control plan had taken water and the plan was illegible. What does SOLAS require?
Your Answer: (Not answered)
Correct Answer: B (The plan must be kept in a conspicuously marked weathertight container and remain clear and legible)
💡 SOLAS II-2/15 requires the fire control plan to be permanently stowed in a conspicuously marked weathertight enclosure outside the deckhouse and to remain complete and legible so shore firefighters can use it quickly. Damage to the plan is a deficiency.
✗
Question 75. What is the first action required when a person falls overboard, under SOLAS and the related rules?
Your Answer: (Not answered)
Correct Answer: C (Raise the alarm immediately, report to the bridge, keep the person in sight and carry out a Williamson or Scharnow turn as necessary)
💡 STCW and SOLAS require immediate alarm, keeping the person in sight, throwing a lifebuoy and manoeuvring the ship back to the position as quickly as possible. Waiting for another ship or abandoning ship is not a correct response.
✗
Question 76. What does SOLAS address regarding class A divisions at the galley?
Your Answer: (Not answered)
Correct Answer: A (Class A divisions between the galley and adjacent accommodation, preventing spread of fire and fumes)
💡 SOLAS requires class A divisions between the galley and adjacent accommodation to prevent the spread of fire. Since the galley presents open flame and oil fire risks, inadequate separation would allow fire to reach the accommodation quickly.
✗
Question 77. What is the aggregate capacity requirement for survival craft on a cargo ship?
Your Answer: (Not answered)
Correct Answer: A (The craft on each side must accommodate all persons on board)
💡 SOLAS III/31 requires the survival craft on each side of a cargo ship to accommodate all persons on board, so that everyone can escape whichever side is damaged.
✗
Question 78. What does SOLAS address regarding fuel for lifeboat engines?
Your Answer: (Not answered)
Correct Answer: B (Fuel with a flashpoint of not less than 43 degrees Celsius, and tank capacity allowing the boat to run at the prescribed speed for a specified time)
💡 SOLAS requires lifeboat engines to use fuel with a flashpoint of not less than 43 degrees Celsius, reducing fire risk, and a tank capacity allowing the boat to run at the prescribed speed for a specified period, ensuring mobility after abandonment.
✗
Question 79. What shall the training manual for life-saving appliances contain?
Your Answer: (Not answered)
Correct Answer: C (Instructions on the use of each appliance and survival information)
💡 Instructions on using each appliance and survival information.
✗
Question 80. What does SOLAS address regarding stopping machinery space ventilation fans?
Your Answer: (Not answered)
Correct Answer: D (Fans must be capable of remote stopping, with the control outside the space)
💡 SOLAS requires machinery space ventilation fans to be capable of being stopped remotely, with the control outside the space, working together with the closing of dampers to cut off the air supply quickly in a fire and prevent it from intensifying.
✗
Question 81. What does SOLAS address regarding the relationship between the rated capacity of survival craft and the persons on board?
Your Answer: (Not answered)
Correct Answer: C (The total rated capacity must meet the needs of all persons on board, with the prescribed margin)
💡 SOLAS requires the total rated capacity of the survival craft, under the rules for each side or the whole ship, to accommodate all persons on board with the prescribed margin. Insufficient capacity would leave some persons with nowhere to go on abandonment, a serious deficiency.
✗
Question 82. What does SOLAS address regarding automatic change-over of the radio reserve source?
Your Answer: (Not answered)
Correct Answer: D (The reserve source must connect automatically or be switched promptly according to procedure when the main source fails)
💡 SOLAS requires the radio reserve source to be connected automatically or switched promptly under the procedure when the main source fails, keeping distress communication capability uninterrupted. A change-over needing lengthy manual action would interrupt emergency communication.
✗
Question 83. The fuel provided for a lifeboat engine should normally allow it to run at rated speed for at least how long?
Your Answer: (Not answered)
Correct Answer: D (Twenty-four hours, though other periods may apply according to the maker)
💡 Under SOLAS III/4 and the lifeboat requirements the fuel provided for the lifeboat engine should allow it to run at rated speed for at least twenty-four hours, so that it can clear the casualty, manoeuvre at sea and rendezvous after abandonment. The fuel system and starting arrangement should be kept in good order.
✗
Question 84. A cargo ship of 4200 GT on an international voyage. How many independently driven fire pumps are required as a minimum?
Your Answer: (Not answered)
Correct Answer: C (Two)
💡 SOLAS II-2/10.2: cargo ships of 1000 GT and above shall have at least two independently driven fire pumps.
✗
Question 85. A class divisions on a passenger ship shall be capable of preventing the passage of smoke and flame to the end of a 60-minute standard fire test. The fire integrity is:
Your Answer: (Not answered)
Correct Answer: B (determined by structure, generally not less than 60 minutes)
💡 A class divisions are defined to withstand a standard fire test for 60 minutes without passage of smoke and flame.
✗
Question 86. How must the loading instrument of a bulk carrier be used?
Your Answer: (Not answered)
Correct Answer: B (Compute strength and stability for the planned sequence before cargo work and monitor continuously during it)
💡 SOLAS requires the approved loading instrument to be used to compute hull strength and stability at each stage of the planned sequence before cargo work, with continuous monitoring during the operation and updating as it progresses, preventing excessive stress at any stage. Computing only at the end cannot prevent damage during the work.
✗
Question 87. The total capacity of the fire pumps on a cargo ship shall not be less than:
Your Answer: (Not answered)
Correct Answer: C (the required capacity of each pump)
💡 SOLAS II-2/10 requires the total capacity of fire pumps on a cargo ship to be not less than the required capacity of each pump.
✗
Question 88. To which craft shall a compass be provided?
Your Answer: (Not answered)
Correct Answer: C (Certain lifeboats and rescue boats)
💡 Compasses are required for particular lifeboats and rescue boats.
✗
Question 89. What is the purpose of a compass corrector on board?
Your Answer: (Not answered)
Correct Answer: C (Eliminating residual deviation of the magnetic compass)
💡 A compass corrector compensates for residual deviation caused by the ship's magnetic field.
✗
Question 90. What is meant by permeability in the subdivision calculation?
Your Answer: (Not answered)
Correct Answer: D (The proportion of the volume of a space that can be occupied by water)
💡 Permeability is the proportion of the volume of a space that can be occupied by water after damage. Its value differs for machinery spaces, accommodation and cargo spaces, and directly affects the volume of water entering and the calculation of residual stability.
✗
Question 91. What do SOLAS and good practice address regarding emergency stopping of the main engine?
Your Answer: (Not answered)
Correct Answer: C (Means for emergency stopping must be provided on the bridge and in the machinery space, operable rapidly in an emergency)
💡 SOLAS and good practice require means for emergency stopping of the main engine, operable quickly from the bridge or the machinery space, preventing an incident from escalating when the propeller is fouled, a person is in the water nearby, or machinery behaves abnormally.
✗
Question 92. Besides the capacity requirement, what else must be considered for liferafts under SOLAS?
Your Answer: (Not answered)
Correct Answer: A (They must be able to float free if the ship sinks, fitted with a hydrostatic release unit)
💡 SOLAS requires liferafts to float free if the ship sinks, fitted with a hydrostatic release unit and a weak link. Locking them or stowing them in a hold makes them unavailable on abandonment and is a deficiency.
✗
Question 93. How many lifebuoys must be fitted with self-igniting lights under SOLAS III/7.1?
Your Answer: (Not answered)
Correct Answer: A (Not less than one half of the total number of lifebuoys)
💡 SOLAS III/7.1 requires not less than one half of the total lifebuoys to be fitted with self-igniting lights. The requirement for buoyant lifelines is a separate provision.
✗
Question 94. Crew members shall be made familiar with the operation of life-saving appliances:
Your Answer: (Not answered)
Correct Answer: A (before sailing and within a reasonable time after joining the ship)
💡 SOLAS III/19 requires familiarization with life-saving appliances before sailing and within a reasonable time after joining.
✗
Question 95. What confidentiality applies to the ship security plan?
Your Answer: (Not answered)
Correct Answer: C (Unauthorised access to its contents must be prevented, with the document marked and distribution restricted)
💡 The ISPS Code requires the ship security plan to be a confidential document, marked as such, with restricted distribution and protected against unauthorised access, including electronic versions, preventing the security measures from being circumvented. It may be shown to authorised persons on inspection.
✗
Question 96. What is the purpose and requirement of quick-closing valves on fuel oil tanks?
Your Answer: (Not answered)
Correct Answer: C (To cut off the fuel supply rapidly from a safe position in the event of fire, operable from outside the protected space)
💡 Under SOLAS II-2/4 quick-closing valves on fuel oil tanks should be capable of rapidly cutting off the fuel supply from a safe position outside the space in the event of a fire in the machinery space, preventing the fire from spreading. The remote or quick-closing function should be tested regularly and kept effective.
✗
Question 97. What fire protection is required in the cargo area of a gas carrier?
Your Answer: (Not answered)
Correct Answer: A (Gas detection and alarm, intrinsically safe or explosion-protected electrical equipment and safety devices protecting the cargo containment system)
💡 SOLAS and the IGC Code require the cargo area of a gas carrier to have flammable gas detection and alarm, intrinsically safe or explosion-protected electrical equipment and devices protecting the pressure and temperature of the cargo containment system, preventing accumulation of leaks and overpressure.
✗
Question 98. What does the weather criterion of the intact stability code examine?
Your Answer: (Not answered)
Correct Answer: B (a gust heeling lever added to that of the steady wind, the angle of heel and the downflooding angle retaining adequate margin)
💡 The criterion splits the wind into a steady pressure and a gust: the ship heels under the steady heeling lever and the gust pushes her further, the area under the righting lever curve having to exceed that under the wind levers, the gust heel staying within the fraction of the downflooding angle and inside the stated limit. Metacentric height or roll period alone cannot answer that question.
✗
Question 99. How many torches shall a lifeboat carry among its equipment?
Your Answer: (Not answered)
Correct Answer: B (Two)
💡 At least two torches.
✗
Question 100. What do SOLAS and good practice recommend for the handling of survival craft after abandonment?
Your Answer: (Not answered)
Correct Answer: B (Move clear of the ship as soon as possible, avoiding suction by the sinking ship or being trapped by burning oil)
💡 After abandonment, survival craft should be moved clear of the ship as soon as possible, avoiding the suction of a sinking ship, falling debris or being surrounded by burning oil. Remaining close to the ship greatly increases the danger.